Reporting Period: | 7/1/2022 - 12/31/2022 |
BRRTS No: | 02-13-580328 |
Activity Name: | HARTMEYER PROPERTY |
Status: | Site Investigation |
Activity: | Report Preparation |
Comments: | Limited soil and groundwater sampling was conducted at the site in August and September 2022 by SCS Engineers, on behalf of the site buyer, and reported to WDNR in a memo dated September 16, 2022. Monthly site inspections and general site maintenance were conducted at the Property by Ramboll on behalf of Kraft-Heinz. |
Submitted by Adam Streiffer on 01/26/2023 |