Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Becker Lake
Status
Complete
Calumet County: Lmi-Df-Calman Watershed Managment Plannin Phase 3: Calumet County proposes to quantify and compartmentalize nutrient budgets for the four lakes situated along the Calumet/Manitowoc County boarder which includes Round, Becker, Boot, and Long Lakes through in-lake, tributary, groundwater and watershed monitoring and modeling. Specifically, Phase 3 will include:
1.
**9**
In-lake baseline water quality monitoring of the four lakes.
2.
**9**
In-lake phosphorus profiles and sediment-water interface samples.
3.
**9**
Sediment core samples and analysis from each lake.
4.
**9**
Tributary flow, phosphorus and suspended solids load monitoring.
5.
**9**
Shallow groundwater monitoring using mini-piezometers.
6.
**9**
Watershed modeling for nutrient budget utilizing EVAAL and FLUX.
7.
**9**
Precipitation monitoring within the watershed.
8.
**9**
Watershed stakeholder and planning committee meetings.
9.
**9**
Stakeholder survey and Agricultural producers interviews.
10.
**9**
Final report summarizing the results as well as an implementation plan for this watershed and these lakes.
The project elements and deliverables are specified in the grant application materials submitted to the Department dated January 30, 2015.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Boot Lake
Status
Complete
Calumet County: Lmi-Df-Calman Watershed Managment Plannin Phase 3: Calumet County proposes to quantify and compartmentalize nutrient budgets for the four lakes situated along the Calumet/Manitowoc County boarder which includes Round, Becker, Boot, and Long Lakes through in-lake, tributary, groundwater and watershed monitoring and modeling. Specifically, Phase 3 will include:
1.
**9**
In-lake baseline water quality monitoring of the four lakes.
2.
**9**
In-lake phosphorus profiles and sediment-water interface samples.
3.
**9**
Sediment core samples and analysis from each lake.
4.
**9**
Tributary flow, phosphorus and suspended solids load monitoring.
5.
**9**
Shallow groundwater monitoring using mini-piezometers.
6.
**9**
Watershed modeling for nutrient budget utilizing EVAAL and FLUX.
7.
**9**
Precipitation monitoring within the watershed.
8.
**9**
Watershed stakeholder and planning committee meetings.
9.
**9**
Stakeholder survey and Agricultural producers interviews.
10.
**9**
Final report summarizing the results as well as an implementation plan for this watershed and these lakes.
The project elements and deliverables are specified in the grant application materials submitted to the Department dated January 30, 2015.
Grant Details
Lake Protection Grant
Date
7/1/1997
Waters Involved
English Lake
Status
Complete
English Lake Management District: Lmi-English Lake Management District Wetland Detention Basin: English Lake Management District proposes to construct a wetland detention basin east of English Lake to treat agricultural runoff from a nearby barnyard/feedlot and cropland. The wetland basin will be built from an approved design to maximize sediment and nutrient removal efficiency. The project activities include site preparation and construction of an approximately 300 foot long dike that will create a detention basin that will result in a wetland about 1.2 acres in surface. The rock spillway and complete approved planting of wetland and aquatic vegetation are also included in this project.
Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
English Lake
Status
Complete
English Lake Management District: Lmi-Df-English Lake Drain Tile Diversion Df Study: The English Lake Management District proposes to conduct a diagnostic/feasibility study on drain tile diversion. The project will consist of a site topographic survey; surface, ground and lake water monitoring; drain tile investigation; threatened and endangered species review; public education and involvement and a final report. This final report will contain the collected data and review of alternatives identified in prior planning grants; examination of alternatives based on feasibility, cost and benefits; and an implementtion plan will be selected as the best management option and detailed in this report.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
English Lake
Status
Complete
English Lake Management District: Lmi-English Lake Se Drain Tile Diversion Project: The English Lake Protection and Rehabilitation District propose to divert a farmland drain tile that currently discharges to English Lake. The drain tile will be re-routed to discharge to a near-by forested wetland, whereby reducing the phosphorus and sediment loading to English Lake. A final report will be provided both in hard copy and electronically.
Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
English Lake
Status
Complete
English Lake Management District: Acq-English Lake "Pluess" Land Aquisition: The English Lake Protection and Rehab District proposes to purchase 9.82 acres of land known as the "Pluess" property. As part of the District's match, they will use proceeds from a bargain sale and the donated value of .33 acre of property known as the "Burns" property.
Grant Details
Lake Protection Grant
Date
5/25/1995
Waters Involved
Lake Winnebago
Status
Complete
Fond Du Lac County: Acq-Fond Du Lac County Camp Shaganappi Acquisition: Fond du Lac County shall participate in the Lake Protection Grant Program by purchasing 97.2 acres of land for public outdoor recreation purposes.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Long Lake
Status
Complete
Calumet County: Lmi-Df-Calman Watershed Managment Plannin Phase 3: Calumet County proposes to quantify and compartmentalize nutrient budgets for the four lakes situated along the Calumet/Manitowoc County boarder which includes Round, Becker, Boot, and Long Lakes through in-lake, tributary, groundwater and watershed monitoring and modeling. Specifically, Phase 3 will include:
1.
**9**
In-lake baseline water quality monitoring of the four lakes.
2.
**9**
In-lake phosphorus profiles and sediment-water interface samples.
3.
**9**
Sediment core samples and analysis from each lake.
4.
**9**
Tributary flow, phosphorus and suspended solids load monitoring.
5.
**9**
Shallow groundwater monitoring using mini-piezometers.
6.
**9**
Watershed modeling for nutrient budget utilizing EVAAL and FLUX.
7.
**9**
Precipitation monitoring within the watershed.
8.
**9**
Watershed stakeholder and planning committee meetings.
9.
**9**
Stakeholder survey and Agricultural producers interviews.
10.
**9**
Final report summarizing the results as well as an implementation plan for this watershed and these lakes.
The project elements and deliverables are specified in the grant application materials submitted to the Department dated January 30, 2015.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Round Lake
Status
Complete
Calumet County: Lmi-Df-Calman Watershed Managment Plannin Phase 3: Calumet County proposes to quantify and compartmentalize nutrient budgets for the four lakes situated along the Calumet/Manitowoc County boarder which includes Round, Becker, Boot, and Long Lakes through in-lake, tributary, groundwater and watershed monitoring and modeling. Specifically, Phase 3 will include:
1.
**9**
In-lake baseline water quality monitoring of the four lakes.
2.
**9**
In-lake phosphorus profiles and sediment-water interface samples.
3.
**9**
Sediment core samples and analysis from each lake.
4.
**9**
Tributary flow, phosphorus and suspended solids load monitoring.
5.
**9**
Shallow groundwater monitoring using mini-piezometers.
6.
**9**
Watershed modeling for nutrient budget utilizing EVAAL and FLUX.
7.
**9**
Precipitation monitoring within the watershed.
8.
**9**
Watershed stakeholder and planning committee meetings.
9.
**9**
Stakeholder survey and Agricultural producers interviews.
10.
**9**
Final report summarizing the results as well as an implementation plan for this watershed and these lakes.
The project elements and deliverables are specified in the grant application materials submitted to the Department dated January 30, 2015.
Grant Details
Lake Protection Grant
Date
9/1/2000
Waters Involved
Silver Lake
Status
Complete
Manitowoc County: Res-Silver Lake Diversion Project: The Silver Lake Protection and Rehabilitation District proposes to complete the diversion of Silver Creek from Silver Lake which will immediately and significantly lower the amount of sediment and organic loading from the creek into the lake and inhibit migration of undesirable fish species into the lake. The project will consist of bank riprap, outlet control structure, peat berm, maintenance, site ground work, design and consultant services and other miscellaneous structures and activities.
Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Silver Lake
Status
Complete
Manitowoc County Lakes Assn: Lmi-Silver Lake Restoration Phase 2: The Manitowoc County Lakes Association proposes to complete Phase 2 of the Silver Lake restoration project. This project will significantly reduce the internal nutrient loading contribution to Silver Lake and reclaim a balanced fishery and lake habitat. This will be achieved through 1) complete eradication of the primarily rough fish population using rotenone, 2) alum treatment to inactivate/reduce internal nutrient load for lake sediments, 3) restocking and regulation of the sport fishery, and 4) terrestrial and littoral habitat restoration along 650 feet of shoreline in the county/city park. The main product will be the restoration of Silver Lake. Press releases, newsletters, and presentations will provide information and education to the public.
Progress reports and a final report will be provided to the Department of Natural Resources both in hard copy and electronically.
Grant Details
Lake Protection Grant
Date
9/1/2007
Waters Involved
Unnamed
Status
Complete
English Lake Management District: Acq-English Lake "Pluess" Land Aquisition: The English Lake Protection and Rehab District proposes to purchase 9.82 acres of land known as the "Pluess" property. As part of the District's match, they will use proceeds from a bargain sale and the donated value of .33 acre of property known as the "Burns" property.
Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Unnamed
Status
Complete
Calumet County: Lmi-Df-Calman Watershed Managment Plannin Phase 3: Calumet County proposes to quantify and compartmentalize nutrient budgets for the four lakes situated along the Calumet/Manitowoc County boarder which includes Round, Becker, Boot, and Long Lakes through in-lake, tributary, groundwater and watershed monitoring and modeling. Specifically, Phase 3 will include:
1.
**9**
In-lake baseline water quality monitoring of the four lakes.
2.
**9**
In-lake phosphorus profiles and sediment-water interface samples.
3.
**9**
Sediment core samples and analysis from each lake.
4.
**9**
Tributary flow, phosphorus and suspended solids load monitoring.
5.
**9**
Shallow groundwater monitoring using mini-piezometers.
6.
**9**
Watershed modeling for nutrient budget utilizing EVAAL and FLUX.
7.
**9**
Precipitation monitoring within the watershed.
8.
**9**
Watershed stakeholder and planning committee meetings.
9.
**9**
Stakeholder survey and Agricultural producers interviews.
10.
**9**
Final report summarizing the results as well as an implementation plan for this watershed and these lakes.
The project elements and deliverables are specified in the grant application materials submitted to the Department dated January 30, 2015.
Grant Details
Large Scale Lake Planning
Date
12/3/1992
Waters Involved
Chilton Millpond 75
Status
Complete
Chilton Lake District: Lake Chilton Water Quality Monitoring & Macrophyte Survey: 1) Monitor water quality during 1993 per application specs. 2) Collect and identify macrophytes. 3) Correlate water flows with amount of sediment accumulation.4) Disseminate information to the public by local newspaper, public meetigns, and summary report mailings.
Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Chilton Millpond 75
Status
Complete
Calumet County: Chilton Millpond Watershed Comp Mgmt Plan: Calumet County proposes to conduct a comprehensive watershed/lake management plan in their county. The project will consist of assessing water quality, identifying upstream non-point source pollution sources, and compilation of a plan to address watershed goals and objectives.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2003
Waters Involved
Jordan Creek
Status
Complete
New Holstein Township: Hayton Area Remediation Proj: Exclusionary easement and installation of runoff management BMPs on the Woelfel farm within the Hayton Remediation Area project
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2004
Waters Involved
South Branch Manitowoc River
Status
Complete
Calumet County: Meyer Groundwater Improvement: to cost-share landowner installations at 70%
Grant Details
Targeted Runoff - Rural Construction
Date
1/1/2005
Waters Involved
Stony Brook
Status
Complete
Calumet County Lcd: Kloten Star Dairy 01: Closure/abandonment of existing manure unit and construction/installation of new manure storage facility to meet revised technical standards.