Watershed - Trade River (SC10)
Trade River Watershed

Details

The Trade River Watershed is approximately 124,754 acres in size and contains 167 miles of streams and rivers, 2,902 acres of lakes and 21,757 acres of wetlands. The watershed is dominated by forest (46%), grassland (19%) and wetlands (17%), and is ranked medium for nonpoint source issues affecting streams. The Trade River begins in Polk County, flows north in Burnett County and loops back to the south into the northwest of Polk County and discharges into the St. Croix River. The river flows through a chain of lakes including Long Trade, Round and Big and Little Trade Lakes.

Date  2010

Ecological Landscapes for Trade River Watershed

Ecological Landscapes

The Trade River Watershed lies primarily in two Ecological Landscapes: the Forest Transition and the Northwest Sands. The Forest Transition Ecological Landscape lies along the northern border of Wisconsin's Tension Zone, through the central and western part of the state, and supports both northern forests and agricultural areas. The central portion of the Forest Transition lies primarily on a glacial till plain deposited by glaciation between 25,000 and 790,000 years ago. The eastern and western portions are on moraines of the Wisconsin glaciation. The growing season in this part of the state is long enough that agriculture is viable, although climatic conditions are not as favorable as in southern Wisconsin. Soils are diverse, ranging from sandy loam to loam or shallow silt loam, and from poorly drained to well drained. The historic vegetation of the Forest Transition was primarily northern hardwood forest. These northern hardwoods were dominated by sugar maple and hemlock, and contained some yellow birch, red pine and white pine. Currently, over 60% of this Ecological Landscape is non-forested. Forested areas consist primarily of northern hardwoods and aspen, with smaller amounts of oak and lowland hardwoods. The eastern portion of the Ecological Landscape differs from the rest of the area in that it remains primarily forested, and includes some ecologically significant areas. Throughout the Ecological Landscape, small areas of conifer swamp are found near the headwaters of streams, and associated with lakes in kettle depressions on moraines. Ground flora show characteristics of both northern and southern Wisconsin, as this Ecological Landscape lies along the Tension Zone. The Northwest Sands Ecological Landscape is a large glacial outwash system consisting of two major landforms: flat plains or terraces along glacial meltwater channels, and pitted or "collapsed" outwash plains containing kettle lakes. Soils are deep sands, low in organic material and nutrients. Historic vegetation at the time of the General Land Office survey was dominantly jack pine and scrub oak forest and barrens. White and red pine forests were also a sizable component of the Ecological Landscape. Numerous barrens occurred in the southwest half of the Ecological Landscape, and a few large barrens within the northeast half. Most of the trees in the barrens were jack pine, but oak savannas also occurred in the south central part of the Ecological Landscape. Current vegetation is a mix of forest, agriculture, and grassland with some wetlands in the river valleys. Pine, aspen-birch and oak equally (27% each) dominate the forested area of the Ecological Landscape. The maple-basswood, spruce-fir, and lowland hardwood forest type groups occupy small percentages of the Ecological Landscape. Within the open lands, there is a relatively large proportion of grassland and shrub land, a small but locally significant amount of emergent/wet meadow and open water, and very little row-crop agriculture.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
10/1/2011
Waters Involved
Big Trade Lake
Status
Complete

Round Trade Lake Improvement Association: Round Trade Lakes 3-Year Aquatic Invasive Species Control Project: Round Trade Lake Improvement Association is sponsoring a 3-year project to implement approved activities from the Round Trade Lakes Aquatic Plant Management Plan. Approved activities include EWM control in Big and Little Trade, Long Trade, and Round Lakes; pre/post treatment aquatic plant surveys and bed mapping in all 4 lakes; purple loosestrife and Japanese knotweed monitoring and control; watercraft inspection; AIS monitoring; various information and education activities; and annual reporting. Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); I & E materials and progress report; CBCW data entry; and a management/treatment summary.

Special Condition: WDNR\2019s pre/post treatment monitoring guideline should be followed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Big Trade Lake
Status
Complete

Round Trade Lake Improvement Association: 2016-2017 Trade Lake System Ais Management Implementation: Round Trade Lakes Improvement Association is implementing AIS management activities for multiple lakes in 2016 and 2017.

Activities include: aquatic plant management planning and monitoring on Long Trade, Round, Little and Big Trade Lakes and Eurasian watermilfoil and curlyleaf pondweed management on Long Trade, Round and Little Trade Lakes. The project also includes partnering with DNR on a dye study and with Grantsburg High School on a native plant reintroduction project in Little Trade; watercraft inspection at 3 landings; purple loosestrife monitoring and biocontrol; and substantial volunteer monitoring, education and outreach.

Final deliverables include: 2018-2022 aquatic plant management plan for the Trade Lakes system that integrates all data, evaluation, and results with a future management strategy; annual summary reports, plan updates and permit applications; submission of all collected data, including watercraft inspection and aquatic plant monitoring information, and results; native plant restoration report; purple loosestrife project summary; and results and examples of information and education outreach.

This scope does not supersede or negate activities described in the grant application and proposal


Grant Details
Aquatic Invasives Control
Date
10/1/2011
Waters Involved
Little Trade Lake
Status
In_Progress

Round Trade Lake Improvement Association: Round Trade Lakes 3-Year Aquatic Invasive Species Control Project: Round Trade Lake Improvement Association is sponsoring a 3-year project to implement approved activities from the Round Trade Lakes Aquatic Plant Management Plan. Approved activities include EWM control in Big and Little Trade, Long Trade, and Round Lakes; pre/post treatment aquatic plant surveys and bed mapping in all 4 lakes; purple loosestrife and Japanese knotweed monitoring and control; watercraft inspection; AIS monitoring; various information and education activities; and annual reporting. Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); I & E materials and progress report; CBCW data entry; and a management/treatment summary.

Special Condition: WDNR\2019s pre/post treatment monitoring guideline should be followed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Little Trade Lake
Status
Proposed

Round Trade Lake Improvement Association: 2016-2017 Trade Lake System Ais Management Implementation: Round Trade Lakes Improvement Association is implementing AIS management activities for multiple lakes in 2016 and 2017.

Activities include: aquatic plant management planning and monitoring on Long Trade, Round, Little and Big Trade Lakes and Eurasian watermilfoil and curlyleaf pondweed management on Long Trade, Round and Little Trade Lakes. The project also includes partnering with DNR on a dye study and with Grantsburg High School on a native plant reintroduction project in Little Trade; watercraft inspection at 3 landings; purple loosestrife monitoring and biocontrol; and substantial volunteer monitoring, education and outreach.

Final deliverables include: 2018-2022 aquatic plant management plan for the Trade Lakes system that integrates all data, evaluation, and results with a future management strategy; annual summary reports, plan updates and permit applications; submission of all collected data, including watercraft inspection and aquatic plant monitoring information, and results; native plant restoration report; purple loosestrife project summary; and results and examples of information and education outreach.

This scope does not supersede or negate activities described in the grant application and proposal


Grant Details
Aquatic Invasives Control
Date
10/1/2011
Waters Involved
Long Trade Lake
Status
In_Progress

Round Trade Lake Improvement Association: Round Trade Lakes 3-Year Aquatic Invasive Species Control Project: Round Trade Lake Improvement Association is sponsoring a 3-year project to implement approved activities from the Round Trade Lakes Aquatic Plant Management Plan. Approved activities include EWM control in Big and Little Trade, Long Trade, and Round Lakes; pre/post treatment aquatic plant surveys and bed mapping in all 4 lakes; purple loosestrife and Japanese knotweed monitoring and control; watercraft inspection; AIS monitoring; various information and education activities; and annual reporting. Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); I & E materials and progress report; CBCW data entry; and a management/treatment summary.

Special Condition: WDNR\2019s pre/post treatment monitoring guideline should be followed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Long Trade Lake
Status
Proposed

Round Trade Lake Improvement Association: 2016-2017 Trade Lake System Ais Management Implementation: Round Trade Lakes Improvement Association is implementing AIS management activities for multiple lakes in 2016 and 2017.

Activities include: aquatic plant management planning and monitoring on Long Trade, Round, Little and Big Trade Lakes and Eurasian watermilfoil and curlyleaf pondweed management on Long Trade, Round and Little Trade Lakes. The project also includes partnering with DNR on a dye study and with Grantsburg High School on a native plant reintroduction project in Little Trade; watercraft inspection at 3 landings; purple loosestrife monitoring and biocontrol; and substantial volunteer monitoring, education and outreach.

Final deliverables include: 2018-2022 aquatic plant management plan for the Trade Lakes system that integrates all data, evaluation, and results with a future management strategy; annual summary reports, plan updates and permit applications; submission of all collected data, including watercraft inspection and aquatic plant monitoring information, and results; native plant restoration report; purple loosestrife project summary; and results and examples of information and education outreach.

This scope does not supersede or negate activities described in the grant application and proposal


Grant Details
Aquatic Invasives Control
Date
10/1/2011
Waters Involved
Round Lake
Status
In_Progress

Round Trade Lake Improvement Association: Round Trade Lakes 3-Year Aquatic Invasive Species Control Project: Round Trade Lake Improvement Association is sponsoring a 3-year project to implement approved activities from the Round Trade Lakes Aquatic Plant Management Plan. Approved activities include EWM control in Big and Little Trade, Long Trade, and Round Lakes; pre/post treatment aquatic plant surveys and bed mapping in all 4 lakes; purple loosestrife and Japanese knotweed monitoring and control; watercraft inspection; AIS monitoring; various information and education activities; and annual reporting. Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); I & E materials and progress report; CBCW data entry; and a management/treatment summary.

Special Condition: WDNR\2019s pre/post treatment monitoring guideline should be followed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Round Lake
Status
Proposed

Round Trade Lake Improvement Association: 2016-2017 Trade Lake System Ais Management Implementation: Round Trade Lakes Improvement Association is implementing AIS management activities for multiple lakes in 2016 and 2017.

Activities include: aquatic plant management planning and monitoring on Long Trade, Round, Little and Big Trade Lakes and Eurasian watermilfoil and curlyleaf pondweed management on Long Trade, Round and Little Trade Lakes. The project also includes partnering with DNR on a dye study and with Grantsburg High School on a native plant reintroduction project in Little Trade; watercraft inspection at 3 landings; purple loosestrife monitoring and biocontrol; and substantial volunteer monitoring, education and outreach.

Final deliverables include: 2018-2022 aquatic plant management plan for the Trade Lakes system that integrates all data, evaluation, and results with a future management strategy; annual summary reports, plan updates and permit applications; submission of all collected data, including watercraft inspection and aquatic plant monitoring information, and results; native plant restoration report; purple loosestrife project summary; and results and examples of information and education outreach.

This scope does not supersede or negate activities described in the grant application and proposal


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Trade River
Status
Complete

Round Trade Lake Improvement Association: 2016-2017 Trade Lake System Ais Management Implementation: Round Trade Lakes Improvement Association is implementing AIS management activities for multiple lakes in 2016 and 2017.

Activities include: aquatic plant management planning and monitoring on Long Trade, Round, Little and Big Trade Lakes and Eurasian watermilfoil and curlyleaf pondweed management on Long Trade, Round and Little Trade Lakes. The project also includes partnering with DNR on a dye study and with Grantsburg High School on a native plant reintroduction project in Little Trade; watercraft inspection at 3 landings; purple loosestrife monitoring and biocontrol; and substantial volunteer monitoring, education and outreach.

Final deliverables include: 2018-2022 aquatic plant management plan for the Trade Lakes system that integrates all data, evaluation, and results with a future management strategy; annual summary reports, plan updates and permit applications; submission of all collected data, including watercraft inspection and aquatic plant monitoring information, and results; native plant restoration report; purple loosestrife project summary; and results and examples of information and education outreach.

This scope does not supersede or negate activities described in the grant application and proposal


Grant Details
Aquatic Invasives Control
Date
4/15/2016
Waters Involved
Trade River
Status
Proposed

Round Trade Lake Improvement Association: 2016-2017 Trade Lake System Ais Management Implementation: Round Trade Lakes Improvement Association is implementing AIS management activities for multiple lakes in 2016 and 2017.

Activities include: aquatic plant management planning and monitoring on Long Trade, Round, Little and Big Trade Lakes and Eurasian watermilfoil and curlyleaf pondweed management on Long Trade, Round and Little Trade Lakes. The project also includes partnering with DNR on a dye study and with Grantsburg High School on a native plant reintroduction project in Little Trade; watercraft inspection at 3 landings; purple loosestrife monitoring and biocontrol; and substantial volunteer monitoring, education and outreach.

Final deliverables include: 2018-2022 aquatic plant management plan for the Trade Lakes system that integrates all data, evaluation, and results with a future management strategy; annual summary reports, plan updates and permit applications; submission of all collected data, including watercraft inspection and aquatic plant monitoring information, and results; native plant restoration report; purple loosestrife project summary; and results and examples of information and education outreach.

This scope does not supersede or negate activities described in the grant application and proposal


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2015
Waters Involved
Big Trade Lake
Status
Complete

Round Trade Lake Improvement Association: Big Trade Lake Early Detection & Response Project: Round-Trade Lake Improvement Association, Inc. is sponsoring a two-year early detection and response project that will monitor and manage a pioneering population of Eurasian watermilfoil in Big Trade Lake.

Project activities include: 1) Pre- and post-treatment aquatic plant monitoring following guidelines provided by the Department on Big Trade Lake and possibly other lakes with prior Department approval; 2) Chemical treatment and/or SCUBA and manual removal of Eurasian watermilfoil on Big Trade Lake only.

Special condition: WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring, pre/post treatment monitoring, and aquatic plant management plan development unless otherwise approved by the Department.

Project deliverables include: annual progress of monitoring and management activities, including aquatic plant survey spreadsheets and pre/post treatment monitoring, and any educational materials developed. Aquatic Plant Management Plan updates that may result from this project.

This scope summarizes the project detail provided in the application and does not supersede tasks/deliverables described therein.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/1/2009
Waters Involved
Trade River
Status
Complete

Round Trade Lake Improvement Association: Trade Lakes Eurasian Watermilfoil Early Detection & Response Project: Round-Trade Lake Improvement Association, Inc. is sponsoring a four-year early detection and response project that will monitor and manage a pioneering population of Eurasian watermilfoil in Trade Lake and develop a management plan for Trade Lake and lakes (Round and Long Trade) upstream in the Trade River system.

Project activities include: 1) Pre- and post-treatment aquatic plant monitoring following guidelines provided by the Department on Trade Lake and possibly other lakes with prior Department approval; 2) Chemical treatment and/or SCUBA and manual removal of Eurasian watermilfoil on Trade Lake only; 3) Aquatic Plant Management Plan for Trade Lake that also addresses upstream aquatic invasive species sources and management in Round and Long Trade Lakes.

Special condition: WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring, pre/post treatment monitoring, and aquatic plant management plan development unless otherwise approved by the Department.

Project deliverables include: annual progress of monitoring and management activities, including aquatic plant survey spreadsheets and pre/post treatment monitoring, and any educational materials developed. Aquatic Plant Management for Trade Lake (minimum) or all lakes in the Trade River system (recommended).

