WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-46-588930 MERCURY MARINE PLANT NO 1 FMR
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
FORMER MERCURY MARINE PLANT NO 1 OZAUKEE SOUTHEAST
Address Municipality
N49 W6337 WESTERN RD CEDARBURG
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the NE 1/4 of Sec 34, T10N, R21E 43.2922934 -87.9885698 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
13
Facility ID PECFA No. EPA ID Start Date End Date
246004770 2021-11-30
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Site Files
Name File
SITE FILE DOCUMENTATION FOR ACTIVITY Download PDF Document
Actions and Documents
Date Code Name File Comment
2024-04-25 99 Miscellaneous Download PDF file VAPOR WORK PLAN ADDENDUM PFET DATA RESULTS TABLES
2024-04-17 99 Miscellaneous Download PDF file RADON SYSTEM DETAILS
2024-04-01 43 Site Activity Status Update Received Download PDF file INDOOR AIR UPDATE
2024-03-20 43 Site Activity Status Update Received Download PDF file UPDATE
2024-03-18 99 Miscellaneous Download PDF file DNR RESPONSE
2024-03-15 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file VAPOR WORK PLAN
2024-03-13 43 Site Activity Status Update Received Download PDF file UPDATE
2024-03-06 43 Site Activity Status Update Received Download PDF file INDOOR AIR UPDATE
2024-02-29 43 Site Activity Status Update Received Download PDF file PFE UPDATE
2024-02-28 43 Site Activity Status Update Received Download PDF file PFE UPDATE
2024-02-26 99 Miscellaneous Download PDF file PLANNED NEXT STEPS
2024-02-23 43 Site Activity Status Update Received Download PDF file UPDATE
2024-02-22 99 Miscellaneous Download PDF file NEXT STEPS REQ
2024-02-15 99 Miscellaneous Download PDF file RESPONSE TO VAPOR
2024-02-15 - Site-specific Correspondence Download PDF file
2024-02-12 99 Miscellaneous Download PDF file VAPOR DATA (DRAFT
2024-02-01 99 Miscellaneous Download PDF file EMAILED CONVERSATION SUMMARY OF PHONE CALL WITH CONSULTANT ON 2024.02.01.
2024-01-09 364 VAL and/or VRSL Exceeded
2024-01-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-12-15 - Site Investigation Download PDF file
2023-11-07 99 Miscellaneous Download PDF file SITE RP INFORMATION REGARDING WILO USA LLC FROM VEDDER PRICE
2023-09-13 99 Miscellaneous Download PDF file EMAIL
2023-08-04 2 Responsible Party (RP) letter sent Download PDF file RP LETTER WILO (FORMER SCOT PUMP)
2023-07-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-02-14 99 Miscellaneous Download PDF file STATUS UPDATE
2023-02-08 99 Miscellaneous Download PDF file STATUS UPDATE
2023-02-04 99 Miscellaneous Download PDF file STATUS UPDATE
2023-01-04 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-09-29 2 Responsible Party (RP) letter sent Indicates multiple files are linked to this action RP LETTER
2022-09-02 200 Push Action Taken Download PDF file PUSH ACTION VI SIWP PAST DUE
2022-08-23 99 Miscellaneous Download PDF file CONTAINED OUT AMENDED LETTER
2022-08-02 98 Technical Assistance Provided Download PDF file CONTAINED OUT CONCURRENCE
2022-08-02 97 Technical Assistance Request Received (fee) Download PDF file RECV'D CK #3433 $700.00
2022-07-22 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-07-22 99 Miscellaneous Download PDF file REMEDIATION SITE - HAZARDOUS WASTE DETERMINATION
2022-07-20 99 Miscellaneous Download PDF file EVALUATE VAPOR RISK, SI NOT COMPLETE
2022-05-27 99 Miscellaneous Download PDF file SUMMARY OF ENVIRONMENTAL CONDITIONS
2022-04-04 99 Miscellaneous Download PDF file MERCURY RESPONSE
2022-04-01 99 Miscellaneous Download PDF file RP RESPONSE VAPOR REMINDER
2022-03-31 99 Miscellaneous Download PDF file VAPOR SCREENING REMINDER TO RPS
2022-03-30 99 Miscellaneous Download PDF file STATUS INQUIRY EMAIL TO THE DEVELOPER
2022-03-14 - Maps Download PDF file MAPS
2022-02-18 99 Miscellaneous Download PDF file INITIAL COMMENTS ON SIWP
2022-01-25 2 Responsible Party (RP) letter sent Download PDF file
2022-01-25 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file REC'D SIWP - FEE FOR TA MEETING APPLIED TO SIWP REVIEW
2022-01-05 98 Technical Assistance Provided TECHNICAL ASSISTANCE MEETING HELD JANUARY 5, 2022
2021-12-07 97 Technical Assistance Request Received (fee) Download PDF file REC'D CK #076058 $700, TECH ASSIST MEETING
2021-11-30 1 Notification of Hazardous Substance Discharge Download PDF file Remedial Site Investigation done by CH2M Hill in 1993
2021-11-30 28 Phase I Environmental Site Assessment (ESA) Rpt Received Download PDF file
2021-11-30 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file 1993 REPORT
2021-11-30 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file PHASE II ESA
1996-02-12 99 Miscellaneous Download PDF file FILE MEMO - PROJECT MANAGER ASSIGNMENT
1996-01-31 99 Miscellaneous Download PDF file SITE UPDATE
1995-11-30 200 Push Action Taken Download PDF file
1995-09-22 99 Miscellaneous Download PDF file UPDATE REQ
1993-09-01 43 Site Activity Status Update Received Download PDF file GW SAMPLING JULY 1993
1993-04-08 99 Miscellaneous Download PDF file REMEDIAL INVESTIGATION RPT - COVER SHEET
1993-03-29 99 Miscellaneous Download PDF file TECH MEMO - SI, SOIL BORING, WELL INSTALLATION AND SOIL SAMPLING
1993-02-09 43 Site Activity Status Update Received Download PDF file WELL LOGS
1993-01-21 99 Miscellaneous Download PDF file PID - SAMPLING
1993-01-13 99 Miscellaneous Download PDF file WELL CONSTRUCTION DOCS
1992-04-15 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file WORK PLAN FOR REMEDIAL INVESTIGATION
1991-01-14 99 Miscellaneous Download PDF file PUBLIC WATER SUPPLY CONTAMINATION - RP LTR
1990-03-20 99 Miscellaneous Download PDF file CEDARBURG GW INVESTIGATION
1990-02-15 99 Miscellaneous Download PDF file CEDARBURG GROUNDWATER INVESTIGATION - VOL 1
1990-01-31 43 Site Activity Status Update Received Download PDF file WATER SAMPLE RESULTS
1989-10-16 99 Miscellaneous Download PDF file SAMPLE RESULTS LTR
1989-06-21 99 Miscellaneous Download PDF file ACCESS REQ
1989-04-03 99 Miscellaneous Download PDF file ACCESS REQ - SCOTT PUMP DIVISION
Relationships to Other Activities
Click Activity Below to View Details
Type Related Activity
Property Affected -> 13-51-575039 284 3RD AVENUE SOUTH
Property Affected -> 13-51-575040 314 3RD AVENUE SOUTH
Property Affected -> 13-51-575041 256 3RD AVENUE SOUTH
Property Affected -> 13-51-575549 307 4TH AVENUE SOUTH
Property Affected -> 13-51-575550 270 3RD AVENUE SOUTH
Substances
Substance Type Amt Released Units
Diesel Fuel (DIESEL) Petroleum
Gasoline - Unleaded and Leaded (LEADED GAS) Petroleum
Gasoline - Unleaded and Leaded (UNLEADED GAS) Petroleum
Petroleum - Unknown Type (FUEL OIL) Petroleum
Responsible Party
GREG'S MOBIL 259 4TH AVE S, PARK FALLS, WI 54552
588930 | 02-46-588930
BOTW Release 4.9 | 04/23/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages