Watershed - Upper Tomahawk River (UW38)
Upper Tomahawk River Watershed

Details

The Upper Tomahawk River Watershed is located in Oneida and Vilas counties. It is 119,568 acres in size and contains 139 miles of streams and rivers, 17,609 acres of lakes and 20,470 acres of wetlands. The watershed is dominated by forest (59%), wetlands (17%) and open water (14%) and is ranked high for nonpoint source issues affecting streams and lakes.

Date  2010

Ecological Landscapes for Upper Tomahawk River Watershed

Ecological Landscapes

The Northern Highlands Ecological Landscape is located in northern central Wisconsin. It is known for its pitted outwash plains and kettle lakes mixed with extensive forests and large peatlands. Its landforms are characterized mainly by pitted outwash but also contain some coarse-textured moraines. Soils are acidic and relatively unproductive due to low moisture-holding capacity and lack of organic matter. Historically, this was Wisconsin's greatest pinery. White and red pine forests largely dominated the vegetation, with some smaller pockets of jack pine. On the more mesic soils, hemlock-hardwood forests were common. Aspen-birch forests occurred in openings formed by disturbance events such as wind or fire. Current forest vegetation is primarily aspen, with some white, red and jack pine in both natural and plantation form. Northern hardwood forests, though reduced in extent, still occur on the more mesic soils. Lowland conifer occupies the many peatlands that are scattered throughout the Ecological Landscape.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
4/1/2009
Waters Involved
Kawaguesaga Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Minocqua/Kawaguesaga Lakes Ais Control Project: Minocqua-Kawaguesaga Lake's Protection Assoc. Inc. is sponsoring a grant on Minocqua-Kawaguesaga Lake's to help fund a 5 year project focusing on EWM management, AIS education, prevention & monitoring. The goal is to reduce treatable EWM coverage by 90% & have a mean density (rake fullness) of <1 in each treatment plot. This will allow the Assoc. to continue management of EWM with minimal state financial assistance.

Project activities: 1)Annual chemical treatments of EWM; 2)Bio-control of selected EWM beds (not grant funded); 3)Annual pre/post treatment monitoring & analysis; 4)Project kick-off & annual informational meetings; 5)Hire 2 AIS CB/CW inspector's (1 through grant); 6)Recruit volunteers & implement a CB/CW program; 7)CLP monitoring & mapping (year's - 1, 2, and 4); 8)Annual volunteer AIS (includes purple loosestrife (PL) and flowering rush) training, monitoring & hand removal by divers; 9)CLMN water quality sampling & shoreline inventory survey; 10)Entry of inspection & monitoring forms onto Dept website; 11)Education activities listed in Task 13, pg 17 of proposal; 12)Develop annual & final project reports.

Project deliverables: 1)Chemical, biological & manual control of EWM; 2)Pre/post treatment, CLP & shoreline inventory survey data; 3)CB/CW inspector's (minimum of 200 hours/landing); 4)Volunteer monitoring (minimum of 72 hours/year); 5)Hand removal of AIS & annual mapping of the areas; 6)Data entry of inspection 3200-120 & monitoring forms; 7)Educational activities & shoreline inventory; 8)Annual & final reports summarizing AIS management & future AIS management suggestions, CB/CW activities, AIS monitoring, & educational activities.

Specific Conditions: Annual & final reports need Dept. review/approval

WDNR Lakes Mgmt. Coor. will be provided with electronic (pdf or word) & hard copy of final report, all annual reports, maps, lake education products, & survey data (includes: pre/post treatment, CLP, shoreland inventory, PL, & flowering rush).


Grant Details
Aquatic Invasives Control
Date
4/1/2014
Waters Involved
Kawaguesaga Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Minocqua/Kawaguesaga Lakes Eurasian Water Milfoil Control: Minocqua and Kawaguesaga Lakes Protection Association is sponsoring an ACEI grant on Minocqua and Kawaguesaga Lakes, in Oneida County. This project will focus on annual EWM management and update the Minocqua and Kawaguesaga Lakes Management Plan (LMP).

Project activities include: 1) Annual herbicide treatments and manual removal of EWM; 2) Annual pre/post treatment monitoring, analysis and mapping; 3) Annual volunteer AIS monitoring; 4) Shoreland restoration design assistance and incentives; 5) Conduct volunteer and paid watercraft inspections; 6) Entry of inspection and monitoring data onto SWIMS; 7) Point-intercept (PI) aquatic plant survey and community mapping; 8) Develop annual project report and an updated LMP.

Project deliverables include: 1) Chemical and manual removal of EWM; 2) Pre/post treatment, PI survey and community mapping data; 3) Entered inspection and monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Annual reports and an updated LMP summarizing EWM management during project and future EWM management direction, inspection activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Annual reports and updated LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of updated LMP, all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/15/2020
Waters Involved
Kawaguesaga Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: 2020 Minocqua-Kawaguesaga Ewm Control & Prevention Project: Minocqua Kawaguesaga Lake Protection Association is sponsoring a project to implement approved Eurasian watermilfoil (EWM) control activities from their aquatic plant management plan.

Project activities include:
1) EWM control with herbicide treatments and DASH/hand pulling removal;
2) Pre-post treatment aquatic plant monitoring including point-intercept and bed mapping surveys;
3) Herbicide concentration monitoring and analysis;
4) Public informational meeting and MKPLA AIS Planning Committee meeting to discuss project results and plan for the coming year;
5) Volunteer EWM monitoring.

Project deliverables include:
1) EWM management and associated reporting;
2) Point-intercept and EWM bed mapping surveys;
3) Herbicide concentration results in SWIMS;
4) Annual AIS monitoring and control strategy reports;
5) Project report and planning meetings;
6) Final report summarizing EWM management and future monitoring and management suggestions.

Specific project conditions:

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. All data and reports, including GIS-based maps, and digital images, must be submitted to the Department. DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Kawaguesaga Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Minocqua-Kawaguesaga 2021 Ewm Control Project - Kawaguesaga: Project Scope and Description of Deliverables

MKLPA is sponsoring a project to implement approved Eurasian watermilfoil (EWM) control activities from their aquatic plant management plan.

Project activities include:
1) EWM control with herbicide treatment and DASH/hand pulling;
2) Pretreatment confirmation/refinement and late season bed mapping surveys (for EWM);
3) Aquatic plant point-intercept surveys (to evaluate large-scale herbicide treatments and for trend data);
4) Herbicide concentration monitoring and analysis;
5) Annual and final AIS strategy assessment reports summarizing EWM management and monitoring during project and future EWM management direction.

Project deliverables include:
1) EWM management and associated reporting;
2) Data from EWM and aquatic plant surveys;
3) Herbicide concentration results in SWIMS;
4) Annual and final AIS monitoring and control strategy reports.

Specific project conditions:

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. All data and reports, including GIS-based maps, and digital images, must be submitted to the Department.

DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.



Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Kawaguesaga Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Minocqua-Kawaguesaga 2021 Ewm Control Project - Minocqua: Project Scope and Description of Deliverables

MKLPA is sponsoring a project to implement approved Eurasian watermilfoil (EWM) control activities from their aquatic plant management plan.

