WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-38-564236 MCABI - TYCO REDEVELOPMENT SITE
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
MCABI - TYCO REDEVELOPMENT SITE MARINETTE NORTHEAST
Address Municipality
1310-1330 MAIN ST MARINETTE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SE 1/4 of the SE 1/4 of Sec 06, T30N, R24E 45.0952066 -87.6208006 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
2.4
Facility ID PECFA No. EPA ID Start Date End Date
2015-08-11
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Actions and Documents
Date Code Name File Comment
2024-01-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-07-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-01-19 857 Materials Management Plan Approved MATERIALS MANAGEMENT FROM LUDINGTON ST ROW (SEE BRRTS # 02-38-591174 FOR DOCUMENT)
2023-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-12-28 854 Materials Management Plan Request Recvd with Fee MATERIALS MANAGEMENT FROM LUDINGTON ST ROW (SEE BRRTS # 02-38-591174 FOR DOCUMENT)
2022-07-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-01-13 43 Site Activity Status Update Received Download PDF file SOIL & GW TESTING LUDINGTON ROW RECONSTRUCTION PROJECT MARINETTE
2022-01-04 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2021-07-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-01-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-21 99 Miscellaneous Download PDF file NEW PROJECT MANAGER - REIF
2020-07-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-01-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-02-12 99 Miscellaneous Download PDF file ADDITIONAL SITE INVESTIGATION REQUIRED
2019-01-11 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-08-22 80 Closure Not Recommended Download PDF file ADDT'L GW SAMPLING FOR PFAS
2018-07-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-06-18 79 Case Closure Review Request Received AUTO-ENTERED
2018-06-05 779 Case Closure Review Fee Received
2018-04-23 151 Remedial Action (RA) Documentation Report Received (non-fee) Download PDF file
2018-04-09 38 Site Investigation Report (SIR) Approved Download PDF file APPROVED - PROCEED WITH CLOSURE REPORT
2018-04-03 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file VPLE SIR RECEIVED
2018-02-16 99 Miscellaneous Download PDF file PREPARE SIR
2018-02-14 43 Site Activity Status Update Received Download PDF file GROUNDWATER RESULTS
2018-02-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2018-02-01 99 Miscellaneous MEMO - SI COMPLETENESS REVIEW
2017-12-20 43 Site Activity Status Update Received Download PDF file GROUNDWATER MONITORING WELL RESULTS
2017-07-27 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-06-30 99 Miscellaneous Download PDF file RESPONSE TO GROUNDWATER SAMPLING REQUEST - WELL ABANDONMENT
2017-02-01 99 Miscellaneous DISCUSSED STATUE OF SITE DEVELOPMENT WITH CONSULTANT
2017-01-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-09-26 98 Technical Assistance Provided Download PDF file APPROVED SOIL MANAGEMENT PLAN
2016-09-23 404 Historic Fill Expedited Exemption Issued Download PDF file
2016-09-23 805 Historic Waste Site AUTO-ADDED
2016-09-12 97 Technical Assistance Request Received (fee) Download PDF file SOIL MANAGEMENT PLAN REVIEW
2016-09-08 403 Historic Fill Expedited Exemption Request (fee) Download PDF file
2016-07-13 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-01-28 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-09-28 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file REVISED SIWP
2015-09-02 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file
2015-08-27 2 Responsible Party (RP) letter sent Download PDF file
2015-08-17 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file
2015-08-11 1 Notification of Hazardous Substance Discharge PHASE II
2015-06-22 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file PARTIAL PHASE I
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
ERP to VPLE (On Property) 06-38-576107 MCABI INCUBATOR SITE (VPLE)
ERP to Mtrls Mgmt 15-38-591306 LUDINGTON ST SPOILS
Substances
Substance Type Amt Released Units
Arsenic Metals
Lead (Pb) Metals
Polynuclear Aromatic Hydrocarbons Petroleum
Volatile Organic Compounds VOC
Responsible Party
TYCO FIRE PROTECTION PRODUCTS 1 STANTON ST, MARINETTE, WI 54143
DNR Project Manager
CODY HEINZE  codyw.heinze@wisconsin.gov
564236 | 02-38-564236
BOTW Release 4.9 | 04/23/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages