CITY OF ARCADIA: TID4 Stormwater Detention Pond | USC-BT02-62201-02 | Complete | 2002 |
MILWAUKEE BOARD OF SCHOOL DIRECTORS: Greener Healthier Schoolyards - Academy of Accelerated Learning | USC40251AY21 | Active | 2021 |
CITY OF KAUKAUNA: Kavanaugh Road Pond | LF03-44241-15A | Complete | 2015 |
CITY OF FOND DU LAC: Hass Circle WQ Pond | UF01-20226-08B | Complete | 2008 |
VILLAGE OF NORTH FOND DU LAC: Mosher Creek Rehabilitation | USC-UF01-20161-03 | Complete | 2003 |
VILLAGE OF LITTLE CHUTE: Polk Pond | LF04-44146-09B | Complete | 2009 |
LITTLE MUSKEGO LAKE P & R DISTRICT: Little/Big Muskegao - Wind Lake | MWL-68400-N | Complete | 1993 |
CITY OF FORT ATKINSON: Larsen Lagoon Retrofit | USC28226Y16 | Complete | 2016 |
CITY OF MIDDLETON: Hwy 12 Catch Basins | LR10-13255-05 | Complete | 2005 |
CITY OF GLENDALE: Bayshore Mall Redevelopment | MI02-40231-05 | Complete | 2005 |
VILLAGE OF CALEDONIA: Franksville Pond Retrofit | SE03-51104-10 | Active | 2010 |
CITY OF SHEBOYGAN: 2nd Creek Dry to Wet Pond Conversion | USC59281Y21 | Active | 2021 |
CITY OF FITCHBURG: Valley View Detention Pond | LR08-13225-12B | Complete | 2012 |
VILLAGE OF PEWAUKEE: DPW Lot Runoff Management | FX07-67171-12 | Complete | 2012 |
CITY OF STOUGHTON: High Efficiency Street Sweeper | USC13281Y19A | Complete | 2019 |
TOWN OF SCOTT: Edmund Pond Reconstruction | USC42036Y19 | Proposed | 2019 |
VILLAGE OF KOHLER: Sheboygan River | SHB-60141-N | Complete | 1993 |
VILLAGE OF ASHWAUBENON: Ashland Pond | LF01-05104-15B | Complete | 2015 |
TOWN OF LEDGEVIEW: Pond #3, Stormwater Detentioon | USC-LF01-05008-02A | Complete | 2002 |
VILLAGE OF KOHLER: Lost Woods Streambank Stabilization | USC-SH03-60141-02 | Complete | 2002 |
VILLAGE OF VALDERS: Valders Branch Streambank & Wetland | MA02-36186-13 | Complete | 2013 |
TOWN OF MENASHA: Shady Lane/Arena Pond | LF06-70008-14 | Complete | 2014 |
CITY OF DE PERE: 22-09 Pond & Drainage System Construction Franklin St. Pond | USC05216Y21 | Active | 2021 |
CITY OF WEST BEND ENGINEERING: Quaas Creek Pollution Reduction Project | USC-MI06-67291-02 | Complete | 2002 |
VILLAGE OF BROWN DEER: Bradley Road Reconstruction | M102-40107-14B | Complete | 2014 |
VILLAGE OF ALLOUEZ: East River | EAS-05102-N | Complete | 1993 |
TOWN OF GRAND CHUTE: South Pond - Hickory Farm | LF04-44020-06C | Complete | 2005 |
MILWAUKEE COUNTY PARKS: North Point Lighthouse - Porous Pavement | MI02-40000-09 | Active | 2009 |
VILLAGE OF LITTLE CHUTE: Ebben Pond | LF02-44146-08 | Complete | 2008 |
CITY OF MADISON: Dunn's Marsh SW Diversion Pond | LR08-13251-08B | Complete | 2008 |
VILLAGE OF HOWARD: Pond#3-Arch St/Duck Ck | LF05-05136-04C | Complete | 2003 |
TOWN OF GRAND CHUTE: Misty Lane Pond | LF04-44020-08C | Proposed | 2008 |
CITY OF WHITEWATER: James Street Detention Basin | LR14-64291-13A | Complete | 2013 |
VILLAGE OF FOX POINT: Greenvale Storm Water Improvement Project | USC40126Y21 | Active | 2021 |
DNR SOUTHERN DISTRICT: Black Earth Creek | BEC-99019-N | Complete | 1990 |
CITY OF MILWAUKEE: Stormwater Treatment Devices | MI02-41251-04 | Complete | 2004 |
VILLAGE OF BELLEVUE: East River | EAS-05006-N | Complete | 1993 |
CITY OF TWO RIVERS: South Columbus Pond | TK01-36286-09A | Complete | 2009 |
CITY OF BROOKFIELD - DPW: Calhoun Road Part II Streambank | USC-MI03-68206-03 C | Complete | 2003 |
CITY OF BROOKFIELD - DPW: Menomonee River Priority Watershed | MNR-68206-N-97 | Complete | 1997 |
VILLAGE OF WHITEFISH BAY: Catch Basin Replacements (76) | USC-MI02-41192-02 | Complete | 2002 |
CITY OF BEAVER DAM: Rechek Water Quality Pond TMDL amended to now be Beaver Dam Library Water Quality Pond | UR03-14206-14 | Complete | 2014 |
CITY OF KAUKAUNA: High-Efficiency Street Sweeper | LF03-44241-15B | Complete | 2015 |
CITY OF APPLETON: Reid Golf Course South Pond | LF03-44201-13B | Complete | 2013 |
TOWN OF GREENVILLE: Rain Garden Retrofits | WR12-44022-15 | Complete | 2015 |
CITY OF OAK CREEK - ENGINEERING: City Hall Parking Lot - Separator | SE05-41265-04B | Complete | 2004 |
VILLAGE OF HOWARD: Pond#4-VanguardWay/Duck Ck | LF05-05136-04D | Complete | 2003 |
CITY OF APPLETON: 441 Regional Detention Pond | LF01-44201-06C | Complete | 2005 |
CITY OF DE PERE: Optimist Park Storm Water Pond | USC05216Y16 | Complete | 2016 |
CITY OF SUN PRAIRIE: Renstone Greenway SW Pond | LR12-13282-08A | Complete | 2008 |
CITY OF FOND DU LAC: Rueping-Macy SW Pond | UF03-20226-09B | Complete | 2009 |
VILLAGE OF RIVER HILLS: Indian Creek Streambank | USC-MI02-41176-02 | Complete | 2002 |
CITY OF MIDDLETON: 2015 Pheasant Branch Streambank Restoration & Habitat Enhancement Project | LR10-13255-15B | Complete | 2015 |
CITY OF MADISON: High-Efficiency Street Sweeper | LR08-13251-08 | Active | 2008 |
CITY OF MIDDLETON: Flood Repair - 2015 Pheasant Branch Streambank Restoration & Habitat Enhancement Project | USC13255Y19FD | Active | 2019 |
CITY OF APPLETON: Meade & Evergreen Pond | USC-LF02-45201-02 | Complete | 2002 |
VILLAGE OF LITTLE CHUTE: Industrial Park Pond Retrofit | LF02-44146-06A | Complete | 2005 |
VILLAGE OF MC FARLAND: Yahara River and Lake Monona | YMO-13154-N | Complete | 1993 |
VILLAGE OF BROWN DEER: Stormwater Devices | MI02-40107-06 | Complete | 2005 |
CITY OF WAUPUN: Harmsen Ave Pond (formerly Monroe St) | USC14292Y19 | Proposed | 2019 |
VILLAGE OF WAUNAKEE: Ripp Park Biofiltration Devices | LR10-13191-10B | Complete | 2010 |
CITY OF MEQUON: Milwaukee River South | MRS-46255-N | Complete | 1993 |
CITY OF MIDDLETON: Yahara-Mendota Priority Lake | YME-13255-N-00 | Complete | 1997 |
CITY OF MIDDLETON: Lakeview Park WQ Improvements | LR10-13255-10 | Complete | 2010 |
CITY OF WAUWATOSA: Inlet Replacements | MI03-40291-06A | Complete | 2005 |
VILLAGE OF MENOMONEE FALLS: Menomonee Falls High Efficiency Street Sweeper | USC67151Y21 | Active | 2020 |
MADISON METROPOLITAN SEWERAGE DISTRICT: Pumping Station 11 Rehabilitation - Permeable Pavement | LR08-13715-15 | Complete | 2015 |
CITY OF WEST BEND: East-West Branch Milwaukee River | EWB-67291-N | Complete | 1992 |
VILLAGE OF GRAFTON: Street Sweeper Program | MI04-45131-06 | Complete | 2005 |
VILLAGE OF ALLOUEZ: Kiwanis Park Pond | LF01-05102-09A | Complete | 2009 |
CITY OF WAUWATOSA: Hart Park Infiltration System | MI03-40291-06B | Complete | 2005 |
CITY OF RIVER FALLS: DEMO - Kinnickinnic River Priority Watershed | KNC-48276-N-00 | Complete | 1996 |
CITY OF BEAVER DAM: Meadow Park Pond | USC14206Y21 | Active | 2021 |
GARNERS CREEK STORM WATER UTILITY: Regal Pond | LF03-44901-09B | Complete | 2009 |
VILLAGE OF DE FOREST: Yahara-Mendota Priority Lake | YME-13118-N-97 | Complete | 1997 |
CITY OF MILWAUKEE - DPW: Public Works Yards BMPs II | MI02-40251-05 (USC) | Active | 2005 |
CITY OF WATERTOWN: Watertown Town Square & Riverwalk | USC28291Y21 | Active | 2021 |
VILLAGE OF MENOMONEE FALLS: Menomonee River | MNR-68151-N | Complete | 1993 |
VILLAGE OF MOUNT PLEASANT: Pike River Improvements - Phase 4C | SE02-51151-10 | Complete | 2010 |
VILLAGE OF BAYSIDE: Milwaukee River South | MRS-41106-N | Complete | 1994 |
CITY OF WAUWATOSA: Catch Basin Replacements | MI03-40291-12 | Complete | 2012 |
COUNTY OF KEWAUNEE: Fairgrounds Storm Water Management | TK03-31000-12 | Complete | 2011 |
TOWN OF MERCER: Eastern Downtown Basin | UC14-26012-12 | Complete | 2012 |
VILLAGE OF LITTLE CHUTE: Vandenbroek Pond | USC44146Y21 | Active | 2021 |
FOX LAKE INLAND LAKE P & R DISTRICT: Fox Lake PRD | UR03-14802-05 | Complete | 2005 |
MT. PLEASANT STORM WATER UTILITY DISTRICT: Indian Hills Retention Ponds | USC-SE03-52008-03 | Complete | 2003 |
CITY OF CUDAHY - DPW: High Efficiency Street Sweeper | MI01-40211-05 | Complete | 2005 |
CITY OF BEAVER DAM: Beaver Dam River Priority Watershed | BDR-14206-N-00 | Complete | 1996 |
CITY OF WAUPACA: Tomorrow - Waupaca River Priority Watershed Project | WPC-69291-N-00 | Complete | 1997 |
TOWN OF LEDGEVIEW: Ledgeview Park Detention Pond | LF01-05025-08 | Complete | 2008 |
MILWAUKEE METROPOLITAN SEWERAGE DISTRICT: 30th St Industrial Corridor NE Stormwater Improvements Detention | MI02-40702-14 | Complete | 2014 |
CITY OF APPLETON: Valley Transit Biofiltration Devices | LF01-44201-06A | Complete | 2005 |
VILLAGE OF SUSSEX: Upper Fox/Illinois Priority Watershed | UFR-68181-N-97 | Complete | 1997 |
CITY OF NEW BERLIN: New Berlin Hills Golf Course | SE03-68261-04B | Complete | 2004 |
VILLAGE OF FOX POINT - ENGINEERING DEPT: Milwaukee River South | MRS-41126-N | Complete | 1994 |
CITY OF FITCHBURG: Apache Drive Detention Pond | LR08-13225-10 | Complete | 2010 |
VILLAGE OF BELLEVUE: Skyview Street SW Pond | LF01-05106-11D | Complete | 2011 |
VILLAGE OF HOWARD: Pond#7-Telluride Trail/Slough Ck | LF05-05136-04F | Complete | 2003 |
CITY OF MILWAUKEE: Public Works Yards BMPs | USC-MI02-41251-03 | Complete | 2003 |
TOWN OF BROOKFIELD: Street Sweeper | FX07-67002-10 | Complete | 2009 |
VILLAGE OF BROWN DEER: Proprietary SW BMP 2014 Project | M102-40107-14A | Active | 2014 |
VILLAGE OF CROSS PLAINS: BLACK EARTH CREEK PRIORITY WATERSHED | BEC-13113-N-97 | Complete | 1997 |
TOWN OF LEDGEVIEW: Beau River Bioretention Pond | USC05025Y19 | Proposed | 2019 |
CITY OF MILWAUKEE - DPW: Public Works Yards BMPs II | MI02-40251-05 | Complete | 2005 |
CITY OF APPLETON: Conkey Detention Pond | LF04-44201-08C | Complete | 2008 |
FOX LAKE INLAND LAKE P & R DISTRICT: Beaver Dam River | BDR-14400-N | Complete | 1995 |
VILLAGE OF HARTLAND: High-Efficiency Street Sweeper | LR13-67136-13A | Complete | 2012 |
CITY OF WAUKESHA - ENGINEERING: High Efficiency Street Sweeping | FX07-67291-05 | Complete | 2005 |
CITY OF WEST BEND: East-West Branch Milwaukee River | EWB-67291-F | Complete | 1990 |
CITY OF WAUWATOSA: 2021-2022 Replacement of Stormwater Inlets With Catch Basins | USC40291Y21 | Active | 2021 |
VILLAGE OF WAUNAKEE: East Third Street Regional Detention Basin | USC-LR10-13191-03 | Complete | 2003 |
VILLAGE OF HARTLAND: Progress Drive / East Industrial Drive Vegetated Infiltration Swales | USC68136Y19 | Active | 2019 |
VILLAGE OF NORTH FOND DU LAC: Indiana Avenue Detention Basin Improvement | USC20161Y19 | Complete | 2019 |
CITY OF EAU CLAIRE: Lowes Creek | LWC-18221-N | Complete | 1993 |
CITY OF CUDAHY: Packard Avenue Reconstruction Streetscape Project | MI01-40211-15 | Complete | 2015 |
CITY OF LANCASTER: Kolar Detention Pond | USC-BT04-22246-02 | Complete | 2002 |
CITY OF MILWAUKEE: Public Works Yard (Tower) Pond | MI02-40251-06 | Complete | 2005 |
VILLAGE OF BELLEVUE: Bower Creek 2002 | USC-LF01-05006-02 | Complete | 2002 |
VILLAGE OF SAUKVILLE: Milwaukee River South | MRS-46181-N | Complete | 1994 |
TOWN OF GRAND CHUTE: Woodman/Bluemound Pond | LF04-44020-08B | Complete | 2008 |
MILWAUKEE METROPOLITAN SEWERAGE DISTRICT: Menomonee River | MNR-41400-N | Complete | 1993 |
ASHLAND COUNTY: Act 157 Flood Risk Reduction Demo Projects | USC02000Y20ENUM | Active | 2020 |
TOWN OF CALEDONIA: SW Pond Retrofits | SE03-51004-06 (USC) | Proposed | 2005 |
VILLAGE OF BELLEVUE: Bower Creek Stabilization | LF01-05106-13 | Complete | 2013 |
VILLAGE OF ALLOUEZ - DPW: Pond #4 - Boyd Street Basin | LF01-05102-05A | Complete | 2005 |
VILLAGE OF ALLOUEZ: Taft Pond | LF01-05102-11A | Complete | 2011 |
VILLAGE OF OSCEOLA: OSCEOLA CREEK PRIORITY WATERSHED | OSC-49165-n-00 | Complete | 1997 |
CITY OF OSHKOSH: 9th & Washburn Detention Basin | UF04-70266-13A | Complete | 2013 |
CITY OF KAUKAUNA: Grignon Stream Restoration | USC44241Y21 | Proposed | 2021 |
CITY OF NEW RICHMOND: City of New Richmond Stormwater Pond Retro #265 | USC55261Y17 | Complete | 2017 |
CITY OF STOUGHTON: Industrial Park South Bio-Swale to Wet Detention Basin Conversion | USC13281Y19 | Complete | 2019 |
CITY OF MADISON: Wingra Creek - Phase I | LR08-13251-05 | Complete | 2005 |
CITY OF WHITEWATER: Business Park Armory Detention Basin | USC28292Y17 | Active | 2017 |
CITY OF APPLETON: Municipal Bldg Separator | LF01-44201-06B | Complete | 2005 |
VILLAGE OF SUSSEX: Butler Wetlands Basin | USC-UF05-68181-02 | Complete | 2002 |
VILLAGE OF WHITEFISH BAY - DPW: Inlet Replacements - 03 Phase | USC-MI02-41192-03 | Complete | 2003 |
CITY OF MENOMONIE: Wakanda Park Stormwater Pond | USC17251Y19 | Proposed | 2019 |
CITY OF ST FRANCIS ENGINEERING: Catch Basin Inlet Replacements | USC-MI01-41281-02 | Complete | 2002 |
CITY OF MILWAUKEE - DPW: Grange Avenue Green Streets - 2012 | MI01-40251-12 | Complete | 2012 |
TOWN OF GRAFTON: River Bend Road Culvert | MI02-45008-13 | Active | 2013 |
OZAUKEE COUNTY: Mee-Kwon County Park Infrastructure & Stormwater Management | USC45000Y21 | Active | 2021 |
CITY OF APPLETON: Leona Street Stormwater Management Pond | USC45201Y19 | Complete | 2019 |
CITY OF ST FRANCIS: Underground WQ Device | MI01-41281-04 | Complete | 2004 |
VILLAGE OF CROSS PLAINS: Black Earth Creek | BEC-13113-N | Complete | 1989 |
CITY OF OCONOMOWOC: Forest Street Wet Pond | USC68265Y19 | Active | 2019 |
TOWN OF GRAND CHUTE: Nordale/Pershing Street Pond | LF04-44020-06A | Complete | 2005 |
CITY OF GLENDALE: Milwaukee River South | MRS-41231-N | Complete | 1993 |
VILLAGE OF KOHLER: High-Efficiency Street Sweeper | SH03-59141-10B | Complete | 2010 |
TOWN OF MINOCQUA: Minocqua Lake Priority Lake Project | MQL-44016-N-96 | Complete | 1996 |
CITY OF MIDDLETON: Middleton Beach Road - Green Street Design | LR10-13255-15 | Active | 2015 |
TOWN OF LEDGEVIEW: Pond #4 - Stormwater Wetland | USC-LF01-05008-02B | Complete | 2002 |
CITY OF DELAVAN - DPW: Ann Street Basin | USC-LR01-65216-02 | Complete | 2002 |
VILLAGE OF SHERWOOD: Meadowcliff Pond | UF02-08179-05 (USC) | Active | 2005 |
VILLAGE OF KIMBERLY: Sunset Park Detention Pond | LF03-44141-08 | Complete | 2008 |
VILLAGE OF ASHWAUBENON: Coronis Pond | USC05104BY17 | Complete | 2017 |