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Aquatic Invasives Early Detection and Response
Date
4/1/2015
Waters Involved
Trade River
Status
Complete

Round Trade Lake Improvement Association: Big Trade Lake Early Detection & Response Project: Round-Trade Lake Improvement Association, Inc. is sponsoring a two-year early detection and response project that will monitor and manage a pioneering population of Eurasian watermilfoil in Big Trade Lake.

Project activities include: 1) Pre- and post-treatment aquatic plant monitoring following guidelines provided by the Department on Big Trade Lake and possibly other lakes with prior Department approval; 2) Chemical treatment and/or SCUBA and manual removal of Eurasian watermilfoil on Big Trade Lake only.

Special condition: WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring, pre/post treatment monitoring, and aquatic plant management plan development unless otherwise approved by the Department.

Project deliverables include: annual progress of monitoring and management activities, including aquatic plant survey spreadsheets and pre/post treatment monitoring, and any educational materials developed. Aquatic Plant Management Plan updates that may result from this project.

This scope summarizes the project detail provided in the application and does not supersede tasks/deliverables described therein.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Coon Lake
Status
Complete

Village Of Frederic: Hlk-Demonstration Project To Promote A Healthy Coon Lake: The Village of Frederic will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan at Coon Lake Park. Practices include: a 350 ft2 native planting and a rain garden. The site will serve as a demonstration site with Healthy Lakes signage. The Village should coordinate with the DNR on the demonstration sign content.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.

Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Antler Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Antler Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Balsam Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Balsam Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
3/31/1995
Waters Involved
Big Butternut Lake
Status
Complete

Big Butternut Lake P & R District: Big Butternut Lake Level Analysis & Macrophyte Survey: Analyze lake water levels to determine an acceptable level and management strategies for Butternut Creek. Conduct a survey of the lake outlet channel, Butternut Creek. Install a staff gage to monitor lake levels. Develop and distribute a lake waterlevel survey to lakeshore residents. Determine management strategies for long-term control of macrophytes. Perform two lake-wide macrophyte surveys. Perform a controlled experiemtnal treatment of curlyleaf pondweed beds to assess potential long termmanagement strategies. Information will be disseminated to the public by newsletter, public meeting, and local newspaper articles. Project results will be reposited at the Village of Luck City Hall.


Grant Details
Large Scale Lake Planning
Date
4/3/1995
Waters Involved
Big Butternut Lake
Status
Complete

Big Butternut Lake P & R District: Big Butternut Lake Water Quality Study: Determine water quality of Big Butternut Lake by measuring physical, chemical, and biological parameters. Analyze data to determine phosphorus and algae dynamics in lake.Estimate current trophic status, effects of internal phosphorus load, and effects of zooplankton population fluctuations on algal abundance.Compare water quality of lake during 1983 with that measured during the course of this study.Disseminate information to the public by newsletter, public meetings, and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Big Butternut Lake
Status
Complete

Big Butternut Lake P & R District: Big Butternut Lake Water Quality Studies & Mgmt Strategies: The Big Butternut Lake Protection and Rehabilitation District proposes to conduct the following lake management activities on Big Butternut Lake: 1) Establish watershed delineation, 2) Create maps showing the GIS database and land use for the watershed. 3) Collect in-lake water quality and flow data and establish phosphorus and hydrologic budgets, 4) Identify BMP's and potential remediation measures for water quality in Big Butternut Lake, and 5) Identify the specific watershed sensitive areas.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Big Butternut Lake
Status
Complete

Big Butternut Lake Protect. & Rehab District: Big Butternut, Feasibility Plan For Wet Detension Basin: The Big Butternut Lake Protection and Rehabilitation District will to conduct a feasibility study and plan design project for a wet detention basin in the watershed of Big Butternut Lake in Polk County. Project activities will include; conducting a proposed site survey, conducting a sub-watershed modeling analysis, preparing engineering plans and specifications, preparing probable cost estimates, perform monitoring and evaluation on an adjacent sub-watershed, and preparing a formal final summary report on project activities.

Specific deliverables for this grant project will include:
* A final report summarizing project activities and recommendations.

Special conditions for this grant project will include:
* The design specifications for the proposed wet detention basin will have to be submitted to the Fisheries Management section of the Department of Natural Resources for review to insure the basin will not become a "fish trap" or otherwise pose a threat to the fishery of Big Butternut Lake.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Big Butternut Lake
Status
Complete

Polk County Lwrd: Big Butternut Aquatic Plant & Stormwater Management Study, (Phase 2): Polk County Land and Water Resources Department is sponsoring a two-phase project to assess water quality and biological conditions and trends; engage and survey landowners and stakeholders; survey and develop a management plan for aquatic plants; and monitor stormwater. Deliverables include: a report that details results of project components, including nutrient budget and modeling, and aquatic plant and stormwater management plans.

The specific Phase 2 (LPL-1298-09) project tasks include: 1) Early season (i.e. June) and summary point-intercept aquatic plant surveys; 2) Wetland vegetation survey; 3) Aquatic plant management plan development, including public participation/meetings; 4) Stormwater monitoring and lab analyses; 5) Stormwater conveyance system review, mapping, and recommendations; 6) Watershed delineation and lake response modeling.

Special Conditions: 1) CLMN efforts should not be duplicated, and these data should be included in the trends analysis and final reporting; 2) WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development; 3) Draft public surveys and shoreline inventory methods must be reviewed and approved by the Department before being initiated.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2009
Waters Involved
Big Butternut Lake
Status
Complete

Polk County Lwrd: Big Butternut Lake Water Quality & Biological Monitoring Study, (Phase 1): Polk County Land and Water Resources Department is sponsoring a two-phase project to assess water quality and biological conditions and trends; engage and survey landowners and stakeholders; survey and develop a management plan for aquatic plants; and monitor stormwater. Deliverables include: a report that details results of project components and results, including nutrient budget and modeling, and aquatic plant and stormwater management plans.

The specific Phase 1 (LPL-1297-09) project tasks include: 1) Expanded water quality monitoring, including algae and zooplankton monitoring; 2) Lake level and precipitation monitoring; 3) In/outflow monitoring; 4) Groundwater monitoring and flow estimates; 5) Sociological survey; 6) Education and outreach, including a pontoon classroom, aquatic plant workshop, and NEMO presentation.

Special Conditions: 1) CLMN efforts should not be duplicated, and these data should be included in the trends analysis and final reporting; 2) WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development; 3) Draft public surveys and shoreline inventory methods must be reviewed and approved by the Department before being initiated.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Camp Douglas Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Camp Douglas Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Coon Lake
Status
Complete

Polk County Lwrd: Coon Lake Biological Study & Community Education: Polk County is sponsoring a two-phase project on Coon Lake to assess watershed, water quality, zooplankton, and aquatic plant conditions; determine nutrient loads and model lake response; distribute and analyze a sociological survey; educate public through library reading program and lake fair; inventory exotic species; coordinate stakeholder participation and planning; develop APM, storm water and lake management plans.

Deliverables include education materials developed; agendas for workshops or attendance lists, fairs and meetings; lake management plan including methodologies, results, and management alternatives discussion and implementation plan. Interim deliverables for each phase include progress reports, maps, spreadsheets, and data collected.

Phase 1 tasks include: 1) Algae and zooplankton sampling and analysis; 2) Mid summer point-intercept aquatic plant survey and APM plan development including public participation/meetings; 3) Education and outreach including Library reading program and Lake Fair; 4) Sociological survey of riparian and Village citizens.

Special Conditions: 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance must be followed for PI survey monitoring and APM plan development. Two sets of aquatic plant vouchers should be collected, one set for DNR distribution to Dr. Freckmann and one set for the lake group or village. The NOR Native Plant Protection Strategy should be integrated into the APM plan; 2) Draft sociological/user surveys must be reviewed and approved by the DNR before being initiated; 3) The sponsor shall immediately contact the DNR if a new Aquatic Invasive Species population is found.

This scope summarizes the detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the DNR in a format specified by the Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Coon Lake
Status
Complete

Polk County Lwrd: Coon Lake Management Study, Phase 2: Polk County is sponsoring a two-phase project on Coon Lake to assess watershed, water quality, zooplankton, and aquatic plant conditions; determine nutrient loads and model lake response; distribute and analyze a sociological survey; educate public through library reading program and lake fair; inventory exotic species; coordinate stakeholder participation and planning; develop APM, storm water and lake management plans.

Deliverables will be education materials developed, agendas or attendance lists for workshops, fairs and meetings, and a lake management plan including methodologies, results, and management alternatives discussion with implementation plan. Interim deliverables for each phase include a progress reports including maps, spreadsheets, and collected data.

Phase 2 tasks include: 1) Expanded monthly water quality monitoring at Deep Hole; 2) Spring and fall turn over monitoring; 3) Water quality and flow monitoring on north and south tributaries; 4) Daily lake level and precipitation monitoring; 5) Storm water monitoring at 5 sites for 3 events; 6) Watershed delineation and lake response modeling; 7) Storm water conveyance system review, mapping, modeling, and recommendations; 8) Nutrient budget development; 9) Lake management plan development including public participation/meetings.

Special Conditions: 1) CLMN efforts should not be duplicated, and these data should be included in the trends analysis and final reporting; 2) The sponsor shall immediately contact the DNR if a new Aquatic Invasive Species population is found.

This scope summarizes the detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the DNR in a format specified by the Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
East Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
East Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Elkins Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Elkins Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Fish Lake
Status
Complete

Town Of Grantsburg: Five Twnsp Watershed & Land Use Plan Project: The Town of Grantsburg proposes to be the project sponsor for a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Townships of Daniels, Grantsburg, Lincoln, West Marshland, and Wood River in Burnett County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, inventory of towns' resources, and developing goals, policies and recommendations for long-range land use and shorelands protection planning.

Specific deliverables for this grant project will include:
? Copies of comprehensive resource and land use maps for the towns and project area.
? Copies of proposed land use and lake protection recommendations.
? A Final Report in booklet or poster format, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Half Moon Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Half Moon Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Hay Creek Flowage
Status
Complete

Town Of Grantsburg: Five Twnsp Watershed & Land Use Plan Project: The Town of Grantsburg proposes to be the project sponsor for a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Townships of Daniels, Grantsburg, Lincoln, West Marshland, and Wood River in Burnett County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, inventory of towns' resources, and developing goals, policies and recommendations for long-range land use and shorelands protection planning.

Specific deliverables for this grant project will include:
? Copies of comprehensive resource and land use maps for the towns and project area.
? Copies of proposed land use and lake protection recommendations.
? A Final Report in booklet or poster format, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Kenny Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Kenny Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Little Pine Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Little Pine Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1996
Waters Involved
Long Trade Lake
Status
Complete

Round Trade Lake Improvement Association: Long-Trade Lake Eurasian Watermilfoil Weevil Study: The Round-Trade Lake Improvement Association proposes to collect data on the macrophyte community in Long Trade Lake and the possible effects of the milfoil weevil on Eurasian watermilfoil in the lake. Project data collection and analysis activities will result in a written report that will present the data collected and discuss the conditions of the macrophytes and the milfoil weevil on Long Trade Lake. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the report. Information about the project results will be disseminated to the public by public meeting, fact sheet, and summary report mailing.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Long Trade Lake
Status
Complete

Polk County Lwrd: Round & Long Trade Lakes Phase 1-Water Quality & Vegetation Assessment: Polk County Land and Water Resources Department, in partnership with Burnett County and Round/Trade Lake Improvement Association, is sponsoring a two-phase Trade River watershed assessment project. The final deliverables include project update newsletters and a report containing collected data summaries, TSI calculations, habitat assessments, nutrient loading and modeling results, stakeholder capacity/education, and management recommendations.

Phase 1 includes:
1. Water quality appraisals for Long Trade and Round Lakes
2. Daily lake level and precipitation monitoring for both lakes.
3. Early season curlyleaf pondweed monitoring.
4. Shoreline and coarse woody habitat assessment and mapping.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.

DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.



Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Long Trade Lake
Status
Complete

Polk County Lwrd: Round & Long Trade Lakes Phase 2-Tributary & Watershed Assessment: Polk County Land and Water Resources Department, in partnership with Burnett County and Round/Trade Lake Improvement Association, is sponsoring a two-phase Trade River watershed assessment project. The final deliverables include project update newsletters and a report containing collected data summaries, TSI calculations, habitat assessments, nutrient loading and modeling results, stakeholder capacity/education, and management recommendations.

Phase 2 includes:
1. Monitoring nine tributary sites for nutrients, chlorides, and TSS (monthly) and in-field parameters and flow (bi-weekly).
2. Groundwater reconnaissance of drinking water wells.
3. Groundtruthing of previous watershed delineation and refinement of models (WiLMS or BATHTUB) using collected data and various land use predictions/scenarios.
4. Identification of critical sites within the watershed.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.

DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.



Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lost Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Lost Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Rice Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Rice Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2005
Waters Involved
Round Lake
Status
Complete

Round Trade Lake Improvement Association: Lake Protection Plan For Round Lake: The Round-Trade Lake Improvement Association will conduct a comprehensive lake management planning project involving a study and evaluation of Round Lake (T37,R18W,S27) in Burnett County. Project activities include; a review of current lake management plans and programs, conducting a lake use survey, conducting a watershed land use data review and modeling exercise, conducting a multi-parameter "self-help" lake water quality monitoring survey, conducting an aquatic plant survey, conducting an evaluation of all past and current lake management information and developing a lake protection plan, a plant management plan and recommendations for future lake management activities.

Specific deliverables for this grant project include:
A comprehensive final project report, including the project results and the following components; (1). An aquatic plant management plan, (2). A lake protection plan, and (3). A listing of all project activities, results, and recommendations.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Round Lake
Status
Complete

Polk County Lwrd: Round & Long Trade Lakes Phase 1-Water Quality & Vegetation Assessment: Polk County Land and Water Resources Department, in partnership with Burnett County and Round/Trade Lake Improvement Association, is sponsoring a two-phase Trade River watershed assessment project. The final deliverables include project update newsletters and a report containing collected data summaries, TSI calculations, habitat assessments, nutrient loading and modeling results, stakeholder capacity/education, and management recommendations.

Phase 1 includes:
1. Water quality appraisals for Long Trade and Round Lakes
2. Daily lake level and precipitation monitoring for both lakes.
3. Early season curlyleaf pondweed monitoring.
4. Shoreline and coarse woody habitat assessment and mapping.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.

DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.



Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Round Lake
Status
Complete

Polk County Lwrd: Round & Long Trade Lakes Phase 2-Tributary & Watershed Assessment: Polk County Land and Water Resources Department, in partnership with Burnett County and Round/Trade Lake Improvement Association, is sponsoring a two-phase Trade River watershed assessment project. The final deliverables include project update newsletters and a report containing collected data summaries, TSI calculations, habitat assessments, nutrient loading and modeling results, stakeholder capacity/education, and management recommendations.

Phase 2 includes:
1. Monitoring nine tributary sites for nutrients, chlorides, and TSS (monthly) and in-field parameters and flow (bi-weekly).
2. Groundwater reconnaissance of drinking water wells.
3. Groundtruthing of previous watershed delineation and refinement of models (WiLMS or BATHTUB) using collected data and various land use predictions/scenarios.
4. Identification of critical sites within the watershed.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.

DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.



Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Saint Croix River
Status
Complete

River Country Rc&D Council, Inc: Green Development Conference: River Country RC&D proposes to conduct a conference entitled "The Nuts and Bolts of Green Development" in conjunction with the St. Croix Basin Partnership Team. Objective of the conference and associated bus tours will be to provide riparian owners, interested citizens, and municipal operators and engineers with information useful to the development of small-scale and community-wide stormwater management practices.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Tobe Lake
Status
Complete

Town Of Grantsburg: Five Twnsp Watershed & Land Use Plan Project: The Town of Grantsburg proposes to be the project sponsor for a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Townships of Daniels, Grantsburg, Lincoln, West Marshland, and Wood River in Burnett County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, inventory of towns' resources, and developing goals, policies and recommendations for long-range land use and shorelands protection planning.

Specific deliverables for this grant project will include:
? Copies of comprehensive resource and land use maps for the towns and project area.
? Copies of proposed land use and lake protection recommendations.
? A Final Report in booklet or poster format, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Town Road Flowage
Status
Complete

Town Of Grantsburg: Five Twnsp Watershed & Land Use Plan Project: The Town of Grantsburg proposes to be the project sponsor for a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Townships of Daniels, Grantsburg, Lincoln, West Marshland, and Wood River in Burnett County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, inventory of towns' resources, and developing goals, policies and recommendations for long-range land use and shorelands protection planning.

Specific deliverables for this grant project will include:
? Copies of comprehensive resource and land use maps for the towns and project area.
? Copies of proposed land use and lake protection recommendations.
? A Final Report in booklet or poster format, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1996
Waters Involved
Trade River
Status
Complete

Round Trade Lake Improvement Association: Long-Trade Lake Eurasian Watermilfoil Weevil Study: The Round-Trade Lake Improvement Association proposes to collect data on the macrophyte community in Long Trade Lake and the possible effects of the milfoil weevil on Eurasian watermilfoil in the lake. Project data collection and analysis activities will result in a written report that will present the data collected and discuss the conditions of the macrophytes and the milfoil weevil on Long Trade Lake. The Department of Natural Resources will be provided with a paper copy and an electronic copy of the report. Information about the project results will be disseminated to the public by public meeting, fact sheet, and summary report mailing.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Trade River
Status
Complete

Polk County Lwrd: Round & Long Trade Lakes Phase 1-Water Quality & Vegetation Assessment: Polk County Land and Water Resources Department, in partnership with Burnett County and Round/Trade Lake Improvement Association, is sponsoring a two-phase Trade River watershed assessment project. The final deliverables include project update newsletters and a report containing collected data summaries, TSI calculations, habitat assessments, nutrient loading and modeling results, stakeholder capacity/education, and management recommendations.

Phase 1 includes:
1. Water quality appraisals for Long Trade and Round Lakes
2. Daily lake level and precipitation monitoring for both lakes.
3. Early season curlyleaf pondweed monitoring.
4. Shoreline and coarse woody habitat assessment and mapping.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.

DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.



Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Trade River
Status
Complete

Polk County Lwrd: Round & Long Trade Lakes Phase 2-Tributary & Watershed Assessment: Polk County Land and Water Resources Department, in partnership with Burnett County and Round/Trade Lake Improvement Association, is sponsoring a two-phase Trade River watershed assessment project. The final deliverables include project update newsletters and a report containing collected data summaries, TSI calculations, habitat assessments, nutrient loading and modeling results, stakeholder capacity/education, and management recommendations.

Phase 2 includes:
1. Monitoring nine tributary sites for nutrients, chlorides, and TSS (monthly) and in-field parameters and flow (bi-weekly).
2. Groundwater reconnaissance of drinking water wells.
3. Groundtruthing of previous watershed delineation and refinement of models (WiLMS or BATHTUB) using collected data and various land use predictions/scenarios.
4. Identification of critical sites within the watershed.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.

DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.



Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Twenty-Ninth Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Twenty-Ninth Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Unnamed
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Unnamed
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete

River Country Rc&D Council, Inc: Green Development Conference: River Country RC&D proposes to conduct a conference entitled "The Nuts and Bolts of Green Development" in conjunction with the St. Croix Basin Partnership Team. Objective of the conference and associated bus tours will be to provide riparian owners, interested citizens, and municipal operators and engineers with information useful to the development of small-scale and community-wide stormwater management practices.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Polk County Lwrd: Round & Long Trade Lakes Phase 1-Water Quality & Vegetation Assessment: Polk County Land and Water Resources Department, in partnership with Burnett County and Round/Trade Lake Improvement Association, is sponsoring a two-phase Trade River watershed assessment project. The final deliverables include project update newsletters and a report containing collected data summaries, TSI calculations, habitat assessments, nutrient loading and modeling results, stakeholder capacity/education, and management recommendations.

Phase 1 includes:
1. Water quality appraisals for Long Trade and Round Lakes
2. Daily lake level and precipitation monitoring for both lakes.
3. Early season curlyleaf pondweed monitoring.
4. Shoreline and coarse woody habitat assessment and mapping.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.

DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.



Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Upper Hay Creek Flowage
Status
Complete

Town Of Grantsburg: Five Twnsp Watershed & Land Use Plan Project: The Town of Grantsburg proposes to be the project sponsor for a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Townships of Daniels, Grantsburg, Lincoln, West Marshland, and Wood River in Burnett County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, inventory of towns' resources, and developing goals, policies and recommendations for long-range land use and shorelands protection planning.

Specific deliverables for this grant project will include:
? Copies of comprehensive resource and land use maps for the towns and project area.
? Copies of proposed land use and lake protection recommendations.
? A Final Report in booklet or poster format, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Whiskey Creek Flowage
Status
Complete

Town Of Grantsburg: Five Twnsp Watershed & Land Use Plan Project: The Town of Grantsburg proposes to be the project sponsor for a watershed and land use planning project addressing resource protection for all lakes, streams, shorelands, wetlands, watersheds and other lands in the Townships of Daniels, Grantsburg, Lincoln, West Marshland, and Wood River in Burnett County. Project activities would include the formation of a Citizen Planning Committee, establishing the scope of the town planning project, conducting I & E and listening public meetings, inventory of towns' resources, and developing goals, policies and recommendations for long-range land use and shorelands protection planning.

Specific deliverables for this grant project will include:
? Copies of comprehensive resource and land use maps for the towns and project area.
? Copies of proposed land use and lake protection recommendations.
? A Final Report in booklet or poster format, incorporating the land use plan and process along with associated colored resource maps and a land and water use development guide.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Small Scale Lake Planning
Date
10/1/2003
Waters Involved
Saint Croix River
Status
Complete

St. Croix County: St. Croix Nutrient River Conference: St. Croix County Land and Water Conservation Department proposes to sponsor a conference in Februrary of 2004 to identify and begin to address factors contributing to the pollution of Lake St. Croix. The goal is to bring together wastewater treatment managers, local officials, water resource professionals, land developers and watershed manager to allow networking and sharing of information associated with nutrient and sediment loading in the lake. The DNR will be provided with both a paper copy and electronic copy of the final report.


Grant Details
Small Scale Lake Planning
Date
10/1/2004
Waters Involved
Saint Croix River
Status
Complete

St. Croix County: St. Croix Basin Conference: St Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix.


Grant Details
Small Scale Lake Planning
Date
4/1/2006
Waters Involved
Saint Croix River
Status
Complete

St. Croix County: St. Croix Conference '06: St. Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix. Major project elements to include: 1) conference costs associated with printing mailing, provision of lunch and transportation, 2) staff coordination.


Grant Details
Small Scale Lake Planning
Date
10/1/2003
Waters Involved
Unnamed
Status
Complete

St. Croix County: St. Croix Nutrient River Conference: St. Croix County Land and Water Conservation Department proposes to sponsor a conference in Februrary of 2004 to identify and begin to address factors contributing to the pollution of Lake St. Croix. The goal is to bring together wastewater treatment managers, local officials, water resource professionals, land developers and watershed manager to allow networking and sharing of information associated with nutrient and sediment loading in the lake. The DNR will be provided with both a paper copy and electronic copy of the final report.


Grant Details
Small Scale Lake Planning
Date
10/1/2004
Waters Involved
Unnamed
Status
Complete

St. Croix County: St. Croix Basin Conference: St Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix.


Grant Details
Small Scale Lake Planning
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete

St. Croix County: St. Croix Conference '06: St. Croix County proposes to sponsor an informational and educational conference relating to the protection and management of Lake St. Croix. Major project elements to include: 1) conference costs associated with printing mailing, provision of lunch and transportation, 2) staff coordination.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Trade River Watershed
Watershed Recommendations
Monitor Fish Tissue
Confirm FCA: IW pre-2000 data
Date
Status
11/7/2011
Proposed
Projects
 
Monitor Invasive Species
Monitor Invasive Species on Round Lake
Date
Status
Monitor Invasive Species on Round Lake, Burnett County
10/1/2011
In Progress
Projects
 
Watercraft Inspections - Clean Boats, Clean Waters
Clean Boats, Clean Waters on Round Lake
Date
Status
Clean Boats, Clean Waters on Round Lake, Burnett County
10/1/2011
In Progress
Projects
 
Trade River WatershedWatershed History Note

The Trade River Watershed lies in both Polk and Burnett counties of Wisconsin. The larger villages in the watershed are Luck and Frederic located along State Highway 35. Originally a logging community, Frederic was founded in 1903 and over the next 70 years grew into a retail and service hub serving northern Polk county and southern Burnett county. South of Frederic is Luck, which was incorporated in 1905, and was originally two settlements, one on Big Butternut Lake, and one further west founded by Danish Immigrants in 1869. This West Denmark settlement is the site of the first cooperative creamery in the United States, and has one of the oldest Danish Lutheran congregations in the country. The two settlements knew it was impractical to remain as separate entities, but disagreed about which would be the center of town. The railroad settled the issue when it laid tracks near the western settlement. Luck was once home to the Duncan Toys Company YoYo factory headquarters which used to produce millions of wooden toy YoYos for children around the world. Duncan's massive factory produced 3,600 of the toys every hour making the factory's hometown of Luck, Wisconsin, the YoYo Capital of the World.

Date  2011