02-37-000006 WAULECO SNE CORP
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
WAULECO MARATHON WEST CNTRL
Address Municipality
125 ROSECRANS STREET WAUSAU
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NW 1/4 of the SE 1/4 of Sec 35, T29N, R07E 44.9494117 -89.6362546 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
8
Facility ID PECFA No. EPA ID Start Date End Date
737063800 1984-10-25
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
SFR Flag  
Site Files
Name File
SITE FILE 1984 Download PDF Document
SITE FILE 1985 Download PDF Document
SITE FILE 1988 Download PDF Document
SITE FILE 1990 Download PDF Document
SITE FILE 1992 Download PDF Document
SITE FILE 1993 Download PDF Document
SITE FILE 1994 Download PDF Document
SITE FILE 1995 Download PDF Document
SITE FILE 1996 Download PDF Document
SITE FILE 1997 Download PDF Document
SITE FILE 1998 Download PDF Document
SITE FILE 1999 Download PDF Document
SITE FILE 2000 Download PDF Document
SITE FILE 2001 Download PDF Document
SITE FILE 2002 Download PDF Document
SITE FILE 2003 Download PDF Document
SITE FILE 2004 Download PDF Document
SITE FILE 2005 Download PDF Document
SITE FILE 2006 Download PDF Document
SITE FILE 2007 Download PDF Document
SITE FILE 2008 Download PDF Document
SITE FILE 2009 Download PDF Document
SITE FILE 2010 Download PDF Document
SITE FILE 2011 Download PDF Document
SITE FILE 2012 Download PDF Document
SITE FILE 2013 Download PDF Document
SITE FILE 2014 Download PDF Document
SITE FILE 2015 Download PDF Document
SITE FILE 2016 Download PDF Document
SITE FILE 2017 Download PDF Document
SITE FILE 1987 Download PDF Document
SITE FILE 1986 JANUARY THROUGH JUNE Download PDF Document
SITE FILE 1986 JULY THROUGH DECEMBER Download PDF Document
SITE FILE 1989 Download PDF Document
SITE FILE 1991 Download PDF Document
Actions and Documents
Date Code Name File Comment
2024-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2024-01-11 43 Site Activity Status Update Received Download PDF file 2023 FOURTH QUARTERLY REPORT
2023-10-27 99 Miscellaneous Download PDF file SITE PAVING AND GRAVEL PLACEMENT
2023-10-27 43 Site Activity Status Update Received Download PDF file 2023 THIRD QUARTERLY REPORT
2023-10-27 99 Miscellaneous Download PDF file PAVING IMPROVEMENT PROJECT
2023-07-17 43 Site Activity Status Update Received Download PDF file 2023 SECOND QUARTERLY REPORT
2023-07-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-06-30 99 Miscellaneous Download PDF file MW40R FREE PRODUCT UPDATE
2023-04-14 43 Site Activity Status Update Received Download PDF file 2023 1ST QUARTERLY REPORT
2023-04-13 43 Site Activity Status Update Received Download PDF file 2022 ANNUAL GROUNDWATER REPORT
2023-01-20 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2023-01-17 43 Site Activity Status Update Received Download PDF file 2022 4TH QUARTERLY REPORT
2022-11-30 98 Technical Assistance Provided Download PDF file
2022-11-08 97 Technical Assistance Request Received (fee) Download PDF file SCHEDULE A TECHNICAL ASSISTANCE MEETING
2022-10-14 43 Site Activity Status Update Received Download PDF file 2022 3RD QUARTER REPORT
2022-09-16 99 Miscellaneous Download PDF file POWER RESTORED TO BUILDING- GWPT SYSTEM OPERATIONAL
2022-07-18 43 Site Activity Status Update Received Download PDF file 2022 2ND QUARTERLY REPORT
2022-07-14 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-04-10 43 Site Activity Status Update Received Download PDF file 2022 FIRST QUARTERLY REPORT
2022-03-30 98 Technical Assistance Provided Download PDF file BIO-TRAP STUDY CONCURRENCE
2022-02-09 43 Site Activity Status Update Received Download PDF file 2021 ANNUAL GROUNDWATER MONITORING REPORT
2022-01-20 43 Site Activity Status Update Received Download PDF file 2021 FOURTH QUARTER REPORT
2022-01-18 97 Technical Assistance Request Received (fee) Download PDF file BIO-TRAP STUDY RESULTS AND MEETING REQUEST
2022-01-11 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2021-11-04 99 Miscellaneous Download PDF file TCE EFFLUENT INFORMATION
2021-10-22 43 Site Activity Status Update Received Download PDF file 2021 THIRD QUARTER REPORT
2021-09-15 43 Site Activity Status Update Received Download PDF file INDOOR AIR SAMPLING OF TREATMENT BUILDING
2021-07-15 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-07-07 43 Site Activity Status Update Received Download PDF file 2ND QUARTERLY REPORT 2021
2021-06-18 99 Miscellaneous Download PDF file REQUEST TO STOP ANALYZING NAPHTHALENE AND XYLENE IN GROUNDWATER
2021-05-28 99 Miscellaneous Download PDF file REQUEST TO ABANDON W1A AND W1B APPROVED
2021-05-05 43 Site Activity Status Update Received Download PDF file 2020 ANNUAL REPORT
2021-04-08 43 Site Activity Status Update Received Download PDF file 2021 FIRST QUARTERLY REPORT
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER - SNE LETTER RETURNED UNDELIVERABLE
2021-03-01 99 Miscellaneous Download PDF file CORRECT BIO TRAP WORK PLAN FIGURE 2
2021-03-01 36 Site Investigation Workplan (SIWP) Approved Download PDF file BIO-TRAP WORK PLAN APPROVAL
2021-01-13 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2020 - 12/31/2020
2021-01-12 43 Site Activity Status Update Received Download PDF file 2020 4TH QUARTER REPORT
2021-01-06 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file
2021-01-06 43 Site Activity Status Update Received Download PDF file 2020 THIRD QUARTER PROGRESS REPORT
2020-10-30 98 Technical Assistance Provided Download PDF file BIODEGRADATION EVALUATION
2020-10-21 99 Miscellaneous Download PDF file EMERGING CONTAMINANT SCOPING STATEMENT
2020-10-15 43 Site Activity Status Update Received Download PDF file 2020 3RD QTR RPT
2020-09-01 97 Technical Assistance Request Received (fee) Download PDF file REVIEW OF TECHNICAL MEMORANDUM LINES OF EVIDENCE OF PCP DEGREDATION
2020-08-21 99 Miscellaneous Download PDF file ASST DISTRICT ATTORNEY REQUEST FOR GW TO SURFACE WATER DISCHARGE
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION (VI) ASSESSMENT NOTIFICATION LTR SENT
2020-08-13 99 Miscellaneous Download PDF file CITY-LEAD SEDIMENT SAMPLING CLARIFICATION
2020-07-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-07-08 43 Site Activity Status Update Received Download PDF file 2020 2ND QUARTER REPORT
2020-05-01 43 Site Activity Status Update Received Download PDF file 2019 ANNUAL GW MONITORING REPORT
2020-04-07 43 Site Activity Status Update Received Download PDF file 2020 1ST QTR REPORT
2020-04-01 99 Miscellaneous Download PDF file REMEDIAL ACTIONS PUBLIC MEETING POSTPONEMENT UPDATE
2020-03-02 38 Site Investigation Report (SIR) Approved Download PDF file
2020-02-12 43 Site Activity Status Update Received Download PDF file WAUSAU SEWER INTERCEPTOR STUDY RESULTS
2020-01-31 137 Site Investigation Report (SIR) Received (fee) Download PDF file REVIEW OF SI REC'D 10/31/2019
2020-01-15 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2020-01-09 43 Site Activity Status Update Received Download PDF file 2019 4TH QUARTER REPORT
2019-12-10 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file RESIDUAL PHASE LNAPL INVESTIGATION
2019-11-14 43 Site Activity Status Update Received Download PDF file RESIDUAL PHASE LNAPL RESULTS TRANSMITTAL
2019-10-31 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file WOOD WASTE BURNING SITE INVESTIGATION REPORT
2019-10-31 43 Site Activity Status Update Received Download PDF file 2019 THIRD QUARTERLY REPORT
2019-09-27 99 Miscellaneous Download PDF file WOOD WASTE BURN SI RESULTS
2019-08-16 98 Technical Assistance Provided Download PDF file
2019-07-18 43 Site Activity Status Update Received Download PDF file 2019 2ND QUARTER REPORT
2019-07-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-06-21 97 Technical Assistance Request Received (fee) Download PDF file REVISED GROUNDWATER REMEDIAL ALTERNATIVE SCREENING
2019-06-12 99 Miscellaneous Download PDF file JUNE 2019 SANITARY SEWER TESTING
2019-06-04 43 Site Activity Status Update Received Download PDF file ADDITIONAL CH 292.31(1)(D) INFORMATION PROVIDED
2019-06-03 99 Miscellaneous Download PDF file NR714 EMAIL REPONSE TO KILIAN - SIWP ADDENDUM #2 NTP
2019-05-31 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file AERIAL DEPOSITION SIWP ADDENDUM #2 NOTICE TO PROCEED
2019-05-16 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file AERIAL DEPOSITION SIEWP ADDENDUM #2 - SOIL SAMPLE LOCATIONS
2019-05-03 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file
2019-04-24 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file RESIDUAL PHASE LNAPL SOIL SIWP
2019-04-24 99 Miscellaneous Download PDF file 03/26/2019 PCP SEWER MANHOLE RESULTS
2019-04-18 99 Miscellaneous Download PDF file NR714 EMAIL RESPONSE TO KILIAN - SIWP APPROVAL
2019-04-16 135 Site Investigation Workplan (SIWP) Received (fee) REVIEW OF SIWP REC ON 03/15/2019 AND SIWP ADDENDUM REC ON 04/09/2019
2019-04-16 36 Site Investigation Workplan (SIWP) Approved Download PDF file SIWP APPROVAL
2019-04-16 99 Miscellaneous Download PDF file WELL W40 VAPOR INTRUSION ASSESSMENT
2019-04-09 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file AERIAL DEPOSITION SIWP ADDENDUM #1 - AIR MODEL INPUTS
2019-04-09 99 Miscellaneous Download PDF file 2019 1ST QTR REPORT
2019-04-08 99 Miscellaneous Download PDF file DNR AIR PROGRAM AERMOD INPUT CORRESPONDENCE
2019-04-05 43 Site Activity Status Update Received Download PDF file 2018 ANNUAL GW REPORT
2019-03-15 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file AERIAL DEPOSITION SIWP
2019-03-15 99 Miscellaneous Download PDF file CH. 292.31(1)(D) REQUESTED INFORMATION LETTER
2019-03-15 99 Miscellaneous Download PDF file CITIZENS FOR CLEAN WAUSAU CONCERNS AND REQUESTS
2019-03-15 43 Site Activity Status Update Received Download PDF file CH 292.31(1)(D) INFORMATION PROVIDED
2019-03-14 99 Miscellaneous Download PDF file GROUNDWATER REMEDIATION SYSTEM ANALYSIS PLAN
2019-03-04 99 Miscellaneous Download PDF file MARCH 4, 2019 MEETING AGENDA
2019-03-04 97 Technical Assistance Request Received (fee) MEETING TO DISCUSS 2019 SITE ACTIVITIES
2019-03-04 98 Technical Assistance Provided 2019 SITE ACTIVITIES MEETING HELD
2019-02-26 99 Miscellaneous Download PDF file 2019 ANNUAL MEETING AGENDA
2019-02-26 99 Miscellaneous Download PDF file CLEAN WAUSAU INVESTIGATION REQUEST
2019-02-21 99 Miscellaneous Download PDF file 06-28-2012 ZASTRO DEPOSITION TRANSCRIPT AND EXHIBITS
2019-02-20 99 Miscellaneous Download PDF file 1996 AND 1997 SANITARY SEWER CORRESPONDANCE
2019-02-15 99 Miscellaneous Download PDF file SANITARY SEWER INVERT DATA - CITY OF WAUSAU
2019-02-08 99 Miscellaneous Download PDF file SEWER INCEPTOR PCP TEST RESULTS
2019-02-05 99 Miscellaneous Download PDF file MW RELOCATION SUMMARY EMAIL
2019-01-24 99 Miscellaneous Download PDF file KILIAN 1938 RIVERSIDE INTERCEPTOR DIAGRAM
2019-01-16 99 Miscellaneous Download PDF file KILIAN NR 714.05 REQUESTED INFO PROVIDED
2019-01-15 99 Miscellaneous Download PDF file CH 292.31(1)(D) REQUEST AND AERIAL DEPOSITION WORK PLAN REQUEST.
2019-01-14 43 Site Activity Status Update Received Download PDF file 2018 4TH QUARTER RPT
2019-01-14 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file W40 SOIL GAS INVESTIGATION WORK PLAN
2019-01-11 99 Miscellaneous Download PDF file JULY 2012 STANTEC SUMMARY OF OPINIONS
2019-01-10 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2018 - 12/31/2018
2018-11-28 99 Miscellaneous Download PDF file NR 714.05(5) PUBLIC NOTIFICATION REQUEST FOR SITE SPECIFIC RESPONSE
2018-11-08 99 Miscellaneous Download PDF file CRESTLINE AIR ARTICLE SEPTEMBER 11 1970
2018-11-02 43 Site Activity Status Update Received Download PDF file 2018 THIRD QUARTER GW REPORT
2018-07-27 43 Site Activity Status Update Received Download PDF file 2017 ANNUAL GW REPORT
2018-07-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-07-13 43 Site Activity Status Update Received Download PDF file 2018 SECOND QUARTERLY REPORT
2018-05-07 - Photos Download PDF file
2018-04-24 43 Site Activity Status Update Received Download PDF file 2018 1ST QTR REPORT
2018-03-27 99 Miscellaneous Download PDF file PCP DIOXIN FINGERPRINTING
2018-03-23 99 Miscellaneous Download PDF file SURFACE WATER DISCHARGE PECKHAM
2018-03-16 99 Miscellaneous Download PDF file MONITORING WELL CONSTRUCTION IMPACTS
2018-03-16 99 Miscellaneous Download PDF file TRIANGULAR WAULECO LOT SAMPLING 2008
2018-02-23 99 Miscellaneous Download PDF file 136 EDWARDS ST WELL TEST
2018-01-09 43 Site Activity Status Update Received Download PDF file 2017 FOURTH QUARTER REPORT
2018-01-05 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2017 - 12/31/2017
2017-12-04 99 Miscellaneous Download PDF file DEPARTMENT REVIEW OF GW RAOR ALTERNATIVES
2017-11-16 43 Site Activity Status Update Received Download PDF file ROAR ALTERNATIVES LIST SUBMITTED
2017-10-20 43 Site Activity Status Update Received Download PDF file 2017 3RD QUARTERLY REPORT RECEIVED
2017-07-21 43 Site Activity Status Update Received Download PDF file 2017 2ND QUARTERLY REPORT RECEIVED
2017-07-11 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2017 - 6/30/2017
2017-05-08 43 Site Activity Status Update Received Download PDF file 2016 ANNUAL GW MONITORING REPORT RECEIVED
2017-04-13 43 Site Activity Status Update Received 2017 1ST QUARTER REPORT RECEIVED
2017-01-24 99 Miscellaneous LNAPL CSM MEETING
2017-01-23 43 Site Activity Status Update Received 2016 4TH QTR REPORT RECEIVED
2017-01-11 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2016 - 12/31/2016
2016-12-12 99 Miscellaneous RAOR MEETING FOLLOW UP ITEMS RECEIVED FROM TRC
2016-11-29 99 Miscellaneous MEETING TO DISCUSS RAOR
2016-10-14 99 Miscellaneous 2016 3RD QUARTERLY REPORT RECEIVED
2016-08-31 82 Remedial Action Options Report (RAOR) Not Approved Download PDF file
2016-07-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-05-17 43 Site Activity Status Update Received 2015 ANNUAL GW MONITORING REPORT RECEIVED.
2016-04-19 43 Site Activity Status Update Received 2016 FIRST QUARTER REPORT RECEIVED
2016-01-12 43 Site Activity Status Update Received 2015 4TH QTR REPORT
2016-01-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-12-18 98 Technical Assistance Provided
2015-12-03 99 Miscellaneous SOIL MOUND REMOVAL MEMORANDUM RECEIVED
2015-10-22 99 Miscellaneous GROUNDWATER QUALITY DATA MEMO RECEIVED
2015-09-28 143 Remedial Action Options Report (RAOR) Received (fee) CH# 1058169
2015-08-31 97 Technical Assistance Request Received (fee) CH# 1056714
2015-08-07 99 Miscellaneous INFORMATION REGARDING CONCRETE AND STEEL IN SOIL MOUND SUBMITTED. TESTING NEEDED FOR DISPOSAL.
2015-07-10 43 Site Activity Status Update Received QTRLY REPORT SUBMITTED WITH SYSTEM DATA ANALYSIS. MINOR AMOUNTS OF FREE PRODUCT IN W07 & W35.
2015-07-08 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-06-04 99 Miscellaneous 3 MWS TRF TO THIS SITE FROM 3M DOWNTOWN SITE (03-37-298678): DFOMW-5, DFOMW-11 & DFOMW-12.
2015-05-20 99 Miscellaneous ANNUAL MEETING. DISCUSSED ADDITIONAL GROUNDWATER AND RESIDUAL PRODUCT INVESTIGATION
2015-04-20 43 Site Activity Status Update Received ANNUAL GW MONITORING REPORT SUBMITTED.
2015-04-20 99 Miscellaneous WORK PLAN FOR EXTENT OF RESIDUAL PHASE PRODUCT AND GROUNDWATER SUBMITTED.
2015-04-16 43 Site Activity Status Update Received QUARTERLY GROUNDWATER ELEVATION AND SYSTEM DATA REPORT SUBMITTED.
2015-03-10 98 Technical Assistance Provided RESPONSE LETTER SENT TO WAULECO TO CLOSURE PRESENTATION AND FOLLOW-UP LETTER
2015-02-18 99 Miscellaneous SOIL BORING WORK SCHEDULED FOR LAST WEEK OF FEBRUARY
2015-02-04 199 Additional Information Received (Fee-Based or Closure) SURFACE WATER DISCHARGE CALCULATION & PROPOSED ROUTE TO ACHIEVE CLOSURE.
2015-01-16 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2015-01-12 43 Site Activity Status Update Received QUARTERLY SYSTEM DATA SUBMITTED ALONG WITH GROUNDWATER ELEVATION DATA
2014-10-20 43 Site Activity Status Update Received THIRD QUARTER REPORT WITH SYSTEM DATA AND GROUNDWATER ELEVATIONS
2014-09-11 99 Miscellaneous CONFERENCE CALL HELD TO DISCUSS A PROCEDURE FOR SURFACE WATER DISCHARGE LIMITS.
2014-08-15 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-07-16 43 Site Activity Status Update Received ANNUAL REPORT SUBMITTED WITH SYSTEM DATA AND ANNUAL GROUNDWATER MONITORING.
2014-07-11 43 Site Activity Status Update Received QTRLY UPDATE WITH SYSTEM OPERATION DATA
2014-07-10 99 Miscellaneous MEETING TO DISCUSS EVALUATING SURFACE WATER PATHWAY.
2014-06-11 198 Request for Additional Information (Fee-Based or Closure) MISSING DOCUMENTATION
2014-05-16 97 Technical Assistance Request Received (fee) CH# 4610
2014-05-01 99 Miscellaneous MTG WITH CLOSURE COMMITTEE TO DISCUSS STEPS TO CLOSURE
2014-04-10 43 Site Activity Status Update Received 1ST QTR REPORT. GROUNDWATER PUMP & TREAT MONITORING WITH FREE PRODUCT OBSERVATIONS
2014-01-17 98 Technical Assistance Provided VERBAL APPROVAL.
2014-01-16 43 Site Activity Status Update Received 4TH QTR 2013 REPORT. SYSTEM AND GROUNDWATER MONITORING COMPLETED.
2014-01-16 199 Additional Information Received (Fee-Based or Closure) ADDITIONAL INFORMATION REGARDING GW PATHWAY SUBMITTED.
2013-12-30 198 Request for Additional Information (Fee-Based or Closure) REQUESTED A GROUNDWATER PATHWAY EVALUATION FOR THE PROPOSED SOIL MOUND COVER
2013-10-31 97 Technical Assistance Request Received (fee) CH# 4538
2013-10-17 43 Site Activity Status Update Received 2013 THIRD QUARTER UPDATE FOR GROUNDWATER TREATMENT SYSTEM.
2013-10-01 99 Miscellaneous ANNUAL MEETING. DISCUSSED LIF SURVEY AND STEPS TO CLOSURE
2013-08-23 43 Site Activity Status Update Received 2013 LIF SURVEY ASSESSMENT
2013-07-12 43 Site Activity Status Update Received QUARTERLY REPORT SUBMITTED WITH SYSTEM MONITORING DATA
2013-05-16 99 Miscellaneous TELEPHONE CONVERSATION WITH CONSULTANT. WILL COMPLETE LIF SURVEY BEFORE OUR ANNUAL MEETING.
2013-04-17 43 Site Activity Status Update Received 2012 ANNUAL GROUNDWATER REPORT SUBMITTED
2013-04-10 43 Site Activity Status Update Received QTRLY REPORT SUBMITTED
2013-01-14 43 Site Activity Status Update Received QTRLY UPDATE SUBMITTED
2012-10-22 43 Site Activity Status Update Received QUARTERLY SYSTEMS REPORT SUBMITTED
2012-07-19 43 Site Activity Status Update Received QUARTERLY REPORT SUBMITTED
2012-07-05 99 Miscellaneous CHANGES TO GROUNDWATER SAMPLING PARAMETERS DISCUSSED. CHANGES WILL BE IMPLEMENTED THIS YEAR
2012-06-04 43 Site Activity Status Update Received Download PDF file VAPOR INTRUSTION RISK SCREENING LEVEL ASSESSMENT
2012-05-16 99 Miscellaneous ANN MTG: STEPS TO CLOSURE, EVAL RED. PUMPING RATE & REQ TO REMOVE VOC'S FROM SAMPLING ANALYSIS
2012-04-25 43 Site Activity Status Update Received ANNUAL REPORT SUBMITTED
2012-04-11 43 Site Activity Status Update Received QUARTERLY REPORT RECEIVED
2012-02-06 43 Site Activity Status Update Received QTLY REPORT SUBMITTED
2011-11-08 43 Site Activity Status Update Received WILL COLLECT MORE GW ELEVATIONS BEFORE ASSESSMING PUMPING RATE REDUCTION
2011-10-25 43 Site Activity Status Update Received QRTLY UPDATE SUBMITTED
2011-07-13 43 Site Activity Status Update Received QTRLY RPT
2011-05-23 99 Miscellaneous ANNUAL MEETING POSTPONED UNTIL NOVEMBER. WANT TO COLLECT MORE GW DATA
2011-05-11 43 Site Activity Status Update Received ANNUAL GW MONITORING REPORT RECEIVED
2011-04-08 43 Site Activity Status Update Received QUARTERLY REPORT - GW PUMPING RATE REDUCED. VERY MINIMAL PRODUCT RECOVERY
2011-02-23 99 Miscellaneous WAULECO TOLD TO PROCEED WITH PUMPING/FREE PRODUCT REDUCTION PLAN.
2011-02-11 99 Miscellaneous ADD'L INFO RE: PROPOSED PUMPING REDUCTION PLAN SUBMITTED.
2011-01-25 99 Miscellaneous REQUEST TO STOP PRODUCT RECOVERY AND ADJUST PUMPING RATES.
2011-01-14 43 Site Activity Status Update Received QUARTERLY REPORT
2010-11-18 99 Miscellaneous FREE PRODUCT ASSESSMENT PLAN SUBMITTED.
2010-10-18 43 Site Activity Status Update Received QUARTERLY GW REPORT; GW LEVELS HIGH, VERY LOW PRODUCT RECOVERY.
2010-08-27 99 Miscellaneous ANNUAL MEETING TO DISCUSS YEARLY PROGRESS & PROPOSED WORK FOR THE NEXT YEAR.
