2024-03-21
|
137
|
Site Investigation Report (SIR) Received (fee)
|
|
REVIEW REQUEST FOR PREVIOUSLY RECEIVED SIR; SEE AC37 DATED 12/8/2023 FOR DOCUMENTATION
|
|
2023-12-08
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
SOIL & GW INVESTIGATION (PAH, VOC, METALS, PFAS)
|
|
2023-07-28
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-01-19
|
857
|
Materials Management Plan Approved
|
|
MATERIALS MANAGEMENT FROM LUDINGTON ST ROW (SEE BRRTS # 02-38-591174 FOR DOCUMENT)
|
|
2023-01-16
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-12-28
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
MATERIALS MANAGEMENT FROM LUDINGTON ST ROW (SEE BRRTS # 02-38-591174 FOR DOCUMENT)
|
|
2022-10-04
|
43
|
Site Activity Status Update Received
|
|
SIR DATA; SOIL & GW DATA (PAH, VOC, PFAS, PCB)
|
|
2022-07-22
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-02-09
|
43
|
Site Activity Status Update Received
|
|
SOIL DISPOSAL DOCUMENTATION FOR WATER METER PROJECT
|
|
2022-01-24
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2022-01-13
|
43
|
Site Activity Status Update Received
|
|
SOIL & GW TESTING LUDINGTON ROW RECONSTRUCTION PROJECT MARINETTE
|
|
2021-08-31
|
36
|
Site Investigation Workplan (SIWP) Approved
|
|
INITIAL SOIL & GW INVESTIGATION
|
|
2021-08-02
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2021 - 6/30/2021
|
|
2021-07-23
|
135
|
Site Investigation Workplan (SIWP) Received (fee)
|
|
|
|
2021-06-22
|
99
|
Miscellaneous
|
|
EXTENSION OF THE SIWP DEADLINE TO JULY 22, 2021
|
|
2021-05-20
|
99
|
Miscellaneous
|
|
APPROVAL TO EXTEND DEADLINE FOR SUBMITTAL OF SIWP TO JUNE 22
|
|
2021-05-07
|
43
|
Site Activity Status Update Received
|
|
REQUEST TO EXTEND DEADLINE FOR SUBMITTAL OF SITE INVESTIGATION WORK PLAN
|
|
2021-05-06
|
43
|
Site Activity Status Update Received
|
|
MMP SOIL SAMPLE RESULTS
|
|
2021-05-03
|
43
|
Site Activity Status Update Received
|
|
MMP SOIL SAMPLE RESULTS
|
|
2021-04-08
|
7
|
Environmental Consultant Hired
|
|
BOB MELLER, FOTH
|
|
2021-03-19
|
857
|
Materials Management Plan Approved
|
|
APPROVAL TO REUSE 14,500 CUBIC YARDS OF CONTAMINATED SOIL ONSITE BENEATH PARKING LOT AND BUILDINGS
|
|
2021-03-19
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2021-03-19
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
BUILDING/PARKING LOT
|
|
2021-03-19
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2021-03-12
|
199
|
Additional Information Received (Fee-Based or Closure)
|
|
ADDITIONAL PFAS SAMPLING RESULTS RECEIVED
|
|
2021-03-09
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
2021-02-12
|
198
|
Request for Additional Information (Fee-Based or Closure)
|
|
PENDING CLARIFICATION OF SAMPLING PROTOCOL & MIRON SAMPLING
|
|
2020-12-24
|
1
|
Notification of Hazardous Substance Discharge
|
|
SOIL CHARACTERIZATION FOR MMP - 9/29/2020; SEE AC 854 OF SAME DATE FOR DOCUMENTATION
|
|
2020-12-24
|
854
|
Materials Management Plan Request Recvd with Fee
|
|
MATERIAL MOVED ON-SITE
|
|
2020-11-25
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
|
|
2020-11-25
|
114
|
PFAS Scoping Statement Received
|
|
SEE AC 29 OF SAME DATE FOR DOCUMENTATION;CONDUCTED PFAS SAMPLING BASED ON ANTICIPATED PRESENCE IN GW
|
|
2020-11-25
|
120
|
PFAS Sampling Completed - Actionable Levels Detected
|
|
SEE AC 29 IF SAME DATE FOR DOCUMENTATION;CONDUCTED PFAS SAMPLING BASED ON ANTICIPATED PRESENCE IN GW
|