2024-04-12
|
99
|
Miscellaneous
|
|
VAPOR UPDATE REC'D
|
|
2024-04-12
|
99
|
Miscellaneous
|
|
GW RPT UPDATE REC'D
|
|
2024-03-27
|
99
|
Miscellaneous
|
|
DEED AND SALE DISCUSSION
|
|
2024-03-18
|
43
|
Site Activity Status Update Received
|
|
ANNUAL GW RPT REC'D
|
|
2024-03-15
|
314
|
Superfund Decision Document (ROD or ESD) - See Description
|
|
ESD
|
|
2024-03-12
|
99
|
Miscellaneous
|
|
PRELIMINARY VI RESULTS
|
|
2024-03-07
|
99
|
Miscellaneous
|
|
LEAD RESULTS
|
|
2024-03-07
|
99
|
Miscellaneous
|
|
DEED RESTRICTION INQUIRY
|
|
2024-03-05
|
314
|
Superfund Decision Document (ROD or ESD) - See Description
|
|
ESD CONCURRENCE LTR SENT
|
|
2024-02-02
|
99
|
Miscellaneous
|
|
EPA REQ FOR ADDT'L INFORMATION
|
|
2024-01-31
|
99
|
Miscellaneous
|
|
VAPOR WORKPLAN
|
|
2024-01-22
|
364
|
VAL and/or VRSL Exceeded
|
|
|
|
2024-01-16
|
99
|
Miscellaneous
|
|
CONDUCTED SITE VISIT WITH EPA & GHD
|
|
2024-01-05
|
99
|
Miscellaneous
|
|
EPA REQUEST
|
|
2024-01-05
|
99
|
Miscellaneous
|
|
PFAS DATA
|
|
2024-01-04
|
99
|
Miscellaneous
|
|
NEW RPM
|
|
2023-12-08
|
99
|
Miscellaneous
|
|
EPA VI REPORT COMMENTS
|
|
2023-12-01
|
43
|
Site Activity Status Update Received
|
|
DECEMBER 2023 VAPOR INTRUSION EVALUATION SUMMARY REPORT
|
|
2023-08-04
|
99
|
Miscellaneous
|
|
2023 VI EVALUATION WORKPLAN ADDENDUM 2
|
|
2023-05-31
|
43
|
Site Activity Status Update Received
|
|
MAY 2023 VAPOR INTRUSION EVALUATION SUMMARY REPORT
|
|
2023-03-03
|
99
|
Miscellaneous
|
|
PARTIAL EPA APPROVAL OF JANUARY 2023 VI WORKPLAN
|
|
2023-02-16
|
99
|
Miscellaneous
|
|
2023 VI ASSESSMENT WORK PLAN APPROVED
|
|
2023-02-16
|
43
|
Site Activity Status Update Received
|
|
2022 ANNUAL GROUNDWATER MONITORING REPORT
|
|
2023-01-31
|
99
|
Miscellaneous
|
|
2023 VI ASSESSMENT WORK PLAN
|
|
2023-01-19
|
43
|
Site Activity Status Update Received
|
|
EPA REQUEST FOR ADDITIONAL VAPOR SAMPLING
|
|
2022-10-25
|
43
|
Site Activity Status Update Received
|
|
QUATERLY PROGRESS REPORT #10 JULY-SEPTEMBER 2022
|
|
2022-06-06
|
99
|
Miscellaneous
|
|
CITIZEN CONTACT VOC CONCENTRATIONS
|
|
2022-05-10
|
114
|
PFAS Scoping Statement Received
|
|
|
|
2022-04-14
|
43
|
Site Activity Status Update Received
|
|
2021 ANNUAL VAPOR INTRUSION EVALUATION REPORT
|
|
2022-02-02
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY REPORT #8 OCTOBER 2021 TO DECEMBER 2021
|
|
2021-12-08
|
43
|
Site Activity Status Update Received
|
|
VAPOR INTRUSTION EVALUAITON REPORT
|
|
2021-12-03
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY REPORT #7 JULY THROUGH SEPTEMBER 2021
|
|
2021-09-08
|
99
|
Miscellaneous
|
|
WAUSAU DRINKING WATER TREATMENT PLANT MODIFICATION APPROVAL
|
|
2021-08-25
|
43
|
Site Activity Status Update Received
|
|
VAPORT INTRUSION REPORT 2020
|
|
2021-08-13
|
43
|
Site Activity Status Update Received
|
|
2020 ANNUAL GROUNDWATER MONITORING REPORT
|
|
2021-08-02
|
99
|
Miscellaneous
|
|
CONDITIONAL EPA APPROVAL - WAUSAU DWTF
|
|
2021-07-09
|
99
|
Miscellaneous
|
|
NR700 SERIES PROCESS QUESTION
|
|
2021-07-01
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT NO. 6
|
|
2021-04-13
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY PROGRESS REPORT #5 OCT-DEC 2020
|
|
2021-04-06
|
130
|
DNR Regulatory Reminder Sent
|
|
VAPOR INTRUSION AND TCE REMINDER LETTER
|
|
2020-08-26
|
43
|
Site Activity Status Update Received
|
|
WC3, WCR, WC5 AND IWD ABANDONMENT
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-07-27
|
43
|
Site Activity Status Update Received
|
|
2020 2ND QUARTER REPORT
|
|
2020-07-14
|
43
|
Site Activity Status Update Received
|
|
DOCUMENTATION OF MONITORING WELL ABANDONMENT AND SEALING
|
|
2020-04-09
|
43
|
Site Activity Status Update Received
|
|
EPA SIXTH 5 YEAR REVIEW
|
|
2020-04-08
|
-
|
Remediation
|
|
|
|
2020-03-02
|
43
|
Site Activity Status Update Received
|
|
2019 ANNUAL MONITORING REPORT
|
|
2019-09-26
|
99
|
Miscellaneous
|
|
NOTICE OF PURCHASE AGREEMENT - WAUSAU CHEMICAL AND CITY OF WAUSAU
|
|
2019-05-09
|
43
|
Site Activity Status Update Received
|
|
EW-1 SHUTDOWN PILOT STUDDY ADDENDUM
|
|
2019-05-06
|
99
|
Miscellaneous
|
|
DRAFT EW-1 SHUTDOWN RPT
|
|
2019-05-06
|
43
|
Site Activity Status Update Received
|
|
EW-1 SHUTDOWN PILOT STUDY REPORT
|
|
2019-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2018 - 12/31/2018
|
|
2018-11-02
|
99
|
Miscellaneous
|
|
SUB-SLAB/INDOOR AIR RESULTS LTRS (5)
|
|
2018-11-02
|
99
|
Miscellaneous
|
|
REQUEST FOR ACCESS LTRS (5)
|
|
2018-07-25
|
43
|
Site Activity Status Update Received
|
|
EW1 SHUTOWN PILOT STUDY ADDENDUM
|
|
2018-07-09
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2018 - 6/30/2018
|
|
2018-06-11
|
-
|
Website URL
|
|
Wausau GW Contam. EPA Superfund NPL/SAA Website This EPA website contains additional information about this Activity.
|
|
2018-02-28
|
43
|
Site Activity Status Update Received
|
|
2017 ANN MONITORING RPT
|
|
2018-01-26
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2017 - 12/31/2017
|
|
2018-01-18
|
43
|
Site Activity Status Update Received
|
|
EW SHUTDOWN PILOT STUDY ADDENDUM
|
|
2017-11-15
|
99
|
Miscellaneous
|
|
SITE VISIT & MTG W/USA EPA & CONSULTANT
|
|
2017-05-23
|
99
|
Miscellaneous
|
|
SUB-SLAB & IA SAMPLING RESULTS SENT TO RESIDENTS
|
|
2017-04-19
|
43
|
Site Activity Status Update Received
|
|
2016 ANNUAL MONITORING RPT
|
|
2017-03-03
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
REVISED VI EVAL WORK PLAN RECD
|
|
2016-10-13
|
43
|
Site Activity Status Update Received
|
|
REVISED 2015 ANNUAL MONITORING REPORT REC
|
|
2016-03-24
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
VI EVAL WORK PLAN RECD
|
|
2016-03-07
|
43
|
Site Activity Status Update Received
|
|
2015 ANN MONITORING REPORT REC
|
|
2015-09-08
|
305
|
Superfund Enforcement Documents - See Description
|
|