2010-07-08 43 Site Activity Status Update Received QUARTERLY STATUS REPORT
2010-06-22 43 Site Activity Status Update Received ANNUAL GW REPORT
2010-03-01 59 Environmental Enforcement Action Completed CLOSED OUT OF ORDER NCD-91-04.
2010-01-12 43 Site Activity Status Update Received SWITCHING TO QUARTERLY REPORTING.
2009-12-18 99 Miscellaneous APPROVED SCHEDULE FOR SAMPLING 3M MONITORING WELLS.
2009-12-14 99 Miscellaneous DNR SUGGESTED GOING TO QUARTERLY REPORTING IN 2010.
2009-12-08 43 Site Activity Status Update Received NOV MONTHLY REPORT; WHEN CAN THEY GO TO QUARTERLY REPORTING?
2009-11-20 43 Site Activity Status Update Received MONTHLY PROGRESS REPORT
2009-11-05 43 Site Activity Status Update Received MONTHLY PROGRESS REPORT
2009-10-27 99 Miscellaneous PROPOSED MONITORONG SCHEDULE OF 3M MONITORING WELLS.
2009-10-08 99 Miscellaneous REQUEST TO CLOSE OUT ORDER.
2009-09-08 43 Site Activity Status Update Received
2009-08-13 43 Site Activity Status Update Received
2009-07-07 43 Site Activity Status Update Received MONTHLY REPORT
2009-06-11 43 Site Activity Status Update Received MONTHLY REPORT - RECOVERED 138 GALLONS OF PRODUCT.
2009-06-11 43 Site Activity Status Update Received MONTHLY STATUS REPORT; RECOVERED 138 GALLONS OF FREE PRODUCT.
2009-06-01 43 Site Activity Status Update Received ANNUAL GW MONITORING REPORT
2009-06-01 43 Site Activity Status Update Received ANNUAL GW MONITORING REPORT.
2009-05-11 43 Site Activity Status Update Received MONTHLY REPORT
2009-04-10 43 Site Activity Status Update Received MAJORITY OF PRODUCT RECOVERED FROM SE CORNER OF PROPERTY.
2009-03-11 43 Site Activity Status Update Received MONTHLY PROGRESS REPORT. GREATEST PRODUCT RECOVERY FROM SW CORNER OF PROPERTY.
2009-02-13 43 Site Activity Status Update Received MAJORITY OF PRODUCT RECIVERED FROM SE CORNER OF THE SITE.
2008-12-12 43 Site Activity Status Update Received MONTHLY REPORT
2008-11-20 43 Site Activity Status Update Received MONTHLY REPORT & SUMMARY OF PW-19 PIPING REPAIR.
2008-10-24 99 Miscellaneous 1995 AIR SPARGE/SVE REPORT.
2008-10-10 43 Site Activity Status Update Received MONTHLY REPORT >90% OF PRODUCT REMOVED FROM NEW WELLS.
2008-10-02 99 Miscellaneous CONST DOC RPT; FOCUSED PUMPING WELL INSTALLATION.
2008-09-05 43 Site Activity Status Update Received PRODUCT RECOVERY UP AND WATER LEVELS DOWN.
2008-08-08 43 Site Activity Status Update Received MONTHLY REPORT
2008-08-07 43 Site Activity Status Update Received ANNUAL GW MONITORING REPORT.
2008-08-05 99 Miscellaneous ANNUAL MEETING.
2008-08-05 43 Site Activity Status Update Received SOIL SAMPLE RESULTS SUBMITTED.
2008-07-14 43 Site Activity Status Update Received MONTHLY REPORT GW AT HIGHEST RECORDED ELEVATION IN 15 YEARS.
2008-06-19 43 Site Activity Status Update Received MONTHLY REPORT REC'D.
2008-05-10 43 Site Activity Status Update Received MONTHLY REPORT.
2008-04-10 43 Site Activity Status Update Received 468 GAL OF PRODUCT WITH 54% FROM NEW WELLS.
2008-03-17 43 Site Activity Status Update Received 118 GALS RECOVERED FROM NEW WELLS.
2008-03-03 99 Miscellaneous MTG WITH CITY TO DISCUSS THOMAS STREET RECONSTRUCTION.
2008-02-20 43 Site Activity Status Update Received ADDED 4 ADD'L FREE PRODUCT REMOVAL WELLS.
2008-01-14 43 Site Activity Status Update Received WELLS TEMP SHUT DOWN FOR INSTALL OF NEW PUMPIING WELL FOR FOCUSED PUMPING PROJECT.
2008-01-14 43 Site Activity Status Update Received FOCUSED PUMPING WELLS STARTED JAN 2008.
2007-12-17 43 Site Activity Status Update Received SYSTEM SHUT DOWN FOR MAINT, NO PRODUCT RECOVERY FOR NOVEMBER 2007.
2007-11-09 43 Site Activity Status Update Received MONTHLY REPORT
2007-10-10 43 Site Activity Status Update Received
2007-09-07 43 Site Activity Status Update Received MONTHLY REPORT.
2007-08-09 43 Site Activity Status Update Received MONTHY REPORT
2007-07-23 43 Site Activity Status Update Received GW ANNUAL REPORT.
2007-07-23 99 Miscellaneous INFORMATION REQUESTED FOR THOMAS STREET RECONSTRUCTION.
2007-07-12 43 Site Activity Status Update Received
2007-06-13 43 Site Activity Status Update Received MONTHLY REPORT - PRODUCT RECOVERY DOWN & 2 WELLS SHUT DOWN FOR REPAIRS.
2007-06-08 99 Miscellaneous CONTAMINATED SOIL FOUND AROUND PW-16; SEE JUNE'S MONTHLY REPORT.
2007-06-04 99 Miscellaneous APPROVAL LETTER FOR SOIL MOUND CHARACTERIZATION REPORT SENT.
2007-05-31 99 Miscellaneous ANNUAL MEETING.
2007-05-08 43 Site Activity Status Update Received MONTHLY REPORT; 107 GALLONS FREE PRODUCT RECOVERED - WATER LEVELS HIGH.