Project activities include:
1) EWM control with herbicide treatment and DASH/hand pulling;
2) Pretreatment confirmation/refinement and late season bed mapping surveys (for EWM);
3) Aquatic plant point-intercept surveys (to evaluate large-scale herbicide treatments and for trend data);
4) Herbicide concentration monitoring and analysis;
5) Annual and final AIS strategy assessment reports summarizing EWM management and monitoring during project and future EWM management direction.

Project deliverables include:
1) EWM management and associated reporting;
2) Data from EWM and aquatic plant surveys;
3) Herbicide concentration results in SWIMS;
4) Annual and final AIS monitoring and control strategy reports.

Specific project conditions:

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. All data and reports, including GIS-based maps, and digital images, must be submitted to the Department.

DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.


Grant Details
Aquatic Invasives Control
Date
4/15/2017
Waters Involved
Little Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake 2017 Ais Monitoring, Mapping, Planning Project: Tomahawk Lake Association, Inc is sponsoring an ACEI grant on the Tomahawk Lake system, in Oneida County. This is a one year project that will focus on AIS management.

Project activities include: 1) Manual removal of EWM with hydraulic conveyor; 2) Mapping and control of purple loosestrife (PL); 3) Develop final project report.

Project deliverables include: 1) Manual control of AIS; 2) Final report summarizing AIS management and future AIS management suggestions and AIS monitoring.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, survey data (includes PL), and all maps and GIS from the project.


Grant Details
Aquatic Invasives Control
Date
10/1/2013
Waters Involved
Mid Lake
Status
Complete

Mid Lake Protection & Management District: Mid Lake Ais Control & Prevention Project Phase 2, 2014-2017: The Mid Lake P&R District is sponsoring an AIS ACEI grant on Mid Lake, in Oneida County. This project will focus on Curly Leaf Pondweed and Purple Loosestrife management in Mid Lake and also update the Mid Lake Management Plan (LMP).

Project activities include: 1) Annual chemical treatments and manual removal of CLP; 2) Annual Pre/Post treatment monitoring and analysis; 3) Annual volunteer AIS and herbicide concentration monitoring; 4) PL mapping and control; 5) Early-season AIS surveys; 6) Conduct volunteer and paid watercraft inspections; 7) Entry of inspection and monitoring data onto SWIMS; 8) Point-intercept (PI) aquatic plant survey and community mapping; 9) Develop annual project report and an updated LMP plan; 10) Stakeholder participation: budget and grant meeting and project status/informational meeting; 11) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and manual removal of CLP and PL; 2) Pre/post treatment, PI survey and community mapping data; 3) Entered inspection and monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Annual reports and an updated LMP plan summarizing EWM management during project and future EWM management direction, boat washing activities, inspection activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Annual reports and LMP need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of updated LMP, all annual reports, all maps, all GIS, survey data (pre/post treatment, early-season and PI), samples of educational and outreach products, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Control
Date
4/1/2009
Waters Involved
Minocqua Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Minocqua/Kawaguesaga Lakes Ais Control Project: Minocqua-Kawaguesaga Lake's Protection Assoc. Inc. is sponsoring a grant on Minocqua-Kawaguesaga Lake's to help fund a 5 year project focusing on EWM management, AIS education, prevention & monitoring. The goal is to reduce treatable EWM coverage by 90% & have a mean density (rake fullness) of <1 in each treatment plot. This will allow the Assoc. to continue management of EWM with minimal state financial assistance.

Project activities: 1)Annual chemical treatments of EWM; 2)Bio-control of selected EWM beds (not grant funded); 3)Annual pre/post treatment monitoring & analysis; 4)Project kick-off & annual informational meetings; 5)Hire 2 AIS CB/CW inspector's (1 through grant); 6)Recruit volunteers & implement a CB/CW program; 7)CLP monitoring & mapping (year's - 1, 2, and 4); 8)Annual volunteer AIS (includes purple loosestrife (PL) and flowering rush) training, monitoring & hand removal by divers; 9)CLMN water quality sampling & shoreline inventory survey; 10)Entry of inspection & monitoring forms onto Dept website; 11)Education activities listed in Task 13, pg 17 of proposal; 12)Develop annual & final project reports.

Project deliverables: 1)Chemical, biological & manual control of EWM; 2)Pre/post treatment, CLP & shoreline inventory survey data; 3)CB/CW inspector's (minimum of 200 hours/landing); 4)Volunteer monitoring (minimum of 72 hours/year); 5)Hand removal of AIS & annual mapping of the areas; 6)Data entry of inspection 3200-120 & monitoring forms; 7)Educational activities & shoreline inventory; 8)Annual & final reports summarizing AIS management & future AIS management suggestions, CB/CW activities, AIS monitoring, & educational activities.

Specific Conditions: Annual & final reports need Dept. review/approval

WDNR Lakes Mgmt. Coor. will be provided with electronic (pdf or word) & hard copy of final report, all annual reports, maps, lake education products, & survey data (includes: pre/post treatment, CLP, shoreland inventory, PL, & flowering rush).


Grant Details
Aquatic Invasives Control
Date
4/1/2014
Waters Involved
Minocqua Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Minocqua/Kawaguesaga Lakes Eurasian Water Milfoil Control: Minocqua and Kawaguesaga Lakes Protection Association is sponsoring an ACEI grant on Minocqua and Kawaguesaga Lakes, in Oneida County. This project will focus on annual EWM management and update the Minocqua and Kawaguesaga Lakes Management Plan (LMP).

Project activities include: 1) Annual herbicide treatments and manual removal of EWM; 2) Annual pre/post treatment monitoring, analysis and mapping; 3) Annual volunteer AIS monitoring; 4) Shoreland restoration design assistance and incentives; 5) Conduct volunteer and paid watercraft inspections; 6) Entry of inspection and monitoring data onto SWIMS; 7) Point-intercept (PI) aquatic plant survey and community mapping; 8) Develop annual project report and an updated LMP.

Project deliverables include: 1) Chemical and manual removal of EWM; 2) Pre/post treatment, PI survey and community mapping data; 3) Entered inspection and monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Annual reports and an updated LMP summarizing EWM management during project and future EWM management direction, inspection activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Annual reports and updated LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of updated LMP, all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/15/2017
Waters Involved
Minocqua Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Minocqua & Kawaguesaga Ais Prevention & Control: Minocqua and Kawaguesaga Lakes Protection Association is sponsoring an ACEI grant on Minocqua and Kawaguesaga Lakes, in Oneida County. This project will focus on annual AIS monitoring and management.

Project activities include: 1) Annual DASH and professional removal of EWM; 2) Annual pre/post treatment monitoring, analysis and mapping; 3) Annual volunteer AIS monitoring; 4) Shoreland restoration design assistance and incentives; 5) Point-intercept (PI) aquatic plant survey and community mapping; 6) Develop annual project reports.

Project deliverables include: 1) Manual removal of EWM; 2) Pre/post treatment, PI survey and community mapping data; 3) AIS educational, prevention and monitoring activities; 4) Shoreland restoration designs; 5) Annual reports summarizing EWM management during project and future EWM management direction, shoreland restorations, AIS monitoring and AIS educational activities.

Specific Conditions for this project: 1) Annual reports need Dept review and approval; 2) Shoreland restoration designs need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/15/2020
Waters Involved
Minocqua Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: 2020 Minocqua-Kawaguesaga Ewm Control & Prevention Project: Minocqua Kawaguesaga Lake Protection Association is sponsoring a project to implement approved Eurasian watermilfoil (EWM) control activities from their aquatic plant management plan.

Project activities include:
1) EWM control with herbicide treatments and DASH/hand pulling removal;
2) Pre-post treatment aquatic plant monitoring including point-intercept and bed mapping surveys;
3) Herbicide concentration monitoring and analysis;
4) Public informational meeting and MKPLA AIS Planning Committee meeting to discuss project results and plan for the coming year;
5) Volunteer EWM monitoring.

Project deliverables include:
1) EWM management and associated reporting;
2) Point-intercept and EWM bed mapping surveys;
3) Herbicide concentration results in SWIMS;
4) Annual AIS monitoring and control strategy reports;
5) Project report and planning meetings;
6) Final report summarizing EWM management and future monitoring and management suggestions.

Specific project conditions:

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. All data and reports, including GIS-based maps, and digital images, must be submitted to the Department. DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Minocqua Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Minocqua-Kawaguesaga 2021 Ewm Control Project - Kawaguesaga: Project Scope and Description of Deliverables

MKLPA is sponsoring a project to implement approved Eurasian watermilfoil (EWM) control activities from their aquatic plant management plan.

Project activities include:
1) EWM control with herbicide treatment and DASH/hand pulling;
2) Pretreatment confirmation/refinement and late season bed mapping surveys (for EWM);
3) Aquatic plant point-intercept surveys (to evaluate large-scale herbicide treatments and for trend data);
4) Herbicide concentration monitoring and analysis;
5) Annual and final AIS strategy assessment reports summarizing EWM management and monitoring during project and future EWM management direction.

Project deliverables include:
1) EWM management and associated reporting;
2) Data from EWM and aquatic plant surveys;
3) Herbicide concentration results in SWIMS;
4) Annual and final AIS monitoring and control strategy reports.

Specific project conditions:

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. All data and reports, including GIS-based maps, and digital images, must be submitted to the Department.

DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.



Grant Details
Aquatic Invasives Control
Date
3/15/2021
Waters Involved
Minocqua Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Minocqua-Kawaguesaga 2021 Ewm Control Project - Minocqua: Project Scope and Description of Deliverables

MKLPA is sponsoring a project to implement approved Eurasian watermilfoil (EWM) control activities from their aquatic plant management plan.

Project activities include:
1) EWM control with herbicide treatment and DASH/hand pulling;
2) Pretreatment confirmation/refinement and late season bed mapping surveys (for EWM);
3) Aquatic plant point-intercept surveys (to evaluate large-scale herbicide treatments and for trend data);
4) Herbicide concentration monitoring and analysis;
5) Annual and final AIS strategy assessment reports summarizing EWM management and monitoring during project and future EWM management direction.

Project deliverables include:
1) EWM management and associated reporting;
2) Data from EWM and aquatic plant surveys;
3) Herbicide concentration results in SWIMS;
4) Annual and final AIS monitoring and control strategy reports.

Specific project conditions:

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. All data and reports, including GIS-based maps, and digital images, must be submitted to the Department.

DNR is to receive copies of the final report along with, or prior to submission of grantee's final payment request. It is recommended that Grantee provide DNR Lake Coordinator with a draft of the final report for comment on report adequacy prior to making final payment to the consultant.

It is strongly recommended that an annual management strategy meeting be held each winter with DNR to discuss EWM management for the next year before aquatic plant management permit applications are submitted.


Grant Details
Aquatic Invasives Control
Date
4/15/2017
Waters Involved
Mud Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake 2017 Ais Monitoring, Mapping, Planning Project: Tomahawk Lake Association, Inc is sponsoring an ACEI grant on the Tomahawk Lake system, in Oneida County. This is a one year project that will focus on AIS management.

Project activities include: 1) Manual removal of EWM with hydraulic conveyor; 2) Mapping and control of purple loosestrife (PL); 3) Develop final project report.

Project deliverables include: 1) Manual control of AIS; 2) Final report summarizing AIS management and future AIS management suggestions and AIS monitoring.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, survey data (includes PL), and all maps and GIS from the project.


Grant Details
Aquatic Invasives Control
Date
4/1/2009
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Lake Tomahawk Ais Control Project: Tomahawk Lake Association, Inc (TLA) is sponsoring an AIS ACEI grant on the Tomahawk Lake system, in Oneida County. This is a five year project that will focus on EWM management, and AIS education, prevention and monitoring. This grant covers the costs of the first 2 year's of implementation. The goal is to reduce the treatable EWM coverage by 80%. This will allow TLA to continue management of EWM with minimal state financial assistance.

Project activities include: 1)Annual chemical treatments of EWM; 2) Manual removal of EWM with hydraulic conveyor; 3)Annual pre/post treatment monitoring and analysis; 4)Project kick-off meeting and annual informational meeting; 5)Hire 1 AIS program coordinator and 2 scuba divers to run hydraulic conveyor; 6)Recruit volunteers and implement a CB/CW program; 7)Mapping and bio-control of purple loosestrife (PL); 8)Annual volunteer AIS training and monitoring; 9)Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 10)Educational outreach activities as listed on pages 7-8 of proposal; 11)Develop annual project report and a final report.

Project deliverables include: 1)Chemical, biological and manual control of AIS, including mapping; 2)Pre/post treatment survey data; 3)AIS Coordinator (minimum of 400 hours per year); 3)Volunteer monitoring (minimum of 136 hours per year); 4)Completed entry of inspection 3200-120 and monitoring forms; 5)Scuba divers; 6)AIS educational activities; 7)Annual reports and final report summarizing AIS management and future AIS management suggestions, CB/CW activities, AIS monitoring, and AIS educational activities.

Specific Conditions: Annual report and final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, maps, educational outreach products, and survey data (includes: pre/post treatment and PL).


Grant Details
Aquatic Invasives Control
Date
4/1/2011
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: The Tomahawk Lake Ais Control Grant 2011 & 2012: Tomahawk Lake Association, Inc (TLA) is sponsoring a project on the Tomahawk Lake system in Oneida County focusing on EWM management, and AIS education, prevention and monitoring. This is a five year project with this grant covering implementation costs of year\2019s 3 and 4. The goal is to reduce the treatable EWM coverage by 80% which will allow TLA to continue management of EWM with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Manual removal of EWM with hydraulic conveyor; 3) Annual pre/post treatment monitoring and analysis; 4) Hire 1 AIS program coordinator, 1 CB/CW inspector and 2 scuba divers to run hydraulic conveyor; 5) Recruit volunteers and implement a CB/CW program; 6) Mapping and control of purple loosestrife (PL); 7) Annual volunteer AIS training and monitoring; 8) Entry of inspection and monitoring forms into SWIMS; 9) Educational outreach activities as listed on pages 21-23 of proposal; 10) Volunteer residual herbicide monitoring; 11) Develop annual project report and a final report.

Project deliverables include: 1) Chemical, biological and manual control of AIS, including mapping; 2) Pre/post treatment survey and residual sampling data; 3) AIS Coordinator (minimum of 400 hours per year); 4) Volunteer monitoring (minimum of 136 hours per year); 5) Inspection and monitoring data entered into SWIMS; 6) Scuba divers; 7) AIS educational activities; 8) Annual reports and final report summarizing AIS management and future AIS management suggestions, CB/CW activities, AIS monitoring, and AIS educational activities.

