WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
15-38-591306 LUDINGTON ST SPOILS
Activity Type Jurisdiction
MATERIALS MANAGEMENT  DNR RR
Location Name County DNR Region
CITY OF MARINETTE MARINETTE NORTHEAST
Address Municipality
1385 LUDINGTON ST MARINETTE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SE 1/4 of Sec 06, T30N, R24E 45.0963578 -87.6225035 Click to view on Google Maps using Lat/Long
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
2023-01-23
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Actions and Documents
Date Code Name File Comment
2023-01-19 864 DNR Response to Materials Management Request Download PDF file MATERIALS MANAGEMENT APPROVED
2023-01-19 56 Continuing Obligation(s) Applied
2023-01-19 222 Continuing Obligation - Maintain Cap Over Contaminated Area MAINTAIN GEOSYNTHETIC CLAY LINER AND SOIL COVER
2023-01-19 226 Continuing Obligation - Vapor Intrusion Response
2023-01-19 232 Continuing Obligation - Residual Soil Contamination
2022-12-28 1 Materials Management Notification
2022-12-28 860 Material Management Request Received Download PDF file MATERIALS MANAGEMENT FROM LUDINGTON ST ROW
Generating Activities Linked to this Receiving Activity
Click Generating Activity Below to View Details
Relationship Type Activity No and Name
Mtrls Mgmt to ERP 02-38-591174 CITY LOT ADJACENT TO LUDINGTON ST
Mtrls Mgmt to ERP 02-38-000047 WPSC MARINETTE MGP (ALT SF)
Mtrls Mgmt to ERP 02-38-000011 JCI/TYCO (ANSUL)
Mtrls Mgmt to ERP 02-38-581955 JCI/TYCO STANTON (PFAS)
Mtrls Mgmt to ERP 02-38-564236 MCABI - TYCO REDEVELOPMENT SITE
Mtrls Mgmt to ERP 02-38-587281 MARINETTE MARINE BLDG 34
Vapor Intrusion Continuing Obligation(s)
(E) Future Redevelopment of Property – Vapor Control Technology Required for Construction: DNR requires notification prior to new building construction or building modifications. Potential for vapor intrusion exists due to residual contamination. Vapor control technologies are required to be installed or modified, and verified protective unless a vapor evaluation is accepted by DNR.
591306 | 15-38-591306
BOTW Release 4.9 | 04/23/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages