Watershed - Manitowish River (UC16)
Manitowish River Watershed

Details

The Manitowish River Watershed lies in the northeastern-most tip of the Upper Chippewa River Basin. and is almost completely contained within the Northern Highland American Legion State Forest. The region is mostly forest and wetlands. The Manitowish River originates in wetland areas of central Vilas County, then runs through several lakes before it joins with the Bear River to form the Flambeau River. The communities in the watershed: Boulder Junction, Manitowish Waters, and Manitowish, are all located along the Manitowish River. though none are known to threaten water quality. The major lakes the river flows through are: Boulder, Island, Spider, Stone, and Rest Lakes. Boulder Lake is under a fish advisory for mercury contamination of walleye.

Date  1996

Ecological Landscapes for Manitowish River Watershed

Ecological Landscapes

The Manitowish River Watershed lies primarily in the Northern Highlands Ecological Landscape which is located in northern central Wisconsin. It is known for its pitted outwash plains and kettle lakes mixed with extensive forests and large peatlands. Its landforms are characterized mainly by pitted outwash but also contain some coarse-textured moraines. Soils are acidic and relatively unproductive due to low moisture-holding capacity and lack of organic matter. Historically, this was Wisconsin's greatest pinery. White and red pine forests largely dominated the vegetation, with some smaller pockets of jack pine. On the more mesic soils, hemlock-hardwood forests were common. Aspen-birch forests occurred in openings formed by disturbance events such as wind or fire. Current forest vegetation is primarily aspen, with some white, red and jack pine in both natural and plantation form. Northern hardwood forests, though reduced in extent, still occur on the more mesic soils. Lowland conifer occupies the many peatlands that are scattered throughout the Ecological Landscape.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Alder Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Gresham Creek
Status
Complete

Gresham Lakes Association, Inc.: Gresham Lakes Ais Control And Prevention Project: Gresham Lakes Association, Inc. is sponsoring an AIS ACEI grant on Gresham Lakes in Vilas County. This four year project will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 8 acres and have a density rating below D=1. This will allow the Gresham Lakes Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) A minimum of 80 volunteer hours of monitoring and 400 hours of CB/CW; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Little Star Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Lower Gresham Lake
Status
Complete

Gresham Lakes Association, Inc.: Gresham Lakes Ais Control And Prevention Project: Gresham Lakes Association, Inc. is sponsoring an AIS ACEI grant on Gresham Lakes in Vilas County. This four year project will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 8 acres and have a density rating below D=1. This will allow the Gresham Lakes Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) A minimum of 80 volunteer hours of monitoring and 400 hours of CB/CW; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Manitowish Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Middle Gresham Lake
Status
Complete

Gresham Lakes Association, Inc.: Gresham Lakes Ais Control And Prevention Project: Gresham Lakes Association, Inc. is sponsoring an AIS ACEI grant on Gresham Lakes in Vilas County. This four year project will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 8 acres and have a density rating below D=1. This will allow the Gresham Lakes Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) A minimum of 80 volunteer hours of monitoring and 400 hours of CB/CW; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Spider Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Waters Chain Ais Control & Prevention Project: North Lakeland Discovery Center is sponsoring an ACEI grant project which will focus on surveying, mapping and controlling CLP and PL in the Manitowish Chain, Vilas County.

Project activities include: 1) Conduct pre/post treatment surveys; 2) Herbicide, biological and hand removal management; 3) Conduct herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop treatment reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Treatment reports.

Specific conditions for this project: Treatment reports need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of treatment reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Upper Gresham Lake
Status
Complete

Gresham Lakes Association, Inc.: Gresham Lakes Ais Control And Prevention Project: Gresham Lakes Association, Inc. is sponsoring an AIS ACEI grant on Gresham Lakes in Vilas County. This four year project will focus on EWM management, and AIS education, prevention and monitoring. The goal is to reduce the treatable EWM to less than 8 acres and have a density rating below D=1. This will allow the Gresham Lakes Association to continue management of AIS with minimal state financial assistance.

Project activities include: 1) Annual chemical treatments of EWM; 2) Volunteer hand removal of isolated EWM plants; 3) Annual Pre and Post treatment monitoring and analysis; 4) Annual volunteer AIS monitoring; 5) Recruit volunteers and implement a CB/CW program; 6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 7) Develop annual project report and a final report.

Project deliverables include: 1) Chemical and hand removal control of EWM; 2) Pre and post treatment survey data; 3) Completed entry of inspection 3200-120 and monitoring forms onto Dept website; 4) AIS educational, prevention and monitoring activities; 5) A minimum of 80 volunteer hours of monitoring and 400 hours of CB/CW; 6) Final report summarizing EWM management during project and future EWM management suggestions, CB/CW activities, AIS monitoring and AIS educational activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Island Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2011
Waters Involved
Island Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 1: North Lakeland Discovery Center is sponsoring an AIRR project which will focus on surveying and mapping CLP and managing up to 27 acres of CLP in Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments; 3) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Island Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Manitowish River
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2011
Waters Involved
Rice Creek
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 1: North Lakeland Discovery Center is sponsoring an AIRR project which will focus on surveying and mapping CLP and managing up to 27 acres of CLP in Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments; 3) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2011
Waters Involved
Spider Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 1: North Lakeland Discovery Center is sponsoring an AIRR project which will focus on surveying and mapping CLP and managing up to 27 acres of CLP in Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments; 3) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Spider Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Stone Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2012
Waters Involved
Trout River
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Edr Project - Phase 2: North Lakeland Discovery Center is sponsoring an Early Detection & Response project focusing on surveying, mapping and controlling CLP in Stone Lake, Island Lake, Spider Lake, and Rice Creek, Vilas County.

Project activities include: 1) Conduct pre/post treatment and peak-biomass surveys; 2) Control CLP by chemical treatments and volunteer hand removal; 3) Conduct volunteer herbicide concentration monitoring; 4) Conduct wild rice surveys and develop maps; 5) Develop letter reports.

Project deliverables include: 1) Aquatic plant survey data and maps; 2) Annual letter report describing the findings of the pre/post treatment and peak-biomass surveys and guidance for continued control actions.

Specific conditions for this project: Annual letter report needs Department review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of letter reports, all maps, and all aquatic plant and GIS data.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Aimer Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aimer Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Alder Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Alder Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Ph Iiib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Alder Lake, Wild Rice Lake and Trout River in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Wild Rice and Alder Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder survey; 2) Water quality assessment; 3) Data analysis; 4) Hire AIS Coordinator and Water Education Intern; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey; 2) Water quality data; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Allequash Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ambleside Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ambleside Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Amik Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Annabelle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Annabelle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Anne Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Anne Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Anne Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Apeekwa Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Armour Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Armour Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Creek
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Aurora Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Averill Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Averill Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Ballard Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bambi Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bambi Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Basin Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Basin Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Battine Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Battine Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bear River
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bear Springs
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beatrice Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beaver Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Beaver Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Beaver Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Beaver Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Belle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Belle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bena Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Benson Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Big Crooked Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Hurst Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Hurst Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Kitten Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Kitten Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Big Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Big Muskellunge Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bills Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Birch Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Blue Gill Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Blue Gill Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Blueberry Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bobidosh Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bobs Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bolin Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bolton Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Bolton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Boot Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Boot Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Borden Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Borden Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Broken Bow Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Brown Beaver Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Brown Beaver Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buck Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Buck Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Buckskin Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Bug Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Bug Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Five Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Ten Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Camp Twelve Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Canteen Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Canteen Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Carlin Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Carlin Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cathaline Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cathaline Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Cedar Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Chewelah Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Chub Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Circle Lily Creek
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Circle Lily Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Clear Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Clear Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Clear Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Phase 2a: North Lakeland Discovery Center is sponsoring a study of Clear Lake and Fawn Lake, in Vilas County focusing on developing a Lake Management Plan (LMP) for Clear Lake and Fawn Lake, conducting AIS education and monitoring, and performing early-season AIS monitoring on Stone Lake and Manitowish Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment and shoreline assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, CLP assessment, community mapping, substrate mapping); 7) Data analysis; 8) Hire AIS Coordinator and Water Education Intern; 9) Volunteer watercraft inspections and AIS monitoring; 10) CLP hand-pulling and PL bio-control program; 11) AIS educational activities; 12) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data, watershed maps, and modeling data; 3) PI and shoreland data; 4) Aquatic plant community and substrate maps and aquatic plant vouchers; 5) Entered inspection and AIS monitoring data into SWIMS; 6) Hired staff; 7) AIS educational products and events; 8) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Clear Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project Phase Iib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Clear Lake, Fawn Lake, Manitowish Lake, and Stone Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Clear, Fawn, Manitowish, and Stone Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Data analysis; 3) Hire AIS Coordinator and Water Education Intern; 4) Volunteer watercraft inspections and AIS monitoring; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered inspection and AIS monitoring data into SWIMS; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Constance Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crab Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crab Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crawford Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crawford Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Crystal Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Cyrus Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Cyrus Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dads Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
David Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Dead Pike Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Decker Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deer Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deer Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Deerfoot Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Doe Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Doe Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Dog Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dorothy Dunn Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Draigers Spring
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Drott Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dumbell Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Dunn Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Dunn Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Eagle Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
East Branch Presque Isle River
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
East Branch Presque Isle River
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Edith Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Edith Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Eloise Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Elsie Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Emily Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Emily Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Escanaba Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Etna Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Favil Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Fawn Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Fawn Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Phase 2a: North Lakeland Discovery Center is sponsoring a study of Clear Lake and Fawn Lake, in Vilas County focusing on developing a Lake Management Plan (LMP) for Clear Lake and Fawn Lake, conducting AIS education and monitoring, and performing early-season AIS monitoring on Stone Lake and Manitowish Lake.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment and shoreline assessment; 5) Professional Dreissena monitoring; 6) Aquatic plant surveys (PI survey, CLP assessment, community mapping, substrate mapping); 7) Data analysis; 8) Hire AIS Coordinator and Water Education Intern; 9) Volunteer watercraft inspections and AIS monitoring; 10) CLP hand-pulling and PL bio-control program; 11) AIS educational activities; 12) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data, watershed maps, and modeling data; 3) PI and shoreland data; 4) Aquatic plant community and substrate maps and aquatic plant vouchers; 5) Entered inspection and AIS monitoring data into SWIMS; 6) Hired staff; 7) AIS educational products and events; 8) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
Fawn Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project Phase Iib: North Lakeland Discovery Center is sponsoring an AEPP grant to study Clear Lake, Fawn Lake, Manitowish Lake, and Stone Lake, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Clear, Fawn, Manitowish, and Stone Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Data analysis; 3) Hire AIS Coordinator and Water Education Intern; 4) Volunteer watercraft inspections and AIS monitoring; 5) AIS educational activities; 6) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Entered inspection and AIS monitoring data into SWIMS; 3) Hired staff; 4) AIS educational products and events; 5) LMP.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Fence Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Findler Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Flambeau Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Flora Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Flora Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Fox Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Frank Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gem Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Gene Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Geneveive Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
George Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Grant Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Great Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gresham Creek
Status
Complete

Town Of Boulder Junction: Gresham Lakes 2008 Eurasian Watermilfoil Treatment Monitoring: Town of Boulder Junction is sponsoring an AIS EPP grant on Upper, Lower, and Middle Gresham Lakes in Vilas County to be completed by June 30, 2009. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Annual Pre and Post treatment monitoring and analysis; 2) Volunteer AIS monitoring; 3) Stakeholder participation: AIS identification training; 4) pretreatment informational meeting, and post treatment monitoring results meeting; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 6) Develop annual project report and a final report.