CITY OF FOND DU LAC: County Fairgrounds SW Pond | UF03-20226-09A | Complete | 2009 |
CITY OF WAUKESHA - ENGINEERING: High Efficiency Street Sweeping | FX07-68291-05 | Proposed | 2005 |
CITY OF MENOMONIE: Menomonie 17th Street Storm Water Pond | USC17251Y16 | Complete | 2016 |
CITY OF MILWAUKEE: Milwaukee River South | MRS-41251-N | Complete | 1989 |
CITY OF MIDDLETON: Pheasant Branch Creek Stabilization | LR10-13255-06 | Complete | 2006 |
CITY OF RACINE: Johnson Park Streambank Stabilization | SE03-51276-12 | Complete | 2012 |
CITY OF TOMAH: DEMO - Lake Tomah | LTM-42286-N | Complete | 1993 |
CITY OF SHEBOYGAN FALLS: Catch Basin Installations | SH03-59282-05 | Complete | 2005 |
TOWN OF GRAND CHUTE: South Glenridge Court Pond | LF04-44020-08A | Complete | 2008 |
CITY OF MUSKEGO: Tess Corners Stormwater Pond | USC-SE03-68251-02 | Complete | 2002 |
CITY OF MILWAUKEE - DPW: South 27th St (SH241) Bioswale Project | M101-40251-14 | Complete | 2014 |
CITY OF TWO RIVERS: Eggers Pond | TK01-36286-09E | Proposed | 2009 |
CITY OF MADISON: Yahara Mendota Priority Watershed | YME-13251-N-00 | Complete | 1997 |
CITY OF TWO RIVERS: West Hawthorne Pond | TK01-36286-09C | Complete | 2009 |
MILWAUKEE COUNTY DPW - 2ND FLOOR: North Channel Wehr Nature Center | SE03-41000-04B | Complete | 2004 |
VILLAGE OF SHOREWOOD HILLS: Shorewood Hills-Blackhawk Stormwater Outfall Improvements | USC13181Y19 | Active | 2019 |
VILLAGE OF BELLEVUE: Daly Drive Storm Water Practice | LF01-05106-11B | Complete | 2011 |
VILLAGE OF BROWN DEER: Deerwood Drive SW Pond | M102-40107-11B | Complete | 2011 |
CITY OF NEW BERLIN: Upper Fox River Illinois | UFR-68261-N | Complete | 1994 |
CITY OF LAKE MILLS: Owen Street Detention Basin | UR02-28246-04 | Complete | 2003 |
VILLAGE OF WHITEFISH BAY: MILWAUKEE RIVER SOUTH | MRS-41192-N | Complete | 2000 |
CITY OF BROOKFIELD - DPW: Underwood Creek Streambank Stabilization | USC-MI03-68206-03 A | Complete | 2003 |
MILWAUKEE METROPOLITAN SEWERAGE DISTRICT: NW Branch Whitnall Park Creek Detention Pond | USC-SE03-41400-02-A1 | Complete | 2001 |
VILLAGE OF MOUNT PLEASANT: Pike River Shoreline - Phase II | SE02-52008-04 | Complete | 2004 |
VILLAGE OF BELLEVUE: Eaton Road Detention Pond | LF01-05106-12B | Complete | 2012 |
VILLAGE OF COMBINED LOCKS: Buchanan Road Stream Restoration | USC44901Y17 | Complete | 2017 |
CITY OF SUN PRAIRIE: Yahara Mendota Priority Lake Project | YME-13282-N-97 | Complete | 1997 |
CITY OF WAUWATOSA: 2019-2020 Replacement of Stormwater Inlets with Catch Basins | USC41291Y19 | Complete | 2019 |
CITY OF MILWAUKEE - DPW: Green Streets in West Grange Avenue | SE05-40251-10 | Complete | 2010 |
TOWN OF ALGOMA: Olde Apple Acres Regional Stormwater Detention Basin | UF04-70002-14 | Active | 2014 |
VILLAGE OF FOX POINT: Doctors Park Ravine Streambank Stabilization | USC-MI02-41126-03 | Complete | 2003 |
CITY OF MUSKEGO: Little/Big Muskego - Wind Lakes | MWL-68251-N | Complete | 1993 |
CITY OF MILWAUKEE - DPW: East Greenfield Avenue Bioswale | MI01-40251-13 | Complete | 2013 |
VILLAGE OF ALLOUEZ: Bethel Pond | USC05102Y19 | Complete | 2019 |
CITY OF RACINE: Reservoir Park Pond Retrofit | SE02-51276-05 | Complete | 2005 |
TOWN OF BUCHANAN: Schmalz Storm Water Mgmt. Facility Construction | USC44006AY21 | Active | 2021 |
VILLAGE OF DOUSMAN: Main St Pollutant Reduction Project | USC_LR13-67116-14 | Complete | 2014 |
CITY OF NEW BERLIN: Ryerson Road Filtration Devices | FX07-67261-11 | Complete | 2011 |
CITY OF NEENAH: Commerce Court Pond Expansion and Storm Sewer Installation | USC71261Y16 | Complete | 2016 |
VILLAGE OF SLINGER: Woodview / St. Paul Church Neighborhood Storm Water Facility | USC67181Y19 | Active | 2019 |
Urban Stormwater Construction Grants | USC | Active | 1960 |
UW-MADISON: Arb Pond #2 Retrofit | LR08-13900-05 | Proposed | 2005 |
CITY OF OAK CREEK: Lakefront Redevelopment-NE Swale & Biofiltration | SE04-40265-14 | Active | 2014 |
VILLAGE OF LITTLE CHUTE: Buchanan Pond Retrofit | LF04-44146-06B | Complete | 2005 |
CITY OF KENOSHA: Gangler Water Quality Pond | USC30241Y19 | Active | 2019 |
CITY OF WAUWATOSA: City-Wide Rain Gardens | MI03-40291-08B | Complete | 2008 |
CITY OF OAK CREEK - ENGINEERING: Recycling Pad Stormceptor | USC-SE05-40265-03 | Complete | 2003 |
VILLAGE OF BELLEVUE: DeBroux Park WQ Project | LF01-05106-11C | Complete | 2011 |
CITY OF RACINE: Colonial Park Root River Stabilization | SE03-51276-08 | Complete | 2008 |
VILLAGE OF MOUNT PLEASANT: Pike River Improvements, Phase 6 | SE02-51151-11 | Complete | 2011 |
VILLAGE OF BROWN DEER: Beaver Creek Stabilization | MI02-40107-08B | Complete | 2008 |
VILLAGE OF BELLEVUE: Fire Lane Drive WQ Pond | LF01-05106-11A | Complete | 2011 |
PEWAUKEE: UPPER FOX/ILLINOIS PRIORITY WATERSHED PROJECT | UFR-68270-N-00 | Complete | 1997 |
VILLAGE OF SUSSEX: Spring Creek Daylighting | FX07-67181-12B | Complete | 2012 |
VILLAGE OF HOWARD: Pond#1-Bakers/Slough Cks | LF05-05136-04A | Complete | 2003 |
CITY OF MIDDLETON: Flood Repair - Pheasant Branch Creek Stabilization | USC13255Y19FA | Active | 2019 |
CITY OF CEDARBURG: Catch Basin Replacements | MI04-45211-05B | Complete | 2005 |
CITY OF CEDARBURG: Parkview Meadows Pond Retrofit | MI04-46211-04B | Complete | 2004 |
CITY OF NEW BERLIN: Root River Streambank Stabilization | SE03-68261-04A | Complete | 2004 |
CITY OF PORT WASHINGTON: Port Washington Gateway Project | USC45271Y17 | Complete | 2017 |
TOWN OF MENASHA: Red Oak Ravine Stream Restoration | LF03-70008-13 | Complete | 2013 |
CITY OF CEDARBURG - DPW: Doerr Way Wet Pond | MI04-45211-05A | Complete | 2005 |
CITY OF OAK CREEK - ENGINEERING: Industrial Park - Hydrodynamic Separator | SE05-41265-04C | Proposed | 2004 |
VILLAGE OF ROTHSCHILD: High Efficiency Street Sweeper | USC37176Y21 | Active | 2021 |
CITY OF MANITOWOC: Dewey Street Pond Retrofit | MA01-36251-12A | Complete | 2012 |
VILLAGE OF BRISTOL: Pond A Restoration | USC-FX01-30004-02 | Complete | 2002 |
VILLAGE OF DOUSMAN: Main St Pollutant Reduction Project | LR13-67116-14 | Proposed | 2014 |
GARNERS CREEK STORM WATER UTILITY: Emerald Pond | LF03-44901-11 | Complete | 2011 |
MILWAUKEE COUNTY DPW - 2ND FLOOR: Zoo - Lake Evinrude Streambank | MI03-41000-04D | Complete | 2004 |
TOWN OF LEDGEVIEW: East River | EAS-05008-N | Complete | 1993 |
VILLAGE OF ASHWAUBENON: East River | EAS-05104-N | Complete | 1994 |
CITY OF MIDDLETON: Flood Repair - Pheasant Branch Park St. to Parmenter Streambank | USC13255Y19FC | Active | 2019 |
CITY OF MONONA: Schluter Beach Storm Water Treatment Structures | LR08-13258-15B | Complete | 2015 |
CITY OF WAUKESHA - ENGINEERING: River Crossing Pond Retrofit | FX04-67291-08 | Complete | 2008 |
CITY OF MENOMONIE: Regional Pond #2 | USC17251Y21 | Active | 2021 |
CITY OF WEST BEND: DEMO - East-West Branch Milwaukee River | EWB-67291-E | Complete | 1985 |
TOWN OF BROOKFIELD: WQ-6 Hawthorne Ridge Channel | FX07-68002-04 | Complete | 2004 |
CITY OF APPLETON: South Island Street SW Devices | LF03-44201-08B | Complete | 2008 |
VILLAGE OF SHERWOOD: Meadowcliff Pond | UF02-08179-05C | Active | 2005 |
WISCONSIN DEPARTMENT OF TRANSPORTATION: Minocqua Lake Priority Lake Project | MQL-99200-N-00 | Complete | 1995 |
VILLAGE OF MUKWONAGO: Pick 'n Save Pond Retrofit | USC68153Y19 | Proposed | 2019 |
VILLAGE OF SHOREWOOD: Milwaukee River South | MRS-41181-N | Complete | 1994 |
TOWN OF OMRO: Ormand Beach Pond Retrofit | UF04-70016-08 | Complete | 2008 |
CITY OF MANITOWOC: Dufek Drive Detention Pond | MA01-36251-12D | Active | 2012 |
CITY OF APPLETON: Apple & Ashwaubenon Creeks Priority Watershed | AAC-45201-N-00 | Complete | 1996 |
CITY OF NEENAH: Harrison North Pond | USC71261Y19 | Active | 2019 |
CITY OF WAUKESHA - ENGINEERING: WWTP Bioretention Basins | FX07-67291-14 | Complete | 2014 |
MILWAUKEE COUNTY UW EXTENSION: Roosevelt Rain Gardens | MI03-40900-06 | Complete | 2005 |
VILLAGE OF SAUKVILLE: Saukville Storm Water Improvements | USC45181Y21 | Active | 2021 |
CITY OF RACINE: Washington Park Streambank | SE03-51279-13 | Complete | 2013 |
CITY OF MILWAUKEE REDEVELOPMENT AUTHORITY: Century City Triangle Neighborhood Park Development | USC40251Y21 | Active | 2021 |
CITY OF FITCHBURG: Red Arrow Trail Detention Pond | LR08-13225-12A | Complete | 2012 |
CITY OF SHEBOYGAN: Business Center Pond Retrofit | SH02-59281-06 | Active | 2006 |
CITY OF RICE LAKE: West South Street Storm Water Pond and Outfall | USC03276Y16 | Complete | 2016 |
CITY OF TWO RIVERS: Wentker Pond | TK01-36286-09D | Complete | 2009 |
CITY OF FRANKLIN: Retrofit of Business Park Ponds | SE03-40226-08 | Complete | 2008 |
UW-MADISON: Lot #34 Bioretention | LR08-13900-05B | Complete | 2005 |
MILWAUKEE COUNTY DPW: Wisconsin Avenue Lagoon Pond #2 | USC-MI03-41000-03 | Complete | 2003 |
CALUMET COUNTY: Calumet County Iron Enhanced Sand Filter | USC08000Y21 | Active | 2021 |
VILLAGE OF ALLOUEZ - DPW: Pond #3 - Optimist Park Basin | LF01-05102-05B | Proposed | 2005 |
VILLAGE OF BUTLER: Menomonee River Priority Watershed | MNR-68107-N-00 | Complete | 1995 |
CITY OF FITCHBURG - ENGINEERING: Nine Springs Creek - Basin Improvement Projects | USC-LR06-13225-02A | Complete | 2002 |
