ACTIVITY DETAILS

 
04-38-586473 JCI/TYCO SPILL
Activity Type / Status Jurisdiction
SPILL  CLOSED DNR RR
Location Name County DNR Region
JCI/TYCO MARINETTE NORTHEAST
Address Municipality
1 STANTON ST MARINETTE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NE 1/4 of the SW 1/4 of Sec 05, T30N, R24E 45.09826 -87.6135237 Click to view on Google Maps using Lat/Long
Additional Activity Details Acres
UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
438039470 2020-07-26 2020-09-17
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Site Files
Name File
Site File Documentation for Activity Download PDF Document
Actions
Date Code Name File Comment
2020-09-17 11 Spill Activity Closed
2020-07-26 1 Spill Incident Occurred
2020-07-26 5 Notification of Hazardous Substance Spill
Spill Details
SERTS Spill ID Spill Occurred Date/Time Spill Reported Date/Time
20200726NE38-1 2020-07-26  1940 2020-07-26  2052
Description of Incident/General Comments
THE RUPTURE OF THE FIRE WATER SUPPLY LINE IS BELIEVED TO HAVE OCCURRED AROUND 7:40 PM AND RESULTED IN A PRESSURE DROP WHICH CAUSED THE MAIN FIRE WATER SUPPLY PUMPS TO ENGAGE. THE PRESSURIZED WATER FROM THIS LEAK CAUSED A FORCEFUL EROSION OF THE SOIL ABOVE THE SUPPLY LINE AND ALSO RESULTED IN THE FRACTURING OF THE PAVEMENT ABOVE THE WATER LINE LEAK. WATER FROM THIS LINE THEN BEGAN TO FLOW UPWARD AND ONTO THE PAVED AREA. ALMOST ALL THE WATER WAS CONTAINED ON SITE DUE FLOOD PREVENTION DEVICES SUCH AS SANDBAGS ALREADY HAVING BEEN OUT ON SITE, COVERING STORM DRAINS AND OUTFALL LOCATIONS. HOWEVER, AN ESTIMATED 50-250 GALLONS OF THIS WATER ENTERED A STORM SEWER WHICH DISCHARGES TO THE MENOMINEE RIVER. SAMPLES OF STANDING WATER WERE COLLECTED TO PROFILE RELEASE. CLEAN HARBORS WAS CONTRACTED TO PERFORM CLEAN UP. WATER WAS PUMPED INTO FRAC TANKS AND SENT FOR DEEP WELL INJECTION. CONCRETE AREA WAS PRESSURE WASHED AND SCRUBBED. CLEAN HARBORS FINISHED WORK 2020/08/03. REPAIRS TO BURST PIPE WERE MADE. 2020/07/28: REIF CONDUCTED SITE VISIT. REMAINING WATER ON SITE WAS CONTAINED AND CLEAN UP WAS UNDERWAY. SUMMARY AND PHOTOS IN FILE. 2020/08/26: WASTEWATER PROGRAM ISSUED NON. 2020/09/09: DOCUMENTATION OF DISPOSAL RECEIVED. CLEAN UP DONE TO EXTENT PRACTICABLE.
Type of Location
INDUSTRIAL FACILITY (FOUNDRY/FACTORY/PLATING/MANUFACTURING)
Spill Cause
EQUIPMENT FAILURE 
Description of Cause or Additional Details
RUPTURED WATER INTAKE LINE
Description of Environmental Impact
RP IS ESTIMATING AT LEAST 10,000 GAL OF RIVER WATER MIXED WITH CONTAMINATED GROUND WATER WAS LOST. IT IS NOT CERTIEN HOW MUCH OF THAT HAS MADE ITS WAY INTO THE MENOMINEE RIVER BUT AT LEAST SOME OF IT HAS.
Cleanup Efforts at Time Incident Reported
CLEAN-UP PROGRESS UNKNOWN OR CLEAN-UP NOT STARTED.
Spiller Actions
Action Comment
Containment
Flushed PRESSURE WASHED
Repairs Made
Vacuum
Substances
Substance Type Amt Released Units
Arsenic (CONTAMINANT IN GW) Metals
Per- and Polyfluoroalkyl Substances (CONTAMINANT IN GW) Industrial Chem
Wastewater (RIVER WATER MIXED WITH CONTAMINATED GROUNDWATER ) Wastewater 100,000 Gal
Waste Destination
Destination Comment
OTHER: VICKERY
Responsible Party
JCI / TYCO 1 STANTON ST, MARINETTE, WI 54143
For More Information on this Activity
Northeast Region Contact: Denise Danelski  denise.danelski@wisconsin.gov
586473 | 04-38-586473