ACTIVITY DETAILS

 
02-38-559214 JCI/TYCO STANTON (VOCS)
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
JCI/TYCO MARINETTE NORTHEAST
Address Municipality
1 STANTON ST MARINETTE
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SW 1/4 of the SW 1/4 of Sec 05, T30N, R24E 45.0957452 -87.616208 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
14.8
Facility ID PECFA No. EPA ID Start Date End Date
438039470 2012-06-14
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
 
Actions and Documents
Date Code Name File Comment
2024-01-14 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-07-14 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-01-20 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-07-22 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-01-22 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2021-07-29 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-06-04 36 Site Investigation Workplan (SIWP) Approved Download PDF file ADDITIONAL SOIL SAMPLING AND ONE ROUND OF GROUNDWATER MONITORING
2021-04-19 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-02-22 80 Closure Not Recommended Download PDF file ADDITIONAL GW & SOIL SAMPLING REQUIRED
2021-01-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2020-10-01 118 PFAS Sampling Not Required At This Time COMPLETED AS PART OF CLOSURE NOT RECOMMENDED PEER REVIEW
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-08-12 99 Miscellaneous Download PDF file DHS PFAS NOTIFICATION PROTOCOLS
2020-08-07 79 Case Closure Review Request Received AUTO-ENTERED
2020-08-07 114 PFAS Scoping Statement Received EC SCOPING RECEIVED WITH CLOSURE REQUEST
2020-07-30 779 Case Closure Review Fee Received
2020-07-30 710 Database Fee Paid for Soil Continuing Obligation(s)
2020-07-27 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2019-09-20 99 Miscellaneous Download PDF file CLARIFICATION REGARDING ADMINISTRATION OF REMEDIATION ACTIVITIES
2019-01-04 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-07-27 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-05-23 99 Miscellaneous Download PDF file CHANGE OF PM - NESTE
2018-01-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2017-07-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-01-09 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-12-16 43 Site Activity Status Update Received CONSULTANT TO PREPARE A CLOSURE REQUEST
2016-07-11 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-05-04 43 Site Activity Status Update Received Download PDF file 2015 ANNUAL SITE SUMMARY
2016-01-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-07-13 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-05-20 99 Miscellaneous SUBMIT SITE FOR CLOSURE REVIEW
2015-03-20 99 Miscellaneous ALTERNATE LOCATION FOR GROUNDWATER MONITORING WELL ACCEPTABLE
2015-03-19 43 Site Activity Status Update Received REQUEST FOR ALTERNATE GROUNDWATER MONITORING WELL LOCATION
2015-03-03 38 Site Investigation Report (SIR) Approved INSTALL ADDT'L GW MONITORING WELLS & COLLECT SOIL SAMPLES AT INSTALLATION. IMPLEMENT MONITORING PRGM
2015-01-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2014-10-16 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SUMMARY OF ADDT'L SI ACTIVITIES
2014-08-25 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-04-23 140 Site Investigation Report (SIR) Not Approved DEGREE AND EXTENT OF SOIL AND GROUNDWATER IMPACTS NOT DEFINED
2014-03-11 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2013-09-26 43 Site Activity Status Update Received CONSULTANT IS IN THE PROCESS OF PREPARING A REPORT FOR TYCO REVIEW
2013-04-10 43 Site Activity Status Update Received SITE INVESTIGATION INITIATED BUT NOT COMPLETE
2012-10-23 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) PROCEED WITH CHANGES TO SOIL AND GROUNDWATER SAMPLE PARAMETERS
2012-10-22 35 Site Investigation Workplan (SIWP) Received (non-fee)
2012-08-20 2 Responsible Party (RP) letter sent
2012-06-14 1 Notification of Hazardous Substance Discharge UNDERGROUND CABLE INSTALLATION 06/14/212
Substances
Substance Type Amt Released Units
Diesel Fuel Petroleum
Gasoline - Unleaded and Leaded Petroleum
Responsible Party
JOHNSON CONTROLS INC 5757 N GREEN BAY AVE, MILWAUKEE, WI 53201
TYCO FIRE PROTECTION PRODUCTS 1 STANTON ST, MARINETTE, WI 54143
TYCO FIRE PRODUCTS LP ONE STANTON ST, MARINETTE, WI 54143
DNR Project Manager
DAVID NESTE  david.neste@wisconsin.gov
559214 | 02-38-559214