2007-04-20 97 Technical Assistance Request Received (fee) REVIEW OF SOIL MOUND CHARACTERIZATION REPORT
2007-04-20 98 Technical Assistance Provided REVIEW OF SOIL MOUND CHARACTERIZATION REPORT
2007-04-10 43 Site Activity Status Update Received MONTHLY REPORT; 105 GALLONS FREE PRODUCT RECOVERED - WATER LEVELS HIGH.
2007-04-02 99 Miscellaneous SOIL MOUND CHARACTERIZATION REPORT
2007-03-07 43 Site Activity Status Update Received MONTHLY STATUS REPORT
2007-02-13 43 Site Activity Status Update Received
2007-01-12 43 Site Activity Status Update Received DEC 06 MONTHLY REPORT. RECORD DEC PRECIPITATION FOR WAUSAU 3.28".
2006-12-22 36 Site Investigation Workplan (SIWP) Approved APPROVEAL OF SOIL MOUND CHARACTERIZATION WORKPLAN.
2006-12-11 43 Site Activity Status Update Received SYSTEM SHUTDOWN & MAINTENANCE AT THE END OF OCTOBER.
2006-11-15 97 Technical Assistance Request Received (fee) WORKPLAN FOR SOIL MOUND CHARACTERIZATION SUBMITTED.
2006-11-15 43 Site Activity Status Update Received ANNUAL MAINTENANCE & SHOUTDOWN AT THE END OF OCTOBER.
2006-11-15 98 Technical Assistance Provided WORKPLAN FOR SOIL MOUND CHARACTERIZATION SUBMITTED.
2006-10-11 43 Site Activity Status Update Received MONTHLY REPORT
2006-09-12 43 Site Activity Status Update Received MONTHLY REPORT
2006-09-05 43 Site Activity Status Update Received REC'D ANNUAL REPORT
2006-08-21 43 Site Activity Status Update Received JULY PROGRESS REPORT
2006-07-20 99 Miscellaneous PW-24 EXCAVATION BACKFILLED ON 7/19/06.
2006-07-13 43 Site Activity Status Update Received MONTHLY REPORT - PRODUCT RECOVERY AT 174 GALLONS.
2006-07-06 83 No Further Action Required per NR 708.09 CLOSEOUT OF PW-24 RELEASE UNDER NR708.09
2006-06-26 183 No Further Action per NR 708.09 Request (fee) CLOSE OUT OF SPILL AT PW-24
2006-06-12 43 Site Activity Status Update Received MAY STATUS REPORT
2006-05-26 99 Miscellaneous ANNUAL MTG
2006-05-24 43 Site Activity Status Update Received ACTIONS IN RESPONSE TO RELEASE AT PW-24
2006-05-23 99 Miscellaneous PRESSURE PULSE PILOT TEST RESULTS
2006-05-12 43 Site Activity Status Update Received MONTHLY PROGRESS REPORT
2006-04-17 43 Site Activity Status Update Received MONTHLY PROGRESS REPORT - 744 GALLSON OF PRODUCT RECOVERED FOR MARCH 2006.
2006-03-14 43 Site Activity Status Update Received MONTHLY REPORT - 547 GALLONS OF PRODUCT RECOVERED.
2006-03-14 99 Miscellaneous SUBMITTAL OF MEASURES TAKEN TO PREVENT FUTURE SPILLS.
2006-03-01 99 Miscellaneous WILL FOLLOW UP W/SOIL REMOVAL FROM SPILL THIS SPRING AFTER GROUND THAWS.
2006-02-27 99 Miscellaneous PRODUCT/WATER SPILL AT WELL PW-27. LOST APPROX. 29 GALLONS.
2006-02-17 43 Site Activity Status Update Received MONTHLY PROGRESS RPT INC IN PRODUCT RECOVERY WITH DECREASE IN WATER LEVELS. 322 GAL RECOVERED
2006-01-24 99 Miscellaneous 18 GALLON SPILL OF PRODUCT ON PAVEMENT WAS CONTAINED & CLEANED UP.
2006-01-17 43 Site Activity Status Update Received WAULECO - MONTHLY PROGRESS REPORT 125 GALLONS OF PRODUCT REMOVED.
2005-12-13 43 Site Activity Status Update Received MONTHLY REPORT
2005-11-21 43 Site Activity Status Update Received SYSTEM SHUT DOWN END OF OCTOBER FOR CARBON CHANGE OUT
2005-10-17 43 Site Activity Status Update Received MONTHLY REPORT
2005-09-15 43 Site Activity Status Update Received MONTHLY REPORT. RMT SUBMITTING MONTHLY REPORTS.
2005-08-24 43 Site Activity Status Update Received MONTHLY REPORT
2005-08-09 43 Site Activity Status Update Received ANNUAL GW & SYSTEM MONITORING REPORT
2005-07-21 43 Site Activity Status Update Received JUNE RPT FROM RMT
2005-06-23 43 Site Activity Status Update Received MONTHLY REPORT
2005-05-24 43 Site Activity Status Update Received
2005-05-06 99 Miscellaneous ANNUAL MEETING
2005-04-25 43 Site Activity Status Update Received
2005-03-15 43 Site Activity Status Update Received FEBRUARY RPT
2005-03-09 99 Miscellaneous DEPARTMENT CONCURS WITH CHANGES
2005-03-07 99 Miscellaneous PROPOSES CHANGES FOR SYSTEM SAMPLING FREQUENCY
2005-03-01 43 Site Activity Status Update Received JANUARY RPT
2005-02-23 99 Miscellaneous RESPONSE TO 3M'S CLOSURE NOTIFICATION
2005-01-26 43 Site Activity Status Update Received DECEMBER REPORT
2005-01-24 99 Miscellaneous SENT LETTER REQUESTING WAULECO 'S COMMENTS BY 2/25/05.
