Watershed - Deerskin River (UW46)
Deerskin River Watershed

Details

The Deerskin River Watershed is located in Forest and Vilas counties. It is approximately 36,403 acres in size and contains 64 miles of streams and rivers, 3,048 acres of lakes and 4,928 acres of wetlands. The watershed is dominated by forests (71%) and wetlands (13%) and is ranked medium for nonpoint source issues affecting lakes.

Date  2010

Ecological Landscapes for Deerskin River Watershed

Ecological Landscapes

The Deerskin River Watershed is located in two ecological landscapes: the North Central Forest and the Northern Highlands. The North Central Forest Ecological Landscape occupies much of the northern third of Wisconsin. Its landforms are characterized by end and ground moraines with some pitted outwash and bedrock controlled areas. Kettle depressions and steep ridges are found in the northern portion. Two prominent areas in this Ecological Landscape are the Penokee-Gogebic Iron Range in the north extending into Michigan, and Timm's Hill, the highest point in Wisconsin (1,951 feet) in the south. Soils consist of sandy loam, sand, and silts. The vegetation is mainly forest, with many wetlands and some agriculture, though the growing season is not as favorable as it is in southern Wisconsin. Lake Superior greatly influences the northern portion of the Ecological Landscape especially during the winter season, producing greater snowfall than in most areas in Wisconsin. The historic vegetation was primarily hemlock-hardwood forest dominated by hemlock, sugar maple, and yellow birch. There were some smaller areas of white and red pine forest scattered throughout the Ecological Landscape, and individual white pines trees were a component of the hemlock-hardwood forest. Harvesting hemlock to support the tanneries was common at the turn of the century, and the species soon became a minor component of forests due to over-harvesting and lack of regeneration. Currently, forests cover approximately 80% of this Ecological Landscape. The northern hardwood forest is dominant, made up of sugar maple, basswood, and red maple, and also including some scattered hemlock and white pine pockets within stands. The aspen-birch forest type group is also relatively abundant, followed by spruce-fir. A variety of wetland community types also are present, both forested and non-forested. The Northern Highlands Ecological Landscape is located in northern central Wisconsin. It is known for its pitted outwash plains and kettle lakes mixed with extensive forests and large peatlands. Its landforms are characterized mainly by pitted outwash but also contain some coarse-textured moraines. Soils are acidic and relatively unproductive due to low moisture-holding capacity and lack of organic matter. Historically, this was Wisconsin's greatest pinery. White and red pine forests largely dominated the vegetation, with some smaller pockets of jack pine. On the more mesic soils, hemlock-hardwood forests were common. Aspen-birch forests occurred in openings formed by disturbance events such as wind or fire. Current forest vegetation is primarily aspen, with some white, red and jack pine in both natural and plantation form. Northern hardwood forests, though reduced in extent, still occur on the more mesic soils. Lowland conifer occupies the many peatlands that are scattered throughout the Ecological Landscape.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Big Sand Lake
Status
Complete

Big Sand Lake Property Owners Association: Big Sand Lake Restoration/Ewm Control: Big Sand Lake Property Owners Association is sponsoring an AIS ACEI grant on Big Sand Lake in Vilas County to be completed by December 31, 2008. This is a five year project that will focus on EWM management, and AIS education, prevention and monitoring. The Association will submit future ACEI grants as needed to continue the five year project. The goal is to have an 80% reduction on the EWM acreage and frequency of occurrence within vegetated areas of the Point-Intercept survey. This will allow Big Sand Lake Property Owners Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual manual removal and chemical treatments of EWM; 2) Annual Pre and Post treatment monitoring and analysis; 3) Annual curly-leaf pondweed assessment; 4) Conduct chemical residual and DO monitoring; 5) Annual volunteer AIS and water quality monitoring; 6) Clean EWM fragments from boat landing; 7) AIS educational and partnering activities; 8) Recruit volunteers and implement a CB/CW program; 9) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 10) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and manual control of EWM; 2) Pre and post treatment and curly-leaf pondweed survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Water quality, residual and DO monitoring data; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2010
Waters Involved
Big Sand Lake
Status
Complete

Big Sand Lake Property Owners Association: Big Sand Ais Control & Prevention Project: Big Sand Lake Association, Inc. is sponsoring an AIS ACEI grant on Big Sand Lake in Vilas County. This is the second grant encumbered (funding years 3 and 4) to help fund a five year project that will focus on EWM management, and AIS education, prevention and monitoring. The Association will submit future ACEI grants as needed to continue the five year project. The goal is to have an 80% reduction on the EWM acreage and frequency of occurrence within vegetated areas of the Point-Intercept survey. This will allow Big Sand Lake Property Owners Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual manual removal and chemical treatments of EWM; 2) Annual Pre and Post treatment monitoring and analysis; 3) Annual curly-leaf pondweed assessment; 4) Conduct chemical residual and DO monitoring; 5) Annual volunteer AIS, water quality and residual monitoring; 5) Clean EWM fragments from boat landing; 6) AIS educational and partnering activities; 7) Recruit volunteers and implement a CB/CW program; 8) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 9) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and manual control of EWM; 2) Pre and post treatment and curly-leaf pondweed survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Water quality, residual and DO monitoring data; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Deerskin River
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Ais 5 Year Control Plan: Long Lake District is sponsoring an AIS ACEI grant on Long Lake in Vilas County to be completed by December 31, 2012. This is a five year project that will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Long Lake District to continue management of AIS on their own.

Project activities include:
1) Annual chemical treatments of EWM
2) Manual removal of EWM as an experimental EWM control technique
3) Annual Pre and Post treatment monitoring and analysis
4) Annual volunteer AIS monitoring
5) Recruit volunteers and implement a CB/CW program
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Point-intercept aquatic plant survey with 2 sets of vouchers
8) Develop annual project report and an updated APM plan

Project deliverables include:
1) Chemical and manual removal control of EWM
2) Pre and post treatment and point-intercept survey data
3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
4) AIS educational, prevention and monitoring activities
5) An updated APM plan summarizing EWM management during project and future EWM management direction, CB/CW activities, AIS monitoring and AIS educational activities

Specific Conditions for this project:
- Updated APM plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of updated APM plan, all annual reports, pre and post treatment and point-intercept survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
10/1/2009
Waters Involved
Deerskin River
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District Ais Control Grant Stage Two: Long Lake District is sponsoring a project that will focus on EWM management, AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres, which will allow the Long Lake District to continue management of AIS with minimal state assistance. This project was partially funded under grant ACEI-031-08 and this grant is a continuation of the same project.

Project activities include: 1) Annual chemical treatments and manual removal of EWM; 2) Annual pre/post treatment monitoring and analysis; 3) Annual volunteer AIS monitoring; 4) Install innovative signage at boat landing; 5) Implement a CB/CW program using volunteers and a paid inspector; 6) Entry of inspection and monitoring forms onto Dept website; 7) Point-intercept (PI) aquatic plant survey and community mapping; 8) Develop annual project report and an updated APM plan.

Project deliverables include: 1) Chemical and manual removal control of EWM; 2) Pre/post treatment, PI survey and community mapping data; 3) Innovative signage and 200 hours of annual inspection time; 4) Completed entry of inspection and monitoring forms onto Dept website; 5) AIS educational, prevention and monitoring activities; 6) Annual reports and an updated APM plan summarizing EWM management during project, future EWM management direction, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Updated APM plan needs Dept review and approval

WDNR Lake Coordinator will be provided with an electronic (pdf or word) and hard copy of updated APM plan, all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2013
Waters Involved
Deerskin River
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Ais Control & Prevention Project: 2013 - 2017: Long Lake of Phelps Lake District is sponsoring an ACEI grant on Long Lake, in Vilas County. This project will focus on annual EWM management in Long Lake and also update the Long Lake Management Plan (LMP).

Project activities include: 1) Annual chemical treatments and manual removal of EWM; 2) Annual pre/post treatment monitoring and analysis; 3) Annual volunteer AIS and herbicide concentration monitoring; 4) Implement volunteer boat washing by handing out boat wash tokens; 5) Conduct volunteer and paid watercraft inspections; 6) Entry of inspection and monitoring data onto SWIMS; 7) Point-intercept (PI) aquatic plant survey and community mapping; 8) Develop annual project report and an updated LMP plan.

Project deliverables include: 1) Chemical and manual removal of EWM; 2) Pre/post treatment, PI survey and community mapping data; 3) Entered inspection and monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Annual reports and an updated LMP plan summarizing EWM management during project and future EWM management direction, boat washing activities, inspection activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Updated LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of updated LMP, all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Long Lake
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Ais 5 Year Control Plan: Long Lake District is sponsoring an AIS ACEI grant on Long Lake in Vilas County to be completed by December 31, 2012. This is a five year project that will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Long Lake District to continue management of AIS on their own.

Project activities include:
1) Annual chemical treatments of EWM
2) Manual removal of EWM as an experimental EWM control technique
3) Annual Pre and Post treatment monitoring and analysis
4) Annual volunteer AIS monitoring
5) Recruit volunteers and implement a CB/CW program
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Point-intercept aquatic plant survey with 2 sets of vouchers
8) Develop annual project report and an updated APM plan

Project deliverables include:
1) Chemical and manual removal control of EWM
2) Pre and post treatment and point-intercept survey data
3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
4) AIS educational, prevention and monitoring activities
5) An updated APM plan summarizing EWM management during project and future EWM management direction, CB/CW activities, AIS monitoring and AIS educational activities

Specific Conditions for this project:
- Updated APM plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of updated APM plan, all annual reports, pre and post treatment and point-intercept survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2013
Waters Involved
Long Lake
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Ais Control & Prevention Project: 2013 - 2017: Long Lake of Phelps Lake District is sponsoring an ACEI grant on Long Lake, in Vilas County. This project will focus on annual EWM management in Long Lake and also update the Long Lake Management Plan (LMP).

Project activities include: 1) Annual chemical treatments and manual removal of EWM; 2) Annual pre/post treatment monitoring and analysis; 3) Annual volunteer AIS and herbicide concentration monitoring; 4) Implement volunteer boat washing by handing out boat wash tokens; 5) Conduct volunteer and paid watercraft inspections; 6) Entry of inspection and monitoring data onto SWIMS; 7) Point-intercept (PI) aquatic plant survey and community mapping; 8) Develop annual project report and an updated LMP plan.

Project deliverables include: 1) Chemical and manual removal of EWM; 2) Pre/post treatment, PI survey and community mapping data; 3) Entered inspection and monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Annual reports and an updated LMP plan summarizing EWM management during project and future EWM management direction, boat washing activities, inspection activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Updated LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of updated LMP, all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2014
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Smoky Lk Control & Prevention Of Eurasian Watermilfoil Rapid Response Project: The Town of Phelps is sponsoring an Early Detection and Response project focusing on a new discovery of Eurasian Watermilfoil (EWM) in Smokey Lake in Vilas County. The project includes surveying, monitoring, mapping, and hand-pulling of EWM in Smoky Lake.

Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by professional hand-removal and DASH efforts; 4) Conduct watercraft inspections and enter data into SWIMS; 5) Host a project wrap-up meeting; 6) Develop annual maps and report; 7) Develop end of project report.

Project deliverables include: 1) EWM survey data and maps; 2) 100 hours of inspection time and entered data; 3) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual reports and final report need Dept. review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/15/2016
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Smoky Lake Eurasian Watermilfoil Control Project, Ph 2: The Town of Phelps is sponsoring an AIRR grant to help fund a project which will focus on surveying, monitoring, mapping, and hand-pulling EWM in Smoky Lake, Vilas County.

Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by volunteer hand-removal, professional hand-removal and DASH efforts; 4) Develop annual maps and report; 5) Develop end of project report.

Project deliverables include: 1) EWM survey data and maps; 2) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual reports and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Anvil Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bass Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Beatrice Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Big Sand Lake
Status
Complete

Big Sand Lake Property Owners Association: Big Sand Lake Management Planning Project: Big Sand Lake Property Owners Association is sponsoring an AEPP project to study Big Sand Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Big Sand Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, community mapping, substrate mapping); 8) Purchase GPS; 9) Data analysis; 10) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) GPS; 7) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI, shoreland assessment, coarse woody habitat assessment, watershed assessment and water quality sampling, all maps from project, and all GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Blackjack Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Carpenter Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Catfish Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Cranberry Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Deerskin Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Deerskin River
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Deerskin River
Status
Complete