LIMITED SI RESULTS RECEIVED FROM WAUSAU CHEMICAL PROPERTY
|
|
2015-03-05
|
43
|
Site Activity Status Update Received
|
|
2014 ANNUAL MONITORING REPORT
|
|
2015-03-05
|
43
|
Site Activity Status Update Received
|
|
ANNUAL RPT AND EW1 PILOT STUDY 2014
|
|
2014-10-29
|
43
|
Site Activity Status Update Received
|
|
WAUSAU GW CONTAMINATION/EW1 SHUTDOWN PILOT STUDY 3RD QTR RESULTS REC'D
|
|
2014-10-21
|
43
|
Site Activity Status Update Received
|
|
E23A WELL ABANDONMENT REPORT RECEIVED
|
|
2014-07-28
|
43
|
Site Activity Status Update Received
|
|
EW1 SHUTDOWN PILOT STUDY 2ND QTR RESULTS REC'D
|
|
2014-07-25
|
99
|
Miscellaneous
|
|
REC'D REQUEST TO ABANDON E23A
|
|
2014-05-19
|
402
|
Historic Fill Case by Case Exemption Issued
|
|
CASE BY CASE EXEMPTION APPROVAL LTR ISSUED. WPS POLE INSTALLATION ON FMR LF
|
|
2014-05-16
|
401
|
Historic Fill Case by Case Exemption Request (fee)
|
|
CH# 900262349
|
|
2014-05-01
|
43
|
Site Activity Status Update Received
|
|
EW1 SHUTDOWN PILOT STUDY 1ST QTR RESULTS REC'D
|
|
2014-04-07
|
99
|
Miscellaneous
|
|
LETTER TO CITY OF WAUSAU & EPA ADDRESSING REDEVELOPMENT OF WAUSAU CHEMICAL PROPERTY
|
|
2014-03-19
|
99
|
Miscellaneous
|
|
CONF CALL W/ EPA TO DISCUSS REDEVELOPMENT OF WAUSAU CHEMICAL PROPERTY
|
|
2014-03-06
|
99
|
Miscellaneous
|
|
MEETING W/ CITY OF WAUSAU TO DISCUSS REDEVELOPMENT OF WAUSAU CHEMICAL PROPERTY
|
|
2014-02-11
|
43
|
Site Activity Status Update Received
|
|
2013 ANNUAL MONITORING RPT REC'D
|
|
2014-01-31
|
99
|
Miscellaneous
|
|
CONF CALL TO DISCUSS SITE REDEVELOPMENT PLANS
|
|
2013-09-09
|
99
|
Miscellaneous
|
|
EW1 SHUTDOWN PILOT STUDY WORK PLAN REC'D
|
|
2013-06-18
|
99
|
Miscellaneous
|
|
CONF CALL W/ EPA & CONSULTANT
|
|
2013-06-06
|
99
|
Miscellaneous
|
|
RESPONSE TO COMMENTS REC'D
|
|
2013-06-05
|
99
|
Miscellaneous
|
|
DRAFT PILOT STUDY PROPOSAL REC'D
|
|
2013-05-31
|
99
|
Miscellaneous
|
|
HISTORICAL GW DATA REC'D
|
|
2013-05-20
|
99
|
Miscellaneous
|
|
REQUEST TO ABANDON WC-3 REC'D
|
|
2013-05-17
|
99
|
Miscellaneous
|
|
CONF CALL W/ EPA & CONSULTANT
|
|
2013-04-26
|
99
|
Miscellaneous
|
|
CONF CALL W/ EPA & CONSULTANT
|
|
2013-04-26
|
99
|
Miscellaneous
|
|
COMMENTS PROVIDED ON DRAFT EW1 PILOT STUDY PROPOSAL
|
|
2013-04-24
|
43
|
Site Activity Status Update Received
|
|
1ST QTR 2013 EW-1 TREATMENT & DISCHARGE RESULTS REC'D
|
|
2013-04-23
|
43
|
Site Activity Status Update Received
|
|
2012 ANNUAL MONITORING REPORT REC'D
|
|
2013-03-15
|
99
|
Miscellaneous
|
|
CONF CALL W/ EPA, CONSULTANT RE: EW1 SHUTDOWN
|
|
2013-03-01
|
99
|
Miscellaneous
|
|
DRAFT EVALUATION EW1 SHUTDOWN REC'D
|
|
2013-02-08
|
99
|
Miscellaneous
|
|
CONF CALL W/ EPA, CONSULTANT RE: EW1 SHUTDOWN
|
|
2012-10-17
|
99
|
Miscellaneous
|
|
3RD QTR 2012 EW1 TREATMENT & DISCHARGE RESULTS REC'D
|
|
2012-10-16
|
99
|
Miscellaneous
|
|
HISTORICAL GW RESULTS & WELL LOGS REC'D FROM CONSULTANT
|
|
2012-10-10
|
99
|
Miscellaneous
|
|
EMAIL TO USEPA RPM FOLLOW UP FROM SITE VISIT
|
|
2012-09-26
|
99
|
Miscellaneous
|
|
SITE VISIT W/ EPA RPM & CONSULTANT
|
|
2012-09-19
|
99
|
Miscellaneous
|
|
E24/E24A MW ABANDONMENT & REPLACEMENT DOCUMENTATION REC'D
|
|
2012-05-03
|
99
|
Miscellaneous
|
|
EMAIL TO EPA RPM CONCURRING W/ CONSULTANT RECOMMENDATIONS
|
|
2012-04-25
|
43
|
Site Activity Status Update Received
|
|
2011 ANNUAL MONITORING RPT REC'D
|
|
2012-04-05
|
43
|
Site Activity Status Update Received
|
|
1ST QTR 2012 EW- 1 TREATMENT & DISCHARGE RESULTS REC'D
|
|
2012-01-10
|
43
|
Site Activity Status Update Received
|
|
4TH QRT 2011 EW1 TREATMENT & DISCHARGE RESULTS REC'D
|
|
2011-10-19
|
43
|
Site Activity Status Update Received
|
|
3RD QRT 2011 EW1 TREATMENT & DISCHARGE RESULTS REC'D
|
|
2011-09-07
|
130
|
DNR Regulatory Reminder Sent
|
|
Vapor Intrusion (VI) Assessment Notification Ltr Sent
|
|
2011-07-26
|
43
|
Site Activity Status Update Received
|
|
1ST & 2ND QUARTER 2011 EW1 TREATMENT & DISCHARGE RESULTS RECEIVED; NEW PUMP & WELL REHAB
|
|
2011-04-05
|
43
|
Site Activity Status Update Received
|
|
2010 ANNUAL MONITORING REPORT RECEIVED
|
|
2011-01-28
|
43
|
Site Activity Status Update Received
|
|
4TH QTR 2010 EW1 TREATMENT & DISCHARGE RESULTS REC'D.
|
|
2010-12-28
|
402
|
Historic Fill Case by Case Exemption Issued
|
|
|
|
2010-12-28
|
805
|
Historic Waste Site
|
|
AUTO-ADDED
|
|
2010-11-18
|
401
|
Historic Fill Case by Case Exemption Request (fee)
|
|
CK# 595883
|
|
2010-11-03
|
99
|
Miscellaneous
|
|
SITE VISIT
|
|
2010-10-14
|
43
|
Site Activity Status Update Received
|
|
3RD QTR 2010 EW1 TREATMENT & DISCHARGE RESUTLS.
|
|
2010-07-29
|
149
|
Remedial Action (RA) Design Report Approved
|
|
|
|
2010-07-29
|
220
|
Continuing Obligation - Soil at Industrial Levels
|
|
|
|
2010-07-29
|
222
|
Continuing Obligation - Maintain Cap Over Contaminated Area
|
|
|
|
2010-07-29
|
224
|
Continuing Obligation - Structural Impediment to Cleanup
|
|
|
|
2010-07-29
|
228
|
Continuing Obligation - Site Specific Condition
|
|
GW PUMP & TREAT ON MARATHON ELECTRIC COP PARCEL.
|
|
2010-07-29
|
56
|
Continuing Obligation(s) Applied
|
|
|
|
2010-07-29
|
232
|
Continuing Obligation - Residual Soil Contamination
|
|
|
|
2010-07-29
|
236
|
Continuing Obligation - Residual GW Contamination
|
|
|
|
2010-07-29
|
50
|
Groundwater Use Restriction Potentially Filed
|
|
|
|
2010-07-19
|
43
|
Site Activity Status Update Received
|
|
SECOND QUARTER 2010 EW1 TREATMENT & DISCHARGE RESULTS REC'D.
|
|
2010-04-16
|
43
|
Site Activity Status Update Received
|
|
FIRSTS QTR 2010 EWI TREATMENT & DISCHARGE RESULTS REC'D.
|
|
2010-04-09
|
326
|
Superfund Five Year Review Report Signed
|
|
|
|
2010-03-08
|
43
|
Site Activity Status Update Received
|
|
2009 ANNUAL MONITORING REPORT
|
|
2010-01-15
|
43
|
Site Activity Status Update Received
|
|
4TH QTR EW1 TREATMENT & DISCHARGE RESULTS REC'D.