2004-12-30 43 Site Activity Status Update Received
2004-11-29 99 Miscellaneous RECEIVED COMMENTS REGARDING 3M CLOSURE
2004-11-26 43 Site Activity Status Update Received PPT TEST COMPLETED
2004-11-01 43 Site Activity Status Update Received SEPTEMBER PROGRESS RPT
2004-10-01 43 Site Activity Status Update Received MONTHLY STATUS REPORT
2004-08-25 43 Site Activity Status Update Received MONTHLY REPORT
2004-07-30 43 Site Activity Status Update Received JUNE PROGRESS RPT
2004-07-13 99 Miscellaneous DMR (DISCHARGE MONITORING REPORT) SUBMITTED
2004-06-22 43 Site Activity Status Update Received MAY RPT. VERY HIGH GW LEVELS. LOW PRODUCT RECOVERY.
2004-06-14 99 Miscellaneous FIRST DISCHARGE MON. FORM AFTER PPT START UP
2004-06-03 43 Site Activity Status Update Received APRIL RPT
2004-05-19 43 Site Activity Status Update Received ANNUAL GW MONITORING RPT
2004-05-18 99 Miscellaneous START UP OF PRESSURE PULSE TECH (PPT) SYSTEM
2004-05-06 99 Miscellaneous APPROVE EXTENSION
2004-04-30 99 Miscellaneous REQUEST EXTENSION TO INJECTION EXEMPTION
2004-04-28 43 Site Activity Status Update Received
2004-03-22 43 Site Activity Status Update Received
2004-02-19 43 Site Activity Status Update Received MONTHLY STATUS REPORT
2004-01-16 43 Site Activity Status Update Received MONTHLY STATUS REPORT
2003-12-22 43 Site Activity Status Update Received NOV. MONTHLY REPORT
2003-12-03 43 Site Activity Status Update Received MONTHLY REPORT
2003-11-14 99 Miscellaneous SHUT DOWN PULSE SYSTEM. MAY RESTART.
2003-10-31 43 Site Activity Status Update Received MONTHLY REPORT
2003-09-24 43 Site Activity Status Update Received MONTHLY RPT
2003-09-12 99 Miscellaneous DMR FROM PILOT TEST
2003-08-18 43 Site Activity Status Update Received
2003-07-23 43 Site Activity Status Update Received INJECTION WELL INSTALLED AND CHANGES MADE TO SYSTEM FOR PILOT TEST
2003-07-10 64 Inject/Infiltrate Request Approved APPROVAL FOR PILOT TEST
2003-07-03 43 Site Activity Status Update Received
2003-06-26 99 Miscellaneous ADD'L SUBMITTAL FOR INJECTION PROPOSAL
2003-05-19 43 Site Activity Status Update Received MONTHLY RPT
2003-05-05 43 Site Activity Status Update Received ANNUAL REPORT
2003-05-02 63 Inject/Infiltrate Request Received (fee)
2003-04-15 43 Site Activity Status Update Received
2003-03-12 43 Site Activity Status Update Received MONTHLY REPORT
2003-02-20 43 Site Activity Status Update Received
2003-01-17 43 Site Activity Status Update Received
2002-12-20 43 Site Activity Status Update Received
2002-11-20 43 Site Activity Status Update Received OCT PROGRESS RPT. RECOVERED 79 GALS.
2002-09-19 43 Site Activity Status Update Received
2002-08-19 43 Site Activity Status Update Received MONTHLY REPORT
2002-07-24 43 Site Activity Status Update Received
2002-06-18 43 Site Activity Status Update Received MONTHLY REPORT
2002-06-04 99 Miscellaneous ANNUAL MEETING
2002-05-29 92 Operation & Maintenance (O&M) Report Received (non-fee)
2002-05-28 43 Site Activity Status Update Received 734 GALLONS OF PRODUCT RECOVERED
2002-04-16 43 Site Activity Status Update Received MONTHLY RPT. 926 GALLONS FREE PRODUCT RECOVERED.
2002-03-27 43 Site Activity Status Update Received
2002-02-26 43 Site Activity Status Update Received
2002-02-25 99 Miscellaneous NFA DENIED. REQUEST ADDITIONAL SI.
2002-01-18 183 No Further Action per NR 708.09 Request (fee)
2002-01-14 43 Site Activity Status Update Received MONTHLY REPORT
2001-12-14 43 Site Activity Status Update Received NOVEMBER MONTHLY REPORT
2001-11-28 43 Site Activity Status Update Received MONTHLY REPORT
2001-10-22 43 Site Activity Status Update Received SYSTEM DOWN FOR MAINTENANCE
2001-09-11 43 Site Activity Status Update Received
2001-08-21 43 Site Activity Status Update Received MONTHLY RPT
2001-07-31 43 Site Activity Status Update Received
2001-06-25 43 Site Activity Status Update Received MONTHLY STATUS RPT
2001-05-31 43 Site Activity Status Update Received APPROXIMATELY 130,000 GALLONS OF FP RECOVERED TO DATE
2001-05-17 43 Site Activity Status Update Received ANNUAL REPORT SUBMITTED
2001-04-26 43 Site Activity Status Update Received APPROX. 4,600 GALLONS FP RECOVERED IN MARCH
2001-03-14 43 Site Activity Status Update Received
2001-02-20 43 Site Activity Status Update Received APPROX. 2,500 GALLONS PRODUCT RECOVERED
2001-01-18 43 Site Activity Status Update Received SYSTEM REPAIRED. 1,468 GALLONS FREE PRODUCT RECOVERED.
2000-12-22 43 Site Activity Status Update Received SYSTEM MAINTENANCE & 375 GAL OF FP
2000-11-27 43 Site Activity Status Update Received RELEASE OF CARBON INTO SANITARY
2000-10-25 43 Site Activity Status Update Received
2000-09-18 43 Site Activity Status Update Received AUGUST PROGRESS RPT. CARBON CHANGE OUT AND 11 PUMPING WELLS REDEVELOPED.
2000-08-28 43 Site Activity Status Update Received
2000-07-28 43 Site Activity Status Update Received JUNE RPT. PW 9 AND 10 SHUT DOWN IN JUNE.
2000-06-27 43 Site Activity Status Update Received MAY RPT. 4,094 GAL FP RECOVERED.