Specific Conditions: Annual reports and final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and annual reports, maps, educational outreach products, and survey data (includes: pre/post treatment and PL).


Grant Details
Aquatic Invasives Control
Date
4/1/2013
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake Ais Grant 2013 & 2014: Tomahawk Lake Association, Inc (TLA) is sponsoring an ACEI grant on the Tomahawk Lake system, in Oneida County. This is a five year project focusing on EWM management, and AIS education, prevention and monitoring. This grant covers the costs of year\2019s 5 and 6 of implementation. The goal is to reduce the treatable EWM coverage by 80%. This will allow TLA to continue management of EWM with minimal state financial assistance. An updated management plan will need to be submitted before applying for further AIS control grant assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Manual removal of EWM with hydraulic conveyor; 3) Annual pre/post treatment monitoring and analysis; 4) Conduct paid and volunteer watercraft inspections; 5) Mapping and control of purple loosestrife (PL); 6) Annual volunteer AIS training and monitoring; 7) Entry of inspection and monitoring forms into SWIMS; 8) Educational outreach activities as listed on pages 25-34 of proposal; 9) Volunteer herbicide concentration monitoring; 10) Develop annual project reports and a final report.

Project deliverables include: 1) Chemical, biological and manual control of AIS, including mapping; 2) Pre/post treatment survey and chemical concentration sampling data; 3) Entered inspection and monitoring data into SWIMS; 4) AIS educational activities; 5) Annual reports and final report summarizing AIS management and future AIS management suggestions, inspection activities, AIS monitoring, and AIS educational activities.

Specific project conditions: Annual reports and final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and annual reports, educational outreach products, survey data (includes: pre/post treatment and PL), and all maps from the project.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake Ais Control For 2015: Tomahawk Lake Association, Inc is sponsoring an ACEI grant on the Tomahawk Lake system, in Oneida County. This is a one year project that will focus on AIS management and watercraft inspections.

Project activities include: 1) Annual chemical treatments of EWM; 2) Manual removal of EWM with hydraulic conveyor; 3) Annual pre/post treatment monitoring and analysis; 4) Conduct paid and volunteer watercraft inspections; 5) Mapping and control of purple loosestrife (PL); 6) Annual volunteer AIS training and monitoring; 7) Entry of inspection and monitoring forms into SWIMS; 8) Develop quarterly and final project reports.

Project deliverables include: 1) Chemical, biological and manual control of AIS, including mapping; 2) Pre/post treatment survey and chemical concentration sampling data; 3) Entered inspection and monitoring data into SWIMS; 4) Final report summarizing AIS management and future AIS management suggestions, inspection activities, and AIS monitoring.

Specific Conditions for this project: Quarterly reports and final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and quarterly reports, survey data (includes: pre/post treatment and PL), and all maps from the project.


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake Ais Control Grant For 2016: Tomahawk Lake Association, Inc is sponsoring an ACEI grant on the Tomahawk Lake system, in Oneida County. This is a one year project that will focus on AIS management.

Project activities include: 1) Annual chemical treatments of EWM; 2) Manual removal of EWM with hydraulic conveyor. 3) Annual pre/post treatment monitoring and analysis. 4) Hire an AIS Coordinator; 5) Mapping and control of purple loosestrife (PL); 6) Annual volunteer AIS training and monitoring; 7) Develop quarterly and final project reports.

Project deliverables include: 1) Chemical and manual control of AIS, including mapping; 2) Pre/post treatment survey data; 3) AIS Coordinator; 4) Final report summarizing AIS management and future AIS management suggestions and AIS monitoring.

Specific Conditions for this project: Quarterly reports and final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and quarterly reports, survey data (includes: pre/post treatment and PL), and all maps and GIS from the project.


Grant Details
Aquatic Invasives Control
Date
4/15/2017
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake 2017 Ais Monitoring, Mapping, Planning Project: Tomahawk Lake Association, Inc is sponsoring an ACEI grant on the Tomahawk Lake system, in Oneida County. This is a one year project that will focus on AIS management.

Project activities include: 1) Manual removal of EWM with hydraulic conveyor; 2) Mapping and control of purple loosestrife (PL); 3) Develop final project report.

Project deliverables include: 1) Manual control of AIS; 2) Final report summarizing AIS management and future AIS management suggestions and AIS monitoring.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, survey data (includes PL), and all maps and GIS from the project.


Grant Details
Aquatic Invasives Control
Date
4/15/2018
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake 2018 Ais/Ewm Control: Tomahawk Lake Association, Inc is sponsoring an ACEI grant on the Tomahawk Lake system, in Oneida County. This is a one year project that will focus on AIS management.

Project activities include: 1) Manual removal of EWM with hydraulic conveyor; 2) Mapping and control of purple loosestrife (PL); 3) Develop final project report.

Project deliverables include: 1) Manual control of AIS; 2) Final report summarizing AIS management and future AIS management suggestions and AIS monitoring.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, survey data (includes PL), and all maps and GIS from the project.


Grant Details
Aquatic Invasives Control
Date
4/15/2017
Waters Involved
Tomahawk Thoroughfare
Status
Complete

Tomahawk Lake Association: Tomahawk Lake 2017 Ais Monitoring, Mapping, Planning Project: Tomahawk Lake Association, Inc is sponsoring an ACEI grant on the Tomahawk Lake system, in Oneida County. This is a one year project that will focus on AIS management.

Project activities include: 1) Manual removal of EWM with hydraulic conveyor; 2) Mapping and control of purple loosestrife (PL); 3) Develop final project report.

Project deliverables include: 1) Manual control of AIS; 2) Final report summarizing AIS management and future AIS management suggestions and AIS monitoring.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, survey data (includes PL), and all maps and GIS from the project.


Grant Details
Aquatic Invasives Control
Date
4/15/2017
Waters Involved
Unnamed
Status
Complete

Tomahawk Lake Association: Tomahawk Lake 2017 Ais Monitoring, Mapping, Planning Project: Tomahawk Lake Association, Inc is sponsoring an ACEI grant on the Tomahawk Lake system, in Oneida County. This is a one year project that will focus on AIS management.

Project activities include: 1) Manual removal of EWM with hydraulic conveyor; 2) Mapping and control of purple loosestrife (PL); 3) Develop final project report.

Project deliverables include: 1) Manual control of AIS; 2) Final report summarizing AIS management and future AIS management suggestions and AIS monitoring.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, survey data (includes PL), and all maps and GIS from the project.


Grant Details
Aquatic Invasives Early Detection and Response
Date
9/1/2008
Waters Involved
Arrowhead Creek
Status
Complete

Town Of Arbor Vitae: Arrowhead Lake Eurasian Water Milfoil Rapid Response Project: The Town of Arbor Vitae is sponsoring a Rapid Response grant to be completed by June 30, 2011. The project will focus on chemically treating 2.6 acres of EWM in Arrowhead Lake.

Project activities include: 1) Pre-treatment survey conducted a week or less prior to treatment; 2) Chemically treat 2.6 acres of EWM; 3) Post-treatment survey between mid-July and mid-August.

Project deliverables include: 1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
9/1/2008
Waters Involved
Arrowhead Lake
Status
Complete

Town Of Arbor Vitae: Arrowhead Lake Eurasian Water Milfoil Rapid Response Project: The Town of Arbor Vitae is sponsoring a Rapid Response grant to be completed by June 30, 2011. The project will focus on chemically treating 2.6 acres of EWM in Arrowhead Lake.