Project deliverables include: 1) Pre and post treatment survey data; 2) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 3) AIS educational, prevention and monitoring activities; 4) Final report summarizing CB/CW activities, AIS monitoring, pre and post treatment monitoring, meetings, GPS locations, and guidance for continued control actions.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, all annual reports, pre and post treatment survey data, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Gresham Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gretchen Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Grey Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Gunlock Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Harris Creek
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Harris Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harris Lake Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harvey Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Harvey Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Haskell Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Headflyer Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Heart Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Heart Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hells Kitchen Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hells Kitchen Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Helmet Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Helmet Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hennig Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Hiawatha Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
2/15/2015
Waters Involved
Hiawatha Lake
Status
Complete

North Lakeland Discovery Center: Town Of Winchester Lake Management Planning Project Ph1, Hiawatha & Harris Lks: North Lakeland Discovery Center is sponsoring an AEPP grant to study Harris Lake and Hiawatha Lakes in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Harris and Hiawatha Lakes and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline and coarse woody habitat assessment; 6) Early-season AIS monitoring and professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, acoustic, community mapping, substrate mapping); 8) Volunteer AIS and lake level monitoring and watercraft inspections; 9) Data analysis; 10) Develop LMP; 11) Hire AIS Coordinator and Water Education Intern; 12) AIS educational activities.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI, shoreland, and coarse woody habitat data; 5) Aquatic plant community and substrate maps; 6) LMP; 7) Hired staff; 8) AIS educational products and events.

Specific conditions for this project: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, and all data and maps from the project.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
High Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
High Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Hobo Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Homestead Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Horsehead Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Horsehead Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Horseshoe Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Ike Walton Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Indian Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Irving Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Island Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2012
Waters Involved
Island Lake
Status
Complete

North Lakeland Discovery Center: Manitowish Chain Of Lakes Management Planning Project, Phase 1b: North Lakeland Discovery Center is sponsoring an AEPP projectt to study Island Lake, Spider Lake and Rice Creek, in Vilas County. The project will focus on developing a Lake Management Plan (LMP) for Island Lake and Spider Lake and conducting AIS education and monitoring.

Project activities include: 1) Stakeholder participation \2013 stakeholder survey, planning meetings (up to 2), kick-off meeting, wrap-up meeting, news release(s), and newsletter article; 2) Water quality sampling and analysis; 3) Watershed assessment and P load modeling; 4) Fisheries assessment; 5) Shoreline assessment; 6) Professional Dreissena monitoring; 7) Aquatic plant surveys (PI survey, CLP assessment, community mapping, substrate mapping); 8) Data analysis; 9) Hire AIS Coordinator and CB/CW Intern; 10) Volunteer watercraft inspections and AIS monitoring; 11) AIS educational activities; 12) Develop LMP.

Project deliverables include: 1) Stakeholder survey, news release(s), and newsletter article; 2) Water chemistry data; 3) Watershed maps and modeling data; 4) PI and shoreland data; 5) Aquatic plant community and substrate maps; 6) Aquatic plant vouchers; 7) Entered inspection and AIS monitoring data into SWIMS; 8) Hired staff; 9) AIS educational products and events; 10) LMP.

Specific project conditions: 1) Draft of stakeholder survey needs to be submitted to Lakes Management Coordinator for review and approval before sending to public; 2) Draft of LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, news release(s), newsletter article, any AIS educational products, stakeholder survey, data from PI, shoreland assessment, watershed assessment and water quality sampling, all maps from project, all GIS data, and aquatic plant vouchers.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jamie Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jamie Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jean Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jenny Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jenny Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Jerms Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Jingwak Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Jingwak Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
John Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
John Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Junction Creek
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Junction Creek
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Katinka Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Katinka Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Keego Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Keego Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Knife Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Knife Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Adelaide
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Alva
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Franchian
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Helen
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Laura
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Rose
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Salsich
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Lake Yolanda
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Langley Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lewis Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Bass Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Bass Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Birch Creek
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Corn Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Crab Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Crab Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Crawling Stone Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Horsehead Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Horsehead Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Hurst Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Hurst Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Papoose Lake
Status
Complete

Town Of Winchester: Ais Community Awareness: The Town of Winchester is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project to be completed by December 31, 2007. The project will focus on AIS education, prevention, and monitoring.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/CleanWaters program at town landings
2) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
4) Construct 5 AIS signboards
5) Construct an AIS display for municipal building, public library and traveling
6) Educational efforts including media releases, presentations and newsletters

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) AIS signboards and displays
3) Media releases, presentations and newsletters
4) Final report summarizing CB/CW activities, AIS monitoring, and signboard/display activities

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photographs of signboards/displays and copies of media releases and newsletters.


Grant Details
Aquatic Invasives Education
Date
10/1/2013
Waters Involved
Little Papoose Lake
Status
Proposed

Co/Pa/Pi Voluntary Lake Association: Connors Lake & Lake Of The Pines Ais Prevention: CO/PA/PI Voluntary Lake Association is sponsoring a 4-yr project to conduct AIS monitoring and update the APM plan for the three lakes.

Project deliverables include GIS data & maps of areas monitored, aquatic plant survey & bed mapping results, examples of AIS education & outreach, AIS monitoring & watercraft inspection data in SWIMS, and an updated APM plan.

Specific project activities include: 1) Pre-post treatment aquatic plant monitoring; 2) Point Intercept plant survey on Lake of the Pines & Papoose Lake; 3) Watercraft inspections, including Landing Blitz participation; 4) AIS education & monitoring; 5) Aquatic Plant Management Plan (APM) update.

Special Conditions: 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for point-intercept survey monitoring and aquatic plant management plan development. The NOR Native Plant Protection Strategy shall be integrated into the APM plan; 2) Sponsor shall contact DNR immediately if a new AIS is found; 3) AIS monitoring and watercraft inspection personnel shall be trained and follow DNR approved protocols; 4) Education materials shall be consistent with the Department\2019s statewide education strategy for preventing and controlling AIS.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Biologist.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Presque Isle Lake
Status
Complete

Town Of Saint Germain: Ais Awareness, Prevention & Early Detection: The Town of St. Germain is sponsoring an Aquatic Invasive Species Education, Prevention, & Planning grant to be completed by December 31, 2007. The project will focus on preventing AIS introductions into town lakes, increasing public awareness of AIS and monitoring for AIS.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire a one day a week employee through contractual agreement with North Lakeland Discovery Center. Employee will display town boat and hand out literature during the mornings and conduct CB/CW trainings during the afternoons of the St. Germain weekly flea market
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Develop AIS awareness materials (windshield cards, grocery bags, bait container labels, placemats, and other AIS hand-out literature)

Project deliverables include:
1) Completed entry of inspection 3200-120 and citizen lake monitoring forms onto Dept website
2) AIS materials: windshield cards, grocery bags, bait container labels, placemats, and other AIS literature
3) Final report (contents listed on page 6 of proposal)


Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, sample of windshield card, grocery bag, bait container label, and placemat.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Presque Isle Lake
Status
Complete

Town Of Presque Isle: 2008 Ais Control, Public Awareness, Education And Prevention Project: The Town of Presque Isle, Vilas County, is sponsoring an AIS grant which will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and expand current CB/CW program at town landings; 2) Recruit volunteers and begin AIS monitoring following Dept/UW Ext guidelines; 3) Entry of inspection forms 3200-120 and monitoring forms onto Dept website; 4) Construct 8 kiosks and install at busiest public landings in Presque Isle; 5) Educational efforts including education/information forums, children's story hour, media releases, and presentations; 6) Conduct a CB/CW and AIS monitoring workshop; 7) Develop final report.

Project deliverables include: 1) Completed entry of inspection Form 3200-120 and monitoring forms onto Dept website; 2) AIS kiosks and photos; 3) Educational efforts and media releases; 4) 75 CB/CW hours; 5) 75 AIS monitoring hours; 6) Final report summarizing CB/CW activities, AIS monitoring, educational activities, media releases, and kiosk activities.

Specific Conditions for this project: Final report needs Dept review and approval


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Sand Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Manitowish Waters Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education Prevention & Planning project which will focus on providing AIS education, preventing AIS introductions into town lakes and AIS monitoring.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 9 high use landings within township from May-October 2006
2) Hire an AIS Coordinator (duties listed in position description in proposal)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Create AIS power point presentation
6) Conduct AIS monitoring
7) Develop AIS information packet and shopping bag inserts
8) Participate in Fourth of July and Cranberry Colorama town events
9) Install AIS signage/kiosks where needed
10) Provide speakers for town gatherings and events

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- AIS power point presentation
- Position description for AIS Coordinator
- AIS information packet, shopping bag inserts and signage (including photo)
- Final report (summarizing CB/CW, AIS monitoring and town events attended with list of speakers)

Specific conditions for this project:
- A minimum of 2080 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables as described above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention & Planning Project: The Town of Manitowish Waters is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education and prevention, monitoring for AIS and preparing an AIS action plan.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire an AIS coordinator (duties listed in position description attached to proposal)
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Conduct 2 shoreline sweeps
5) Conduct "Guided AIS Monitoring"
6) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
7) Develop a local "Plan of Action" for AIS containment and management
8) Build portable CB/CW kiosks
9) Assemble 10 AIS monitoring equipment packages

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) An AIS containment and management plan
3) Portable CB/CW kiosks
4) AIS monitoring equipment packages
5) Final report summarizing CB/CW activities, AIS monitoring, and the AIS plan of action

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of portable kiosks.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Star Lake
Status
Complete

Town Of Manitowish Waters: Ais Education, Prevention And Planning Project: The Town of Manitowish Waters is sponsoring an AIS EPP grant to be completed by December 31, 2008. The project will focus on AIS education, prevention, and monitoring.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire an AIS coordinator (duties listed in position description attached to proposal); 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Conduct 2 shoreline sweeps; 5) Conduct "Guided AIS Monitoring"; 6) Entry of inspection forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 7) Disseminate AIS information at boat landings, public areas, resorts, businesses, tournaments, and newsletter; 8) Sponsor an AIS float at 4th of July parade and an AIS booth at various public events.

Project deliverables include: 1) Completed entry of inspection 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 2) Photographs of float and AIS booth; 3) Final report summarizing CB/CW activities and AIS monitoring and education activities.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and photographs of float and AIS booth.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Little Star Lake
Status
Complete

Town Of Plum Lake: Ais Education Project: The Town of Plum Lake is sponsoring an AIS grant which will focus on community based AIS education, prevention and monitoring.

Project activities include: 1) Recruit volunteers and expand the CB/CW program throughout the township; 2) Recruit volunteers to participate in shoreline inspections for AIS infestations; 3) Develop AIS prevention news(letters/releases), bookmarks, postcards, a photo storyboard, AIS informational kits, and AIS welcome packets; 4) Establish a local AIS informational resource library; 5) Entry of inspection forms (3200-120) and monitoring forms onto dept website; 6) Develop partnerships with other local organizations to expand AIS awareness; 7) Conduct at least 2 CB/CW and 3 AIS monitoring workshops/trainings; 8) Send 4 volunteers to WAL Lakes Convention; 9) Host an end of the season volunteer recognition gathering.

Project deliverables include: 1) AIS Materials: news(letters/releases), postcards, bookmarks, photo-storyboard, AIS informational kits and welcome packets; 2) Completed entry of inspection (3200-120) and monitoring forms onto dept website; 3) Trained CB/CW and AIS monitoring volunteers. 40 hrs of CB/CW activities and 40 hrs of AIS monitoring activities total; 4) A Final report summarizing CB/CW, AIS monitoring, and AIS educational activities; 5) Attendance of 4 volunteers at the WAL Lakes Convention; 6) Volunteer recognition dinner.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, copies of any newsletters, press releases, bookmarks, AIS welcome packets, a photograph of the storyboard, and a photograph of the "traveling trophy" winner.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Sugarbush Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS introductions into town lakes, monitoring for AIS and providing AIS education.

Project activities include:
1) Recruit volunteers and implement a CB/CW program at 7 high use landings within township from May-September 2006
2) Hire an AIS Coordinator (duties include training volunteers, landing inspections, AIS monitoring, and entry of inspection forms)
3) Deliver suspect AIS to WDNR
4) Entry of inspection forms 3200-120 onto Dept website by Coordinator
5) Publicize outcome of grant in local media
6) Conduct in-water AIS monitoring
7) Develop AIS information packet and brochure
8) Participate in Lac du Flambeau Lake Fest
9) Install AIS signage/kiosks

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Local media articles/media releases
- Position description for AIS Coordinator
- AIS information packet, brochure, and signage
- Final report (contents listed on pg 10 of proposal)

Specific conditions for this project:
- A minimum of 1200 boat landing inspection hours are needed for this project
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report including the deliverables listed above.


Grant Details
Aquatic Invasives Education
Date
4/1/2007
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education, & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning grant to be completed by December 31, 2007. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include:
1) Recruit volunteers and implement a Clean Boat/Clean Water program at town landings
2) Hire 2 AIS coordinators
3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines
4) Entry of inspection forms 3200-120 and monitoring forms onto Dept website
5) Create a Town Lakes Committee website
6) Conduct AIS educational & outreach activities as listed in Objectives C and D of proposal (page 8)
7) Provide learning experiences on managing purple loosestrife and rusty crayfish

Project deliverables include:
1) Completed entry of inspection 3200-120 and monitoring forms onto Dept website
2) Town Lakes Committee website
3) AIS educational and outreach activities/products
4) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS

Specific Conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an AIS project to be completed by December 31, 2008. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and outreach activities as listed in Goal 1 of proposal (pages 6-10); 6) Provide learning experiences on managing purple loosestrife; 7) Prepare a long-term plan for AIS, including creating/conducting a survey of lake users.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) AIS educational and outreach activities/products; 3) Copy of public survey and results; 4) First draft of long-term plan; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2009
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant to be completed by December 31, 2009. The project will focus on AIS education, prevention, monitoring, and management.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2) Hire 3 AIS coordinators; 3) Conduct AIS citizen lake monitoring following Dept/UW Ext guidelines; 4) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 5) Conduct AIS educational and communication activities as listed in Goal 1, obj's 1 and 4 of proposal; 6) Develop plan and manage purple loosestrife; 7) Prepare a finance plan.

Project deliverables include: 1) Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 3 AIS coordinators; 3) Finance and purple loosestrife plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, and management of AIS.

Specific Conditions for this project: Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, finance plan, purple loosestrife plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2010
Waters Involved
Little Ten Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Watercraft Inspection, Education & Lake Monitoring Project: The Town of Lac du Flambeau is sponsoring an AIS EPP grant partnering with the Town of Manitowish Waters, Lac du Flambeau Band of Chippewa Indians, Manitowish Waters Lakes Association, and Discovery Center. The project will focus on AIS education, prevention, monitoring, and management within the Lac du Flambeau and Manitowish Waters Townships in Vilas County.

Project activities include: 1) Recruit volunteers and implement a CB/CW program at town landings; 2)Hire 2 AIS coordinators; 3) Conduct volunteer AIS lake and scuba diving boat landing monitoring; 4) Conduct PI aquatic plant surveys on Squaw and Crawling Stone Lakes; 5) Entry of inspection Forms 3200-120 and monitoring Forms 3200-124 and/or 3200-130 onto Dept website; 6) Conduct AIS educational and communication activities as listed in Goal 1, obj\2019s 1 and 4 of proposal; 7) Develop action plan to manage purple loosestrife (PL); 8) Develop a Manitowish Waters Town AIS Strategic Plan.

Project deliverables include: 1)Completed entry of inspection Forms 3200-120 and monitoring Forms 3200-124 onto Dept website; 2) 2 AIS coordinators; 3) PL action plan and Manitowish Waters Strategic Plan; 4) AIS educational and communication activities/products; 5) Final report summarizing CB/CW activities, AIS monitoring, management of AIS, and all other project activities.

Specific Conditions for this project: Community survey and final report need Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, strategic plan, purple loosestrife action plan, and samples of educational and outreach products.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Trout Lake
Status
Complete

Town Of Lac Du Flambeau: Ais Boat Inspection, Education, & Lake Monitoring: The Town of Lac du Flambeau is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on preventing AIS