CITY OF MONROE: 21st Street Detention Pond | SP01-23251-10 | Complete | 2010 |
CITY OF WHITEWATER: High Efficiency Street Sweeper | USC28292Y21 | Active | 2021 |
VILLAGE OF ASHWAUBENON: Holmgren Pond | LF02-05104-15 | Complete | 2015 |
CITY OF TWO RIVERS: Carron Pond | TK01-36286-09B | Complete | 2009 |
CITY OF GREEN BAY: DEMO - Duck Creek Priority Watershed | DUK-05231-N-00 | Complete | 1995 |
CITY OF RACINE: Mound Street SW Devices | SE03-51276-11 | Complete | 2011 |
CITY OF MONONA: Yahara River and Lake Monona | YMO-13258-N | Complete | 1992 |
CITY OF PLATTEVILLE: Roundtree Branch Streambank Protection | USC22271Y19 | Active | 2019 |
CITY OF SHEBOYGAN: Sheboygan River | SHB-60281-N | Complete | 1993 |
CITY OF WAUPUN: Claggett Water Quality Pond | UR12-14292-11 | Active | 2011 |
CITY OF MEQUON: Trinity Creek Wetland Rehabilitation - Phase II | USC-MI02-46255-03 | Complete | 2003 |
CITY OF WAUKESHA: Upper Fox River Illinois | UFR-68291-N | Complete | 1993 |
CITY OF FITCHBURG - ENGINEERING: Nine Springs Creek-Streambank Stabilization | USC-LR06-13225-02B | Complete | 2002 |
CITY OF BROOKFIELD - DPW: Kinsey Park Streambank Stabilization | USC-MI03-68206-03 B | Complete | 2003 |
CITY OF FRANKLIN: SWP-1 Detention Pond | USC-SE05-41226-03 | Complete | 2003 |
CITY OF WATERTOWN: Mary Street SW Facility II | UR01-28291-12 | Complete | 2012 |
CITY OF MANITOWOC: 41st & Custer Street WQ Pond | MA02-36251-08 | Complete | 2008 |
CITY OF MIDDLETON: 2019 Pheasant Branch Park to Paramenter Street Streambank Stabilization Project | USC13255Y19 | Active | 2019 |
VILLAGE OF LITTLE CHUTE: Evergreen Pond | LF02-44146-09A | Complete | 2009 |
VILLAGE OF CAMPBELLSPORT: East-West Branch Milwaukee River | EWB-20111-N | Complete | 1993 |
CITY OF WEST ALLIS: A-C Wet Detention Basin | USC-MI03-41292-02 | Complete | 2002 |
VILLAGE OF ELM GROVE: Stormwater Retention Storage Sites | USC-MI03-68122-03 A | Complete | 2003 |
CITY OF TWO RIVERS: Eggers Pond | USC36286Y21 | Active | 2021 |
VILLAGE OF HARTLAND: Site 1 & 4 Detention Basins | LR13-67136-06 | Complete | 2005 |
CITY OF VERONA: High-Efficiency Street Sweeper | SP15-13286-11B | Complete | 2011 |
VILLAGE OF BROWN DEER: Beaver Creek WQ Devices | MI02-40107-05 | Complete | 2005 |
CITY OF MONONA: Underground Wet Detention Basin | USC13258Y21 | Active | 2021 |
CITY OF WAUWATOSA: Replacement Stormwater Inlets - Catch Basins | M103-40291-14 | Complete | 2014 |
CITY OF WHITEWATER: Bloomingfield Acres & E Clay St Detention Basins | LR14-64291-14 | Complete | 2014 |
CITY OF OSHKOSH: City Hall Underground Storage | UF04-70266-13B | Complete | 2013 |
VILLAGE OF BELLEVUE: Meadow Park Streambank Stabilization | USC-LF01-05006-03 | Complete | 2003 |
CITY OF MADISON: Yahara River and Lake Monona | YMO-13251-N | Complete | 1991 |
VILLAGE OF WAUNAKEE: Industrial Park Detention Pond | LR10-13191-10A | Complete | 2010 |
CITY OF PORTAGE: Village Road Underground Storm Water Detention | USC11271Y19 | Active | 2019 |
TOWN OF MADISON: Nygard Street Detention Device | USC-LR09-13032-02 | Complete | 2002 |
SHEBOYGAN FALLS: Sheboygan River Priority Watershed Project | SHB-60282-N-97 | Complete | 1997 |
CITY OF DELAFIELD: Dix Wet Detention Basin | LR13-68216-02 | Complete | 2002 |
VILLAGE OF KOHLER: Kohler Co. Dry Pond Retrofit | SH03-59141-10A | Active | 2010 |
CITY OF WAUWATOSA: Inlet Replacements: 2010-2011 | MI03-40291-10 | Complete | 2010 |
VILLAGE OF LITTLE CHUTE: Buchanan Pond Expansion | LF04-44146-10 | Complete | 2010 |
TOWN OF GRAND CHUTE: Kools Pond/Spencer Street | LF04-45020-04 | Complete | 2004 |
CITY OF WAUWATOSA: Replacement of Stormwater Inlets with Catch Basins | USC41291Y16 | Complete | 2016 |
CITY OF APPLETON: High-Efficiency Street Sweeper | LF04-44201-09A | Complete | 2009 |
CITY OF WAUWATOSA: Stormwater Inlet Replacement | USC-MI03-41291-03 | Complete | 2003 |
CITY OF DE PERE: 21-09 Pond & Drainage System Construction Matthew Dr. Ponds | USC05216AY21 | Active | 2021 |
VILLAGE OF BROWN DEER: WQ Treatment Devices | MI02-40107-08A | Complete | 2008 |
CITY OF WISCONSIN RAPIDS: Two Mile Pond | CW10-71291-12 | Complete | 2012 |
MILWAUKEE COUNTY DPW: Zoo Dumpsters Containment Pad | USC-MI03-41000-02 | Complete | 2002 |
VILLAGE OF ASHWAUBENON: Duck Creek Priority Watershed | DUK-05104-N-00 | Complete | 1997 |
CITY OF WHITEWATER: Whitewater Creek Streambank Restoration | LR14-64291-13B | Complete | 2013 |
VILLAGE OF ELM GROVE: Underwood Creek Streambank Stabilization | USC-MI03-68122-03 B | Complete | 2003 |