|
|
2009-11-09
|
43
|
Site Activity Status Update Received
|
|
3RD QTR EW1 TREATMENT & DISCHARGE RESULTS REC'D.
|
|
2009-07-06
|
43
|
Site Activity Status Update Received
|
|
2ND QTR EW1 TREATMENT & DISCHARGE RESULTS REC'D.
|
|
2009-06-22
|
43
|
Site Activity Status Update Received
|
|
2008 ANNUAL REPORT
|
|
2009-04-23
|
43
|
Site Activity Status Update Received
|
|
FIRST QUARTER PROGRESS REPORT
|
|
2009-02-27
|
43
|
Site Activity Status Update Received
|
|
2007 ANNUAL MONTIROING REPORT.
|
|
2008-10-24
|
43
|
Site Activity Status Update Received
|
|
3RD QUARTER 2008 DMR
|
|
2008-09-02
|
43
|
Site Activity Status Update Received
|
|
EW1 REPORT
|
|
2008-04-18
|
43
|
Site Activity Status Update Received
|
|
2005-06 GW REPORT.
|
|
2007-09-26
|
99
|
Miscellaneous
|
|
USEPA WITH WDNR CONCUR APPROVAL TO CLOSE EAST BANK SVE SYSTEM.
|
|
2007-08-31
|
99
|
Miscellaneous
|
|
DEED RESTRICTION FOR WAUSAU CHEMICAL REC'D.
|
|
2007-04-26
|
99
|
Miscellaneous
|
|
DEED RESTRICTION AT WAUSAU CHEMICAL RECORDED.
|
|
2006-12-05
|
99
|
Miscellaneous
|
|
SITE VISIT & MEET EPA & MARATHON ELECTRIC.
|
|
2006-04-25
|
99
|
Miscellaneous
|
|
EWI DISCHARGE REPORT
|
|
2006-04-13
|
99
|
Miscellaneous
|
|
DRAFT DEED RESTRICTION & DEEDS FOR WAUSAU CHEMICAL PROPERTY REC'D
|
|
2006-02-06
|
43
|
Site Activity Status Update Received
|
|
QUARTERLY GWE REPORT
|
|
2005-11-14
|
43
|
Site Activity Status Update Received
|
|
EW 1 REPORT RECEIVED
|
|
2005-08-15
|
43
|
Site Activity Status Update Received
|
|
ANNUAL MONITORING REPORT
|
|
2005-06-30
|
99
|
Miscellaneous
|
|
5 YEAR REVIEW SIGNED
|
|
2005-01-21
|
99
|
Miscellaneous
|
|
4TH QRT 2004 - EWI DISCHARGE REPORT
|
|
2004-11-01
|
99
|
Miscellaneous
|
|
QRTLY RPT ON EW-1
|
|
2004-07-16
|
99
|
Miscellaneous
|
|
DISCHARGE MONITORING REPORT
|
|
2004-04-23
|
43
|
Site Activity Status Update Received
|
|
2003 GW MON RPT
|
|
2004-04-22
|
43
|
Site Activity Status Update Received
|
|
1ST QRT 2004 P&T RPT
|
|
2003-10-15
|
43
|
Site Activity Status Update Received
|
|
GW P & T STATUS
|
|
2003-08-15
|
99
|
Miscellaneous
|
|
EW1 DISCHARGE RPT
|
|
2003-04-14
|
43
|
Site Activity Status Update Received
|
|
|
|
2003-02-07
|
99
|
Miscellaneous
|
|
02 4TH QRT. EW1 REPORT
|
|
2002-12-02
|
99
|
Miscellaneous
|
|
AGENCY'S APPROVAL OF EAST SVE MONITORING PLAN
|
|
2002-12-02
|
99
|
Miscellaneous
|
|
AGENCY'S LETTER RE WAUSAU CHEM P & T
|
|
2002-11-26
|
99
|
Miscellaneous
|
|
DNR COMMENTS TO EPA
|
|
2002-11-15
|
99
|
Miscellaneous
|
|
CRA PROPOSAL FOR GW MONITORING OF SVE SHUT OFF @ WCC
|
|
2002-11-04
|
43
|
Site Activity Status Update Received
|
|
RPT ON EW-1
|
|
2002-11-04
|
99
|
Miscellaneous
|
|
EW1 3RD QRT REPORT
|
|
2002-10-02
|
99
|
Miscellaneous
|
|
MEETING AT SITE
|
|
2002-07-12
|
43
|
Site Activity Status Update Received
|
|
PROGRESS REPORT ON EW1
|
|
2002-05-29
|
43
|
Site Activity Status Update Received
|
|
|
|
2002-04-17
|
99
|
Miscellaneous
|
|
DNR REQUEST FOR GW REPORT
|
|
2002-04-12
|
43
|
Site Activity Status Update Received
|
|
1 Q. EW1 REPORT.
|
|
2002-03-11
|
99
|
Miscellaneous
|
|
SOIL SAMPLE REPORT. REQUEST TO SHUT DOWN SVE.
|
|
2002-03-06
|
43
|
Site Activity Status Update Received
|
|
4 Q. EW1 REPORT.
|
|
2001-11-07
|
99
|
Miscellaneous
|
|
SITE VISIT AT WAUSAU CHEM.
|
|
2001-03-14
|
99
|
Miscellaneous
|
|
2000 ANNUAL REPORT
|
|
2001-01-10
|
99
|
Miscellaneous
|
|
REQUEST FOR SEASONAL SHUTDOWN OF SVE
|
|
2000-07-30
|
24
|
Long Term Monitoring Plan Received (non-Fee)
|
|
|
|
2000-07-14
|
43
|
Site Activity Status Update Received
|
|
|
|
2000-07-10
|
99
|
Miscellaneous
|
|
FIVE YEAR REVIEW REPORT
|
|
2000-06-14
|
43
|
Site Activity Status Update Received
|
|
MAY 2000
|
|
2000-05-10
|
43
|
Site Activity Status Update Received
|
|
APRIL 2000
|
|
2000-04-26
|
99
|
Miscellaneous
|
|
EPA COMMENTS ON GW MONITORING PLAN
|
|
2000-04-07
|
43
|
Site Activity Status Update Received
|
|
MARCH 2000
|
|
2000-03-10
|
43
|
Site Activity Status Update Received
|
|
FEBRUARY 2000
|
|
2000-02-07
|
43
|
Site Activity Status Update Received
|
|
|
|
2000-01-11
|
99
|
Miscellaneous
|
|
DECEMBER 1999 STATUS
|
|
1999-12-14
|
43
|
Site Activity Status Update Received
|
|
NOVEMBER
|
|
1999-11-12
|
43
|
Site Activity Status Update Received
|
|
OCTOBER
|
|
1999-10-15
|
43
|
Site Activity Status Update Received
|
|
|
|
1999-09-15
|
43
|
Site Activity Status Update Received
|
|
|
|
1999-08-31
|
99
|
Miscellaneous
|
|
MWS WC6A, WC6, TCT44 AND E30 ABANDONED.
|
|
1999-08-24
|
43
|
Site Activity Status Update Received
|
|
|
|
1999-08-11
|
43
|
Site Activity Status Update Received
|
|
JULY
|
|
1999-07-09
|
43
|
Site Activity Status Update Received
|
|
|
|
1999-04-12
|
43
|
Site Activity Status Update Received
|
|
MONTHLY PROGRESS REPORT #96
|
|
1999-03-11
|
43
|
Site Activity Status Update Received
|
|
MONTHLY STATUS REPORT #95
|
|
1997-03-17
|
99
|
Miscellaneous
|
|
DNR COMMENTS RE SVE CLOSURE. ADD'L WORK NEEDED.
|
|
1997-01-13
|
99
|
Miscellaneous
|
|
E. BANK SVE CLOSURE RPT
|
|
1992-01-01
|
211
|
Operation & Maintenance Start - State Lead
|
|
|
|
1991-01-01
|
99
|
Miscellaneous
|
|
RA CONSENT DECREE
|
|
1990-03-01
|
99
|
Miscellaneous
|
|
REMEDIAL DESIGN COMPLETE
|
|
1989-09-02
|
99
|
Miscellaneous
|
|
RO CONSENT DECREE
|
|
1989-09-01
|
99
|
Miscellaneous
|
|
ROD
|
|
1988-12-01
|
99
|
Miscellaneous
|
|
ROD INTERIM
|
|
1986-06-10
|
99
|
Miscellaneous
|
|
NPL LISTING
|
|
1984-03-05
|
350
|
Superfund Site Assessment Preliminary Assessment (PA)
|
|
|
|
1983-02-15
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
|
1983-02-15
|
301
|
Superfund NPL, NPL Proposed or Alternative Approach Site
|
|
301 DATE BASED ON FINAL NPL LISTING DATE
|