WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-09-588115 CHIPPEWA VALLEY AIRPORT PFAS
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
CHIPPEWA VALLEY REGIONAL AIRPORT CHIPPEWA WEST CNTRL
Address Municipality
3800 STARR AVE EAU CLAIRE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SW 1/4 of Sec 33, T28N, R09W 44.8624776 -91.4829155 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
609109380 2021-08-05
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  PFAS flag
Actions and Documents
Date Code Name File Comment
2024-03-27 43 Site Activity Status Update Received Download PDF file 2023 SUPPLEMENTAL SITE INVESTIGATION
2024-01-09 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-08-28 99 Miscellaneous Download PDF file SITE INVESTIGATION STATUS UPDATE REQESTED
2023-06-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-03-02 99 Miscellaneous Download PDF file FAA REVIEW OF SI ACTIVITIES
2023-01-19 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2023-01-13 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2022-12-19 200 Push Action Taken Download PDF file
2022-08-23 99 Miscellaneous Download PDF file PROJECT TIMELINE UPDATE RECEIVED
2022-07-22 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-07-22 43 Site Activity Status Update Received Download PDF file INITIAL PFAS SOIL AND GW RESULTS
2022-07-22 120 PFAS Sampling Completed - Actionable Levels Detected
2022-07-11 99 Miscellaneous Download PDF file FIELD SAMPLE RESULTS DELAYED
2022-01-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2022-01-11 36 Site Investigation Workplan (SIWP) Approved Download PDF file
2022-01-11 116 PFAS Sampling Required
2022-01-06 199 Additional Information Received (Fee-Based or Closure) RECEIVED UPDATED SIWP PROPOSAL
2022-01-06 99 Miscellaneous Download PDF file UPDATED SIWP PROPOSAL
2021-12-22 198 Request for Additional Information (Fee-Based or Closure) Download PDF file REQUESTED CHANGES TO SIWP
2021-11-19 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file
2021-11-19 99 Miscellaneous Download PDF file SIWP PRESS RELEASE
2021-11-19 7 Environmental Consultant Hired AECOM
2021-11-19 114 PFAS Scoping Statement Received PFAS SCOPING STATEMENT IN SIWP FROM 11/19/2021
2021-11-03 99 Miscellaneous Download PDF file SIWP STATUS UPDATE
2021-08-05 2 Responsible Party (RP) letter sent Download PDF file
2021-07-06 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Per- and Polyfluoroalkyl Substances Industrial Chem
Responsible Party
CHIPPEWA VALLEY REGIONAL AIRPORT 3800 STARR AVE, EAU CLAIRE, WI 54703
DNR Project Manager
MATT THOMPSON  matthewa.thompson@wisconsin.gov
588115 | 02-09-588115
BOTW Release 4.9 | 04/23/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages