LRP - Licenses

LRP - Regulations

LRP - Permits

Recreation - Statewide

Recreation - Trapping

Recreation - Fishing

Recreation - Hunting

Env. Protection - Management

Env. Protection - Emergency

Env. Protection - Resources

To sign up for updates or to access your subscriber preferences, please enter your contact information below.



 
Report
a solid or hazardous waste complaint to the DNR.
Publishing procedures

2011 Wisconsin Act 167 [exit DNR] went into effect Aug. 1, 2012. This law requires the DNR to post hearing and license notices on its website, in addition to newspapers. The date of posting on the DNR website now determines when public comment periods end.

Contact information
For information on waste facility public comment periods, contact:
DNR Waste & Materials Management Program

Waste & Materials Management Program announcements and public comment opportunities

Public comment opportunities from the DNR's Waste & Materials Management Program are available on this page. You can also view DNR-wide public hearings, meetings and public comment opportunities.

There is one landfill feasibility determination available for public comment and one available for public informational purposes.

EIS

Environmental Impact Statement (EIS)

Most Waste and Materials Management projects do not require an EIS. However, the department may determine to follow the EIS process on a case by case basis.

An EIS is an evaluation of how taking an action may affect the environment. Among other things an EIS takes a look at project alternatives, impacts the proposed project may have on the environment compared to the alternatives, an evaluation of the positive and negative impacts of the project, the precedent that may be established, and the degree of risk. The EIS process requires prior environmental analysis, public notice of the EIS, a public hearing and a WEPA compliance determination.

Landfill feasibility

Solid waste landfill feasibility

Under s. 289.23, Wis. Stats., a landfill owner proposing a new landfill or an expansion of an existing landfill must submit a detailed feasibility report to the DNR. Once the DNR determines the report is complete - i.e., it contains all the elements required by Wisconsin Administrative Code - the report and its associated documents are posted on our website for public review and comment. This is also an opportunity for qualified persons to request an informational hearing or a contested case hearing. Section 289.26, Wis. Stats., provides a 30-day deadline for public comments and hearing requests to be submitted.

Chapter NR 512, Wis. Adm. Code, specifies the minimum information that must be included in a feasibility report. This includes:

  • a comprehensive and detailed site-specific geologic and hydrogeologic investigation that includes baseline groundwater quality data;
  • a preliminary engineering design;
  • an environmental analysis is conducted;
  • documentation of the need for the proposed landfill; and
  • an analysis of the alternatives to landfilling, such as waste reduction, reuse, recycling, composting and energy recovery initiatives and services.

After the public comment period has ended, the DNR issues a feasibility determination which, if positive, allows the applicant to proceed with development of a detailed plan of operation for the proposed landfill. The feasibility determination will include a determination of compliance with WEPA and NR 150.

Current opportunities

Outagamie County

Notice of Feasibility Report and Preliminary Environmental Impact Decision for the Proposed Outagamie County Northwest Landfill (NWLF), located in the village of Little Chute, Outagamie County

Public notice date: July 17, 2019
Public comment deadline: August 16, 2019
, 4:30 p.m.

Warning: Several of these files are large, so downloading may take a few minutes on slow internet connections.The documents available here are can also be viewed at one of the locations listed in the public notice.

Documents prepared by the DNR:

Documents prepared and submitted on behalf of the landfill applicant:

Feasibility Report

Feasibility Report Appendices

Feasibility Report Addendum 1

  • Text [PDF]
  • Attachments 1-7 [PDF]
    • Attachment 1: Revised Table 3-1 and Table 3-1A
    • Attachment 2: Baseline Monitoring Summary Table and Exemption Request
    • Attachment 3: Revised Drawings
    • Attachment 4: Clay Testing Summary
    • Attachment 5: Signed Requests for Local Approvals
    • Attachment 6: Revised Tables
    • Attachment 7: Revised Appendix G-8 (Page 2403)
  • Attachments 8-11 [PDF]
    • Attachment 8: Paper Mill Sludge Laboratory Testing Results
    • Attachment 9: Revised Tables 11-1 through 11-8 and Revised Figure 2-2
    • Attachment 10: Letter from Brown, Outagamie, and Winnebago Counties
    • Attachment 11: Sampling and Analysis Plan
Contact information
For information, contact:
Jackie Marciulionis
Hydrogeologist
DNR Waste and Materials Management Program
Glacier Ridge

A public informational hearing regarding the feasibility report at Advanced Disposal Services Glacier Ridge Landfill was held on April 29, 2019 at the City of Mayville municipal building. The City of Mayville withdrew a request for a contested case hearing, initially scheduled to be held immediately after the Public Informational Hearing. The Department provided written response to oral and written comments submitted regarding the feasibility report.

Notice of Feasibility Report and Preliminary Environmental Impact Decision for the Proposed Advanced Disposal Services South-Southeast Landfill Vertical Expansion, Glacier Ridge Landfill, Horicon, Wisconsin, located in the towns of Williamstown and Hubbard, Dodge County (DNR license number 3068)

Public notice date: December 5, 2018
Public comment deadline: January 4, 2019

Warning: Several of these files are large, so downloading may take a few minutes on slow internet connections.The documents available here are can also be viewed at one of the locations listed in the public notice.

Documents prepared by the DNR:

Documents prepared and submitted on behalf of the landfill applicant:

Feasibility Report: Text, Tables and Figures

Feasibility Report Appendices

Feasibility Report Plan Sheets

Feasibility Report Addendum 1 (2/15/2019) ]PDF]

Contact information
For information, contact:
Adam Hogan
Hydrogeologist
DNR Waste and Materials Management Program

TSD feasibility

Hazardous waste treatment, storage and disposal facility (TSD) feasibility

Once the DNR determines the hazardous waste treatment, storage and disposal facility Feasibility and Plan of Operation Report (FPOR) is complete, the department prepares a public notice, a radio announcement, an environmental analysis and a preliminary determination on the FPOR. These are now being posted by DNR on our website for public review and comment.

Chapters NR 664 and NR 670, Wis. Adm. Code, specify hazardous waste treatment, storage and disposal (TSD) facility standards and hazardous waste licensing and decision making procedures. The feasibility determination will include a determination of compliance with WEPA and NR 150.

Current opportunities

There are no public comment opportunities related to hazardous waste facilities at this time.

Prior compliance

Prior compliance announcements

A prior environmental analysis of an action can be used to demonstrate WEPA compliance for future actions that are similar in kind, scale and environmental setting. A determination that the prior environmental analysis meets the prior compliance requirements for the new action, and public notice of the prior compliance determination, are required in most Waste Program cases, except for Class 1 and Class 2 TSD facility plan modifications that are actions where prior compliance is defined by rule. An overall WEPA compliance determination is required for all actions using prior compliance.

Current opportunities

There are no prior compliance notices at this time.

Public hearing

Public informational hearing

Under s. 289.26, Wis. Stats., within 30 days after the notice under s. 289.25 (3) is published for a solid waste disposal facility, or within 45 days after the notice under s. 289.25 (3) is published for a hazardous waste facility, any county, city, village or town, the applicant or any 6 or more persons may file a written request for an informational hearing on the matter with the DNR. The request shall indicate the interests of the municipality or persons who file the request and state the reasons why the hearing is requested.

In accordance with s. 299.17, Wis. Stats., to the greatest extent possible, the DNR shall publish on the DNR's website the current status of any application filed with the DNR for a permit, license or other approval under chs. 281 to 285 or 289 to 299. The information shall include notice of any hearing scheduled by the DNR with regard to the application.

Current scheduled public informational hearings

Please go to landfill feasibility for information related to the contested case hearing regarding the feasibility report at Advanced Disposal Services Glacier Ridge Landfill.

Last revised: Tuesday July 16 2019