ACTIVITY DETAILS

 
02-38-587281 MARINETTE MARINE BLDG 34
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
MARINETTE MARINE CORP MARINETTE NORTHEAST
Address Municipality
1600 ELY ST MARINETTE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SE 1/4 of Sec 06, T30N, R24E 45.0971155 -87.6204277 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
Electronic Only - No Hard File UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
438005480 2020-12-24
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag   PFAS flag
Actions and Documents
Date Code Name File Comment
2024-03-21 137 Site Investigation Report (SIR) Received (fee) REVIEW REQUEST FOR PREVIOUSLY RECEIVED SIR; SEE AC37 DATED 12/8/2023 FOR DOCUMENTATION
2023-12-08 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SOIL & GW INVESTIGATION (PAH, VOC, METALS, PFAS)
2023-07-28 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-01-19 857 Materials Management Plan Approved MATERIALS MANAGEMENT FROM LUDINGTON ST ROW (SEE BRRTS # 02-38-591174 FOR DOCUMENT)
2023-01-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-12-28 854 Materials Management Plan Request Recvd with Fee MATERIALS MANAGEMENT FROM LUDINGTON ST ROW (SEE BRRTS # 02-38-591174 FOR DOCUMENT)
2022-10-04 43 Site Activity Status Update Received Download PDF file SIR DATA; SOIL & GW DATA (PAH, VOC, PFAS, PCB)
2022-07-22 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-02-09 43 Site Activity Status Update Received Download PDF file SOIL DISPOSAL DOCUMENTATION FOR WATER METER PROJECT
2022-01-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2022-01-13 43 Site Activity Status Update Received Download PDF file SOIL & GW TESTING LUDINGTON ROW RECONSTRUCTION PROJECT MARINETTE
2021-08-31 36 Site Investigation Workplan (SIWP) Approved Download PDF file INITIAL SOIL & GW INVESTIGATION
2021-08-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-07-23 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file
2021-06-22 99 Miscellaneous Download PDF file EXTENSION OF THE SIWP DEADLINE TO JULY 22, 2021
2021-05-20 99 Miscellaneous Download PDF file APPROVAL TO EXTEND DEADLINE FOR SUBMITTAL OF SIWP TO JUNE 22
2021-05-07 43 Site Activity Status Update Received Download PDF file REQUEST TO EXTEND DEADLINE FOR SUBMITTAL OF SITE INVESTIGATION WORK PLAN
2021-05-06 43 Site Activity Status Update Received Download PDF file MMP SOIL SAMPLE RESULTS
2021-05-03 43 Site Activity Status Update Received Download PDF file MMP SOIL SAMPLE RESULTS
2021-04-08 7 Environmental Consultant Hired Download PDF file BOB MELLER, FOTH
2021-03-19 857 Materials Management Plan Approved Download PDF file APPROVAL TO REUSE 14,500 CUBIC YARDS OF CONTAMINATED SOIL ONSITE BENEATH PARKING LOT AND BUILDINGS
2021-03-19 56 Continuing Obligation(s) Applied
2021-03-19 222 Continuing Obligation - Maintain Cap Over Contaminated Area BUILDING/PARKING LOT
2021-03-19 232 Continuing Obligation - Residual Soil Contamination
2021-03-12 199 Additional Information Received (Fee-Based or Closure) Download PDF file ADDITIONAL PFAS SAMPLING RESULTS RECEIVED
2021-03-09 2 Responsible Party (RP) letter sent Download PDF file
2021-02-12 198 Request for Additional Information (Fee-Based or Closure) PENDING CLARIFICATION OF SAMPLING PROTOCOL & MIRON SAMPLING
2020-12-24 1 Notification of Hazardous Substance Discharge SOIL CHARACTERIZATION FOR MMP - 9/29/2020; SEE AC 854 OF SAME DATE FOR DOCUMENTATION
2020-12-24 854 Materials Management Plan Request Recvd with Fee Download PDF file MATERIAL MOVED ON-SITE
2020-11-25 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file
2020-11-25 114 PFAS Scoping Statement Received SEE AC 29 OF SAME DATE FOR DOCUMENTATION;CONDUCTED PFAS SAMPLING BASED ON ANTICIPATED PRESENCE IN GW
2020-11-25 120 PFAS Sampling Completed - Actionable Levels Detected SEE AC 29 IF SAME DATE FOR DOCUMENTATION;CONDUCTED PFAS SAMPLING BASED ON ANTICIPATED PRESENCE IN GW
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
ERP to Mtrls Mgmt 15-38-591306 LUDINGTON ST SPOILS
Substances
Substance Type Amt Released Units
Arsenic Metals
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120) Industrial Chem
Polynuclear Aromatic Hydrocarbons Petroleum
Volatile Organic Compounds VOC
Responsible Party
FINCANTIERI MARINETTE MARINE 1600 ELY ST, MARINETTE, WI 54143
DNR Project Manager
DAVID NESTE  david.neste@wisconsin.gov
587281 | 02-38-587281