LRP - Licenses

LRP - Regulations

LRP - Permits

Recreation - Statewide

Recreation - Trapping

Recreation - Fishing

Recreation - Hunting

Env. Protection - Management

Env. Protection - Emergency

Env. Protection - Resources

To sign up for updates or to access your subscriber preferences, please enter your contact information below.



 

Public hearings calendar

Public hearings are meetings in which the public is invited to speak on the record about an issue. If you are unable to attend a hearing in person, you can also submit written comments on most public hearing issues.

Email graphic Subscribe to receive email updates for Weekly Hearings and Meetings.

Accessibility and related links

Accessibility

Pursuant to the Americans with Disabilities Act, reasonable accommodations, including the provision of informational material in an alternative format, will be provided for qualified individuals with disabilities upon request. Please call the contact person listed for the meeting with specific information on your request at least 10 days before the date of the scheduled meeting.

Related Links

See all events 

 for     

 

December 2019

Wednesday, December 11

10:00 a.m. to 11:00 a.m.
Wednesday, December 11, 2019
Public informational hearing regarding the proposed reissuance of a Wisconsin Pollutant Discharge Elimination System permit for the City of Mellen wastewater treatment facility.
Spooner DNR Service Center, 810 W. Maple St.
Spooner, Wisconsin 54801 (Washburn County)
View map of location
Contact: Sheri Snowbank , 715-635-4131
Detailed information: The City of Mellen Wastewater Treatment facility is located at 500 Christ Lutz Drive in Mellen Wisconsin. Discharge is to the Bad River in Ashland County within the Upper Bad River Watershed in the Lake Superior dBrainage Basin. The proposed WPDES permit WI-0020311-10-0 includes a proposed Mercury Variance.
Hearing Notice [PDF]
WPDES public notices

Published: 10/23/2019 2:08:35 PM


Thursday, December 12

1:00 p.m. to end of agenda
Thursday, December 12, 2019
Public hearing on an air permit application for Waupaca Foundry Inc - Plants 2/3
Waupaca County Courthouse, 811 Harding St., Room: Room LL43
Waupaca, Wisconsin 54981 (Waupaca County)
View map of location
Contact: Ron Binzley, 608-264-9243
Detailed information: Waupaca Foundry Inc. - Plants 2/3, located at 1955 Brunner Drive, Waupaca, Waupaca County, (FID 469033840) submitted to the Department of Natural Resources a permit application, including plans and specifications for revision of 469033840-P22 for operation of a gray iron foundry and construction and operation of a mesh belt machine, a robot arm pick and sort operation, and a sand conveyor cooler and to make other changes identified as part of the Dust Optimization Project.
Air pollution control construction permit no. 19-RAB-059
Air pollution control operation permit no. 469033840-P25
Public Hearing Notice

Published: 11/13/2019 3:44:18 PM


1:00 p.m. to end of agenda
Thursday, December 12, 2019
Public hearing on a permanent rule, WM-05-19, relating to the 2019 Bureau of Wildlife Management housekeeping rule
State Natural Resources Building (GEF 2), 101 S. Webster St., Room: 613
Madison, Wisconsin 53703 (Dane County)
View map of location
Contact: Scott Karel, 608-267-2452
Detailed information: These rule changes are proposed to update administrative code language to correct inconsistencies, update outdated language, and provide clarification when appropriate. This rule package will amend regulations for hunting and trapping, found in Ch's. NR 8, 10, 12, 11, 16, 17, 19 and 45 Wis. Admin. Code.
Public hearing notice [PDF]

Published: 11/19/2019 12:49:16 PM


2:00 p.m. to end of agenda
Thursday, December 12, 2019
Public hearing on a emergency rule, WM-18-19 (E), to revise ch. NR 10, relating to ruffed grouse management
State Natural Resources Building (GEF 2), 101 S. Webster St., Room: 613
Madison, Wisconsin 53703 (Dane County)
View map of location
Contact: Mark Witecha, 608-267-7861
Detailed information: This rule shortens the 2019 ruffed grouse season for grouse management zone A so that it will close on January 5, 2020, instead of January 31, 2020 
Public Hearing Notice [PDF]
Proposed emergency administrative rules

Published: 11/12/2019 12:14:42 PM


Tuesday, December 17

10:00 a.m. to end of agenda
Tuesday, December 17, 2019
Public hearing on an air permit application for Neenah Foundry Co - Plants 2 and 3 (W2179) gray and ductile iron foundry in Neenah, Winnebago County.
Neenah Public Library, 240 E Wisconsin Ave, Room: Room 202
Neenah, Wisconsin 54956 (Winnebago County)
View map of location
Contact: Mark Stohl, 262-884-2340
Detailed information: Neenah Foundry Co - Plants 2 And 3 (W2179), located at 2121 Brooks Ave, Neenah, Winnebago County, Wisconsin, FID 471033860, submitted to the Department of Natural Resources (DNR) a permit application, including plans and specifications, for construction and operation of the Plant 2 BMD vibratory shakeout and to construct a new exhaust stack to supplement collection and control of the Plant 2 BMD sand handling system. Air pollution control construction permit no. 19-MCS-146. Public Hearing Notice

Published: 12/6/2019 12:00:46 PM


Wednesday, December 18

11:00 a.m. to end of agenda
Wednesday, December 18, 2019
Public hearing concerning the proposed State Implementation Plan (SIP) revision for redesignation request for the Wisconsin portion of the Chicago Naperville(IL-IN-WI) 2008 8-hour ozone nonattainment area (the eastern part of Kenosha County).
Kenosha Public Library - Southwest Branch, 7979 38th Ave., Room: Room A/B
Kenosha, Wisconsin 53143 (Kenosha County)
View map of location
Contact: Cami Peterson, 608-267-7546
Detailed information: The DNR is submitting a SIP revision to the U.S. EPA as required by the federal Clean Air Act (CAA). This SIP requests EPA to approve Wisconsin's redesignation request and maintenance plan for the Wisconsin potiion of the Chicago Naperville(IL-IN-WI) 2008 8-hour ozone nonattainment area (the eastern part of Kenosha County). Ozone monitoring data for the most recent three years, 2017 through 2019, demonstrate that the air quality meets the 2008 ozone national ambient air quality standards (NAAQS) in the Chicago nonattainment area.
Public hearing notice [PDF]
Proposed SIP Revision [PDF]

Published: 11/18/2019 10:27:34 AM


Friday, December 20

11:00 a.m. to end of agenda
Friday, December 20, 2019
Public informational hearing regarding the proposed reissuance of the Wisconsin Pollutant Discharge Elimination System permit for the City of Sparta
La Crosse DNR Service Center, 3550 Mormon Coulee Road
La Crosse, Wisconsin 54601 (La Crosse County)
View map of location
Contact:
Jennifer Jerich, 920-387-7886

Detailed information: Sparta Wastewater Treatment Facility is located at 805 Richgruber Road, Sparta. Discharge is to La Crosse River in the Little La Crosse River Watershed of the Bad Axe- La Crosse River Basin in Monroe County. The proposed WPDES WI-0020737-10-0 includes a variance to the water quality standard for mercury.
Hearing Notice
WPDES public notices

Published: 11/8/2019 9:49:08 AM


 

January 2020

Monday, January 6

10:00 a.m. to end of agenda
Monday, January 06, 2020
Public informational hearing regarding the proposed issuance of a Wisconsin Pollutant Discharge Elimination System permit for the Village of Browntown Waste Water Treatment Facility.
Fitchburg DNR Service Center, 3911 Fish Hatchery Road
Fitchburg, Wisconsin 53711 (Dane County)
View map of location
Contact: Jennifer Jerich,  920-387-7886
Detailed information:
The Browntown Wastewater Treatment Facility is located at 319 East Murray Street, Browntown, Wisconsin. Discharge is to Skinner Creek (Jordan and Skinner Creek Watershed) in Green County. The proposed WPDES permit WI-0032051-07-0 includes a variance to the water quality standard for Phosphorus.

Published: 11/19/2019 12:49:16 PM


Monday, January 13

4:30 p.m. to 5:30 p.m.
Monday, January 13, 2020
Notice of Public Hearing for Proposed State Implementation Plan (SIP) Revision for the Redesignation Request and Maintenance Plan for the Shoreline Sheboygan County 1997 and 2008 8-Hour Ozone Nonattainment Area
Mead Public Library, 710 N. 8th St., Room: Loft Conference Room
Sheboygan, Wisconsin 53081 (Sheboygan County)
View map of location
Contact: Cami Peterson, 608-267-7546
Detailed information: The DNR is submitting this state implementation plan (SIP) revision to the U.S. Environmental Protection Agency (EPA) as required by the federal Clean Air Act (CAA). This SIP requests EPA to approve Wisconsin's redesignation request and maintenance plan for the Shoreline Sheboygan County 1997 and 2008 8-Hour ozone nonattainment area. Preliminary data from Kohler-Andrae air quality monitor for the years 2017 through 2019 demonstrate that the air quality meets the 1997 and 2008 ozone national ambient air quality standards (NAAQS) in the Shoreline Sheboygan County nonattainment area. The area is therefore eligible for redesignation to attainment for these standards.
Public hearing notice [PDF]
Proposed SIP revision [PDF]

Published: 12/5/2019 4:21:59 PM


Tuesday, January 14

10:00 a.m. to end of agenda
Tuesday, January 14, 2020
Notice of Public Hearing Proposed State Implementation Plan (SIP) Revision for Redesignation Request and Maintenance Plan for the Door County 2015 8-Hour Ozone Nonattainment Area
Door County Public Library - Sturgeon Bay Branch, 107 S. 4th Avenue, Room: Conference Room 2
Sturgeon Bay, Wisconsin 54235 (Door County)
View map of location
Contact: Cami Peterson, 608-267-7546
Detailed information: The DNR is submitting this SIP revision to the U.S. EPA as required by the federal Clean Air Act (CAA). This SIP requests EPA to approve Wisconsin's redesignation request and maintenance plan for the Door County 2015 8-hour ozone nonattainment area. Ozone monitoring data for the most recent three years, 2017 through 2019, demonstrate that the air quality meets the 2015 ozone national ambient air quality standards (NAAQS) in the Door County nonattainment area.
Public Hearing Notice [PDF]
Proposed SIP Revision [PDF]

Published: 11/22/2019 2:46:22 PM


Note: Actual hearing end times may be earlier or later than scheduled. Hearing dates and times are subject to change. Please verify meeting dates and times prior to attendance.

Last revised: Friday, June 14, 2019