Project activities include: 1) Pre-treatment survey conducted a week or less prior to treatment; 2) Chemically treat 2.6 acres of EWM; 3) Post-treatment survey between mid-July and mid-August.

Project deliverables include: 1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2011
Waters Involved
Arrowhead Lake
Status
Complete

Town Of Arbor Vitae: Arrowhead Lake Ewm Edr Project - Phase Ii: The Town of Arbor Vitae is sponsoring an AIRR project which will focus on managing EWM in Arrowhead Lake.

Project activities include: 1) Pre/post treatment surveys; 2) Reimburse retroactive costs of chemical treatments during 2011; 3) Peak-biomass survey and hand-pulling during 2012.

Project deliverables include: Project summary report.

Specific conditions for this project: Project summary report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) electronic copy of report, and all data and maps.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/13/2007
Waters Involved
Harriet Creek
Status
Complete

Lake Nokomis Concerned Citizen'S Inc.: Lake Nokomis 2007 Eurasian Water Milfoil Control: Lake Nokomis Concerned Citizens, Inc. is sponsoring an Aquatic Invasive Species Rapid Response grant to be completed by December 31, 2007. The project will focus on chemically treating 17.9 acres of EWM in Lake Nokomis.

Project activities include:
1) Pre-treatment survey conducted a week or less prior to treatment
2) Chemically treat 17.9 acres of EWM
3) Post-treatment survey between mid-July and mid-August.

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
2/28/2005
Waters Involved
Kawaguesaga Lake
Status
Complete

Minocqua/Kawaguesaga Lakes Protection Assn.: Eurasian Water Milfoil 2005 Control Project: The Minocqua/Kawaguesaga Lakes Protection Association will sponsor a project to treat Eurasian water-milfoil during the spring of 2005, with the goal of early eradication. The association will also provide an educational component to teach area residents of the dangers of aquatic invasive species and control/prevention measures, as well as giving periodic project updates.

Products:

1) Pioneer beds of Eurasian water-milfoil will be chemically treated in accordance with the Department issued Aquatic Plant Management permit.
2) Pre and post treatment surveys (for known and unknown areas of infestation) mapping the location and densities of EWM will be conducted.
3) A final report will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2017
Waters Involved
Little Spider Lake
Status
Complete

Little Spider Lake Association: Little Spider Lake Ewm Edr Project (2017 - 2019): Little Spider Lake Association is sponsoring an early detection/response project which will focus on surveying, mapping and hand-pulling the new discovery of EWM in Little Spider Lake, Vilas County.

Project activities include: 1) Conduct annual early-season AIS and peak-biomass surveys; 2) Volunteer AIS monitoring and hand removal; 3) Professional EWM removal; 4) Purchase GPS; 5) Develop annual maps and letter report.

Project deliverables include: 1) EWM and PI survey data and maps; 2) GPS; 3) Annual letter report describing the findings of the early-season survey, peak-biomass survey, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/23/2007
Waters Involved
Little Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Aquatic Plant Management Plans: Tomahawk Lake Property Owners Association is sponsoring an AIS RR grant to be completed by December 31, 2007. The project will focus on chemically treating approximately 31 acres of EWM in Lake Tomahawk.

Project activities include:
1) Pre-treatment survey conducted a week or less prior to treatment
2) Chemically treat approximately 31 acres of EWM
3) Post-treatment survey between mid-July and mid-August following Dept protocols established in April 2007

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
2/28/2005
Waters Involved
Mid Lake
Status
Complete

Mid Lake Protection & Management District: Curly Leaf Pondweed Treatment & Survey: The Mid Lake District will sponsor a project to treat curly-leaf pondweed during the Spring of 2005, with the goal of early eradication. The District will also provide an educational component to teach area residents of the dangers of aquatic invasive species and control/prevention measures, as well as giving periodic project updates.

Products:

1) Pioneer beds of curly-leaf pondweed will be chemically treated in accordance with the Department issued Aquatic Plant Management permit.
2) Pre and post treatment surveys (for known and unknown areas of infestation) mapping the location and densities of CLP will be conducted.
3) A final report will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/23/2007
Waters Involved
Mud Lake
Status
Complete

Tomahawk Lake Association: Aquatic Plant Management Plans: Tomahawk Lake Property Owners Association is sponsoring an AIS RR grant to be completed by December 31, 2007. The project will focus on chemically treating approximately 31 acres of EWM in Lake Tomahawk.

Project activities include:
1) Pre-treatment survey conducted a week or less prior to treatment
2) Chemically treat approximately 31 acres of EWM
3) Post-treatment survey between mid-July and mid-August following Dept protocols established in April 2007

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
2/28/2005
Waters Involved
Tomahawk Lake
Status
Complete

Town Of Lake Tomahawk: Aquatic Invasive Species Control: The Town of Lake Tomahawk in cooperation with the Lake Tomahawk riparian associations (Pottawattomie Colony, Inc. and Tomahawk Lake Property Owners Assn.) will sponsor a project to treat eurasian water-milfoil during the spring of 2005, with the hope of early eradication. They will also provide an educational component to teach area residents of the dangers of aquatic invasive species and control/prevention measures, as well as giving periodic project updates.

Products:

1) Pioneer beds of eurasian water-milfoil will be chemically treated in accordance with the Department issued chemical control permit.
2) Pre and post treatment surveys (for known and unknown areas of infestation), mapping the location and densities of EWM, will be conducted.
3) A final report will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/23/2007
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Aquatic Plant Management Plans: Tomahawk Lake Property Owners Association is sponsoring an AIS RR grant to be completed by December 31, 2007. The project will focus on chemically treating approximately 31 acres of EWM in Lake Tomahawk.

Project activities include:
1) Pre-treatment survey conducted a week or less prior to treatment
2) Chemically treat approximately 31 acres of EWM
3) Post-treatment survey between mid-July and mid-August following Dept protocols established in April 2007

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
9/6/2007
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Lake Tomahawk Ais Prevention & Control Stragegy, No. 1: Tomahawk Lake Property Owners Association, Inc. is sponsoring two AIS Rapid Response grants to be completed by December 31, 2008. The project will focus on chemically treating approximately 30 acres of Eurasian Water Milfoil (EWM) in Lake Tomahawk.

Project activities include: 1. Complete an EWM proposed treatment survey; 2. Complete Pre/Post treatment survey; 3. Chemically treat approximately 30 acres of EWM; 4. Prepare Aquatic Plant Management Report.

Project deliverables include: Final report describing the findings of the pre and post treatment surveys, GPS locations, updated EWM maps, and guidance for continued control actions.

Specific conditions for this project: Final report needs Dept review and approval; all EWM surveys must follow WDNR Pre and Post treatment monitoring protocols (April 2008)

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, Aquatic plant survey data, GPS data and maps.


Grant Details
Aquatic Invasives Early Detection and Response
Date
9/6/2007
Waters Involved
Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Lake Tomahawk Ais Prevention & Control Strategy, No. 2: Tomahawk Lake Property Owners Association, Inc. is sponsoring two AIS Rapid Response grants to be completed by December 31, 2008. The project will focus on chemically treating approximately 30 acres of Eurasian Water Milfoil (EWM) in Lake Tomahawk.

Project activities include: 1. Complete an EWM proposed treatment survey; 2. Complete Pre/Post treatment survey; 3. Chemically treat approximately 30 acres of EWM; 4. Prepare Aquatic Plant Management Report.

Project deliverables include: Final report describing the findings of the pre and post treatment surveys, GPS locations, updated EWM maps, and guidance for continued control actions.

Specific conditions for this project: Final report needs Dept review and approval; all EWM surveys must follow WDNR Pre and Post treatment monitoring protocols (April 2008)

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, Aquatic plant survey data, GPS data and maps.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/13/2007
Waters Involved
Tomahawk River
Status
Complete

Lake Nokomis Concerned Citizen'S Inc.: Lake Nokomis 2007 Eurasian Water Milfoil Control: Lake Nokomis Concerned Citizens, Inc. is sponsoring an Aquatic Invasive Species Rapid Response grant to be completed by December 31, 2007. The project will focus on chemically treating 17.9 acres of EWM in Lake Nokomis.

Project activities include:
1) Pre-treatment survey conducted a week or less prior to treatment
2) Chemically treat 17.9 acres of EWM
3) Post-treatment survey between mid-July and mid-August.

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/23/2007
Waters Involved
Tomahawk Thoroughfare
Status
Complete

Tomahawk Lake Association: Aquatic Plant Management Plans: Tomahawk Lake Property Owners Association is sponsoring an AIS RR grant to be completed by December 31, 2007. The project will focus on chemically treating approximately 31 acres of EWM in Lake Tomahawk.

Project activities include:
1) Pre-treatment survey conducted a week or less prior to treatment
2) Chemically treat approximately 31 acres of EWM
3) Post-treatment survey between mid-July and mid-August following Dept protocols established in April 2007

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
3/23/2007
Waters Involved
Unnamed
Status
Complete

Tomahawk Lake Association: Aquatic Plant Management Plans: Tomahawk Lake Property Owners Association is sponsoring an AIS RR grant to be completed by December 31, 2007. The project will focus on chemically treating approximately 31 acres of EWM in Lake Tomahawk.

Project activities include:
1) Pre-treatment survey conducted a week or less prior to treatment
2) Chemically treat approximately 31 acres of EWM
3) Post-treatment survey between mid-July and mid-August following Dept protocols established in April 2007

Project deliverables include:
1) Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions.

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2013
Waters Involved
Upper Kaubashine Lake
Status
Complete

Town Of Hazelhurst: Upper Kaubashine Lake Ais Early Detection & Response: 2014 - 2016: The Town of Hazelhurst is sponsoring an Early Detection & Response project which will focus on surveying, monitoring, mapping, and hand-pulling the new discovery of EWM in Upper Kaubashine Lake, Oneida County.

Project activities include: 1) Conduct annual early-season AIS and peak-biomass surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by professional hand-removal efforts; 4) Host a project kick-off meeting; 5) Purchase a GPS; 6) Develop annual maps and letter report.

Project deliverables include: 1) EWM survey data and maps; 2) GPS; 3) Annual letter report describing the findings of the early-spring survey, peak-biomass survey, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2016
Waters Involved
Upper Kaubashine Lake
Status
Complete

Town Of Hazelhurst: Upper Kaubashine Ais Early Detection & Response, Phase 2: The Town of Hazelhurst is sponsoring an AIRR grant which will help fund a project which will focus on surveying, monitoring, mapping, and hand-pulling EWM in Upper Kaubashine Lake, Oneida County and start the development of a Lake Management Plan (LMP).

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Aquatic plant surveys (PI survey, acoustic survey, early-season AIS survey, EWM peak-biomass, community mapping, and substrate mapping); 3) Professional Dreissana monitoring; 4) Start development of LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) PI data; 3) Aquatic plant community and substrate maps; 4) Aquatic plant vouchers; 5) LMP;

Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI survey, acoustic survey, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Alice Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Amber Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Amber Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Bear Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Bearskin Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Big Arbor Vitae Lake
Status
Complete

Vilas County Land & Water Conserv Committee: Vilas County Ais Education, Prevention, & Planning Project 2013-2016: The Vilas County Land and Water Conservation Committee is sponsoring an Education, Prevention and Planning project focusing on AIS education, prevention and monitoring.

Project activities include: 1) County staff support with AIS funding (AIS focus on education, monitoring, inspections, fieldwork/sampling and data entry/analysis (coordinated with WDNR)); 2) Outreach and education: AIS workshops, press releases, updated website, July 4th boat landing blitz, bait dealer initiative, establish law enforcement partnership, maintain partnership email, assist in updating boat landing signage, and informational presentations; 3) Expand existing watercraft inspection internship program; 4) Attend WL convention, VCLA meetings, AIS coordinator meetings, local lake meetings, town lake committee meetings, etc. for training, coordination and presentations; 5) AIS education materials (literature, brochures and AIS workshop packets); 6) Develop annual reports, annual maps and final report summarizing project activities.

Project deliverables include: 1) Workshops, outreach and field sampling data and data entry and analysis; 2) Hired staff; 3) AIS education materials; 4) Annual reports and maps, and final report.

Specific Conditions for this project: Annual reports and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual reports, final report, and all maps and samples or photographs of AIS educational materials.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Muskellunge Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Blueberry Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bobs Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Five Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Ten Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Twelve Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crystal Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dads Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Decker Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Dollar Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dorothy Dunn Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Drager Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Drott Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Dugout Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Eloise Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Escanaba Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Foster Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Frank Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Garth Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hennig Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hobo Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Horseshoe Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Hughitt Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Indian Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Inkwell Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake System Updated Apm Plan - Ewm Mapping Phase: Project Scope and Description of Deliverables

The Tomahawk Lake Association (TLA) is sponsoring a project which will focus on updating their aquatic plant management plan for all of the lakes in the watershed. The three phases \2013 EWM Mapping, PI Survey, and Management Planning - will be used together to update the management plan. The Project has the following goals/activities: 1) Conduct aquatic plant point-intercept (PI) surveys (following DNR protocol); 2) Conduct late season EWM mapping surveys, and volunteer EWM surveillance monitoring; 3) Develop an online EWM mapping application; 4) Conduct a lake stakeholder social survey; 5) Develop an updated aquatic plant management plan.

Project deliverables include: 1) Data from aquatic plant, EWM mapping, and social surveys; 2) annual project report; and 3) an updated aquatic plant management plan.

Specific project conditions: WDNR Lake Biologist will be provided with an electronic copy of reports/management plans; data from aquatic plant, EWM mapping, and social surveys; all maps and GIS data from project. WDNR Lake Biologist will be invited to management plan development meetings.

This scope summarizes the project detail provided in the grant application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Inkwell Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake System Updated Apm Plan - Mgmt Planning Phase: Project Scope and Description of Deliverables

The Tomahawk Lake Association (TLA) is sponsoring a project which will focus on updating their aquatic plant management plan for all of the lakes in the watershed. The three phases \2013 EWM Mapping, PI Survey, and Management Planning - will be used together to update the management plan. The Project has the following goals/activities: 1) Conduct aquatic plant point-intercept (PI) surveys (following DNR protocol); 2) Conduct late season EWM mapping surveys, and volunteer EWM surveillance monitoring; 3) Develop an online EWM mapping application; 4) Conduct a lake stakeholder social survey; 5) Develop an updated aquatic plant management plan.

Project deliverables include: 1) Data from aquatic plant, EWM mapping, and social surveys; 2) annual project report; and 3) an updated aquatic plant management plan.

Specific project conditions: WDNR Lake Biologist will be provided with an electronic copy of reports/management plans; data from aquatic plant, EWM mapping, and social surveys; all maps and GIS data from project. WDNR Lake Biologist will be invited to management plan development meetings.

This scope summarizes the project detail provided in the grant application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Inkwell Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake System Updated Apm Plan - Pi Survey Phase: The Tomahawk Lake Association (TLA) is sponsoring a project which will focus on updating their aquatic plant management plan for all of the lakes in the watershed. The three phases \2013 EWM Mapping, PI Survey, and Management Planning - will be used together to update the management plan. The Project has the following goals/activities: 1) Conduct aquatic plant point-intercept (PI) surveys (following DNR protocol); 2) Conduct late season EWM mapping surveys, and volunteer EWM surveillance monitoring; 3) Develop an online EWM mapping application; 4) Conduct a lake stakeholder social survey; 5) Develop an updated aquatic plant management plan.

Project deliverables include: 1) Data from aquatic plant, EWM mapping, and social surveys; 2) annual project report; and 3) an updated aquatic plant management plan.

Specific project conditions: WDNR Lake Biologist will be provided with an electronic copy of reports/management plans; data from aquatic plant, EWM mapping, and social surveys; all maps and GIS data from project. WDNR Lake Biologist will be invited to management plan development meetings.

This scope summarizes the project detail provided in the grant application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jean Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Katherine Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Katherine Lake
Status
Complete

Town Of Hazelhurst: Town Of Hazelhurst Ais Monitoring & Inspection Program: The Town of Hazelhurst is sponsoring a project on Katherine Lake and McCormick Lake in Oneida County focusing on Town-wide AIS education, and lake specific prevention and monitoring.

Project activities include: 1) Hire AIS project coordinator; 2)Sponsor an annual CB/CW workshop; 3) Perform watercraft inspections and conduct AIS monitoring on McCormick and Katherine Lakes; 4) Develop and distribute AIS informational napkins; 5) Create a Hazelhurst Town Lakes Committee; 6) Entry of inspection and monitoring forms into SWIMS; 7) Disseminate AIS information at boat landings, public areas, and businesses and private resorts.

Project deliverables include: 1) Minimum of 200 hours of watercraft inspection hours at Lake Katherine; 2) Completed entry of inspection and monitoring forms into SWIMS; 3) Hired coordinator; 4) Completed workshops, AIS napkins and Town Lakes Committee; 5) AIS educational materials; 6) Final report summarizing CB/CW activities, AIS monitoring, and AIS educational activities.

Specific project conditions: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and samples of AIS educational materials.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Kitty Springs
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Alva
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Laura
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Salsich
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Lake Seventeen
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Langley Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Lee Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lewis Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Star Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
2/15/2017
Waters Involved
Little Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake 2017 Ais Monitoring, Mapping & Planning: Tomahawk Lake Association, Inc is sponsoring a one year project that will focus on AIS monitoring and mapping.

Project activities include: 1) Annual EWM pre/post treatment monitoring and analysis; 2) Hire an AIS Coordinator; 3) Purple loosestrife (PL) monitoring and mapping; 4) Annual volunteer AIS training and monitoring; 5) Develop final project report.

Project deliverables include: 1) Pre/post treatment survey data and maps; 2) AIS Coordinator; 3) Final report summarizing AIS management and future AIS management suggestions and AIS monitoring.

Specific Conditions for this project: Final report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, survey data (includes: pre/post treatment and PL), and all maps and GIS from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Little Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake System Updated Apm Plan - Ewm Mapping Phase: Project Scope and Description of Deliverables

The Tomahawk Lake Association (TLA) is sponsoring a project which will focus on updating their aquatic plant management plan for all of the lakes in the watershed. The three phases \2013 EWM Mapping, PI Survey, and Management Planning - will be used together to update the management plan. The Project has the following goals/activities: 1) Conduct aquatic plant point-intercept (PI) surveys (following DNR protocol); 2) Conduct late season EWM mapping surveys, and volunteer EWM surveillance monitoring; 3) Develop an online EWM mapping application; 4) Conduct a lake stakeholder social survey; 5) Develop an updated aquatic plant management plan.

Project deliverables include: 1) Data from aquatic plant, EWM mapping, and social surveys; 2) annual project report; and 3) an updated aquatic plant management plan.

Specific project conditions: WDNR Lake Biologist will be provided with an electronic copy of reports/management plans; data from aquatic plant, EWM mapping, and social surveys; all maps and GIS data from project. WDNR Lake Biologist will be invited to management plan development meetings.

This scope summarizes the project detail provided in the grant application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Little Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake System Updated Apm Plan - Mgmt Planning Phase: Project Scope and Description of Deliverables

The Tomahawk Lake Association (TLA) is sponsoring a project which will focus on updating their aquatic plant management plan for all of the lakes in the watershed. The three phases \2013 EWM Mapping, PI Survey, and Management Planning - will be used together to update the management plan. The Project has the following goals/activities: 1) Conduct aquatic plant point-intercept (PI) surveys (following DNR protocol); 2) Conduct late season EWM mapping surveys, and volunteer EWM surveillance monitoring; 3) Develop an online EWM mapping application; 4) Conduct a lake stakeholder social survey; 5) Develop an updated aquatic plant management plan.

Project deliverables include: 1) Data from aquatic plant, EWM mapping, and social surveys; 2) annual project report; and 3) an updated aquatic plant management plan.

Specific project conditions: WDNR Lake Biologist will be provided with an electronic copy of reports/management plans; data from aquatic plant, EWM mapping, and social surveys; all maps and GIS data from project. WDNR Lake Biologist will be invited to management plan development meetings.

This scope summarizes the project detail provided in the grant application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Little Tomahawk Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake System Updated Apm Plan - Pi Survey Phase: The Tomahawk Lake Association (TLA) is sponsoring a project which will focus on updating their aquatic plant management plan for all of the lakes in the watershed. The three phases \2013 EWM Mapping, PI Survey, and Management Planning - will be used together to update the management plan. The Project has the following goals/activities: 1) Conduct aquatic plant point-intercept (PI) surveys (following DNR protocol); 2) Conduct late season EWM mapping surveys, and volunteer EWM surveillance monitoring; 3) Develop an online EWM mapping application; 4) Conduct a lake stakeholder social survey; 5) Develop an updated aquatic plant management plan.

Project deliverables include: 1) Data from aquatic plant, EWM mapping, and social surveys; 2) annual project report; and 3) an updated aquatic plant management plan.

Specific project conditions: WDNR Lake Biologist will be provided with an electronic copy of reports/management plans; data from aquatic plant, EWM mapping, and social surveys; all maps and GIS data from project. WDNR Lake Biologist will be invited to management plan development meetings.

This scope summarizes the project detail provided in the grant application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Tree Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Long Interlaken Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Lost Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Lost Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Lower Kaubashine Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Lower Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Lucy Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Marlands Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
McCormick Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
McGinnis Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Mid Lake
Status
Complete

Mid Lake Protection & Management District: Mid Lake Early Season Clp Harvesting Program & Ais Project: The Mid Lake P&R District is sponsoring a project for Mid Lake in Oneida County focusing on AIS education and CLP monitoring.

Project activities include: 1) Initiate a watercraft inspection program; 2) Annual volunteer AIS monitoring; 3) Entry of inspection and monitoring forms into SWIMS; 4) Develop and install kiosk in Thoroughfare; 5) Conduct CLP pre/post harvesting monitoring and mapping; 6) Develop and distribute an AIS pamphlet; 7) Prepare annual summaries and final report.

Project deliverables include: 1) Entered data from inspection and monitoring into SWIMS; 2) Kiosk and AIS pamphletl; 3) Annual pre/post monitoring data and maps; 4) Annual reports and final report summarizing AIS activities, CLP monitoring and future management guidance.

Specific Conditions: Annual reports and final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of annual reports and final report, an AIS pamphlet, and a photograph of completed kiosk.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Mid Lake
Status
Complete

Mid Lake Protection & Management District: Mid Lake Ais Control & Prevention Project Phase 1 2013: Mid Lake P&R District is sponsoring a project which will focus on surveying, monitoring, mapping, and managing the CLP and purple loosestrife in Mid Lake, Oneida County.

Project activities include: 1) Conduct point-intercept (PI) aquatic plant and early-season AIS surveys; 2) Conduct volunteer AIS monitoring; 3) Control CLP and purple loosestrife by hand removal efforts; 4) Conduct watercraft inspections; 5) Enter watercraft inspection data into SWIMS; 6) Purchase GPS; 7) Develop annual maps and letter report.

Project deliverables include: 1) PI and early season AIS survey data and maps; 2) Entered inspection data; 3) GPS; 4) Letter report describing the findings of the PI survey, early-spring survey, hand-pulling efforts, and guidance for continued CLP control actions.

Specific conditions for this project: Letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter report, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Middle Ellerson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Middle Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Miller Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Minette Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Mishonagon Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Mitten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Monahan Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Moss Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Moving Cloud Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Mud Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
2/15/2017
Waters Involved
Mud Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake 2017 Ais Monitoring, Mapping & Planning: Tomahawk Lake Association, Inc is sponsoring a one year project that will focus on AIS monitoring and mapping.

Project activities include: 1) Annual EWM pre/post treatment monitoring and analysis; 2) Hire an AIS Coordinator; 3) Purple loosestrife (PL) monitoring and mapping; 4) Annual volunteer AIS training and monitoring; 5) Develop final project report.

Project deliverables include: 1) Pre/post treatment survey data and maps; 2) AIS Coordinator; 3) Final report summarizing AIS management and future AIS management suggestions and AIS monitoring.

Specific Conditions for this project: Final report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, survey data (includes: pre/post treatment and PL), and all maps and GIS from the project.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Mud Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake System Updated Apm Plan - Ewm Mapping Phase: Project Scope and Description of Deliverables

The Tomahawk Lake Association (TLA) is sponsoring a project which will focus on updating their aquatic plant management plan for all of the lakes in the watershed. The three phases \2013 EWM Mapping, PI Survey, and Management Planning - will be used together to update the management plan. The Project has the following goals/activities: 1) Conduct aquatic plant point-intercept (PI) surveys (following DNR protocol); 2) Conduct late season EWM mapping surveys, and volunteer EWM surveillance monitoring; 3) Develop an online EWM mapping application; 4) Conduct a lake stakeholder social survey; 5) Develop an updated aquatic plant management plan.

Project deliverables include: 1) Data from aquatic plant, EWM mapping, and social surveys; 2) annual project report; and 3) an updated aquatic plant management plan.

Specific project conditions: WDNR Lake Biologist will be provided with an electronic copy of reports/management plans; data from aquatic plant, EWM mapping, and social surveys; all maps and GIS data from project. WDNR Lake Biologist will be invited to management plan development meetings.

This scope summarizes the project detail provided in the grant application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Mud Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake System Updated Apm Plan - Mgmt Planning Phase: Project Scope and Description of Deliverables

The Tomahawk Lake Association (TLA) is sponsoring a project which will focus on updating their aquatic plant management plan for all of the lakes in the watershed. The three phases \2013 EWM Mapping, PI Survey, and Management Planning - will be used together to update the management plan. The Project has the following goals/activities: 1) Conduct aquatic plant point-intercept (PI) surveys (following DNR protocol); 2) Conduct late season EWM mapping surveys, and volunteer EWM surveillance monitoring; 3) Develop an online EWM mapping application; 4) Conduct a lake stakeholder social survey; 5) Develop an updated aquatic plant management plan.

Project deliverables include: 1) Data from aquatic plant, EWM mapping, and social surveys; 2) annual project report; and 3) an updated aquatic plant management plan.

Specific project conditions: WDNR Lake Biologist will be provided with an electronic copy of reports/management plans; data from aquatic plant, EWM mapping, and social surveys; all maps and GIS data from project. WDNR Lake Biologist will be invited to management plan development meetings.

This scope summarizes the project detail provided in the grant application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Education
Date
3/15/2021
Waters Involved
Mud Lake
Status
Complete

Tomahawk Lake Association: Tomahawk Lake System Updated Apm Plan - Pi Survey Phase: The Tomahawk Lake Association (TLA) is sponsoring a project which will focus on updating their aquatic plant management plan for all of the lakes in the watershed. The three phases \2013 EWM Mapping, PI Survey, and Management Planning - will be used together to update the management plan. The Project has the following goals/activities: 1) Conduct aquatic plant point-intercept (PI) surveys (following DNR protocol); 2) Conduct late season EWM mapping surveys, and volunteer EWM surveillance monitoring; 3) Develop an online EWM mapping application; 4) Conduct a lake stakeholder social survey; 5) Develop an updated aquatic plant management plan.

Project deliverables include: 1) Data from aquatic plant, EWM mapping, and social surveys; 2) annual project report; and 3) an updated aquatic plant management plan.

Specific project conditions: WDNR Lake Biologist will be provided with an electronic copy of reports/management plans; data from aquatic plant, EWM mapping, and social surveys; all maps and GIS data from project. WDNR Lake Biologist will be invited to management plan development meetings.

This scope summarizes the project detail provided in the grant application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.

If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to submission of grantee's final payment request


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Muskesin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2005
Waters Involved
Myrtle Lake
Status
Complete

Town Of Hazelhurst: Ais Lake Monitoring - Boat Landings: The Town of Hazelhurst will sponsor a project involving 14 local lake associations to take part in Clean Boat-Clean Waters trainings. The township will hire inspectors to monitor boat landings during weekends, holidays, and fishing tournaments. Inspectors will inspect boats, survey boaters about aquatic invasive species, and share AIS information and materials to increase public awareness of AIS issues and prevent additional AIS from entering area lakes. High priority will be placed on Katherine and McCormick Lakes. The township will work to create a partnership with the 14 lake associations and have the volunteer inspectors monitor the local private boat landings. A power washer will be purchased and made available to inspectors for high use boating events. AIS educational materials will be distributed to local resorts, guides/bait shops, motel, and boat sales/rental outlets. The township will also form a five person volunteer committee to develop an AIS Rapid Response Plan.

A final report including a summary of inspections completed, findings and the AIS Rapid Response Plan will be made available to the DNR, Oneida County Land Conservation Dept., local lake associations, districts, and media.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mystery Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nebish Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nineweb Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nixon Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nixon Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pallette Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Partridge Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Partridge Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Patterson Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pine Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pine Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releas