2000-06-01 43 Site Activity Status Update Received APRIL RECOVERED 24,700 GALLONS PRODUCT
2000-05-02 43 Site Activity Status Update Received 100,000 GAL FREE PRODUCT RECOVERED TO DATE 3/30/00
2000-04-07 43 Site Activity Status Update Received 6,485 GAL OF PRODUCT RECOVERED IN FEBRUARY
2000-01-31 43 Site Activity Status Update Received 1,471 GAL RECOVERED
1999-12-23 43 Site Activity Status Update Received 369 GAL RECOVERED. SYSTEM UPGRADE COMPLETE
1999-12-01 43 Site Activity Status Update Received SYSTEM SHUT DOWN FOR MAINTENANCE. 379 GAL RECOVERED.
1999-11-02 43 Site Activity Status Update Received SEPTEMBER REPORT.
1999-09-30 43 Site Activity Status Update Received 1,093 GAL OF FREE PRODUCT RECOVERED
1999-09-01 43 Site Activity Status Update Received APPROX. 1,900 GAL. RECOVERED IN JULY.
1999-07-30 43 Site Activity Status Update Received APPROX 2,200 GAL FP RECOVERED IN JUNE
1999-06-18 43 Site Activity Status Update Received RECOVERED 5,740 GAL OF PRODUCT IN MAY
1999-06-02 43 Site Activity Status Update Received APPROX 7,200 GAL OF PRODUCT RECOVERED IN APRIL. APPROX 75,000 GAL RECOVERED TO DATE.
1999-04-21 43 Site Activity Status Update Received 7,000 GAL FREE PRODUCT REMOVED
1999-04-07 147 Remedial Action (RA) Design Report Received (non-fee) CONSTRUCTION RPT FOR ADD'L RECOVERY WELLS
1999-03-29 43 Site Activity Status Update Received 5,305 GAL FREE PRODUCT RECOVERED
1999-02-25 43 Site Activity Status Update Received 3,718 GAL FREE PRODUCT RECOVERED
1999-01-19 43 Site Activity Status Update Received ANNUAL GW REPORT 1998
1998-12-08 43 Site Activity Status Update Received ADD'L RW IN - STARTUP IN DECEMBER
1998-11-27 43 Site Activity Status Update Received
1998-10-05 43 Site Activity Status Update Received AUGUST RPT. 468 GAL FREE PRODUCT RECOVERED
1998-09-09 43 Site Activity Status Update Received
1998-06-04 43 Site Activity Status Update Received APRIL UPDATE. MERCURY FOUND.
1998-05-21 43 Site Activity Status Update Received
1998-02-09 43 Site Activity Status Update Received EFFLUENT & PRODUCT REC. NUMBERS
1997-12-30 43 Site Activity Status Update Received
1997-12-04 355 Superfund No Further Remedial Action Planned (NFRAP) EPA'S DATABASE.
1996-03-11 43 Site Activity Status Update Received 1995 ANNUAL GW MONITORING RPT
1994-03-25 43 Site Activity Status Update Received FEBRUARY PROGRESS RPT
1994-02-06 43 Site Activity Status Update Received JANUARY PROGRESS RPT
1994-01-24 43 Site Activity Status Update Received DECEMBER PROGRESS RPT
1993-11-12 99 Miscellaneous REQUEST MODIFICATIONS TO QUARTERLY SAMPLING INC. DISCONTINUING CARBAMATES
1993-09-28 99 Miscellaneous ADDENDUM TO TRACER STUDY
1993-08-19 43 Site Activity Status Update Received STATUS OF SOIL INVESTIGATION AND DEMO ACTIVITIES
1993-06-14 43 Site Activity Status Update Received QRTLY RPT AND MAY PROGRESS RPT
1993-05-17 43 Site Activity Status Update Received APRIL PROGRESS RPT
1993-04-18 43 Site Activity Status Update Received SEMI-ANNUAL GW MONITORING RPT
1992-12-15 99 Miscellaneous BUILDING DEMOLITION 78% COMPLETE.
1992-09-15 43 Site Activity Status Update Received SEMIANNUAL GW MONITORING RPT
1992-07-17 43 Site Activity Status Update Received JUNE PROGRESS RPT
1992-06-22 43 Site Activity Status Update Received EVALUATION OF TREATMENT SYSTEM ALTERNATIVES
1992-03-28 43 Site Activity Status Update Received QTLY GW UPDATE
1992-03-16 99 Miscellaneous FINALIZING BIDS FOR BUILING DEMOLITION.
1992-03-13 43 Site Activity Status Update Received INTERIM STATUS RPT
1992-01-10 99 Miscellaneous ENVIRONMENTAL DEMOLITION PLAN
1991-05-31 18 Administrative or Consent Order Issued
1991-05-30 3 Notice of Noncompliance (NON) Issued
1990-07-05 92 Operation & Maintenance (O&M) Report Received (non-fee)
1990-06-18 37 Site Investigation Report (SIR) Received (non-fee)
1990-01-30 37 Site Investigation Report (SIR) Received (non-fee) HYDROGEOLOGIC AND ASSESSMENT RPT
1989-02-09 39 Remedial Action Options Report (RAOR) Received (non-fee) FEASIBILITY STUDY
1987-10-06 351 Superfund Site Assessment Site Inspection (SI) EPA'S DATABASE.
1987-07-28 43 Site Activity Status Update Received RIVER AND SEDIMENT SAMPLING RESULTS
1986-10-09 37 Site Investigation Report (SIR) Received (non-fee) HYDROGEOLOGIC AND ASSESSMENT RPT
1986-08-05 350 Superfund Site Assessment Preliminary Assessment (PA) EPA'S DATABASE.
1986-02-19 303 Superfund Site Assessment Action Taken - Not on NPL or SAS EPA'S DATABASE.
1984-12-13 35 Site Investigation Workplan (SIWP) Received (non-fee) SOIL AND GW SAMPLING
1984-11-02 2 Responsible Party (RP) letter sent
1984-10-25 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Mercury Metals
Non-Chlorinated Solvents VOC
Other Substance Not Listed Other
Other Substance Not Listed Other
Responsible Party
SNE CORP 910 CLEVELAND AVE, WAUSAU, WI 54401
WAULECO INC 1800 NORTH POINT DR, STEVENS POINT, WI 54481
DNR Project Manager
MATT THOMPSON  matthewa.thompson@wisconsin.gov
32728 | 02-37-000006
BOTW Release 4.9 | 04/23/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages