Watershed - Tamarack Pioneer River (UW45)
Tamarack Pioneer River Watershed

Details

The Tamarack Pioneer River Watershed is located in Vilas County. It is 133,929 acres in size and contains 183 miles of rivers and streams, 14,007 acres of lakes and 23,826 acres of wetlands. The watershed is dominated by forest (63%), wetlands (18%) and open water (10%) and is ranked medium for nonpoint source issues affecting lakes.

Date  2010

Ecological Landscapes for Tamarack Pioneer River Watershed

Ecological Landscapes

The Tamarack Pioneer River Watershed is located primarily in the Northern Highlands Ecological Landscape which is located in northern central Wisconsin. It is known for its pitted outwash plains and kettle lakes mixed with extensive forests and large peatlands. Its landforms are characterized mainly by pitted outwash but also contain some coarse-textured moraines. Soils are acidic and relatively unproductive due to low moisture-holding capacity and lack of organic matter. Historically, this was Wisconsin's greatest pinery. White and red pine forests largely dominated the vegetation, with some smaller pockets of jack pine. On the more mesic soils, hemlock-hardwood forests were common. Aspen-birch forests occurred in openings formed by disturbance events such as wind or fire. Current forest vegetation is primarily aspen, with some white, red and jack pine in both natural and plantation form. Northern hardwood forests, though reduced in extent, still occur on the more mesic soils. Lowland conifer occupies the many peatlands that are scattered throughout the Ecological Landscape.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
10/1/2011
Waters Involved
Boot Lake
Status
Complete

Boot Lake Assn Inc: Boot Lake Ais Control & Prevention Project: Boot Lake Association is sponsoring an AIS ACEI grant on Boot Lake, in Vilas County. This is the first grant that will, cover costs for the first two years, encumbered as part of a four year project that will focus on EWM management, and AIS education, prevention and monitoring. Annual goals are to reduce the density of 75% of the treatable EWM by one level and to have a 50% decrease in littoral EWM frequency of occurrence from the point-intercept sampling. This will allow the Boot Lake association to continue management of EWM with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of EWM; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Clean Boat Clean Water (CBCW)volunteer and paid watercraft inspections; 6) Entry of inspection and monitoring forms into SWIMS; 7) Volunteer residual herbicide monitoring; 8) Develop management strategy to protect native plants; 9) Develop annual project reports and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey and residual sampling data; 3) Watercraft inspector; 4) A minimum of 200 hours of watercraft inspection time; 5) Entered inspection and monitoring data into SWIMS; 6) Native plant protection strategy; 7) AIS educational, prevention and monitoring activities; 8) Annual reports and final report summarizing EWM management during project and future EWM management suggestions, CBCW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Annual and final reports needs WDNR review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report and annual reports, pre and post treatment survey data, native plant protection strategy, all maps, GIS data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2014
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Aquatic Invasive Species Prevention & Control Project: Lac Vieux Desert Lake Association is sponsoring an ACEI grant on Lac Vieux Desert Lake, in Vilas County. This project will focus on EWM management in Lac Vieux Desert Lake.

Project activities include: 1) Annual hand and DASH removal of EWM; 2) Annual pre/post treatment monitoring, analysis and mapping (early season and mid-late summer AIS surveys for EWM and CLP); 3) Annual wild rice mapping; 4) Annual volunteer AIS monitoring; 5) Conduct boat washing; 6) Entry of monitoring data onto SWIMS; 7) Develop annual project report and final report.

Project deliverables include: 1) Removal of EWM; 2) EWM Pre/post treatment data and mapping; 3) Wild rice maps; 4) Entered monitoring data onto SWIMS; 5) AIS educational, prevention and monitoring activities; 6) Annual reports and final report summarizing EWM management during project and future EWM/CLP management direction, boat washing activities, inspection activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Annual reports and final report needs Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all annual reports, final report, all maps, all GIS, AIS and aquatic plant survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Mud Creek
Status
Complete

Unified Lower Eagle River Chain Of Lakes Com: Eagle River Chain Of Lakes Ais Project: The Unified Lower Eagle River Chain of Lakes Commission (ULERCLC) is sponsoring an AIS ACEI grant on the Eagle River Chain of Lakes in Vilas County. This is a three year, three phase project that will focus on Eurasian Water-Milfoil (EWM) management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to half its current size within three years and allow the ULERCLC to continue management of AIS on its own.

Project activities include:
1) Annual chemical treatments of EWM
2) Volunteer hand removal of EWM as an experimental EWM control technique
3) Annual Pre and Post treatment monitoring and analysis
4) Annual volunteer AIS monitoring
5) Recruit volunteers and implement a CB/CW program
6) Stakeholder participation: CB/CW training, budget and grant meeting, project status/informational meeting
7) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
8) Develop annual project report and a final report

Project deliverables include:
1) Chemical and hand removal control of EWM
2) Pre and post treatment survey data
3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
4) AIS educational, prevention and monitoring activities
5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Rice Creek
Status
Complete

Unified Lower Eagle River Chain Of Lakes Com: Eagle River Chain Of Lakes Ais Project: The Unified Lower Eagle River Chain of Lakes Commission (ULERCLC) is sponsoring an AIS ACEI grant on the Eagle River Chain of Lakes in Vilas County. This is a three year, three phase project that will focus on Eurasian Water-Milfoil (EWM) management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to half its current size within three years and allow the ULERCLC to continue management of AIS on its own.

Project activities include:
1) Annual chemical treatments of EWM
2) Volunteer hand removal of EWM as an experimental EWM control technique
3) Annual Pre and Post treatment monitoring and analysis
4) Annual volunteer AIS monitoring
5) Recruit volunteers and implement a CB/CW program
6) Stakeholder participation: CB/CW training, budget and grant meeting, project status/informational meeting
7) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
8) Develop annual project report and a final report

Project deliverables include:
1) Chemical and hand removal control of EWM
2) Pre and post treatment survey data
3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
4) AIS educational, prevention and monitoring activities
5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Twin Lakes
Status
Complete

Town Of Phelps: North & South Twin Lakes Ais Control & Prevention Project: The Town of Phelps, in cooperation with project partner North and South Twin Lakes Riparian Association (NSTLRA) is sponsoring an AIS ACEI grant on North and South Twin Lakes in Vilas County. This is a four year project that will focus on Eurasian Water-Milfoil (EWM) management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Town of Phelps and NSTLRA to continue management of AIS on their own.

Project activities include:
1) Annual chemical treatments of EWM
2) Hand removal by divers of EWM as an experimental EWM control technique
3) Annual Pre and Post treatment monitoring and analysis
4) Annual volunteer AIS monitoring
5) Recruit volunteers and implement a CB/CW program
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop annual project report and a final report

Project deliverables include:
1) Chemical and hand removal control of EWM
2) Pre and post treatment survey data
3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
4) AIS educational, prevention and monitoring activities
5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ais Control & Prevention; Phase 1: North and South Twin Lakes Riparian Association (NSTLRA), is sponsoring two AIS ACEI grants on North and South Twin Lakes in Vilas County to be completed by June 30, 2012. This is a four year project that will focus on EWM management, and AIS education, prevention and monitoring. Phase 1 focuses on Treatment Monitoring and Stakeholder Participation. Phase 2 focuses on Treatment Implementation. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Town of Phelps and NSTLRA to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Hand removal by divers of EWM as an experimental EWM control technique; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6)Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ais Control & Prevention; Phase 2: North and South Twin Lakes Riparian Association (NSTLRA), is sponsoring two AIS ACEI grants on North and South Twin Lakes in Vilas County to be completed by June 30, 2012. This is a four year project that will focus on EWM management, and AIS education, prevention and monitoring. Phase 1 focuses on Treatment Monitoring and Stakeholder Participation. Phase 2 focuses on Treatment Implementation. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Town of Phelps and NSTLRA to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Hand removal by divers of EWM as an experimental EWM control technique; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6)Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2010
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ais Control & Prevention Project, 2.0: The North and South Twin Lakes Riparian Association (NSTLRA) is sponsoring an AIS ACEI grant on North and South Twin Lakes in Vilas County. This is the second ACEI grant encumbered, funding years 3 and 4, as part of a four year project that will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres. This will allow NSTLRA to continue management of AIS with minimal state assistance.

Project activities include: 1) Annual chemical treatments of EWM and residual monitoring; 2) Hand removal by divers of EWM as an experimental EWM control technique; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring, innovative signage improvements and an AIS pamphlet distribution; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey and residual monitoring data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, photographs of signage improvements, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2013
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Ais Control & Prevention Project 2013: The North and South Twin Lakes Riparian Association (NSTLRA) is sponsoring an AIS ACEI grant on North and South Twin Lakes in Vilas County. The project will focus on EWM monitoring, mapping and management. An updated lake management plan will need to be developed before another Established AIS grant application will be considered.

Project activities include: 1) Chemical treatments and manual removal of EWM; 2) Annual Pre/post treatment monitoring and analysis; 3) Annual volunteer AIS and herbicide concentration monitoring; 4) Entry of monitoring data onto SWIMS; 5) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre/post treatment survey and chemical concentration monitoring data; 3) Entered monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all annual reports, pre/post treatment survey data, and all data and maps from the project.


Grant Details
Aquatic Invasives Control
Date
4/1/2014
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ais Control & Prevention Project: Hand Harvesting 2014-2015: North and South Twin Lakes Riparian Association is sponsoring an ACEI grant on North and South Twin Lakes, in Vilas County. This project will focus on EWM management.

Project activities include: 1) Annual professional hand-harvesting of EWM; 2) Annual EWM peak biomass survey, analysis and mapping; 3) Annual volunteer AIS monitoring and watercraft inspections; 4) Implement volunteer boat washing by handing out boat wash tokens; 5) Entry of inspection and monitoring data onto SWIMS; 6) South Twin Lake point-intercept (PI) aquatic plant survey; 7) Develop annual project report.

Project deliverables include: 1) Manual removal of EWM; 2) Peak biomass, PI survey and community mapping data; 3) Entered inspection and monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Annual reports summarizing EWM management during project and future EWM management direction, boat washing activities, inspection activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Annual reports need Dept review and approval..

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ewm Control & Prevention Project: North and South Twin Lakes Riparian Association is sponsoring an ACEI grant on North and South Twin Lakes, in Vilas County. This project will focus on EWM management.

Project activities include: 1) Annual professional hand-harvesting of EWM; 2) Herbicide treatments of EWM; 3) Herbicide concentration monitoring; 4) Pre/post treatment monitoring and analysis; 5) Annual EWM peak biomass survey, analysis and mapping; 6) Annual volunteer AIS monitoring; 7) South Twin Lake point-intercept (PI) aquatic plant survey; 8) Develop annual treatment report and updated management plan.

Project deliverables include: 1) Manual removal and chemical control of EWM; 2) Pre/post treatment, herbicide monitoring, peak biomass, and PI survey data; 3) Treatment report and updated management plan.

Specific Conditions for this project: Annual reports and updated management plan need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all annual reports, all maps, all GIS, and survey data.


Grant Details
Aquatic Invasives Control
Date
10/1/2007
Waters Involved
Twin River
Status
Complete

Town Of Phelps: North & South Twin Lakes Ais Control & Prevention Project: The Town of Phelps, in cooperation with project partner North and South Twin Lakes Riparian Association (NSTLRA) is sponsoring an AIS ACEI grant on North and South Twin Lakes in Vilas County. This is a four year project that will focus on Eurasian Water-Milfoil (EWM) management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Town of Phelps and NSTLRA to continue management of AIS on their own.

Project activities include:
1) Annual chemical treatments of EWM
2) Hand removal by divers of EWM as an experimental EWM control technique
3) Annual Pre and Post treatment monitoring and analysis
4) Annual volunteer AIS monitoring
5) Recruit volunteers and implement a CB/CW program
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop annual project report and a final report

Project deliverables include:
1) Chemical and hand removal control of EWM
2) Pre and post treatment survey data
3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
4) AIS educational, prevention and monitoring activities
5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ais Control & Prevention; Phase 1: North and South Twin Lakes Riparian Association (NSTLRA), is sponsoring two AIS ACEI grants on North and South Twin Lakes in Vilas County to be completed by June 30, 2012. This is a four year project that will focus on EWM management, and AIS education, prevention and monitoring. Phase 1 focuses on Treatment Monitoring and Stakeholder Participation. Phase 2 focuses on Treatment Implementation. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Town of Phelps and NSTLRA to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Hand removal by divers of EWM as an experimental EWM control technique; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6)Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2008
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ais Control & Prevention; Phase 2: North and South Twin Lakes Riparian Association (NSTLRA), is sponsoring two AIS ACEI grants on North and South Twin Lakes in Vilas County to be completed by June 30, 2012. This is a four year project that will focus on EWM management, and AIS education, prevention and monitoring. Phase 1 focuses on Treatment Monitoring and Stakeholder Participation. Phase 2 focuses on Treatment Implementation. The goal is to reduce the treatable EWM to less than 10 acres. This will allow the Town of Phelps and NSTLRA to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Hand removal by divers of EWM as an experimental EWM control technique; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6)Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2010
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ais Control & Prevention Project, 2.0: The North and South Twin Lakes Riparian Association (NSTLRA) is sponsoring an AIS ACEI grant on North and South Twin Lakes in Vilas County. This is the second ACEI grant encumbered, funding years 3 and 4, as part of a four year project that will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 10 acres. This will allow NSTLRA to continue management of AIS with minimal state assistance.

Project activities include: 1) Annual chemical treatments of EWM and residual monitoring; 2) Hand removal by divers of EWM as an experimental EWM control technique; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring, innovative signage improvements and an AIS pamphlet distribution; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey and residual monitoring data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, photographs of signage improvements, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/1/2013
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Ais Control & Prevention Project 2013: The North and South Twin Lakes Riparian Association (NSTLRA) is sponsoring an AIS ACEI grant on North and South Twin Lakes in Vilas County. The project will focus on EWM monitoring, mapping and management. An updated lake management plan will need to be developed before another Established AIS grant application will be considered.

Project activities include: 1) Chemical treatments and manual removal of EWM; 2) Annual Pre/post treatment monitoring and analysis; 3) Annual volunteer AIS and herbicide concentration monitoring; 4) Entry of monitoring data onto SWIMS; 5) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre/post treatment survey and chemical concentration monitoring data; 3) Entered monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all annual reports, pre/post treatment survey data, and all data and maps from the project.


Grant Details
Aquatic Invasives Control
Date
4/1/2014
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ais Control & Prevention Project: Hand Harvesting 2014-2015: North and South Twin Lakes Riparian Association is sponsoring an ACEI grant on North and South Twin Lakes, in Vilas County. This project will focus on EWM management.

Project activities include: 1) Annual professional hand-harvesting of EWM; 2) Annual EWM peak biomass survey, analysis and mapping; 3) Annual volunteer AIS monitoring and watercraft inspections; 4) Implement volunteer boat washing by handing out boat wash tokens; 5) Entry of inspection and monitoring data onto SWIMS; 6) South Twin Lake point-intercept (PI) aquatic plant survey; 7) Develop annual project report.

Project deliverables include: 1) Manual removal of EWM; 2) Peak biomass, PI survey and community mapping data; 3) Entered inspection and monitoring data onto SWIMS; 4) AIS educational, prevention and monitoring activities; 5) Annual reports summarizing EWM management during project and future EWM management direction, boat washing activities, inspection activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Annual reports need Dept review and approval..

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all annual reports, all maps, all GIS, survey data (pre/post treatment and PI), and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Ewm Control & Prevention Project: North and South Twin Lakes Riparian Association is sponsoring an ACEI grant on North and South Twin Lakes, in Vilas County. This project will focus on EWM management.

Project activities include: 1) Annual professional hand-harvesting of EWM; 2) Herbicide treatments of EWM; 3) Herbicide concentration monitoring; 4) Pre/post treatment monitoring and analysis; 5) Annual EWM peak biomass survey, analysis and mapping; 6) Annual volunteer AIS monitoring; 7) South Twin Lake point-intercept (PI) aquatic plant survey; 8) Develop annual treatment report and updated management plan.

Project deliverables include: 1) Manual removal and chemical control of EWM; 2) Pre/post treatment, herbicide monitoring, peak biomass, and PI survey data; 3) Treatment report and updated management plan.

Specific Conditions for this project: Annual reports and updated management plan need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all annual reports, all maps, all GIS, and survey data.


Grant Details
Aquatic Invasives Control
Date
10/1/2011
Waters Involved
Watersmeet Lake
Status
Complete

Unified Lower Eagle River Chain Of Lakes Com: Eagle River Chain Of Lakes Ais Porject, Phase 5: The Unified Lower Eagle River Chain of Lakes Commission (ULERCLC) is sponsoring an AIS grant on the Eagle River Chain of Lakes. This is the fifth phase of a project focusing on EWM management, AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to half its current size and allow the ULERCLC to continue management on its own.

Project activities: 1) Annual chemical treatments of EWM and residual monitoring; 2) Volunteer hand removal of EWM as an experimental control technique; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) PL mapping and control; 6) PI surveys and aquatic plant community mapping; 7) Recruit volunteers and implement a CB/CW program; 8) Stakeholder participation: CB/CW training, budget and grant meeting, project status/informational meeting; 9) Entry of inspection and monitoring forms onto SWIMS; 10) Develop management strategy (working with UW Ext) to protect native plants; 11) Develop annual and final project reports.

Project deliverables include: 1) Chemical and hand removal control of EWM and PL control; 2) Pre and post treatment survey and residual monitoring data; 3) Entered inspection and monitoring data into SWIMS; 4) A minimum of 400 hours of CB/CW; 5) PI data; 6) Aquatic plant community and substrate maps; 7) Aquatic plant vouchers; 8) Native plant protection strategy; 9) AIS educational, prevention and monitoring activities; 10) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of final report, all annual reports, pre and post treatment survey and PI data, native plant protection strategy, samples of educational and outreach products, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Control
Date
4/1/2014
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Aquatic Invasive Species Prevention & Control Project: Lac Vieux Desert Lake Association is sponsoring an ACEI grant on Lac Vieux Desert Lake, in Vilas County. This project will focus on EWM management in Lac Vieux Desert Lake.

Project activities include: 1) Annual hand and DASH removal of EWM; 2) Annual pre/post treatment monitoring, analysis and mapping (early season and mid-late summer AIS surveys for EWM and CLP); 3) Annual wild rice mapping; 4) Annual volunteer AIS monitoring; 5) Conduct boat washing; 6) Entry of monitoring data onto SWIMS; 7) Develop annual project report and final report.

Project deliverables include: 1) Removal of EWM; 2) EWM Pre/post treatment data and mapping; 3) Wild rice maps; 4) Entered monitoring data onto SWIMS; 5) AIS educational, prevention and monitoring activities; 6) Annual reports and final report summarizing EWM management during project and future EWM/CLP management direction, boat washing activities, inspection activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Annual reports and final report needs Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all annual reports, final report, all maps, all GIS, AIS and aquatic plant survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Early Detection and Response
Date
8/21/2015
Waters Involved
Buckatabon Creek
Status
Proposed

Town Of Conover: Buckatabon Lakes Early Detection & Rapid Response Project: The Town of Conover is sponsoring an Early Detection & Response project which will focus on surveying, monitoring, mapping, and hand-pulling the new discovery of EWM in Upper and Lower Buckatabon Lakes, Vilas County.

Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by volunteer hand-removal and DASH efforts; 4) Conduct watercraft inspections and enter data into SWIMS; 5) Conduct milfoil genetics testing; 6) Develop annual maps and report; 7) Develop end of project report.

Project deliverables include: 1) EWM survey data and maps; 2) 200 hours of inspection time and entered data; 3) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual reports and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2016
Waters Involved
Buckatabon Creek
Status
Complete

Town Of Conover: Buckatabon Lakes Early Detection & Rapid Response Project: The Town of Conover is sponsoring an Early Detection & Response project which will focus on surveying, monitoring, mapping, and hand-pulling the new discovery of EWM in Upper and Lower Buckatabon Lakes, Vilas County.

Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by volunteer hand-removal and DASH efforts; 4) Conduct watercraft inspections and enter data into SWIMS; 5) Conduct milfoil genetics testing; 6) Develop annual maps and report; 7) Develop end of project report.

Project deliverables include: 1) EWM survey data and maps; 2) 200 hours of inspection time and entered data; 3) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual reports and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
9/23/2008
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Eurasian Watermilfoil Rapid Response Project: LVD Lake Association is sponsoring an AIRR grant to be completed by June 30, 2011. The project will focus on surveying and mapping all EWM and managing up to 10 acres of EWM in LVD Lake.

Project activities include: 1)Pre-treatment survey (spring of 2009 and 2010) conducted a week or less prior to treatment; 2)Manage up to 10 acres of EWM; 3)Post-treatment survey (summer of 2009) between mid-July and mid-August.

Project deliverables include: 1)Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions during fall of 2009; 2)Summary report of results from spring 2010 survey.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2016
Waters Involved
Lower Buckatabon Lake
Status
Complete

Town Of Conover: Buckatabon Lakes Early Detection & Rapid Response Project: The Town of Conover is sponsoring an Early Detection & Response project which will focus on surveying, monitoring, mapping, and hand-pulling the new discovery of EWM in Upper and Lower Buckatabon Lakes, Vilas County.

Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by volunteer hand-removal and DASH efforts; 4) Conduct watercraft inspections and enter data into SWIMS; 5) Conduct milfoil genetics testing; 6) Develop annual maps and report; 7) Develop end of project report.

Project deliverables include: 1) EWM survey data and maps; 2) 200 hours of inspection time and entered data; 3) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual reports and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
8/21/2015
Waters Involved
Upper Buckatabon Lake
Status
Proposed

Town Of Conover: Buckatabon Lakes Early Detection & Rapid Response Project: The Town of Conover is sponsoring an Early Detection & Response project which will focus on surveying, monitoring, mapping, and hand-pulling the new discovery of EWM in Upper and Lower Buckatabon Lakes, Vilas County.

Project activities include: 1) Conduct annual early-season and mid-late season AIS surveys; 2) Conduct volunteer AIS surveillance monitoring; 3) Control EWM by volunteer hand-removal and DASH efforts; 4) Conduct watercraft inspections and enter data into SWIMS; 5) Conduct milfoil genetics testing; 6) Develop annual maps and report; 7) Develop end of project report.

Project deliverables include: 1) EWM survey data and maps; 2) 200 hours of inspection time and entered data; 3) Annual reports and final report describing the findings of the AIS, hand-pulling efforts, and guidance for continued control actions.

Specific conditions for this project: Annual reports and final report need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of reports, all maps, and all aquatic plant and any GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
9/23/2008
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Eurasian Watermilfoil Rapid Response Project: LVD Lake Association is sponsoring an AIRR grant to be completed by June 30, 2011. The project will focus on surveying and mapping all EWM and managing up to 10 acres of EWM in LVD Lake.

Project activities include: 1)Pre-treatment survey (spring of 2009 and 2010) conducted a week or less prior to treatment; 2)Manage up to 10 acres of EWM; 3)Post-treatment survey (summer of 2009) between mid-July and mid-August.

Project deliverables include: 1)Final report describing the findings of the pre and post treatment surveys, GPS locations, and guidance for continued control actions during fall of 2009; 2)Summary report of results from spring 2010 survey.

Specific conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Alma Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Alma Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Andrew Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Andrew Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Anvil Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Aspen Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Aspen Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bass Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Beatrice Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Muskellunge Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Riparian Owners Assoc: Black Oak Lake Ais Education, Prevention & Planning, Phase I: Black Oak Lake Riparian Owners Association, Inc. is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at Black Oak Lake landing; 2) Hire a CB/CW inspector through contractual agreement with Trees for Tomorrow; 3) Host AIS ID and CB/CW trainings; 4) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 6) Purchase a storage box for the boat landing, EWM laminates, and carwash tokens; 7) Conduct an AIS meander survey with a professional biologist; 8) Conduct AIS educational and outreach activities (kiosk, placemats, school presentation, Rusty Crayfish assessment, recognition gifts, homeowners packet); 9) Conduct 2 surveys: lake user and economic impact; 10) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter and newspaper article(s).

Project deliverables include: 1) CB/CW inspector; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 3) Results of AIS meander survey; 4) Assembled AIS information and newsletter and newspaper article(s) and AIS educational and outreach activities; 5) Results of user survey and economic impact survey; 6) Final report summarizing CB/CW activities, AIS monitoring, AIS educational activities, and Rusty Crayfish assessment.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, samples of assembled AIS information, newsletter and newspaper article(s), and homeowners packet.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Blackjack Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Blueberry Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bobs Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Boot Creek
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Boot Creek
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Boot Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Boot Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bragonier Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bragonier Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Brazell Creek
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Brazell Creek
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Brazell Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Brazell Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bullfrog Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bullfrog Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Five Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Ten Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Camp Twelve Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Twelve Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Camp Twelve Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Carpenter Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Catfish Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Chickaree Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Chickaree Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Cooks Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Cooks Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Cranberry Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crystal Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dads Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Decker Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Deer Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Deer Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Deerskin Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Deerskin River
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Dollar Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dorothy Dunn Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Draigers Spring
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Drott Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Duck Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Eagle Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Eagle River
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
East Branch Blackjack Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Eloise Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Escanaba Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ewald Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Ewald Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Finger Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Finley Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Finley Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Frank Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Frost Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Frost Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Harmony Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hennig Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hobo Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Honeysuckle Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Honeysuckle Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Horseshoe Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Indian Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jean Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Alva
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Laura
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lake Mary
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lake Mary
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Salsich
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Langley Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lewis Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Mud Creek
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Mud Creek
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Saint Germain Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Saint Germain Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Star Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lone Tree Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lotus Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Lotus Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lower Ninemile Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lynx Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
McDonald Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
McDonald Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
McGinnis Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
McLeod Creek
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
McLeod Creek
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Monahan Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mud Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Mud Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Muskellunge Creek
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Muskellunge Creek
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Muskellunge Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Muskellunge Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Mystery Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nebish Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Nelson Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Nelson Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ninemile Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nineweb Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nixon Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Nixon Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Otter Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pallette Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Partridge Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Partridge Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Perch Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Perch Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pickerel Creek
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Pickerel Creek
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pickerel Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Pickerel Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pincherry Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Pincherry Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pine Creek
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pine Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Pine Creek
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Pine Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Plum Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Plum Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Rade Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Rainbow Spring
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Range Line Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Range Line Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Razorback Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Rice Creek
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Rice Creek
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Rice Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Rice Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Scattering Rice Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Seneca Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Seneca Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Snipe Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Snipe Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Snyder Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Spirit Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Spring Meadow Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Spruce Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Star Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Star Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Starrett Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stella Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stevenson Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stevenson Creek Flowage
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Stewart Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2012
Waters Involved
Stormy Lake
Status
Complete

Friends Of The Gile Flowage Inc: Integrated Education, Planning & Research Approach To Spiny Water Flea Populations In Northern Lakes: The Friends of the Gile Flowage are sponsoring a project addressing the problem of spiny water flea on a regional scale in Northern Wisconsin and Upper Michigan (including Stormy Lake, Gile Flowage, and Lake Gogebic).

Project goals includes: 1) An education and response program to increase lake users\2019 knowledge of the biology and transport of AIS (with particular focus on spiny water fleas) and reduces the opportunity for spiny water fleas (and other AIS) to invade new bodies of water. It is important to convey consistent and streamline best management practices with regard to AIS prevention. 2) Develop adaptive lake management plan for the three focus lakes (Stormy Lake, Gile Flowage, and Lake Gogebic) that integrates existing information about the lakes and addresses AIS, including spiny water fleas. 3) Integrate Education, Response and Planning components with spiny water flea research efforts being conducted in the region and elsewhere to incorporate up-to-date practical information. This is especially important with respect to developing consistent and practical best management practices with regard to AIS transport.


Project deliverables include: 1) Regional comprehensive education and response program; 2) An adaptive management plan for each of the three focus lakes; 3) Overall project report summarizing all project products; 4) Regional spiny water flea containment strategy; 5) Summary report covering boat washing operations includeing hours of use at various lakes, problems encountered with use, acceptance, willingness of public to use or allow use, overall success of use to eliminate the spread of SWF. 6) Strategic plan.

Specific project conditions: 1) The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project. 2) Contact Erin McFarlane (715-346-4978) and Laura Herman (715-365-8998) at UW-Extension to learn about the Clean Lakes/Clean Waters Program and AIS monitoring programs.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Sucker Creek Springs
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Sunset Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Sunset Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tambling Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tepee Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Tepee Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tinsel Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Management Planning Project: North and South Twin Lakes Riparian Association is sponsoring an AEPP grant to study North and South Twin Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for North and South Twin Lakes and AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries, Shoreline, and Coarse Woody Habitat assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, early-season AIS survey, EWM peak-biomass, community mapping, and substrate mapping); 7) Volunteer AIS monitoring; 8) Data analysis and Lake Management Plan.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland and woody habitat data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Lake Management Plan.

Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI survey, early-season AIS survey, EWM peak-biomass survey, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Twin Lakes
Status
Proposed

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Management Planning Project: North and South Twin Lakes Riparian Association is sponsoring an AEPP grant to study North and South Twin Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for North and South Twin Lakes and AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries, Shoreline, and Coarse Woody Habitat assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, early-season AIS survey, EWM peak-biomass, community mapping, and substrate mapping); 7) Volunteer AIS monitoring; 8) Data analysis and Lake Management Plan.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland and woody habitat data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Lake Management Plan.

Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI survey, early-season AIS survey, EWM peak-biomass survey, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Management Planning Project: North and South Twin Lakes Riparian Association is sponsoring an AEPP grant to study North and South Twin Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for North and South Twin Lakes and AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries, Shoreline, and Coarse Woody Habitat assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, early-season AIS survey, EWM peak-biomass, community mapping, and substrate mapping); 7) Volunteer AIS monitoring; 8) Data analysis and Lake Management Plan.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland and woody habitat data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Lake Management Plan.

Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI survey, early-season AIS survey, EWM peak-biomass survey, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
2/15/2016
Waters Involved
Twin River
Status
Proposed

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Management Planning Project: North and South Twin Lakes Riparian Association is sponsoring an AEPP grant to study North and South Twin Lakes, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for North and South Twin Lakes and AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries, Shoreline, and Coarse Woody Habitat assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, early-season AIS survey, EWM peak-biomass, community mapping, and substrate mapping); 7) Volunteer AIS monitoring; 8) Data analysis and Lake Management Plan.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland and woody habitat data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Lake Management Plan.