MILWAUKEE COUNTY DPW - 2ND FLOOR: Wehr Nature Center Drainage Channel - South | SE03-41000-04A | Complete | 2004 |
VILLAGE OF BAYSIDE: Capacity, Infiltration/Pollutant Reduction Program | MI02-40106-14 | Complete | 2014 |
CITY OF RIVER FALLS: St. Croix Street Pond Reconstruction | USC48276Y19 | Active | 2019 |
VILLAGE OF NEWBURG: East-West Branch Milwaukee River | EWB-67161-N | Complete | 1994 |
CITY OF TWO RIVERS: Riverview Pond | USC36286Y19 | Active | 2019 |
VILLAGE OF BROWN DEER: 43rd Street SW Pond | MI02-40107-11A | Complete | 2011 |
VILLAGE OF ALLOUEZ - DPW: Pond #1 - Longview Avenue Basin | LF01-05102-05C | Complete | 2005 |
TOWN OF DELAVAN: Turtle Creek | TUR-65006-N | Complete | 1994 |
CITY OF BROOKFIELD: Calhoun Channel Restoration | FX07-67206-06 | Active | 2006 |
CITY OF FITCHBURG: Lacy Heights Bioretention Facilty | USC13225Y16 | Complete | 2016 |
CITY OF PORT WASHINGTON: Municipal Service Center Rain Gardens | SH01-45271-06 | Complete | 2005 |
CITY OF KAUKAUNA: Piggly Park SW Pond | LF03-44241-08 | Complete | 2008 |
CITY OF MADISON: Nakoma Park Streambank Restoration | LR08-13251-15 | Complete | 2015 |
TOWN OF MENASHA: Cold Spring Pond | LF06-70008-09 | Complete | 2009 |
CITY OF FOND DU LAC: Sullivan Drive WQ Pond | UF01-20226-08A | Complete | 2008 |
CITY OF APPLETON: Northland Avenue Biofilters | LF04-44201-08A | Complete | 2008 |
CITY OF MIDDLETON: South Fork Pheasant Branch | LR10-13255-12A | Complete | 2012 |
CITY OF OSHKOSH: Oakwood Road Storm Water Facility | UF04-70266-10 | Complete | 2010 |
VILLAGE OF GERMANTOWN: Lake Park Pond Rehabilitation - Continuation | USC-MI03-67131-02 | Complete | 2002 |
VILLAGE OF BELLEVUE: Manitowoc Road Detention Pond | LF01-05106-12E | Complete | 2012 |
TOWN OF BROOKFIELD: Upper Fox/Illinois Priority Watershed | UFR-68002-N-00 | Complete | 1996 |
VILLAGE OF BROWN DEER: Deerwood Drive SW Pond | MI02-40107-11B | Active | 2011 |
UW-MADISON: Detention Basin No. 4 (Lot 60) | LR10-13900-11 | Complete | 2011 |
VILLAGE OF BROWN DEER: Southbranch Creek SW Devices | MI02-40107-12 | Complete | 2012 |
VILLAGE OF JACKSON: Cedar Creek | CCK-67141-N | Complete | 1993 |
VILLAGE OF BROWN DEER: Beaver Creek Restoration | MI02-41107-04 | Complete | 2004 |
VILLAGE OF ALLOUEZ - DPW: Pond #2 - Macco Basin | LF01-05102-05D | Complete | 2005 |
VILLAGE OF BELLEVILLE: Green View Place Pond Retrofit | SP13-23106-12 | Complete | 2012 |
VILLAGE OF KIMBERLY: Memorial Pond | LF03-44141-15A | Complete | 2015 |
CITY OF NEENAH: Municipal Garage Pond | LF06-70261-06 | Complete | 2006 |
VILLAGE OF KIMBERLY: Cedar Pond | LF03-44141-15B | Complete | 2015 |
CITY OF CEDARBURG: 2004 & 2005 Stormceptors | MI04-46211-04A | Complete | 2004 |
CITY OF OSHKOSH: Washburn St-Westowne Ave Area Storm Water Quality Detention Basin | UF04-70266-15 | Active | 2015 |
TOWN OF SCOTT: Sister's Pond | LF01-05036-13 | Active | 2013 |
VILLAGE OF GERMANTOWN: Menomonee River | MNR-67131-N | Complete | 1993 |
CITY OF OAK CREEK: Lakefront Redevelopment-NE Swale & Biofiltration | SE04-40265-14A | Complete | 2014 |
CITY OF KAUKAUNA: Horseshoe Park Pond | LF03-44241-09B | Complete | 2009 |
CITY OF MILWAUKEE REDEVELOPMENT AUTHORITY: Menomonee Riverbank Restoration | MI03-40908-11 | Active | 2011 |
MILWAUKEE COUNTY DPW - 2ND FLOOR: Zoo - Elk & Pony Yard | MI03-41000-04F | Complete | 2004 |
UNIVERSITY OF WISCONSIN-MADISON: Detention Basin No. 1 | LR10-13900-10 | Complete | 2010 |
CITY OF WAUWATOSA: SW Inlet Replacements | MI03-40291-08A | Complete | 2008 |
CITY OF WEST BEND: High-Efficiency Street Sweeper | MI06-66291-11 | Complete | 2011 |
UW-MADISON: Anglers' Cove BMPs | USC-LR09-13400-03A | Complete | 2002 |
CITY OF CEDARBURG: Cedar Creek | CCK-46211-N | Complete | 1993 |
CITY OF MONONA: Storm Water Treatment Devices | LR08-13258-15 | Complete | 2015 |
CITY OF SOUTH MILWAUKEE - ENGINEERING: Catch Basin Replacement Project | USC-SE05-41282-02 | Complete | 2002 |
CITY OF GREENFIELD: Kinnickinnic River Priority Watershed | KNK-41236-N-00 | Complete | 1995 |
TOWN OF LEDGEVIEW: Fox River Court Bioretention Pond | USC05025Y19A | Proposed | 2019 |
CITY OF WAUWATOSA: Schoonmacher Creek Restoration | MI03-40291-06C | Complete | 2006 |
CITY OF WHITEWATER: Ann Street Detention Basin | LR14-64291-15 | Complete | 2015 |
CITY OF FITCHBURG: Byrne Pond Retrofit | USC13225Y17 | Active | 2017 |
VILLAGE OF RIVER HILLS: Milwaukee River South | MRS-41176-N | Complete | 1993 |
CITY OF STURGEON BAY: Red River & Sturgeon Bay Priority Watershed | RLS-15281-N | Complete | 1996 |
TOWN OF LAWRENCE: Business Park Detention Basin Retrofit | LF02-05024-05 | Complete | 2005 |
GARNERS CREEK STORM WATER UTILITY: Main Street Pond | LF03-44901-09A | Complete | 2009 |
VILLAGE OF COMBINED LOCKS: Memorial Park Streambank Restoration Projects | USC44111Y21 | Active | 2021 |
CITY OF MIDDLETON: Flood Repair - South Fork Pheasant Branch | USC13255Y19FB | Active | 2019 |
VILLAGE OF GRAFTON: Falls & Green Bay Road Pond | MI02-45131-08 | Complete | 2008 |
MT. PLEASANT STORM WATER UTILITY DISTRICT: Pike River Improvements - Phase 5 | SE02-51151-09 | Complete | 2009 |
FOX LAKE INLAND LAKE P & R DISTRICT: Fox Lake Priority Lake Project | PLC-UR03-14400-02 | Complete | 2002 |
VILLAGE OF ASHWAUBENON: Plymrock Pond | USC05104Y21 | Active | 2021 |
CITY OF ST FRANCIS ENGINEERING: Kinnickinnic River PWS | KNK-41281-N | Complete | 2000 |
VILLAGE OF HOWARD: Pond #8, Cutty Sark-Slough Creek | LF05-05136-05 | Complete | 2005 |
MILWAUKEE COUNTY DPW: Zoo - Wash Bay & Rerouting | MI03-41000-04E | Complete | 2004 |
TOWN OF GRAND CHUTE: North Pond - Hickory Farm | LF04-44020-06B | Complete | 2005 |
CITY OF OAK CREEK: Drexel Town Center Green Infrastructure | SE05-40265-14B | Complete | 2014 |
GARNERS CREEK STORM WATER UTILITY: 2015 Streambank Erosion Control | LF03-44901-15 | Complete | 2015 |
CITY OF BELOIT: Turtle Creek Streambank Stabilization | USC53206Y21 | Proposed | 2021 |
CITY OF BEAVER DAM: Watermark Project Permeable Pavement Installation | USC14206Y16 | Unfunded | 2016 |
UW-MADISON: Pond #4 - UW Arboretum | LR08-13900-06 | Proposed | 2005 |
VILLAGE OF ALLOUEZ: High Efficiency Street Sweeper | LF01-05102-11B | Complete | 2011 |
VILLAGE OF GRAFTON: Milwaukee River South | MRS-46131-N | Complete | 1993 |
VILLAGE OF PEWAUKEE: Upper Fox River Illinois | UFR-68171-N | Complete | 1993 |
CITY OF FOND DU LAC: Lake Winnebago/East Priority Watershed | WNE-20226-N-00 | Complete | 1997 |
CITY OF PESHTIGO: Peshtigo River Detention Pond | GB07-38271-04 | Complete | 2003 |
CITY OF DE PERE: East River Priority Watershed Project | EAS-05216-N-00 | Complete | 1995 |
CITY OF FITCHBURG: Yahara River and Lake Monona | YMO-13225-N | Complete | 1992 |
VILLAGE OF ASHWAUBENON: Marhill Pond | USC05104Y19 | Complete | 2019 |
TOWN OF DELAVAN: Turtle Creek | TUR-65006-F | Complete | 1990 |
VILLAGE OF SHERWOOD: Meadowcliff Pond | UF02-08179-05 | Complete | 2005 |
DNR SOUTHEAST DISTRICT: Cedar Creek | CCK-99100-N | Complete | 1995 |
CITY OF MIDDLETON: Park St. to Parmenter Streambank | LR10-13255-12B | Complete | 2012 |
VILLAGE OF PEWAUKEE - DPW [ROI: GRANT DECLINED]: Village Park Rain Garden | FX07-67171-06 | Active | 2005 |
TOWN OF BUCHANAN: Speedway Heights Pond | LF03-44006-10 | Complete | 2010 |
MILWAUKEE COUNTY DPW: Street Sweeper | MI02-41000-04C | Complete | 2004 |
CITY OF MIDDLETON: Hwy 12 Catch Basins | LR10-13255-05 (USC) | Complete | 2005 |
OZAUKEE COUNTY: North Branch Milwaukee River | MNB-46000-N | Complete | 1989 |
VILLAGE OF SHOREWOOD HILLS: Marina Biofiltration Devices | LR10-13181-10 | Complete | 2010 |
CITY OF OAK CREEK - ENGINEERING: Shepard Hills Vegative Buffer | SE03-41265-04A | Complete | 2004 |
CITY OF MENOMONIE: East Menomonie WQ Project | LC04-17251-06 | Complete | 2006 |
CITY OF RACINE: Island Park Streambank Stabilization | SE03-51276-06 | Complete | 2005 |
VILLAGE OF WAUNAKEE: Yahara-Mendota Priority Lake Project | YME-13191-N-97 | Complete | 1997 |
CITY OF APPLETON: Reid Golf Course East Pond | LF03-44201-13A | Complete | 2013 |
CITY OF WHITEWATER: South Janesville Street Detention Basin | USC28292Y17B | Proposed | 2017 |
CITY OF MILWAUKEE: 91st & Dean Wet Detention Basin | USC-MI03-41251-02 | Complete | 2002 |
VILLAGE OF HARTLAND: Bark River Streambank Restoration | LR13-67136-13B | Complete | 2013 |
CITY OF RACINE: Lake View Park Green Alley | USC52276Y19 | Complete | 2019 |
CITY OF FOND DU LAC: Galloway Water Quality Pond | UF03-20226-11 | Complete | 2011 |
CITY OF CUDAHY: Kinnickinnic River | KNK-41211-N | Complete | 1994 |
CITY OF MADISON: Rimrock Road Wet Pond Conversion | USC13251Y17 | Active | 2017 |
CITY OF OAK CREEK - ENGINEERING: Arthur Avenue WQ Conveyance | SE05-40265-05 | Complete | 2005 |
TOWN OF BUCHANAN: N130 CTH N Storm Water Mgmt. Facility Construction | USC44006Y21 | Active | 2021 |
VILLAGE OF ALLOUEZ: Hoffman Pond | LF01-05102-09B | Complete | 2009 |
CITY OF VERONA: W. Verona Ave. Basin Retrofit | SP15-13286-11A | Complete | 2011 |
CITY OF APPLETON: Memorial Park South WQ Pond | LF04-44201-09B | Complete | 2009 |
CITY OF WAUWATOSA: Menomonee River | MNR-41291-N | Complete | 1994 |