Long Lake Association Of Vilas County: Aquatic Plant Management Plans: Long Lake Association is sponsoring an Aquatic Invasive Species (AIS) Education, Planning and Prevention grant to be completed by June 30, 2007. Big Sand Lake Property Owners Association is a project partner. The project will focus on developing APM Plans for Long and Big Sand Lakes in Vilas County. Completion of an APM Plan will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Review and summarize available aquatic plant survey data from point-intercept surveys completed summer '06.
2) Administer a public questionnaire regarding lake management activities
3) Hold at least 3 meetings throughout project
4) Aquatic plant community mapping and analysis
5) Delineate watershed and land uses
6) Summarize existing water quality information
7) Educational article
8) AIS education and prevention efforts through meetings, article, and APM Plan implementation recommendations
9) Develop APM Plan

Project deliverables include:
1) Educational article and public questionnaire
2) Aquatic plant community and watershed maps
3) APM Plan

Specific conditions for this project:
- A draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, data from watershed and land use analysis, copy of educational article, copy of public questionnaire, and all maps from project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Dollar Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Duck Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Eagle Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Eagle River
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
East Branch Blackjack Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Finger Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Harmony Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Long Lake
Status
Complete

Long Lake Association Of Vilas County: Aquatic Plant Management Plans: Long Lake Association is sponsoring an Aquatic Invasive Species (AIS) Education, Planning and Prevention grant to be completed by June 30, 2007. Big Sand Lake Property Owners Association is a project partner. The project will focus on developing APM Plans for Long and Big Sand Lakes in Vilas County. Completion of an APM Plan will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Review and summarize available aquatic plant survey data from point-intercept surveys completed summer '06.
2) Administer a public questionnaire regarding lake management activities
3) Hold at least 3 meetings throughout project
4) Aquatic plant community mapping and analysis
5) Delineate watershed and land uses
6) Summarize existing water quality information
7) Educational article
8) AIS education and prevention efforts through meetings, article, and APM Plan implementation recommendations
9) Develop APM Plan

Project deliverables include:
1) Educational article and public questionnaire
2) Aquatic plant community and watershed maps
3) APM Plan

Specific conditions for this project:
- A draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, data from watershed and land use analysis, copy of educational article, copy of public questionnaire, and all maps from project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lower Ninemile Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lynx Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ninemile Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Otter Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Rade Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Scattering Rice Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Spirit Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Spring Meadow Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Sucker Creek Springs
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tambling Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Thoroughfare Creek
Status
Complete

Long Lake Association Of Vilas County: Aquatic Plant Management Plans: Long Lake Association is sponsoring an Aquatic Invasive Species (AIS) Education, Planning and Prevention grant to be completed by June 30, 2007. Big Sand Lake Property Owners Association is a project partner. The project will focus on developing APM Plans for Long and Big Sand Lakes in Vilas County. Completion of an APM Plan will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Review and summarize available aquatic plant survey data from point-intercept surveys completed summer '06.
2) Administer a public questionnaire regarding lake management activities
3) Hold at least 3 meetings throughout project
4) Aquatic plant community mapping and analysis
5) Delineate watershed and land uses
6) Summarize existing water quality information
7) Educational article
8) AIS education and prevention efforts through meetings, article, and APM Plan implementation recommendations
9) Develop APM Plan

Project deliverables include:
1) Educational article and public questionnaire
2) Aquatic plant community and watershed maps
3) APM Plan

Specific conditions for this project:
- A draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, data from watershed and land use analysis, copy of educational article, copy of public questionnaire, and all maps from project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tinsel Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Un Spring
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Unnamed
Status
Complete

Long Lake Association Of Vilas County: Aquatic Plant Management Plans: Long Lake Association is sponsoring an Aquatic Invasive Species (AIS) Education, Planning and Prevention grant to be completed by June 30, 2007. Big Sand Lake Property Owners Association is a project partner. The project will focus on developing APM Plans for Long and Big Sand Lakes in Vilas County. Completion of an APM Plan will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control.

Project activities include:
1) Review and summarize available aquatic plant survey data from point-intercept surveys completed summer '06.
2) Administer a public questionnaire regarding lake management activities
3) Hold at least 3 meetings throughout project
4) Aquatic plant community mapping and analysis
5) Delineate watershed and land uses
6) Summarize existing water quality information
7) Educational article
8) AIS education and prevention efforts through meetings, article, and APM Plan implementation recommendations
9) Develop APM Plan

Project deliverables include:
1) Educational article and public questionnaire
2) Aquatic plant community and watershed maps
3) APM Plan

Specific conditions for this project:
- A draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plan needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plan, data from watershed and land use analysis, copy of educational article, copy of public questionnaire, and all maps from project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Upper Ninemile Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Voyageur Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
West Branch Blackjack Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Big Sand Lake
Status
Complete

Big Sand Lake Property Owners Association: Big Sand Lake Clean Boats Clean Waters 2013: The Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Water project at one public boat landing on Sand Lake for 2013.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Big Sand Lake
Status
Complete

Big Sand Lake Property Owners Association: Big Sand Lake Clean Boats Clean Waters Project 2014: Big Sand Lake Property Owners Association will sponser a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Big Sand Lake
Status
Complete

Big Sand Lake Property Owners Association: Big Sand Lake 2015 Clean Boats Clean Waters Project: The Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Waters program on Big Sand Lake in 2015 which includes 1 public landing.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Big Sand Lake
Status
Complete

Big Sand Lake Property Owners Association: Big Sand Lake Property Owners Association: The Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Big Sand Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Big Sand Lake
Status
Complete

Big Sand Lake Property Owners Association: Big Sand Lake Property Owners Association 2017 Cbcw: Big Sand Lake Property Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG SAND LAKE.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Deerskin Lake
Status
Complete

Deerskin Lake Association: Deerskin Lake Clean Boats Clean Waters 2013: The Deerskin Lake Association will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on one public boat landing.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Deerskin Lake
Status
Complete

Deerskin Lake Association: Deerskin Lake Clean Boats Clean Waters Project 2014: Deerskin Lake Association will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Deerskin Lake
Status
Complete

Deerskin Lake Association: Deerskin Lake 2015 Clean Boats Clean Waters Project: The Deerskin Lake Association is sponsoring a Clean Boats Clean Waters project in 2015 at one public boat landing on Deerskin Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Deerskin Lake
Status
Complete

Deerskin Lake Association: Deerskin Lake Association 2016 Clean Boats Clean Waters: The Deerskin Lake Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Deerskin Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Deerskin Lake
Status
Complete

Deerskin Lake Association: Deerskin Lake Association 2017 Cbcw: Deerskin Lake Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on DEERSKIN LAKE.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Deerskin River
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Of Phelps Clean Boats Clean Waters 2013: The Long Lake of Phelps Lake District will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on one public boat landing.


Grant Details
Clean Boats, Clean Waters
Date
4/13/2014
Waters Involved
Deerskin River
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Clean Boats Clean Waters Project 2014: Long Lake of Phelps Lake District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Deerskin River
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Clean Boats Clean Waters Project 2015: Long Lake Of Phelps Lake District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Deerskin River
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2016 Clean Boats Clean Waters: The Long Lake of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Long Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Deerskin River
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2017 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Long Lake
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Of Phelps Clean Boats Clean Waters 2013: The Long Lake of Phelps Lake District will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on one public boat landing.


Grant Details
Clean Boats, Clean Waters
Date
4/13/2014
Waters Involved
Long Lake
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Clean Boats Clean Waters Project 2014: Long Lake of Phelps Lake District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Long Lake
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Clean Boats Clean Waters Project 2015: Long Lake Of Phelps Lake District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Long Lake
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2016 Clean Boats Clean Waters: The Long Lake of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Long Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Long Lake
Status
Complete

Long Lake Of Phelps Lake District: Long Lake Of Phelps Lake District 2017 Cbcw: Long Lake Of Phelps Lake District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on LONG LAKE.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Anvil Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Bass Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Beatrice Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Blackjack Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Carpenter Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Catfish Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Cranberry Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Deerskin Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Deerskin River
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Dollar Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Duck Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Eagle Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Eagle River
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
East Branch Blackjack Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Finger Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Harmony Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Lower Ninemile Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Lynx Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Ninemile Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Otter Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Rade Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Scattering Rice Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Spirit Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Spring Meadow Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Sucker Creek Springs
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Tambling Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Tinsel Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Un Spring
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Unnamed
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Upper Ninemile Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Voyageur Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
West Branch Blackjack Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Afterglow Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Afterglow Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Baker Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Baker Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Big Sand Lake
Status
Complete

Big Sand Lake Property Owners Association: Big Sand Lake Eurasian Watermilfoil Weevil Study: The Big Sand Lake Property Owners Association proposes to evaluate the effect of the supplemental enhancement of weevil populations as a selective aquatic plant management technique to control Myriophyllum spicatum. Project activities will result in a field evalution of experimental weevil stocking, a status report and presentation to the lake group, and a final report including feasibility recommendations. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. Information about the project will be disseminated to the public by fact sheet distribution, public meeting, and summary report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Big Sand Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Big Sand Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Blackjack Springs
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Blackjack Springs
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Camp One Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Camp One Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Camp Two Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Camp Two Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Catherine Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Catherine Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Crystal Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Crystal Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Deerskin Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Deerskin Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Deerskin Lake
Status
Complete

Town Of Washington: Anvil, Boot & Deerskin Lakes Limnological Baseline Studies & Apm Plans: The Town of Washington is sponsoring a large scale lake planning grant to study Anvil, Boot and Deerskin Lakes in Forest and Vilas Counties with a study completion date of June 30, 2008. The Town of Lincoln, Town of Cloverland, and City of Eagle River are project partners. The project will focus on developing an Aquatic Plant Mangement (APM) Plan for each lake.

Project activities include:
1) Data review, project kick-off meeting and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from Deerskin Lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, P, Chla, and DO through citizen lake monitor and Temp during survey period for Anvil Lake, - secchi, P, and Chla through citizen lake monitor and DO and Temp during aquatic plant sampling for Deerskin Lake - secchi, DO, P, Chla, and Temp during survey period for Boot Lake
6) Watershed and land use analysis
7) Develop APM Plans

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from Deerskin Lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plans

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plans needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plans, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from Deerskin Lake.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Dewey Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Dewey Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Eleanore Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Eleanore Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Ellen Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Ellen Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Elvoy Springs
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Elvoy Springs
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Gail Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Gail Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Goodall Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Goodall Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Gross Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Gross Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Imogene Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Imogene Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Jewel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Jewel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Kentuck Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Kentuck Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Kildare Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Kildare Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Lac Vieux Desert
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Lac Vieux Desert
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Long Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Long Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Manuel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Manuel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Muskeg Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Muskeg Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Norwood Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Norwood Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Noseeum Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Noseeum Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Pickel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Pickel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Plymouth Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Plymouth Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Potfish Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Potfish Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Reservoir Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Reservoir Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Robinson Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Robinson Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Secret Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Secret Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Spectacle Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Spectacle Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Stub Walsh Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Stub Walsh Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Sugar Maple Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Sugar Maple Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Twin Lakes
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Twin Lakes
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Vista Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Vista Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Warvet Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Warvet Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Weber Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Weber Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Whispering Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Whispering Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Afterglow Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Baker Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Beaver Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Big Sand Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Blackjack Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Blackjack Springs
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Brule Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Camp One Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Camp Two Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Catherine Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Crystal Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Deerskin Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Deerskin Lake
Status
Complete

Deerskin Lake Association: Deerskin Lake Aquatic Plant Studies: Deerskin Lake Association is sponsoring a SPL grant to study Deerskin Lake in Vilas County. The project will focus on studying the aquatic plant community and developing a summary report.

Project activities include: 1) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 2) Data analysis; 3) Summary report.

Project deliverables include: 1) PI data; 2) Aquatic plant community and substrate maps; 3) Summary report.

Specific conditions or this project: Draft of summary report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of summary report and all data and maps from the project.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Deerskin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Dewey Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Eleanore Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Eleanore Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Ellen Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Elvoy Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Elvoy Springs
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gail Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Goodall Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gross Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gross Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Haymeadow Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Imogene Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Jewel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kentuck Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kentuck Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kildare Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kildare Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lac Vieux Desert
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Deerskin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Smoky Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lobischer Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Long Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Manuel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Military Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Muskeg Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Muskrat Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Norwood Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Noseeum Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Pickel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Plymouth Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Potfish Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Potfish Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Reservoir Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Robinson Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Secret Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Spectacle Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Spectacle Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Stub Walsh Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Sugar Maple Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Thoroughfare Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin Lakes
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Un Spring
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Vista Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Warvet Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Weber Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Whispering Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Wisconsin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Deerskin River Watershed
Watershed Recommendations
Citizen-Based Stream Monitoring
 
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
6/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Deerskin River
Date
Status
Monitoring of water quality by stream volunteers on the Deerskin River.
6/29/2011
In Progress
Projects
 
Deerskin River WatershedWatershed History Note