Specific conditions for this project: 1) Draft of stakeholder survey needs Dept review and approval; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, stakeholder survey, data from PI survey, early-season AIS survey, EWM peak-biomass survey, shoreland assessment, woody habitat assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Un Spring
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Un Spring
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Un Spring
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Un Spring
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Riparian Owners Assoc: Black Oak Lake Ais Education, Prevention & Planning, Phase I: Black Oak Lake Riparian Owners Association, Inc. is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at Black Oak Lake landing; 2) Hire a CB/CW inspector through contractual agreement with Trees for Tomorrow; 3) Host AIS ID and CB/CW trainings; 4) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 6) Purchase a storage box for the boat landing, EWM laminates, and carwash tokens; 7) Conduct an AIS meander survey with a professional biologist; 8) Conduct AIS educational and outreach activities (kiosk, placemats, school presentation, Rusty Crayfish assessment, recognition gifts, homeowners packet); 9) Conduct 2 surveys: lake user and economic impact; 10) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter and newspaper article(s).

Project deliverables include: 1) CB/CW inspector; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 3) Results of AIS meander survey; 4) Assembled AIS information and newsletter and newspaper article(s) and AIS educational and outreach activities; 5) Results of user survey and economic impact survey; 6) Final report summarizing CB/CW activities, AIS monitoring, AIS educational activities, and Rusty Crayfish assessment.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, samples of assembled AIS information, newsletter and newspaper article(s), and homeowners packet.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Unnamed
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Upper Ninemile Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Voyageur Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Watersmeet Lake
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Watersmeet Lake
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
West Branch Blackjack Creek
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
West Plum Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wharton Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
White Birch Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
White Birch Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
White Squaw Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Wilson Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Wisconsin River
Status
Complete

Town Of Cloverland: Cloverland Boat Inspection For Ais: The Town of Cloverland is sponsoring an AIS Education Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Cloverland's "clean lakes" and stopping EWM from leaving Boot Lake.

Project activities include:
1) Recruit volunteers and implement a Clean Boats/Clean Water program at 4 public landings from May-October 2006
2) Hire an AIS Coordinator (primary duties listed on pg 17 of proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Announce grant approval, project description and final results in local newspaper
6) Develop a preliminary AIS plan for 2007

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Two local newspaper articles
- Approximately 160 hours of volunteer time per landing (Boot, Pickerel, Muskellunge, and Snipe)
- Informational packets developed
- Position description of AIS Coordinator
- Final report (contents listed on pg 18 of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and deliverable listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Wisconsin River
Status
Complete

Town Of Cloverland: Town Of Cloverland Lakes Management Planning Project: The Town of Cloverland is sponsoring an AIS AEPP grant to be completed by December 31, 2011. The project will focus on AIS education, prevention and monitoring and also study and develop lake management plans (LMP's) for 21 lakes within the township.

Project activities include: 1) Stakeholder participation - kick-off meeting, stakeholder survey, planning meetings, wrap-up meeting, trainings/workshops (2-CB/CW, AIS, CLMN, native aquatic plants, lake association formation, and 2-aquatic plant sampling methods), brochure/pamphlet, news releases, and newsletter articles; 2) Youth involvement and education; 3) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, and calcium); 4) Aquatic plant survey (point-intercept (PI)) and community mapping; 5) CLP, fisheries and watershed assessment; 6) CB/CW program and volunteer monitoring; 7) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 8) Develop LMP's.

Project deliverables include: 1) Stakeholder survey, brochure/pamphlet, news releases, and newsletter articles; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124/3200-130 into Dept website; 3) PI and CLP survey and water quality data; 4)Aquatic plant community and watershed maps; 5) Two sets of aquatic plant vouchers per lake; 6) LMP's.

Specific Conditions include: 1) Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; 2) Vouchers should be submitted to Lakes Management Coordinator as soon as possible after aquatic plant survey's; 3) LMP's need Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP's, news releases, newsletter articles, stakeholder survey, brochure/pamphlet, PI, CLP, and water quality data, data from watershed assessment, all maps from project, all GIS data, and a set of aquatic plant vouchers from each lake.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Big Portage Lake
Status
Complete

Big Portage Lake Riparian Owners Association: Big Portage Lake Clean Boats Clean Waters 2013: Big Portage Lake Riparian Owners Association will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on one public boat landing.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Big Portage Lake
Status
Complete

Big Portage Lake Riparian Owners Association: Big Portage Lake Clean Boats Clean Waters Project 2014: Big Portage Lake Riparian Owners Association will sponser a Clean Boats Clean Waters landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Big Portage Lake
Status
Complete

Big Portage Lake Riparian Owners Association: Big Portage Lake Clean Boats Clean Waters Projcet 2015: Big Portage Lake Riparian Owners Association will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Big Portage Lake
Status
Complete

Big Portage Lake Riparian Owners Association: Big Portage Lake Riparian Owners Association Clean Boats Clean Waters 2016: The Big Portage Lake Riparian Owners Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Big Portage Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Big Portage Lake
Status
Complete

Big Portage Lake Riparian Owners Association: Big Portage Lake Riparian Owners Association 2017 Cbcw: Big Portage Lake Riparian Owners Association is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BIG PORTAGE LAKE.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Clean Boats Clean Waters 2013: The Black Oak Lake Foundation is sponsoring a project to conduct a Clean Boats Cleans Waters boat landing inspection program in 2013 at one public landing on Black Oak Lake.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Clean Boats Clean Waters Project 2014: Black Oak Lake Preservation FOundation will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake 2015 Clean Boats Clean Water Project: The Black Oak Lake Preservation Foundation is sponsoring a Clean Boats Clean Waters project to conduct a CBCW program at one public landing on Black Oak Lake in 2015.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lk Preservation Foundation 2016 Cbcw: The Black Oak Lake Preservation Foundation is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Black Oak Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Pres Fdn 2017 Cbcw: Black Oak Lake Pres Fdn is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BLACK OAK.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Clean Boats Clean Waters 2013: The Lac Vieux Desert Lake Association will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on one public boat landing.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Clean Boats Clean Waters Project 2014: Lac Vieux Desert Lake Association will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert 2015 Clean Boats Clean Waters Project: The Lac Vieux Desert Lake Association is sponsoring a 2015 Clean Boats Clean Waters project at one public boat landing on Lac Vieux Desert.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desrt Lake Association 2016 Clean Boats Clean Waters: The Lac Vieux Desert Lake Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Lac Vieux Desert Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Association, Inc 2017 Cbcw: Lac Vieux Desert Lake Association, Inc is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on LAC VIEUX DESERT.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Clean Boats Clean Waters Project 2013: The North South Twin Lake Riparian Owners Association will sponsor a Clean Boats Clean Waters landing inspection program at one boat landing for 2013.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Twin Lakes
Status
Proposed

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Clean Boats Clean Waters Project 2013: The North South Twin Lake Riparian Owners Association will sponsor a Clean Boats Clean Waters landing inspection program at one boat landing for 2013.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North And South Twin Lakes Clean Boats Clean Waters Project 2014: North South Twin lake Riparian Association Inc. will sponser a Clean Boats Clean Water landing inspection program at 1 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Twin Lakes
Status
Proposed

North & South Twin Lakes Riparian Assn: North And South Twin Lakes Clean Boats Clean Waters Project 2014: North South Twin lake Riparian Association Inc. will sponser a Clean Boats Clean Water landing inspection program at 1 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North And South Twin Lakes Clean Boats Clean Waters Project 2015: North South Twin Lake Riparian Association, Inc. will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North South Twin Lake Riparian Association Inc. 2016 Clean Boats Clean Waters: The North South Twin Lake Riparian Association, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on North Twin Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Riparian Assn 2017 Cbcw: North & South Twin Lakes Riparian Assn is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on NORTH TWIN LAKE.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Clean Boats Clean Waters Project 2013: The North South Twin Lake Riparian Owners Association will sponsor a Clean Boats Clean Waters landing inspection program at one boat landing for 2013.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Twin River
Status
Proposed

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Clean Boats Clean Waters Project 2013: The North South Twin Lake Riparian Owners Association will sponsor a Clean Boats Clean Waters landing inspection program at one boat landing for 2013.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North And South Twin Lakes Clean Boats Clean Waters Project 2014: North South Twin lake Riparian Association Inc. will sponser a Clean Boats Clean Water landing inspection program at 1 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Twin River
Status
Proposed

North & South Twin Lakes Riparian Assn: North And South Twin Lakes Clean Boats Clean Waters Project 2014: North South Twin lake Riparian Association Inc. will sponser a Clean Boats Clean Water landing inspection program at 1 public accesses in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North And South Twin Lakes Clean Boats Clean Waters Project 2015: North South Twin Lake Riparian Association, Inc. will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2015


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North South Twin Lake Riparian Association Inc. 2016 Clean Boats Clean Waters: The North South Twin Lake Riparian Association, Inc. is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on North Twin Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Twin River
Status
Complete

North & South Twin Lakes Riparian Assn: North & South Twin Lakes Riparian Assn 2017 Cbcw: North & South Twin Lakes Riparian Assn is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on NORTH TWIN LAKE.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Clean Boats Clean Waters 2013: The Black Oak Lake Foundation is sponsoring a project to conduct a Clean Boats Cleans Waters boat landing inspection program in 2013 at one public landing on Black Oak Lake.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Clean Boats Clean Waters Project 2014: Black Oak Lake Preservation FOundation will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake 2015 Clean Boats Clean Water Project: The Black Oak Lake Preservation Foundation is sponsoring a Clean Boats Clean Waters project to conduct a CBCW program at one public landing on Black Oak Lake in 2015.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lk Preservation Foundation 2016 Cbcw: The Black Oak Lake Preservation Foundation is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Black Oak Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Pres Fdn 2017 Cbcw: Black Oak Lake Pres Fdn is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on BLACK OAK.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2013
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Clean Boats Clean Waters 2013: The Lac Vieux Desert Lake Association will sponsor a Clean Boats Clean Waters landing inspection program for 2013 on one public boat landing.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Clean Boats Clean Waters Project 2014: Lac Vieux Desert Lake Association will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert 2015 Clean Boats Clean Waters Project: The Lac Vieux Desert Lake Association is sponsoring a 2015 Clean Boats Clean Waters project at one public boat landing on Lac Vieux Desert.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desrt Lake Association 2016 Clean Boats Clean Waters: The Lac Vieux Desert Lake Association is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Lac Vieux Desert Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Association, Inc 2017 Cbcw: Lac Vieux Desert Lake Association, Inc is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on LAC VIEUX DESERT.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Anvil Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Bass Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Beatrice Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Blackjack Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Carpenter Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Catfish Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Cranberry Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Deerskin Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Deerskin River
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Dollar Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Duck Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Eagle Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Eagle River
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
East Branch Blackjack Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Finger Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Harmony Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Lower Ninemile Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Lynx Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Ninemile Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Otter Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Rade Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Scattering Rice Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Spirit Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Spring Meadow Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Sucker Creek Springs
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Tambling Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Tinsel Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
2/14/1996
Waters Involved
Torch Lake
Status
Complete

Vilas County: Acq-Torch Lake Land Acquisition - Crist Property: Vilas County will acquire 60 acres of land with frontage on Torch Lake and the Wisconsin River for lake protection and public outdoor recreation purposes. Eligible costs are outlined on the attached Cost Estimate Worksheet. PER SPONSOR: PROJECT FELL THROUGH; GRANT AWARD WITHDRAWN.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Un Spring
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Unnamed
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Upper Ninemile Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
Voyageur Lake
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Lake Protection Grant
Date
9/1/2011
Waters Involved
West Branch Blackjack Creek
Status
Complete

Town Of Washington: Lmi-Lake Management Plan Implementation Project For Anvil Lake: The Town of Washington is sponsoring a project on Anvil Lake, Vilas County. The project will focus on studying water quality and developing an Anvil Lake Management Plan (LMP).

Project activities include: 1) Develop water and P budget; 2) Water quality evaluation and groundwater assessment; 3) WiLMS simulation modeling; 4) Stakeholder participation; 5) Collect sediment cores for historical and future lake water quality assessment; 6) Implementation of County sewage ordinance and association shoreline restoration project; 7) Develop annual reports, a scientific investigations report and LMP.

Project deliverables include: 1) Precipitation and lake-stage data presented \201Creal time\201D on USGS website; 2) Annual USGS WI data reports, scientific investigations report and LMP.

Specific Conditions for this project: Reports and LMP need Dept. review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of all reports and stakeholder participation materials, GIS maps, and project data.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Afterglow Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Afterglow Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Baker Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Baker Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Big Portage Lake
Status
Complete

Big Portage Lake Riparian Owners Association: Big Portage Lake Management Plan, Phase Ii: Big Portage Lake Riparian Owners Association is sponsoring a phased large scale lake planning grants to study Big Portage Lake in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Big Portage Lake. This grant is for phase 2. (Phase 3 of the LMP will be applied for in February of 2010.)

Project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, pH, Alk, suspended solids, and Calcium) \2013 sampling by citizen monitor and consultant; 3) Point-intercept (PI) aquatic plant survey, community mapping and analysis; 4) Curly-leaf pondweed survey; 5) Shoreline assessment; 6) Fisheries assessment; 7) Watershed assessment and P load modeling; 8) CB/CW, volunteer AIS monitoring and professional Dreissena monitoring; 9) Develop LMP.

Project deliverables include: 1) PI and shoreland assessment data; 2) Aquatic plant community and watershed maps; 3) Two sets of aquatic plant vouchers.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release(s), newsletter article, stakeholder survey, data from watershed assessment, PI survey, shoreland assessment, and water quality sampling, all maps from project, and all GIS data, and vouchers.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Big Portage Lake
Status
Complete

Big Portage Lake Riparian Owners Association: Big Portage Lake Management Planning Project, Phase 1: Big Portage Lake Riparian Owners Association is sponsoring a phased large scale lake planning grants to study Big Portage Lake in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Big Portage Lake. This grant is for phase 1. (Phase 3 of the LMP will be applied for in February of 2010.)

Project activities include: 1) Stakeholder participation \2013 kick-off meeting, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis (Secchi, P, Chla, DO, temp, N, conductivity, pH, Alk, suspended solids, and Calcium) \2013 sampling by citizen monitor and consultant; 3) Point-intercept (PI) aquatic plant survey, community mapping and analysis; 4) Curly-leaf pondweed survey; 5) Shoreline assessment; 6) Fisheries assessment; 7) Watershed assessment and P load modeling; 8) CB/CW, volunteer AIS monitoring and professional Dreissena monitoring; 9) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Shoreland and water chemistry data; 3) Shoreline assessment; 4) CBCW data .

Specific conditions: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news release(s), newsletter article, stakeholder survey, data from watershed assessment, PI survey, shoreland assessment, and water quality sampling, all maps from project, and all GIS data, and vouchers.


Grant Details
Large Scale Lake Planning
Date
10/1/2010
Waters Involved
Big Portage Lake
Status
Complete

Big Portage Lake Riparian Owners Association: Big Portage Lake Management Planning Project, Phase 3: Big Portage Lake Riparian Owners Association is sponsoring phased large scale lake planning grants to study Big Portage Lake, in Vilas County. The project will focus on developing a Lake Management Plan for Big Portage Lake. Phases 1 and 2 were funded in the August 2009 grant cycle and Phase 3 was funded in August 2010.

Phase 3 project activities include: 1) Stakeholder participation - stakeholder survey; 2) CB/CW activities; 3) Data analysis; 4) Develop Lake Management Plan.

Project deliverables include: 1) Stakeholder survey; 2) Entry of watercraft inspection forms onto SWIMS; 3) Lake Management Plan.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Lake Management Plan needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of stakeholder survey, LMP, all data and maps, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Big Sand Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Big Sand Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2003
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Riparian Owners Assoc: Black Oak Lake Comprehensive Management Plan: The Black Oak Lake Association is sponsoring the first phase in a long term project that will create a comprehensive plan through a partnership with Conserve School and Black Oak Lake Association. There are three main products that will come out of this grant, a comprehensive lake management plan in an initial version, a GIS project that will be built upon in future years and an education program for students at Conserve School and lake residents. The detailed items that will be completed are listed on pages 5-8 of the approved proposal dated July 29, 2003.

The Department will receive both paper and electronic copies off all reports, GIS data, lake data and other materials produced as part of this project.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Riparian Owners Assoc: Black Oak Lake Protection Program, Phase Ii: Black Oak Lake Riparian Owners Association Inc., will conduct a lake evaluation and update the Phase I Black Oak Lake Adaptive Management Plan with the development of the Phase II Black Oak Lake Management Plan.

The project includes: 1) review recent aquatic macrophyte surveys 2) aquatic plant survey using point intercept method and development of aquatic plant management (APM) plan following DNR guidelines 3) conduct a near-shore riparian plan survey 4) detailed analysis of current lake monitoring activities 5) elucidate potential reasons for increase in water clarity in 2005 6) participate in management of Black Oak Lake lake trout population 7) gather and interpret additional historical data on Black Oak Lake 8) integrate Phase II findings into the Phase I Black Oak Lake adaptive management plan.

Project deliverables include:
- Detailed analysis of water quality sampling results and Black Oak's TSI
- Aquatic plant survey final report with a section on near-shore riparian plants culminating in an APM plan
- Two plant voucher specimens for each plant found in aquatic plant survey - one for WI DNR and one for Black Oak Lake Association
- Augment Phase I GIS project with new layers from Phase II
- Black Oak Lake Adaptive Management Plan Phase II
Specific conditions for this project:
- Project design plans and subsequent Black Oak Lake Management Plan need review and approval from Lakes Coordinator before project begins and adoption of final plan/management recommendations.
- Applicant is required to provide a mid-term project update to Lakes Coordinator.

Wisconsin Department of Natural Resources Lakes Coordinator will be provided with electronic (pdf) and (2) hard copies of the Black Oak Lake Adaptive Management Plan Phase II and APM plan, a copy of the GIS project on CD-ROM, and all raw data in electronic format.


Grant Details
Large Scale Lake Planning
Date
4/1/2008
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Riparian Owners Assoc: Black Oak Lake Watershed Protection Program - Phase 3: Black Oak Lake Riparian Owners Association is sponsoring a large scale lake planning grant to continue to study Black Oak Lake in Vilas County with a study completion date of December 31, 2008. The project will focus on establishing a baseline of the littoral zone and riparian area condition in order to monitor lake and riparian ecosystem quality and stability in the future for Black Oak Lake.

Project activities include:
1) Document the littoral zone and riparian area condition using digital photography
2) Qualitatively document the littoral zone and riparian area using a volunteer-based rapid assessment technique
3) Quantitatively document the littoral zone and riparian area using the USEPA Lake Assessment Procedure along with the WDNR Supplemental Lakeshore Assessment
4) Integrate Phase 3 results into the Black Oak Lake Adaptive Management Plan

Project deliverables include:
1) An electronic, image-based waterfront archive that presents geographic data, digital photographic documentation and qualitative assessment results as an appendix in the Black Oak Lake Adaptive Management Plan
2) Report of the USEPA and WDNR quantitative assessment as an appendix in the Black Oak Lake Adaptive Management Plan

Specific conditions for this project:
- Report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of appendices and an electronic copy of the image-based waterfront archive


Grant Details
Large Scale Lake Planning
Date
10/1/2010
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Long Term Water Quality & Stage Monitoring, Phase 5: Black Oak Lake Riparian Owners Association is sponsoring phased lake planning project to study Black Oak Lake, in Vilas County. The project will focus on aquatic invasive species prevention (AIS) activities, studying shorelands and water quality in Black Oak Lake and then update the Black Oak Lake Adaptive Management Plan (LMP). This would allow Black Oak Lake to become eligible for lake protection grant money in the shoreland restoration category.

Phase 5 project activities include: 1) Conduct water quality sampling (CLMN \2013 secchi, P and chla, grant \2013 N, ammonia, Ca, alk, ss, pH, and cond); 2) Install lake stage monitoring station and begin measurements; 3) Develop water quality and lake stage monitoring plan; 4) Hire CB/CW monitor and continue CB/CW program; 5) Conduct educational and outreach: water quality and stage monitoring training, press release and newsletter; 6) Update LMP.

Project deliverables include: 1) Water quality and lake stage data; 2) Water quality and lake stage monitoring plan; 3) Entered watercraft inspection data onto SWIMS; 4) Updated LMP.

Specific conditions for this project: 1) Draft water quality and lake stage monitoring plan needs Dept review and approval; 2) LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, water quality and lake stage monitoring plans, all data and results, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2010
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Protection & Restoration Of Riparian Shorelines, Phase 4: Black Oak Lake Riparian Owners Association is sponsoring phased project to study Black Oak Lake, in Vilas County. The project will focus on aquatic invasive species prevention (AIS) activities, studying shorelands and water quality in Black Oak Lake and then update the Black Oak Lake Adaptive Management Plan (LMP). This would allow Black Oak Lake to become eligible for lake protection grant money in the shoreland restoration category.

Phase 4 project activities include: 1) Review and analyze littoral zone and riparian area conditions to prioritize shoreline restoration and protection areas; 2) Select candidate protection and restoration sites; 3) Develop protection/restoration plan for each demonstration area; 4) Hire CB/CW monitor and continue CB/CW program; 5) Update LMP with protection/restoration plans.

Project deliverables include: 1) Littoral zone and riparian area data and results; 2) Shoreland restoration and protection plan that includes 4-7 individual demonstration site plans; 3) Entered watercraft inspection data onto SWIMS; 4) Updated LMP.

Specific project conditions: 1) Draft restoration/protection plans need Dept review and approval; 2) LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, restoration/protection plans, all results from data analysis, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2013
Waters Involved
Black Oak Lake
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Watershed Protection Program Phase 6: Black Oak Lake Preservation Foundation is sponsoring a large scale lake planning grant to study Black Oak Lake, in Vilas County. The project will focus on aquatic invasive species prevention (AIS) activities, studying aquatic plants, water quality, groundwater, and a sediment core in Black Oak Lake and then update the Black Oak Lake Adaptive Lake Management Plan (LMP).

Phase 6 project activities include: 1) Conduct water quality sampling and analysis; 2) Install mini-piezometers to monitor groundwater movement; 3) Aquatic plant community analysis (Compare aquatic plant point-intercept (PI) surveys); 4) Sediment core analysis; 5) Conduct watercraft inspections; 6) Entry of inspection data into SWIMS; 7) Update LMP.

Project deliverables include: 1) Water quality and groundwater data; 2) Entered watercraft inspection data onto SWIMS; 3) Updated LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, and all data, maps and GIS data from the project.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Blackjack Springs
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Blackjack Springs
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Camp One Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Camp One Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Camp Two Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Camp Two Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Castle Rock Ditch
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Catherine Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Catherine Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cruson Slough
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Crystal Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Crystal Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Deerskin Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Deerskin Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Dewey Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Dewey Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Eleanore Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Eleanore Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Ellen Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Ellen Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Elvoy Springs
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Elvoy Springs
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Gail Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Gail Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Goodall Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Goodall Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Gross Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Gross Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Imogene Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Imogene Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Jewel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Jewel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Kentuck Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Kentuck Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Kildare Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Kildare Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Lac Vieux Desert
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Lac Vieux Desert
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Management Planning Project, Phase 1: Lac Vieux Desert Lake Association is sponsoring a project to study Lac Vieux Desert Lake in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Lac Vieux Desert Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control. Phases 1 and 2 were funded in this grant cycle (Feb 2009) and Phase 3 will be submitted for funding in August 2009.

Project activities include: 1) Stakeholder participation - kick-off meeting, AIS training, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report; 2)Recruit volunteers and implement a CB/CW program; 3) Annual volunteer AIS monitoring; 4) Water quality sampling (secchi, P, Chla, N, conductivity, pH, total Alk, total suspended solids, calcium, DO, and temp); 5) Curly-leaf pondweed (CLP) survey and aquatic plant community mapping; 6) Sensitive area delineation; 7)Fisheries assessment; 8)Watershed assessment and P load modeling; 9) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release, newsletter article, and progress report; 2) Aquatic plant community and watershed maps; 3) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 4) Water quality and P modeling data; 5) LMP.

Specific conditions: Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, stakeholder survey, news release, newsletter article, progress report, data and P modeling from watershed assessment, all GIS data, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Management Planning Project, Phase 2: Lac Vieux Desert Lake Association is sponsoring project to study Lac Vieux Desert Lake in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Lac Vieux Desert Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control. Phases 1 and 2 were funded in this grant cycle (Feb 2009) and Phase 3 will be submitted for funding in August 2009.

Project activities include: 1) Stakeholder participation - kick-off meeting, AIS training, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report; 2)Recruit volunteers and implement a CB/CW program; 3) Annual volunteer AIS monitoring; 4) Water quality sampling (secchi, P, Chla, N, conductivity, pH, total Alk, total suspended solids, calcium, DO, and temp); 5) Curly-leaf pondweed (CLP) survey and aquatic plant community mapping; 6) Sensitive area delineation; 7)Fisheries assessment; 8)Watershed assessment and P load modeling; 9) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release, newsletter article, and progress report; 2) Aquatic plant community and watershed maps; 3) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 4) Water quality and P modeling data; 5) LMP.

Specific conditions: Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, stakeholder survey, news release, newsletter article, progress report, data and P modeling from watershed assessment, all GIS data, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Lac Vieux Desert
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Management Planning Project, Phase Iii: Lac Vieux Desert Lake Association is sponsoring a project which will focus on developing a Lake Management Plan (LMP) for Lac Vieux Desert Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control. Phases 1 and 2 were funded in Feb 2009 and Phase 3 was funded during this cycle.

Project activities include: 1) Stakeholder participation \2013 kick-off meeting, AIS training, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report; 2) Recruit volunteers and implement a CB/CW program; 3) Annual volunteer AIS monitoring; 4) Water quality sampling (secchi, P, Chla, N, conductivity, pH, total Alk, total suspended solids, calcium, DO, and temp); 5) Curly-leaf pondweed (CLP) survey and aquatic plant community mapping; 6) Sensitive area delineation; 7) Fisheries assessment; 8) Watershed assessment and P load modeling; 9) Develop LMP.

Project deliverables include: 1) Lake Management Plan.

Specific conditions: 1) LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, stakeholder survey, news release, newsletter article, progress report, data and P modeling from watershed assessment, all GIS data, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Du Bay
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Long Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Long Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Manuel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Manuel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Muskeg Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Muskeg Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Norwood Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Norwood Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Noseeum Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Noseeum Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Pickel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Pickel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2006
Waters Involved
Pickerel Creek
Status
Complete

Town Of Washington: Anvil, Boot & Deerskin Lakes Limnological Baseline Studies & Apm Plans: The Town of Washington is sponsoring a large scale lake planning grant to study Anvil, Boot and Deerskin Lakes in Forest and Vilas Counties with a study completion date of June 30, 2008. The Town of Lincoln, Town of Cloverland, and City of Eagle River are project partners. The project will focus on developing an Aquatic Plant Mangement (APM) Plan for each lake.

Project activities include:
1) Data review, project kick-off meeting and project final meeting
2) Develop public questionnaire and prepare educational article
3) Point-intercept (PI) survey of aquatic plants with 2 sets of pressed plants from Deerskin Lake
4) Aquatic plant community mapping and analysis
5) Water quality sampling - secchi, P, Chla, and DO through citizen lake monitor and Temp during survey period for Anvil Lake, - secchi, P, and Chla through citizen lake monitor and DO and Temp during aquatic plant sampling for Deerskin Lake - secchi, DO, P, Chla, and Temp during survey period for Boot Lake
6) Watershed and land use analysis
7) Develop APM Plans

Project deliverables include:
1) Public questionnaire and educational article
2) PI data and aquatic plant community and watershed maps
3) 2 sets of pressed aquatic plants from Deerskin Lake (one set for lake group and second for Dept)
4) Water quality sampling results
5) APM Plans

Specific conditions for this project:
- Draft of public questionnaire should be submitted to Lakes Management Coordinator for review before sending to public
- APM Plans needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of APM Plans, educational article, public questionnaire, data from watershed and land use analysis, data from PI survey, data from water quality sampling, all maps from project, and a set of pressed aquatic plants from Deerskin Lake.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Plymouth Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Plymouth Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Potfish Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Potfish Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Reservoir Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Reservoir Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Rice Creek
Status
Complete

Town Of Washington: Watersmeet Lake Aquatic Plant Survey & Apm Plan: The Town of Washington in cooperation with the City of Eagle River and Town of Lincoln will conduct an aquatic plant survey, lakeshore resident survey and develop an aquatic plant management (APM) plan for the Eagle River Chain of Lakes (Chain).

The project includes: 1) a "kickoff meeting" to coordinate and finalize project plan 2) review existing lake morphology, data, degree of lake use, water quality records, and aquatic plant survey data 3) aquatic plant survey using point intercept method for Watersmeet Lake 4) lakeshore resident survey 5) measure water clarity at the deep hole within each lake basin 6) development of APM plan for the Chain following DNR guidelines.

Project deliverables include: 1) Aquatic plant survey report with a section on invasive species education, watershed, water quality, and lakeshore resident survey results, 2) APM Plan for the Eagle River Chain of Lakes, 3) Two plant voucher specimens for each plant found in aquatic plant survey of the Chain- one each for DNR and the T. of Washington, 4) Mid term project update, 5) Consultant will provide the Township with 3 copies of draft and final report, one educational article and public questionnaire, attendance at "kickoff meeting", Town meeting to present project results and a site visit to discuss goals of project, CD containing APM Plan files, and CD per lake with GPS points of aquatic plants presence and abundance.

Specific conditions: Project design plans, resident survey questions, and APM plan, need review and approval from DNR before project begins and adoption of final management recommendations.

Wisconsin Department of Natural Resources will be provided with electronic (pdf) and hard copies (2) of APM plan, all raw data in electronic format, and a copy of CD's created during project. Project results will be disseminated to the public via a presentation the Town of Washington.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Robinson Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Robinson Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Secret Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Secret Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Spectacle Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Spectacle Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Stub Walsh Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Stub Walsh Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Sugar Maple Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Sugar Maple Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Twin Lakes
Status
Complete

North & South Twin Lakes Assn: Twin Lakes Water Quality Assmt & Exotic Species Prevention: The North and South Twin Lakes Riparian Association proposes to assess the water quality of North and South Twin lakes. Project activities include water quality monitoring, water quality assessment and interpretation, and placing exotic species prevention signs at boat landings on North and South Twin Lakes. The project will result in a final report. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter mailing, entire report mailing, public meeting, and newspaper article.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Twin Lakes
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Twin Lakes
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Twin Lakes
Status
Complete

Town Of Phelps: Comprehensive Lake Management Plan Phase Ii, North Twin: The Town of Phelps will sponsor this project which will build upon the 2000 comprehensive plan for North and South Twin lakes to incorporate changes that have occurred. The project will focus on an Aquatic Plant Management Plan with a focus on non-native species (curly leaf and EWM) and a more in-depth look at water quality issues on the lakes. The project will result in an updated plan and management recommendations and implementation strategies.

All final reports will provided to the Department with raw and summarized data in both hard copy and electronic format. Aquatic Plant Survey Methods must be pre-approved by Laura Herman, DNR Aquatic Plant Specialist.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Twin Lakes
Status
Complete

Town Of Phelps: Comprehensive Lake Management Plan, Phase Ii, South Twin: The Town of Phelps will sponor this project which will build upon the 2000 comprehensive plan for North and South Twin lakes to incorporate changes that have occurred. The project will focus on an Aquatic Plant Management Plan with a focus on non-native species (curly leaf and EWM) and a more in-depth look at water quality issues on the lakes. The project will result in an updated plan and management recommendations and implementation strategies.

All final reports will provided to the Department with raw and summarized data in both hard copy and electronic format. Aquatic Plant Survey Methods must be pre-approved by Laura Herman, DNR Aquatic Plant Specialist.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Riparian Owners Assoc: Black Oak Lake Protection Program, Phase Ii: Black Oak Lake Riparian Owners Association Inc., will conduct a lake evaluation and update the Phase I Black Oak Lake Adaptive Management Plan with the development of the Phase II Black Oak Lake Management Plan.

The project includes: 1) review recent aquatic macrophyte surveys 2) aquatic plant survey using point intercept method and development of aquatic plant management (APM) plan following DNR guidelines 3) conduct a near-shore riparian plan survey 4) detailed analysis of current lake monitoring activities 5) elucidate potential reasons for increase in water clarity in 2005 6) participate in management of Black Oak Lake lake trout population 7) gather and interpret additional historical data on Black Oak Lake 8) integrate Phase II findings into the Phase I Black Oak Lake adaptive management plan.

Project deliverables include:
- Detailed analysis of water quality sampling results and Black Oak's TSI
- Aquatic plant survey final report with a section on near-shore riparian plants culminating in an APM plan
- Two plant voucher specimens for each plant found in aquatic plant survey - one for WI DNR and one for Black Oak Lake Association
- Augment Phase I GIS project with new layers from Phase II
- Black Oak Lake Adaptive Management Plan Phase II
Specific conditions for this project:
- Project design plans and subsequent Black Oak Lake Management Plan need review and approval from Lakes Coordinator before project begins and adoption of final plan/management recommendations.
- Applicant is required to provide a mid-term project update to Lakes Coordinator.

Wisconsin Department of Natural Resources Lakes Coordinator will be provided with electronic (pdf) and (2) hard copies of the Black Oak Lake Adaptive Management Plan Phase II and APM plan, a copy of the GIS project on CD-ROM, and all raw data in electronic format.


Grant Details
Large Scale Lake Planning
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Riparian Owners Assoc: Black Oak Lake Watershed Protection Program - Phase 3: Black Oak Lake Riparian Owners Association is sponsoring a large scale lake planning grant to continue to study Black Oak Lake in Vilas County with a study completion date of December 31, 2008. The project will focus on establishing a baseline of the littoral zone and riparian area condition in order to monitor lake and riparian ecosystem quality and stability in the future for Black Oak Lake.

Project activities include:
1) Document the littoral zone and riparian area condition using digital photography
2) Qualitatively document the littoral zone and riparian area using a volunteer-based rapid assessment technique
3) Quantitatively document the littoral zone and riparian area using the USEPA Lake Assessment Procedure along with the WDNR Supplemental Lakeshore Assessment
4) Integrate Phase 3 results into the Black Oak Lake Adaptive Management Plan

Project deliverables include:
1) An electronic, image-based waterfront archive that presents geographic data, digital photographic documentation and qualitative assessment results as an appendix in the Black Oak Lake Adaptive Management Plan
2) Report of the USEPA and WDNR quantitative assessment as an appendix in the Black Oak Lake Adaptive Management Plan

Specific conditions for this project:
- Report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of appendices and an electronic copy of the image-based waterfront archive


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2010
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Long Term Water Quality & Stage Monitoring, Phase 5: Black Oak Lake Riparian Owners Association is sponsoring phased lake planning project to study Black Oak Lake, in Vilas County. The project will focus on aquatic invasive species prevention (AIS) activities, studying shorelands and water quality in Black Oak Lake and then update the Black Oak Lake Adaptive Management Plan (LMP). This would allow Black Oak Lake to become eligible for lake protection grant money in the shoreland restoration category.

Phase 5 project activities include: 1) Conduct water quality sampling (CLMN \2013 secchi, P and chla, grant \2013 N, ammonia, Ca, alk, ss, pH, and cond); 2) Install lake stage monitoring station and begin measurements; 3) Develop water quality and lake stage monitoring plan; 4) Hire CB/CW monitor and continue CB/CW program; 5) Conduct educational and outreach: water quality and stage monitoring training, press release and newsletter; 6) Update LMP.

Project deliverables include: 1) Water quality and lake stage data; 2) Water quality and lake stage monitoring plan; 3) Entered watercraft inspection data onto SWIMS; 4) Updated LMP.

Specific conditions for this project: 1) Draft water quality and lake stage monitoring plan needs Dept review and approval; 2) LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, water quality and lake stage monitoring plans, all data and results, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2010
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Protection & Restoration Of Riparian Shorelines, Phase 4: Black Oak Lake Riparian Owners Association is sponsoring phased project to study Black Oak Lake, in Vilas County. The project will focus on aquatic invasive species prevention (AIS) activities, studying shorelands and water quality in Black Oak Lake and then update the Black Oak Lake Adaptive Management Plan (LMP). This would allow Black Oak Lake to become eligible for lake protection grant money in the shoreland restoration category.

Phase 4 project activities include: 1) Review and analyze littoral zone and riparian area conditions to prioritize shoreline restoration and protection areas; 2) Select candidate protection and restoration sites; 3) Develop protection/restoration plan for each demonstration area; 4) Hire CB/CW monitor and continue CB/CW program; 5) Update LMP with protection/restoration plans.

Project deliverables include: 1) Littoral zone and riparian area data and results; 2) Shoreland restoration and protection plan that includes 4-7 individual demonstration site plans; 3) Entered watercraft inspection data onto SWIMS; 4) Updated LMP.

Specific project conditions: 1) Draft restoration/protection plans need Dept review and approval; 2) LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, restoration/protection plans, all results from data analysis, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2013
Waters Involved
Unnamed
Status
Complete

Black Oak Lake Pres Fdn: Black Oak Lake Watershed Protection Program Phase 6: Black Oak Lake Preservation Foundation is sponsoring a large scale lake planning grant to study Black Oak Lake, in Vilas County. The project will focus on aquatic invasive species prevention (AIS) activities, studying aquatic plants, water quality, groundwater, and a sediment core in Black Oak Lake and then update the Black Oak Lake Adaptive Lake Management Plan (LMP).

Phase 6 project activities include: 1) Conduct water quality sampling and analysis; 2) Install mini-piezometers to monitor groundwater movement; 3) Aquatic plant community analysis (Compare aquatic plant point-intercept (PI) surveys); 4) Sediment core analysis; 5) Conduct watercraft inspections; 6) Entry of inspection data into SWIMS; 7) Update LMP.

Project deliverables include: 1) Water quality and groundwater data; 2) Entered watercraft inspection data onto SWIMS; 3) Updated LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, and all data, maps and GIS data from the project.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Vista Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Vista Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Warvet Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Warvet Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Watersmeet Lake
Status
Complete

Town Of Washington: Watersmeet Lake Aquatic Plant Survey & Apm Plan: The Town of Washington in cooperation with the City of Eagle River and Town of Lincoln will conduct an aquatic plant survey, lakeshore resident survey and develop an aquatic plant management (APM) plan for the Eagle River Chain of Lakes (Chain).

The project includes: 1) a "kickoff meeting" to coordinate and finalize project plan 2) review existing lake morphology, data, degree of lake use, water quality records, and aquatic plant survey data 3) aquatic plant survey using point intercept method for Watersmeet Lake 4) lakeshore resident survey 5) measure water clarity at the deep hole within each lake basin 6) development of APM plan for the Chain following DNR guidelines.

Project deliverables include: 1) Aquatic plant survey report with a section on invasive species education, watershed, water quality, and lakeshore resident survey results, 2) APM Plan for the Eagle River Chain of Lakes, 3) Two plant voucher specimens for each plant found in aquatic plant survey of the Chain- one each for DNR and the T. of Washington, 4) Mid term project update, 5) Consultant will provide the Township with 3 copies of draft and final report, one educational article and public questionnaire, attendance at "kickoff meeting", Town meeting to present project results and a site visit to discuss goals of project, CD containing APM Plan files, and CD per lake with GPS points of aquatic plants presence and abundance.

Specific conditions: Project design plans, resident survey questions, and APM plan, need review and approval from DNR before project begins and adoption of final management recommendations.

Wisconsin Department of Natural Resources will be provided with electronic (pdf) and hard copies (2) of APM plan, all raw data in electronic format, and a copy of CD's created during project. Project results will be disseminated to the public via a presentation the Town of Washington.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Weber Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Weber Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Whispering Lake
Status
Complete

Town Of Phelps: Town Of Phelps Lake Inventory And Land Use Plan: The Town of Phelps proposes to conduct a lakes inventory to develop a comprehensive land use plan. Project deliverables are:

1)Development of maps showing existing land uses within the town.

2)Statistical information on the Towns population, along with maps, charts, and slide presentation materials that can be used for public information meetings. The results will be distributed by newsletter mailing, fact sheet distribution, public meetings, poster display and comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/1998
Waters Involved
Whispering Lake
Status
Complete

Town Of Phelps: Town Of Phelps Management Planning, Phase 2: The Town of Phelps proposes to analyze the information from the Phase 1 lakes inventory and develop recommendations for future land and water resource uses within the Town. Project deliverables are:
1)Development of a Comprehensive Land Use Plan, to include maps, recommendations and an implementation strategy. The project will be distributed through public meetings(s) and a Comprehensive Management Plan. The Department of Natural Resources will be provided with two (2) copies of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Wisconsin River
Status
Complete

Town Of Washington: Watersmeet Lake Aquatic Plant Survey & Apm Plan: The Town of Washington in cooperation with the City of Eagle River and Town of Lincoln will conduct an aquatic plant survey, lakeshore resident survey and develop an aquatic plant management (APM) plan for the Eagle River Chain of Lakes (Chain).

The project includes: 1) a "kickoff meeting" to coordinate and finalize project plan 2) review existing lake morphology, data, degree of lake use, water quality records, and aquatic plant survey data 3) aquatic plant survey using point intercept method for Watersmeet Lake 4) lakeshore resident survey 5) measure water clarity at the deep hole within each lake basin 6) development of APM plan for the Chain following DNR guidelines.

Project deliverables include: 1) Aquatic plant survey report with a section on invasive species education, watershed, water quality, and lakeshore resident survey results, 2) APM Plan for the Eagle River Chain of Lakes, 3) Two plant voucher specimens for each plant found in aquatic plant survey of the Chain- one each for DNR and the T. of Washington, 4) Mid term project update, 5) Consultant will provide the Township with 3 copies of draft and final report, one educational article and public questionnaire, attendance at "kickoff meeting", Town meeting to present project results and a site visit to discuss goals of project, CD containing APM Plan files, and CD per lake with GPS points of aquatic plants presence and abundance.

Specific conditions: Project design plans, resident survey questions, and APM plan, need review and approval from DNR before project begins and adoption of final management recommendations.

Wisconsin Department of Natural Resources will be provided with electronic (pdf) and hard copies (2) of APM plan, all raw data in electronic format, and a copy of CD's created during project. Project results will be disseminated to the public via a presentation the Town of Washington.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Management Planning Project, Phase 1: Lac Vieux Desert Lake Association is sponsoring a project to study Lac Vieux Desert Lake in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Lac Vieux Desert Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control. Phases 1 and 2 were funded in this grant cycle (Feb 2009) and Phase 3 will be submitted for funding in August 2009.

Project activities include: 1) Stakeholder participation - kick-off meeting, AIS training, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report; 2)Recruit volunteers and implement a CB/CW program; 3) Annual volunteer AIS monitoring; 4) Water quality sampling (secchi, P, Chla, N, conductivity, pH, total Alk, total suspended solids, calcium, DO, and temp); 5) Curly-leaf pondweed (CLP) survey and aquatic plant community mapping; 6) Sensitive area delineation; 7)Fisheries assessment; 8)Watershed assessment and P load modeling; 9) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release, newsletter article, and progress report; 2) Aquatic plant community and watershed maps; 3) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 4) Water quality and P modeling data; 5) LMP.

Specific conditions: Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, stakeholder survey, news release, newsletter article, progress report, data and P modeling from watershed assessment, all GIS data, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Management Planning Project, Phase 2: Lac Vieux Desert Lake Association is sponsoring project to study Lac Vieux Desert Lake in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Lac Vieux Desert Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control. Phases 1 and 2 were funded in this grant cycle (Feb 2009) and Phase 3 will be submitted for funding in August 2009.

Project activities include: 1) Stakeholder participation - kick-off meeting, AIS training, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report; 2)Recruit volunteers and implement a CB/CW program; 3) Annual volunteer AIS monitoring; 4) Water quality sampling (secchi, P, Chla, N, conductivity, pH, total Alk, total suspended solids, calcium, DO, and temp); 5) Curly-leaf pondweed (CLP) survey and aquatic plant community mapping; 6) Sensitive area delineation; 7)Fisheries assessment; 8)Watershed assessment and P load modeling; 9) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release, newsletter article, and progress report; 2) Aquatic plant community and watershed maps; 3) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 4) Water quality and P modeling data; 5) LMP.

Specific conditions: Draft of stakeholder survey should be submitted to Lakes Management Coordinator for review before sending to public; LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, stakeholder survey, news release, newsletter article, progress report, data and P modeling from watershed assessment, all GIS data, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Wisconsin River
Status
Complete

Lac Vieux Desert Lake Association, Inc: Lac Vieux Desert Lake Management Planning Project, Phase Iii: Lac Vieux Desert Lake Association is sponsoring a project which will focus on developing a Lake Management Plan (LMP) for Lac Vieux Desert Lake. Completion of a LMP will allow for potential Aquatic Invasive Species (AIS) cost sharing grants and permits for Eurasian water-milfoil (EWM) control. Phases 1 and 2 were funded in Feb 2009 and Phase 3 was funded during this cycle.

Project activities include: 1) Stakeholder participation \2013 kick-off meeting, AIS training, stakeholder survey, planning meetings (up to 2), wrap-up meeting, news release, newsletter article, and progress report; 2) Recruit volunteers and implement a CB/CW program; 3) Annual volunteer AIS monitoring; 4) Water quality sampling (secchi, P, Chla, N, conductivity, pH, total Alk, total suspended solids, calcium, DO, and temp); 5) Curly-leaf pondweed (CLP) survey and aquatic plant community mapping; 6) Sensitive area delineation; 7) Fisheries assessment; 8) Watershed assessment and P load modeling; 9) Develop LMP.

Project deliverables include: 1) Lake Management Plan.

Specific conditions: 1) LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, stakeholder survey, news release, newsletter article, progress report, data and P modeling from watershed assessment, all GIS data, and all maps from project.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Wisconsin River
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Afterglow Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Baker Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Beaver Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Big Sand Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Black Oak Lake
Status
Complete

Vilas County Lakes Association: Black Oak Lake Water Quality Data Collection Project: The Vilas County Lakes Association Inc. will sponsor a project which will include the collection of detailed water quality data on Black Oak Lake in Vilas County, and will include a written summary of that data. Deliverables include a written and electronic version of the final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Blackjack Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Blackjack Springs
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Brule Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Camp One Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Camp Two Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Catherine Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Crystal Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Deerskin Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Deerskin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Dewey Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Eleanore Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Eleanore Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Ellen Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Elvoy Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Elvoy Springs
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
2/15/2016
Waters Involved
Finger Lake
Status
Complete

Friends Of Finger Lakes Inc.: Finger Lake Stewardship Porgram - Watershed & Shorelands: The Friends of Finger Lake Association is sponsoring a small scale Lake Planning grant to study the Finger Lake, in Vilas County. The project will focus on watershed and riparian assessments.

Project activities include: 1) Watershed analysis; 2) Riparian habitat assessment; 3) Summary report.

Project deliverables include: 1) Watershed and shoreland data and mapping; 2) Summary report.

Specific conditions for this project: Draft of summary report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of summary report and all data and maps from the project.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gail Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Goodall Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gross Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Gross Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Haymeadow Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Imogene Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Jewel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kentuck Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kentuck Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kildare Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Kildare Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lac Vieux Desert
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Deerskin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Little Smoky Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Lobischer Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Long Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Manuel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2010
Waters Involved
Marshall Lake
Status
Complete

Town Of Conover: Marshall Lake Aquatic Plant Survey Project: The Town of Conover is sponsoring a small scale lake planning grant to study aquatic plants in Marshall Lake, Vilas County. The project will focus on performing a point-intercept (PI) aquatic plant survey and completing a report from the data gathered.

Project activities include: 1) Conduct PI survey; 2) Develop final report that summarizes data collected and provides management guidance.

Project deliverables include: 1) PI data and mapping; 2) Aquatic plant vouchers; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, collected data and maps, and a set of aquatic plant vouchers.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Military Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Muskeg Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Muskrat Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Norwood Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Noseeum Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Pickel Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Plymouth Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Potfish Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Potfish Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Reservoir Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Robinson Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Secret Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Smoky Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Spectacle Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Spectacle Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Stub Walsh Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Sugar Maple Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Thoroughfare Creek
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
10/1/2002
Waters Involved
Twin Lakes
Status
Complete

School District Of Phelps: North & South Twin Lakes: Foiled By Milfoil Action Alert: This Project is sponsored by the School District of Phelps and is in partnership with the North & South Twin Lake Riparian Association. This project will provide for student and community education on aquatic exotics, specifically Eurasian Watermilfoil, and lake management.

Project Deliverables & Requirements include:
1. Educational items developed and created by the students at Phelps School (laminated plants, Plant ID posters, displays, etc.).
2. Multimedia presentation and maps of the locations where EWM was found on the lakes.

The grantee will provide the Department copies maps, data and/or reports created as a part of this project. In addition an executive summary of the work completed under this grant, copies of newsletter articles, newspaper articles and documentation of any other presentations or events attended. For events that students will be attending a brief summary of what each student did and who the audience was will be provided to the Department prior to final payment.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin Lakes
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Twin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Un Spring
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Unnamed
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Town Of Conover: Marshall Lake Aquatic Plant Survey Project: The Town of Conover is sponsoring a small scale lake planning grant to study aquatic plants in Marshall Lake, Vilas County. The project will focus on performing a point-intercept (PI) aquatic plant survey and completing a report from the data gathered.

Project activities include: 1) Conduct PI survey; 2) Develop final report that summarizes data collected and provides management guidance.

Project deliverables include: 1) PI data and mapping; 2) Aquatic plant vouchers; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, collected data and maps, and a set of aquatic plant vouchers.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Vista Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Warvet Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Weber Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Whispering Lake
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Wisconsin River
Status
Complete

Town Of Phelps: Town Of Phelps Dissolved Oxygen Meter: The Town of Phelps is sponsoring a small scale lake planning grant to study DO levels within lakes in the Town of Phelps and Vilas County with a study completion date of December 31, 2009. The project will focus on purchasing a DO meter for Citizen Lake Monitoring Network (CLMN) sampling and water quality assessments during aquatic invasive species (AIS) management activities.

Project activities include: 1) Purchase Hach HQ30D meter and LDO probe w/30m cable; 2) Perform DO/Temp profiles as part of CLMN sampling and monitoring during AIS management and study; 3) Submit DO/Temp profile data to WDNR; 4) Develop final report summarizing sampling.

Project deliverables include: 1) Hach HQ30D meter and LDO probe; 2) DO/Temp profiles; 3) Final report.

Specific conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Tamarack Pioneer River Watershed
Watershed Recommendations
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
11/15/2011
Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
10/25/2011
Proposed
Projects
 
Tamarack Pioneer River WatershedWatershed History Note