This watershed is located in east-central Polk County and contains the Apple River drainage upstream from below the Apple River Flowage dam in Amery. The watershed is approximately 125,074 acres in size and consists of 139 miles of streams and rivers, 7,663 acres of lakes and 16,247 acres of wetlands. The watershed is dominated by forest (43%), grassland (23%) and agriculture (14%). It is ranked high for nonpoint source issues affecting lakes and medium for nonpoint source issues affecting streams. The Upper Apple River is a fertile warmwater stream which flows into what is known as the Apple River Flowage in the community of Amery. The Apple River flowage has problems typical of man-made flowages including excessive siltation and nutrients which combine to create favorable conditions for nuisance aquatic plant growth.

Date  2010

Population, Land Use

Nearly half of the total area in the Upper Apple River Watershed is covered by forest. Almost another third (32%) of the area is reserved for agricultural purposes. Open water and space constitute a sizeable portion (10%) of the watershed, as well. Wetlands account for almost six percent of the total area. Grassland covers less than two percent of area in the watershed, while suburban and urban environments amount to only one-quarter of one percent and one-tenth of one percent, respectively.

Date  2011

Nonpoint and Point Sources

The Upper Apple River Watershed is ranked as a low priority overall for nonpoint source (NPS) pollution and is similarly ranked for groundwater NPS pollution. Lakes within the watershed, however, are ranked as being at a high risk for NPS pollution and streams are ranked as medium priority for NPS pollution. Twin Lake, Pike Lake, Apple River Flowage, Big Blake Lake, Big Round Lake, Bone Lake, White Ash Lake, and Staples Lake have all been ranked as high lakes for NPS pollution.

Date  2011

Ecological Landscapes for Upper Apple River Watershed

Ecological Landscapes

The Forest Transition Ecological Landscape lies along the northern border of Wisconsin’s Tension Zone, through the central and western part of the state, and supports both northern forests and agricultural areas. The central portion of the Forest Transition lies primarily on a glacial till plain, deposited by glaciation between 25,000 and 790,000 years ago. The eastern and western portions are on moraines of the Wisconsin glaciation. The growing season in this part of the state is long enough that agriculture is viable, although climatic conditions are not as favorable as in southern Wisconsin. Soils are diverse, ranging from sandy loam to loam or shallow silt loam, and from poorly drained to well drained. The historic vegetation of the Forest Transition was primarily northern hardwood forest. These northern hardwoods were dominated by sugar maple and hemlock, and contained some yellow birch, red pine, and white pine. Currently, over 60% of this ecological landscape is non-forested. Forested areas consist primarily of northern hardwoods and aspen, with smaller amounts of oak and lowland hardwoods. The eastern portion of the ecological landscape differs from the rest of the area in that it remains primarily forested, and includes some ecologically significant areas. Throughout the ecological landscape, small areas of conifer swamp are found near the headwaters of streams, and associated with lakes in kettle depressions on moraines. As this ecological landscape lies along the Tension Zone, ground flora show characteristics of both northern and southern Wisconsin.

Date  2011

Hydrologic Features

The hydrology of Apple River watershed is a reflection of the heterogeneous landforms and land uses within the watershed. Nearly half of the watershed consists of flat glacial plains that have been clear cut and drained to support intensive agricultural activities. The streams and rivers in agricultural regions of the watershed are flashy and erosive, carrying large sediment and nutrient loads to the watersheds lakes and reservoirs. However, the remainder of the watershed is covered with glacial moraines, kettle lakes and wetlands the majority of which are still forested. At these locations in the watershed there is considerably less runoff as precipitation can slowly infiltrate into the groundwater.

Date  2011

Upper Apple River Watershed At-a-Glance

Impaired Water in Upper Apple River Watershed
River and Stream QualityAll Waters in Watershed

According to the WDNR’s Register of Waterbodies (ROW) database, there are over 257 miles of streams and rivers in the Upper Apple River Watershed; 106 miles of these waters have been entered into the WDNR’s assessment database. Of these 106 miles, the vast majority (88%) are meeting Fish and Aquatic Life uses and are specified as in “good” condition. The condition of the remaining stream miles is not known or documented.

Date  2011

Watershed Trout Streams
Watershed Outstanding & Exceptional Resources

Lakes and Impoundments

Over 13,800 lake acres are entered into the state’s assessment database. Over 38% of the 13,800 acres are indicated as supporting Fish and Aquatic Life uses; less than two percent are indicated as not supporting Fish and Aquatic Life uses. The remaining lake acres within the watershed have not been assessed for Fish and Aquatic Life use support. A small percentage of lake acres have also been assessed for Fish Consumption and Recreation uses. Bone Lake and Big Round Lake are the largest lakes in the watershed at over one thousand acres in size, each.

Date  2011

Wetland Health

Wetland Status The Upper Apple River Watershed is located in east-central Polk County. An estimated 11% of the current land uses in the watershed are wetlands. Currently, about 66% of the original wetlands in the watershed are estimated to exist. Of these wetlands, the majority include scrub (39%), forested wetlands (34%), and emergent wetlands (20%), which include marshes and wet meadows. Wetland Restorability: Of the 6,979 acres of estimated lost wetlands in the watershed, approximately 95% are considered potentially restorable based on modeled data, including soil types, land use, and land cover (Chris Smith, DNR, 2009).

Date  2011

Impaired Waters

Both North Lake and Scott Lake are on the 303(d) list for mercury contamination from atmospheric deposition since 1998.

Date  2011

List of Impaired Waters

Aquatic Invasive Species

Aquatic Invasive Species are pervasive in the Upper Apple River Watershed. Banded mystery snails have been documented in Big Blake Lake, Bone Lake, and Staples Lake since 2007. Chinese mystery snails have also been found in Big Blake Lake, Bone Lake, North Lake, North Twin Lake, North White Ash Lake, Pipe Lake, Scott Lake, Staples Lake, White Ash Lake, and the Lake of the Woods. The Apple River Flowage, Big Blake Lake, Big Round Lake, Bone Lake, White Ash Lake, Staples Lake, North Twin Lake, and Pike Lake have all been found to support populations of curly-leaf pondweed. Big Blake Lake is also home to Eurasian water-milfoil. Furthermore, rusty crayfish have been verified and vouchered in Wood River and Apple River.

Date  2011

Groundwater

Groundwater The following groundwater information is for Polk County (from Protecting Wisconsin’s Groundwater through Comprehensive Planning website, http://wi.water.usgs.gov/gwcomp/), which roughly approximates to the Upper Apple River Watershed. Amery is the only municipal water system in the Upper Apple River Watershed that has a wellhead protection plan. In addition, Polk County has adopted an animal waste management ordinance. From 1979 to 2005, total water use in Polk County has increased from about 5.4 million gallons per day to about 10.9 million gallons per day. The increase in total water use over this period is due to primarily to increases in domestic, aquaculture, and public use and losses usage. The proportion of county water use supplied by groundwater has consistently been above 98% during the period 1979 to 2005. Private Wells Ninety-one percent of 783 private well samples collected in Polk County from 1990 through 2006 met the health-based drinking water limit for nitrate-nitrogen. Land use affects nitrate concentrations in groundwater. An analysis of over 35,000 Wisconsin drinking water samples found that drinking water from private wells was three times more likely to be unsafe to drink due to high nitrate in agricultural areas than in forested areas. High nitrate levels were also more common in sandy areas where the soil is more permeable. In Wisconsin’s groundwater, 80% of nitrate inputs originate from manure spreading, agricultural fertilizers, and legume cropping systems. A 2002 study estimated that one-quarter of private drinking water wells in the region of Wisconsin that includes Polk County contained a detectable level of an herbicide or herbicide metabolite. Pesticides occur in groundwater more commonly in agricultural regions, but can occur anywhere pesticides are stored or applied. There are no atrazine prohibition areas in Polk County. Ninety-four percent of 18 private well samples collected in Polk County met the health standard for arsenic. Potential Sources of Contamination There are no concentrated animal feeding operations (CAFOs) in the Upper Apple River Watershed; nor are there any licensed landfills or Superfund sites within the watershed.

Date  2011

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
4/1/2007
Waters Involved
Big Blake Lake
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Big Blake Lake Ais Management Plan Implementation Project: Big Blake Lake Protection & Rehabilitation District is sponsoring a five-year project to implement approved aquatic plant management activities. Approved activities include mechanically harvesting curlyleaf pondweed in selected areas, aquatic plant surveys and reporting, and information and education outreach activities. Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); information and education products; and an updated Aquatic Plant Management Plan.

Special Conditions:
1. WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development.
2. All Clean Boats Clean Waters data must be collected on forms provided by UW-Extension/DNR and entered into the statewide database for reporting.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/15/2001
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Curlyleaf Pondweed & Giant Knotweed Control: Bone Lake Management District is sponsoring a 3-yr project to implement approved activities from the Bone Lake Aquatic Plant Management Plan.

Project deliverables include GIS data & maps of areas monitored, aquatic plant & turion monitoring results, AIS monitoring data in SWIMS, management/treatment summaries.

Specific project activities include: 1) Curly-leaf pondweed herbicide control; 2) Knotweed control; 3) Pre-post treatment aquatic plant monitoring; 4) Turion monitoring.

Special Conditions: 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance shall be followed for aquatic plant monitoring; 2) Sponsor shall contact DNR immediately if a new AIS is found.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Biologist.


Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Apm Plan Implementation 2009 - 2011: The Bone Lake Management District is sponsoring a project to implement approved activities from the Bone Lake Aquatic Plant Management Plan. Approved activities include chemically treating curlyleaf pondweed in a limited number of high-density areas, aquatic plant surveys, AIS monitoring, watercraft inspection, and reporting. Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); information and education products; CBCW data entry; and a management/treatment summary.

Special Conditions: 1) WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development/updates, if applicable; 2) The Department may provide pre- and post-treatment methodology; 3) Clean Boats Clean Waters data collection summary. Data collected must include those data required as part of the CBCW program and must be entered in the statewide database to be eligible for grant reimbursement.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
10/1/2011
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Ais Curlyleaf Pondweed Control Project: The Bone Lake Management District is sponsoring a project to implement approved activities from the Bone Lake Aquatic Plant Management Plan. Approved activities include chemically treating curlyleaf pondweed in a limited number of high-density areas, pre/post treatment aquatic plant surveys,and turion monitoring. Deliverables include GIS maps of areas monitored; aquatic plant and turion survey results (spreadsheets and narrative summary); and a management/treatment summary.

Special Condition: WDNR\2019s pre/post treatment monitoring guideline should be followed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Control
Date
4/1/2007
Waters Involved
Little Blake Lake
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Big Blake Lake Ais Management Plan Implementation Project: Big Blake Lake Protection & Rehabilitation District is sponsoring a five-year project to implement approved aquatic plant management activities. Approved activities include mechanically harvesting curlyleaf pondweed in selected areas, aquatic plant surveys and reporting, and information and education outreach activities. Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); information and education products; and an updated Aquatic Plant Management Plan.

Special Conditions:
1. WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development.
2. All Clean Boats Clean Waters data must be collected on forms provided by UW-Extension/DNR and entered into the statewide database for reporting.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/1/2007
Waters Involved
Lost Creek
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Big Blake Lake Ais Management Plan Implementation Project: Big Blake Lake Protection & Rehabilitation District is sponsoring a five-year project to implement approved aquatic plant management activities. Approved activities include mechanically harvesting curlyleaf pondweed in selected areas, aquatic plant surveys and reporting, and information and education outreach activities. Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); information and education products; and an updated Aquatic Plant Management Plan.

Special Conditions:
1. WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development.
2. All Clean Boats Clean Waters data must be collected on forms provided by UW-Extension/DNR and entered into the statewide database for reporting.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
4/1/2007
Waters Involved
Straight River
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Big Blake Lake Ais Management Plan Implementation Project: Big Blake Lake Protection & Rehabilitation District is sponsoring a five-year project to implement approved aquatic plant management activities. Approved activities include mechanically harvesting curlyleaf pondweed in selected areas, aquatic plant surveys and reporting, and information and education outreach activities. Deliverables include GIS maps of areas monitored; aquatic plant survey results (spreadsheets and narrative summary); information and education products; and an updated Aquatic Plant Management Plan.

Special Conditions:
1. WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development.
2. All Clean Boats Clean Waters data must be collected on forms provided by UW-Extension/DNR and entered into the statewide database for reporting.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/3/2010
Waters Involved
Pike Lake
Status
Complete

Amery Lakes P & R District: Pike Lake Eurasian Watermilfoil Rapid Response: Amery Lakes P&R District is sponsoring a three-year early detection and response project that will monitor and manage a pioneering population of Eurasian watermilfoil and inform and educate the local community. The project area includes North and South Twin Lakes, which are connected to Pike.

Project activities include: 1) Point-intercept survey(s) and seasonal and/or pre- and post-treatment aquatic plant monitoring following guidelines provided by the Department; 2) Chemical treatment and/or SCUBA and manual removal of Eurasian watermilfoil ; 3) Information and education program.

Special condition: WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring, pre/post treatment monitoring, and aquatic plant management plan development unless otherwise approved by the Department.

Project deliverables include: annual progress and final reports of monitoring and management activities, including aquatic plant survey spreadsheets and pre/post treatment monitoring, and any educational materials developed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
Apple River
Status
Complete

White Ash Lake P & R District: Harvester Gps System: The White Ash Lake PRD proposes to purchase and install a GPS guided navigation system on their aquatic plant harvester to increase the effectiveness and efficiency of the District's harvesting operations. This will enable early season harvesting of curly leaf pond weed providing better control of this invasive species. Early season beds of curlyleaf pondweed can be located before they are visible at the surface, operating the harvester from GPS coordinates mapped in the previous season. Early season harvest will prevent production of reproductive plant turions and potentially reduce plant densities annually. Conceptually, monotypic beds of curlyleaf pondweed can be reduced or eliminated.

Other objectives are to reduce cutting time, harvesting costs and improve record keeping and operation planning.

The District will provide a report at the conclusion of the project period that evaluates the performance of their harvesting operation relative to these objectives including any reductions in the areal coverage of curly leaf pond weed. Information about the project will also be shared through newsletters and the District's website.


Grant Details
Aquatic Invasives Education
Date
4/1/2012
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Ais Education, Prevention And Planning Project: The Apple River P&R District is sponsoring an AIS project including a Clean Boat/Clean Water inspection program at the public boat landing (City of Amery to supply payroll services), monitoring for invasive aquatic plants, AIS control activities, harvester planning, nuisance control and navigation monitoring, public awareness, and improved information signage at the landing.

Deliverables include a final report including: 1) a summary of project accomplishments; 2) Watercraft inspection report including time and number of people reached; CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of workshops and/or inspector training such as agendas and attendance lists; 4) Report on nuisance monitoring and vegetation caused navigation impairment; 5) results of monitoring observations of any detected invasive species with appropriate maps; 6) Purple Loosestrife control efforts; 7) Report on planning and actions to control newly discovered AIS; 8) Report on boat landing site planning and development; 9) Copies of brochures, educational materials, and mailings paid for through this grant; 10) Report on construction/maintenance of signage.

Special project conditions: Sponsor shall immediately contact the DNR if a new aquatic invasive species is found.

This scope summarizes details provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Aquatic Invasives Education
Date
12/17/2012
Waters Involved
Big Blake Lake
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Big Blake Lake Ais Control: Education, Prevention & Planning Project: The Blake Lake Protection & Rehabilitation District is sponsoring a four-year project to support their AIS prevention and CLP control project. The primary purpose of the project is to determine if harvesting can reduce CLP and turion distribution and abundance.

Approved activities include aquatic plant, CLP turion, and water quality monitoring, analyses and reporting; a sociological survey; information and education outreach; and watercraft inspection.

Deliverables include a final report consisting of GIS maps of areas monitored; aquatic plant survey, turion monitoring, and water quality data/results (spreadsheets and narrative summary) information and education products; and watercraft inspection data entered into SWIMS.

Special Conditions: 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development; 2) The turion monitoring plan and analyses/results must be approved by DNR. DNR may engage third-party technical oversight for monitoring, analyses, and reporting as a quality assurance measure; 3) Sociological survey should be reviewed by DNR Social Research Scientist before implementation.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Big Round Lake
Status
Complete

Big Round Lake Protection And Rehab District: Big Round Lake Cbcw Ais Education & Prevention: The Big Round Lake protection and rehabilitation district is sponsoring a three year AIS prevention and education project including a CB/CW inspection program Big Round Lake supplemented with ILIDS, inspector training, AIS identification and prevention education, informational signage at landings.

Deliverables include a comprehensive report with: 1) A final report summarizing accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing total time and number of people reached. Report also includes installation of ILIDS device, ILIDS inspection report including time and number of launches and potential violations, and landing improvements such as signage; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of workshops and/or inspector training such as agendas and attendance lists; 4) Copies of educational materials and mailings paid by this grant; 5) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee provide DNR AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Big Round Lake
Status
In_Progress

Big Round Lake Protection And Rehab District: Big Round Lake Cbcw Ais Education & Prevention: The Big Round Lake protection and rehabilitation district is sponsoring a three year AIS prevention and education project including a CB/CW inspection program Big Round Lake supplemented with ILIDS, inspector training, AIS identification and prevention education, informational signage at landings.

Deliverables include a comprehensive report with: 1) A final report summarizing accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing total time and number of people reached. Report also includes installation of ILIDS device, ILIDS inspection report including time and number of launches and potential violations, and landing improvements such as signage; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of workshops and/or inspector training such as agendas and attendance lists; 4) Copies of educational materials and mailings paid by this grant; 5) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee provide DNR AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Big Round Lake
Status
Proposed

Big Round Lake Protection And Rehab District: Big Round Lake Cbcw Ais Education & Prevention: The Big Round Lake protection and rehabilitation district is sponsoring a three year AIS prevention and education project including a CB/CW inspection program Big Round Lake supplemented with ILIDS, inspector training, AIS identification and prevention education, informational signage at landings.

Deliverables include a comprehensive report with: 1) A final report summarizing accomplishments/progress of the project including watercraft inspection and lake monitoring report detailing total time and number of people reached. Report also includes installation of ILIDS device, ILIDS inspection report including time and number of launches and potential violations, and landing improvements such as signage; 2) CB/CW survey results; daily results will be entered into the DNR CB/CW database; 3) Verification of workshops and/or inspector training such as agendas and attendance lists; 4) Copies of educational materials and mailings paid by this grant; 5) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended that Grantee provide AIS Coordinator with a draft final report. If consultant is to provide final report, it is recommended that Grantee provide DNR AIS Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Ais Prevention Project: The Bone Lake Protection and Rehabilitation District will conduct an AIS Prevention and Education Program on Bone Lake. This project includes five main components of a comprehensive AIS program; 1. Education to lake users, 2. Clean Boats, Clean Waters watercraft inspection and boater education program, 3. Lake monitoring, 4. Contingency plan per NR 198.43 if a new invasive species is found, and 5. Funding. Specific project activities include: 600 AIS information mailings; approximately 200 CBCW volunteer hours, approximately 240 self-help AIS monitoring volunteer hours; installation of 5 AIS signs; and annual technical reports and APM Plan updates.

Upon completion of this project, the sponsor will provide the State with:
* a comprehensive report listing the findings of the aquatic plant inspections and a summary of all project activities,
* data and information, including maps and digital images, acquired as part of the project shall be reported to the Department in the format specified by the regional Lake Coordinator.

Special conditions for this project:
* Draft public surveys must be reviewed and approved by the Department before being initiated.
* The aquatic plant "inspections" and monitoring activity should be conducted utilizing methodology approved by the Department.
* The project sponsor shall immediately contact the proper DNR authorities in the event of the discovery of a new Aquatic Invasive Species infestation.
* All information collected during the watercraft inspection and boater education portion of the project will be entered into the Clean Boats Clean Waters database by the sponsor and reported as such in the final report.


Grant Details
Aquatic Invasives Education
Date
10/1/2011
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Ais Education: The Bone Lake Management District is sponsoring a 3-year AIS prevention and education project including a CBCW inspection program at the public landing supplemented with ILIDS, point intercept plant survey, AIS identification and prevention workshops; public awareness, improved information signage at the landing, and monitoring for invasive plants around Bone Lake.

Deliverables include a comprehensive report with: 1) A summary of project activities including CBCW survey & monitoring results, installation of ILIDS device, report on ILIDS observations (total number of launches and potential violations), inspector/monitor training, public outreach, AIS monitoring results of any detected invasive species including knotweed with appropriate maps, report on signage; 2) Watercraft inspection report (time & number of people reached); Daily CBCW survey results and remote monitoring results entered into the DNR CBCW website SWIMS database; 3) Point intercept plant survey results; 4) Verification of workshops and/or inspector training (agendas and attendance lists); 5) Copies of project educational materials and mailings; 6)) Updated APM plan; 8) AIS related materials generated or paid for by this grant.

Special conditions 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and/or aquatic plant management plan development; 2) The sponsor shall immediately contact DNR if a new aquatic invasive species is found.

This scope summarizes application details and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the AIS Coordinator. It is recommended the Grantee provide AIS Coordinator with a draft final report for comment on report adequacy prior to making final payment to any consultant. The DNR shall receive a paper and electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
North Pipe Lake
Status
Complete

Pipe & N. Pipe Lake P & R District: 5 Year Ais Inspection/Control And Cbcw Program: The Pipe and North Pipe P&R District is sponsoring a 5-Year AIS prevention & education project which includes inspection of boats at public boat landings utilizing paid, trained inspectors & volunteers. This grant also includes hiring a consultant to perform monthly aquatic plant surveys.

Activities include: 1) CBCW boat inspection/education beginning Fishing Opener running through mid September; 2) Monthly aquatic plant survey (June-October).

Deliverables include: 1) Annual Report summarizing accomplishments of the project for that year; 2) Annual CB/CW Watercraft inspection report including time & number of people reached and survey results entered into the DNR CB/CW database; 3) Annual copy of aquatic plant survey results including maps; 4) A Final Report summarizing the five year grant accomplishments, including copies of brochures & educational materials used, any AIS materials generated or paid for by this grant. Paper and electronic copies are to be submitted for the final report.

Special conditions: The project sponsor shall immediately contact the DNR if a new aquatic invasive species infestation is found.

This scope summarizes the scope provided in the grant application and does not supersede the application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2013
Waters Involved
North Pipe Lake
Status
Complete

Pipe & N. Pipe Lake P & R District: 4 Year Ais Inspection/Control & Cbcw Program: Pipe & North Pipe Lakes P&R District is sponsoring a 4-yr project to conduct watercraft inspections and AIS monitoring.

Project deliverables include annual reports documenting AIS education & outreach, AIS monitoring & watercraft inspection data in SWIMS, Landing Blitz participation, and partnership with Sheriff\2019s Department.

Specific project activities include: 1) Watercraft inspections; 2) AIS monitoring; 3) Participation in Landing Blitz program; 4) Installing new AIS signs at boat landing; 5) Establishing partnership with Polk County Sheriff\2019s Department.

Special Conditions: 1) Sponsor shall contact DNR immediately if a new AIS is found; 2) AIS monitoring and watercraft inspection personnel shall be trained and follow DNR approved protocols.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lakes Biologist.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Pipe Lake
Status
Complete

Pipe & N. Pipe Lake P & R District: 5 Year Ais Inspection/Control And Cbcw Program: The Pipe and North Pipe P&R District is sponsoring a 5-Year AIS prevention & education project which includes inspection of boats at public boat landings utilizing paid, trained inspectors & volunteers. This grant also includes hiring a consultant to perform monthly aquatic plant surveys.

Activities include: 1) CBCW boat inspection/education beginning Fishing Opener running through mid September; 2) Monthly aquatic plant survey (June-October).

Deliverables include: 1) Annual Report summarizing accomplishments of the project for that year; 2) Annual CB/CW Watercraft inspection report including time & number of people reached and survey results entered into the DNR CB/CW database; 3) Annual copy of aquatic plant survey results including maps; 4) A Final Report summarizing the five year grant accomplishments, including copies of brochures & educational materials used, any AIS materials generated or paid for by this grant. Paper and electronic copies are to be submitted for the final report.

Special conditions: The project sponsor shall immediately contact the DNR if a new aquatic invasive species infestation is found.

This scope summarizes the scope provided in the grant application and does not supersede the application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Unnamed
Status
Complete

Pipe & N. Pipe Lake P & R District: 5 Year Ais Inspection/Control And Cbcw Program: The Pipe and North Pipe P&R District is sponsoring a 5-Year AIS prevention & education project which includes inspection of boats at public boat landings utilizing paid, trained inspectors & volunteers. This grant also includes hiring a consultant to perform monthly aquatic plant surveys.

Activities include: 1) CBCW boat inspection/education beginning Fishing Opener running through mid September; 2) Monthly aquatic plant survey (June-October).

Deliverables include: 1) Annual Report summarizing accomplishments of the project for that year; 2) Annual CB/CW Watercraft inspection report including time & number of people reached and survey results entered into the DNR CB/CW database; 3) Annual copy of aquatic plant survey results including maps; 4) A Final Report summarizing the five year grant accomplishments, including copies of brochures & educational materials used, any AIS materials generated or paid for by this grant. Paper and electronic copies are to be submitted for the final report.

Special conditions: The project sponsor shall immediately contact the DNR if a new aquatic invasive species infestation is found.

This scope summarizes the scope provided in the grant application and does not supersede the application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2004
Waters Involved
White Ash Lake
Status
Complete

White Ash Lake P & R District: Harvester Gps System: The White Ash Lake PRD proposes to purchase and install a GPS guided navigation system on their aquatic plant harvester to increase the effectiveness and efficiency of the District's harvesting operations. This will enable early season harvesting of curly leaf pond weed providing better control of this invasive species. Early season beds of curlyleaf pondweed can be located before they are visible at the surface, operating the harvester from GPS coordinates mapped in the previous season. Early season harvest will prevent production of reproductive plant turions and potentially reduce plant densities annually. Conceptually, monotypic beds of curlyleaf pondweed can be reduced or eliminated.

Other objectives are to reduce cutting time, harvesting costs and improve record keeping and operation planning.

The District will provide a report at the conclusion of the project period that evaluates the performance of their harvesting operation relative to these objectives including any reductions in the areal coverage of curly leaf pond weed. Information about the project will also be shared through newsletters and the District's website.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Apple River
Status
Complete

Apple River P & R District: Apple River Flowage 2015 Clean Boats Clean Waters Project: The Apple River P&R District is sponsoring a Clean Boats Clean Waters project in 2015 which includes one public boat landing.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Apple River
Status
Complete

Apple River P & R District: Apple River Flowage P&R District 2016 Clean Boats Clean Waters: The Apple River P&R District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Apple River Flowage.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Apple River
Status
Complete

Apple River P & R District: Apple River P & R District 2017 Cbcw: Apple River P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on APPLE RIVER FLOWAG.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Apple River Flowage 2015 Clean Boats Clean Waters Project: The Apple River P&R District is sponsoring a Clean Boats Clean Waters project in 2015 which includes one public boat landing.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Apple River Flowage P&R District 2016 Clean Boats Clean Waters: The Apple River P&R District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Apple River Flowage.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Apple River P & R District 2017 Cbcw: Apple River P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 1 single public boat landings and 0 public boat landing pairs on APPLE RIVER FLOWAG.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Big Round Lake
Status
Complete

Big Round Lake Protection And Rehab District: Big Round Lake 2015 Clean Boats Clean Waters Project: The Big Round Lake P&R District is sponsoring a 2015 Clean Boats Clean Waters Project on one public boat landing on Big Round Lake.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Management District 2017 Cbcw: Bone Lake Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on BONE LAKE.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
North Twin Lake
Status
Complete

Amery Lakes P & R District: North Twin, Pike And South Twin Lakes Clean Boats Clean Waters Project 2014: Amery Lakes Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
North Twin Lake
Status
Complete

Amery Lakes P & R District: Amery Lakes 2015 Clean Boats Clean Waters Project: The Amery Lakes P&R District is sponsoring a 2015 Clean Boats Clean Waters Project at one public landing on the Amery Lakes chain.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
North Twin Lake
Status
Complete

Amery Lakes P & R District: Amery Lakes P & R District 2017 Cbcw: Amery Lakes P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on PIKE LK/N TWIN LK.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
Pike Lake
Status
Proposed

Amery Lakes P & R District: North Twin, Pike And South Twin Lakes Clean Boats Clean Waters Project 2014: Amery Lakes Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Pike Lake
Status
Complete

Amery Lakes P & R District: Amery Lakes 2015 Clean Boats Clean Waters Project: The Amery Lakes P&R District is sponsoring a 2015 Clean Boats Clean Waters Project at one public landing on the Amery Lakes chain.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Pike Lake
Status
Complete

Amery Lakes P & R District: Amery Lakes P & R District 2017 Cbcw: Amery Lakes P & R District is sponsoring a Clean Boats Clean Waters project in 2017 at 0 single public boat landings and 1 public boat landing pairs on PIKE LK/N TWIN LK.


Grant Details
Clean Boats, Clean Waters
Date
4/1/2014
Waters Involved
South Twin Lake
Status
Proposed

Amery Lakes P & R District: North Twin, Pike And South Twin Lakes Clean Boats Clean Waters Project 2014: Amery Lakes Protection and Rehabilitation District will sponsor a Clean Boats Clean Water landing inspection program at 1 public access in 2014.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
South Twin Lake
Status
Complete

Amery Lakes P & R District: Amery Lakes 2015 Clean Boats Clean Waters Project: The Amery Lakes P&R District is sponsoring a 2015 Clean Boats Clean Waters Project at one public landing on the Amery Lakes chain.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Straight River
Status
Complete

Big Round Lake Protection And Rehab District: Big Round Lake 2015 Clean Boats Clean Waters Project: The Big Round Lake P&R District is sponsoring a 2015 Clean Boats Clean Waters Project on one public boat landing on Big Round Lake.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Apple River
Status
Complete

Apple River P & R District: Hlk-Apple River Flowage Shoreline Native Plantings: Apple River P & R District will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: 350 ft2 native plantings on 5 properties.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Hlk-Apple River Flowage Shoreline Native Plantings: Apple River P & R District will implement best practices described in Wisconsin\2019s 2014-2017 Healthy Lakes Implementation Plan. Practices include: 350 ft2 native plantings on 5 properties.

The best practices require a contract to remain in effect for 10 years and must include minimum operation and maintenance requirements and data collection as described in grant condition #17. If best practice(s) are implemented on land owned by the grant Sponsor, this Lake Protection Grant Agreement serves as the contract. If best practice(s) are implemented on land other than the sponsor\2019s, a contract between the sponsor and landowner that abides by grant condition #17 is required.

The Department may require re-payment of project installation costs if the best practice is disturbed or removed. The Sponsor and/or the Department may perform site inspections and/or monitoring to ensure project success.

Deliverables: Best practice location and design information, if not included in the application; signed 10-year landowner contract; pre and post project installation photographs; summary of education activities and publicity/promotion of Healthy Lakes initiative, if applicable.
Special conditions: The state share of each best practice cannot exceed $1,000. The state share of grant administration and technical assistance costs may not exceed 10% of the grant award; technical assistance does not include implementation labor. Funding cannot be used for mitigation or regulatory compliance activities. Water regulation and/or county zoning permits must be issued before construction. The Healthy Lakes logo should be used for promotion and publicity, and DNR recognized as a funding source.


Grant Details
Lake Protection Grant
Date
7/1/2010
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Lmi-Bone Lake Comprehensive Plan Implementation: Bone Lake Management District will implement recommendations described in its comprehensive management plan including activities to reduce erosion; improve habitat and water quality; and expand lake protection/restoration marketing. Activities include: 1) design/build retention basins; 2) restore shorelines and integrate shoreline woody habitat; 3) implement residential diversion/infiltration best management practices (e.g. berms, rain gardens, rain barrels); 4) continue informational/educational outreach efforts, including implementing waterfront runoff marketing plan.

Shoreline restorations on properties using grant funds require a Department approved restrictive covenant permanently establishing the vegetative buffer on the parcel. Restorations will follow standards set forth in NR 191.24(3) unless mutually agreed to in writing with the regional lake coordinator before implementation occurs. Stormwater BMPs will have maintenance, operation, and protection plans specified in a ten-year contract for each site. The Department may perform site inspection and/or monitoring.

Project deliverables include: a report summarizing project activities describing accomplishments and challenges; final shoreline restoration plans/maps for grant funded implementation sites; pre/post photos of funded restorations; list of property owners and parcels committed to restrictive covenants or copies of signed covenants; educational materials developed.

Special conditions: project design plans and landowner contracts need approval before project begins; applicable water regulation permits must be issued before construction activities commence.

This scope summarizes the detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Lake Protection Grant
Date
4/15/2015
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Lmi-Lake Management Plan Implementation: Bone Lake Management District is sponsoring a Lake Protection grant to implement activities from their approved lake management plan.

The specific project tasks include: 1) Design and install watershed BMPs; 2) Mini (10x35 foot) shoreline buffer restorations; 3) Design and install waterfront runoff projects; 4) ALUM dosage analysis; 5) Installation of woody habitat structures; 6) Establish Slow-No-Wake Ordinance; 7) Develop land protection strategy.

Maintenance, operation, and protection will be specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.

Project deliverables include: a report and map summarizing project activities including number of shoreline buffers and watershed BMPs installed, number of runoff reduction sites installed, pre/post photos of funded restorations and other BMPs, list of property owners and parcels committed to covenants and/or contracts, alum dosage report, and educational materials developed.

Special conditions: Applicable water regulation and/or county zoning permits must be issued before construction activities commence.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Lake Protection Grant
Date
8/1/2009
Waters Involved
North Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: Lmi-Pipe Lakes Action Plan Implementation: Pipe and North Pipe Lakes P&R District will implement recommendations described in the Pipe Lakes Action Plan. Activities include: 1) repair/replace problem culverts and remediate erosion on intermittent tributaries; 2) design/build detention basins in subwatershed contributing the most pollution; 3) restore shorelines, integrating woody habitat; 4) implement residential diversion/infiltration BMPs (e.g. berms, rain gardens, rain barrels); 5) complete whole-lake, point-intercept aquatic plant surveys on both lakes; 6) monitor tributary and lake water quality and quantity; 7) information and education.

Shoreline restoration parcels require a Department approved restrictive covenant that permanently establishes a vegetative buffer. Restorations will follow standards iin NR 191.24(3) unless mutually agreed to in writing with the regional lake coordinator before implementation. Storm water BMPs will include maintenance and operation plans specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.

Deliverables include: a report summarizing project activities, accomplishments and challenges; final shoreline restoration plans/maps for Department funded sites; pre/post photos of funded restorations; list of property owners and parcels committed to restrictive covenants or copies of signed covenants; aquatic plant survey results/report including associated spreadsheets and GIS files; water quality monitoring results; educational materials developed.

Special conditions: project design plans and landowner contracts need approval before project begins; water regulation permits must be issued before construction.

This scope summarizes the scope in the grant application and does not supersede those application tasks/deliverables. Data, records, reports, educational materials, including GIS-based maps and digital images, must be submitted in a format specified by the regional lake coordinator.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
North Twin Lake
Status
Complete

City Of Amery: Lmi-Amery Lakes Management Plan Implementation: The City of Amery in partnership with the Amery Lakes District will develop a storm water management plan/ordinance and implement run-off control best management practices in priority (i.e. high nutrient load) sub-watersheds. Specifically, the City will: 1) update existing ordinances and develop a storm water management plan to reduce non-point source pollution; 2) design/build wetland basins and rain gardens at Soldier's Field; 3) design-build rain gardens at Flagpole Park; 4) select and install storm water control (e.g. rain gardens and barrels, shoreline buffers, porous pavement, and/or infiltration trenches) practices at demonstration sites within city limits; 5) develop example storm water education materials that will be applicable to other small cities; 6) inventory and measure in-lake habitat, including undeveloped shoreline and critical areas and develop plans for long-range protection and for measuring success of storm water control BMPs.

Special conditions:
* Project design plans need approval before project begins, and applicable water regulation permits must be issued before construction activities commence.
* Best management practices installed at Soldier's Field and Flagpole Park will be maintained for a minimum of 10 years.
* An operation and maintenance plan will be developed for care of the BMPs.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
3/2/1994
Waters Involved
Pike Lake
Status
Complete

City Of Amery: Acq-Pike Lake - York Acquisition: The City of Amery will acquire approximately 32.7 acres of land along the northwest side of Pike Lake. Project costs include the cost of the parcel ($160,500) and the appraisal cost ($950).


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Pike Lake
Status
Complete

City Of Amery: Lmi-Amery Lakes Management Plan Implementation: The City of Amery in partnership with the Amery Lakes District will develop a storm water management plan/ordinance and implement run-off control best management practices in priority (i.e. high nutrient load) sub-watersheds. Specifically, the City will: 1) update existing ordinances and develop a storm water management plan to reduce non-point source pollution; 2) design/build wetland basins and rain gardens at Soldier's Field; 3) design-build rain gardens at Flagpole Park; 4) select and install storm water control (e.g. rain gardens and barrels, shoreline buffers, porous pavement, and/or infiltration trenches) practices at demonstration sites within city limits; 5) develop example storm water education materials that will be applicable to other small cities; 6) inventory and measure in-lake habitat, including undeveloped shoreline and critical areas and develop plans for long-range protection and for measuring success of storm water control BMPs.

Special conditions:
* Project design plans need approval before project begins, and applicable water regulation permits must be issued before construction activities commence.
* Best management practices installed at Soldier's Field and Flagpole Park will be maintained for a minimum of 10 years.
* An operation and maintenance plan will be developed for care of the BMPs.

A final report in PDF format summarizing the results of the project as well as copies of databases, maps, GIS files, guidebooks, ordinances or any other products resulting from the project shall be provided to the Department for review prior to final payment.


Grant Details
Lake Protection Grant
Date
8/1/2009
Waters Involved
Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: Lmi-Pipe Lakes Action Plan Implementation: Pipe and North Pipe Lakes P&R District will implement recommendations described in the Pipe Lakes Action Plan. Activities include: 1) repair/replace problem culverts and remediate erosion on intermittent tributaries; 2) design/build detention basins in subwatershed contributing the most pollution; 3) restore shorelines, integrating woody habitat; 4) implement residential diversion/infiltration BMPs (e.g. berms, rain gardens, rain barrels); 5) complete whole-lake, point-intercept aquatic plant surveys on both lakes; 6) monitor tributary and lake water quality and quantity; 7) information and education.

Shoreline restoration parcels require a Department approved restrictive covenant that permanently establishes a vegetative buffer. Restorations will follow standards iin NR 191.24(3) unless mutually agreed to in writing with the regional lake coordinator before implementation. Storm water BMPs will include maintenance and operation plans specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.

Deliverables include: a report summarizing project activities, accomplishments and challenges; final shoreline restoration plans/maps for Department funded sites; pre/post photos of funded restorations; list of property owners and parcels committed to restrictive covenants or copies of signed covenants; aquatic plant survey results/report including associated spreadsheets and GIS files; water quality monitoring results; educational materials developed.

Special conditions: project design plans and landowner contracts need approval before project begins; water regulation permits must be issued before construction.

This scope summarizes the scope in the grant application and does not supersede those application tasks/deliverables. Data, records, reports, educational materials, including GIS-based maps and digital images, must be submitted in a format specified by the regional lake coordinator.


Grant Details
Lake Protection Grant
Date
8/1/2009
Waters Involved
Unnamed
Status
Complete

Pipe & N Pipe Lake P&R District: Lmi-Pipe Lakes Action Plan Implementation: Pipe and North Pipe Lakes P&R District will implement recommendations described in the Pipe Lakes Action Plan. Activities include: 1) repair/replace problem culverts and remediate erosion on intermittent tributaries; 2) design/build detention basins in subwatershed contributing the most pollution; 3) restore shorelines, integrating woody habitat; 4) implement residential diversion/infiltration BMPs (e.g. berms, rain gardens, rain barrels); 5) complete whole-lake, point-intercept aquatic plant surveys on both lakes; 6) monitor tributary and lake water quality and quantity; 7) information and education.

Shoreline restoration parcels require a Department approved restrictive covenant that permanently establishes a vegetative buffer. Restorations will follow standards iin NR 191.24(3) unless mutually agreed to in writing with the regional lake coordinator before implementation. Storm water BMPs will include maintenance and operation plans specified in a ten-year contract for each BMP site. The Department may perform site inspection and/or monitoring.

Deliverables include: a report summarizing project activities, accomplishments and challenges; final shoreline restoration plans/maps for Department funded sites; pre/post photos of funded restorations; list of property owners and parcels committed to restrictive covenants or copies of signed covenants; aquatic plant survey results/report including associated spreadsheets and GIS files; water quality monitoring results; educational materials developed.

Special conditions: project design plans and landowner contracts need approval before project begins; water regulation permits must be issued before construction.

This scope summarizes the scope in the grant application and does not supersede those application tasks/deliverables. Data, records, reports, educational materials, including GIS-based maps and digital images, must be submitted in a format specified by the regional lake coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Antler Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Antler Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
12/23/1991
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Apple River Flowage Watershed & Septic Runoff Survey & Eval: 1)Conduct survey of lake district using aerial photography to identify areas of lake with aquatic vegetation, sources of point and nonpoint pollution.2) Recommend remedial action for imporpoerly functioning septic tanks and fields.3) Disseminate information to the public by newsletter, local newspaper, and a public meeting.


Grant Details
Large Scale Lake Planning
Date
4/1/2012
Waters Involved
Apple River Flowage
Status
Complete

Polk County Lwrd: Apple River Flowage Water Quality & Biological Assessment: Polk County is sponsoring a project to assess watershed, water quality, plankton, algae, and shoreline conditions; determine nutrient loads, budget, and model lake response; distribute and analyze a sociological survey; educate public through pontoon classroom and shoreline restoration workshop; develop a lake management plan including public participation/meetings.

Specific project tasks include: 1. Expanded bimonthly water quality monitoring including spring and fall overturn; 2. Lake sediment sampling; 3. Tributary water quality and flow monitoring; 4. Daily lake level and precipitation monitoring; 5. Plankton and algae assessment; 6. Shoreline assessment and restoration workshop; 7. Watershed delineation and modeling; 8. Sociological survey; 9. Pontoon classroom; 10. Lake management plan development including public participation/meeting.

Final deliverables include examples of education materials developed; agenda or attendance lists for workshops, planning meetings, and education events; and a single lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan that is approvable for Lake Protection Grant eligibility.

Special conditions: 1. CLMN efforts shall not be duplicated, and these data shall included in the trends analysis and final reporting; 2. Draft sociological/user surveys must be reviewed and approved by the Department before being initiated; 3. Shoreline inventory methods must be approved by the Department before being initiated.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Balsam Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Balsam Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Big Blake Lake
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Blake Lake Macrophyte Survey And Management Plan: Blake Lake Protection and Rehabilitation District proposes to conduct a macrophyte survey and develop a macrophyte management plan for Blake Lake. Project activities include conducting two macrophyte surveys in June and August of 1997, conducting a survey of shoreland property owners, and completing a macrophyte management plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Big Blake Lake
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Big Blake Aquatic Plant & Invertebrate Monitoring Project: The Blake Lake Protection and Rehabilitation District will assess and characterize the current seasonal changes in the aquatic plant community structure, littoral aquatic macroinvertebrate community structure, and shoreline land use for Blake Lake in Polk County. The current aquatic plant community will be compared with previous data. An updated aquatic plant management plan will be developed including a comprehensive management strategy focusing on the control and prevention of exotic plants and enhancing the native plant community. All aquatic plant transect data including reporting the Relative Abundance & Frequency of Occurrence and other basic statistics including the Floristic Quality Index, will be summarized and reported in table format in the final report.

Aquatic macroinvertebrate monitoring will be conducted twice in 2004 to assess possible impacts of monotypic aquatic plant beds on the density and diversity of aquatic insects. The macroinvertebrate community structure for all samples shall be broken down to Lowest Paractical Taxonomic Unit LPTU using Hilsenhoff's most current taxonomic key for each habitat type (treated vs. untreated for the following: high density crispus beds, mixed beds, and native beds). A unit independent measure of the variability of samples coming from each specific habitat type (six in all) using the coefficient of variation reported in table format shall also be provided.

The methodology for the shoreline/riparian zone survey shall be submitted to Jim Cahow, by June 15, 2004 and summarized in the project final report. Recommendations on how to decrease negative impacts from existing shoreland management will be made to the Lake District and property owners. Shoreline restoration goals will be established, impacted shoreland areas contributing nonpoint source pollution will be prioritized and exotic species will be mapped.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Big Blake Lake
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Big Blake Water Quality & Plankton Monitoring Project: The Blake Lake Protection and Rehabilitation District proposes to conduct monitoring to assess and characterize the water quality, phyoplankton and zooplankton community structure, and other related factors on Big Blake Lake in Polk County. Ongoing project activities will be disseminated via newsletter (s), meeting (s), and final report mailings.

Specific conditions for this grant project will include frequency of sampling, parameter lists and methodologies as identified and agreed to in correspondence between the Department and the Limnological Institute.

Specific deliverables for this grant project include:
* A report describing the ecological significance and importance of algae and zooplankton populations;
* A copy of the quality assurance protocol for the multi-sensor probe;
* A final report compiling all information collected during the project activities listed above.

Ongoing project activities will be disseminated via newsletter (s), meeting (s), and final report mailings. The Department will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/2013
Waters Involved
Big Blake Lake
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Comprehensive Lake Planning & Paleolimnology Project: The Blake Lake P&R District is sponsoring a project to develop a comprehensive lake management plan including public participation / meetings.

The final deliverables include agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project tasks include: 1) Historic watershed land use assessment & loadings; 2) Identify runoff patterns & delineate environmentally sensitive areas in the watershed; 3) Sediment core collection & analysis; 4) Planning committee meetings; 5) Lake Management Plan development.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Big Round Lake
Status
Complete

Big Round Lake Protection And Rehab District: Big Round Lake Comprehensive Management Plan Project: The Big Round Lake Protection and Rehabilitation District will conduct a comprehensive lake management planning project involving a study and evaluation of Big Round Lake in Polk County. Project activities include; conducting an in-lake water quality monitoring survey, conducting an aquatic plant survey, conducting a watershed runoff survey, conducting a shoreline septic leachate survey, conducting a shoreland habitat survey, conducting a wildlife observations survey, conducting a watershed analysis and developing a nutrient budget, developing a model for calculating lake response to phosphorus loadings, conducting an information and education program, and the development of a comprehensive lake management plan.

Specific deliverables for this grant project include:
? A final technical comprehensive lake management plan and report that covers all project activities and recommendations.
? A final non-technical summary report in a newsletter form that can be widely distributed to lake users and lake residents.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
9/29/1995
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Hydrologic And Phosphorus Budget Development: Determine hydrologic and nutrient budgets and the sediment-phosphorus release rates for Bone Lake:
1. Collect sediment cores from the lake and conduct sediment-phosphorus release analyses.
2. Develop annualized hydrologic budget for the lake.
3. Develop annualized phosphorus budget for the lake.
4. Prepare a final report summarizing the results of tasks 1-3.
5. Disseminate information on the project results to the public by newsletter, and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
9/29/1995
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Water Quality Study: 1. Monitor the current water quality of Bone Lake.
2. Prepare time-depth isopleth diagrams of temperature, dissolved oxygen and phosphorus.
3. Prepare maps depicting early and late summer macrophyte growth.
4. Collect lake level and precipitation data.
5. Evaluate land use within the watershed.
6. Complete surveys to investigate conflicts in water use, fishing, and boating.
7. Prepare a final report addressing the results of the above tasks.
8. Disseminate information on the project results to the public by newsletter and newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1998
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake-Phase 3 Lake Management Plan: The Bone Lake Management District proposes to develop and complete a comprehensive lake management plan, which will constitute a Phase 3 project in the process towards the development of a comprehensive Lake Management Plan for Bone Lake, Polk County. The project activities include; 1) establishment of long term water quality goals for Bone Lake, 2) model and evaluate potential watershed management measures, septic systems loading, and internal loading, 3) identity and evaluate riparian management practices, and 4) prepare the Bone Lake Management Plan. Project deliverables include a comprehensive lake management plan for Bone Lake. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Aquatic Plant Monitoring Project: The Bone Lake Management District will assess and characterize the current aquatic plant community structure, littoral aquatic macroinvertebrate community structure, and shoreline land use for Bone Lake in Polk County. An aquatic plant management strategy will be developed and incorporated into the Bone Lake Management Plan. The strategy will provide baseline data for the development of an aquatic plant management plan. All aquatic plant transect data including reporting the Relative Abundance & Frequency of Occurrence and other basic statistics including the Floristic Quality Index, will be summarized and reported in table format in the final report.

Aquatic macroinvertebrate monitoring will be conducted twice in 2004 to assess possible impacts of monotypic aquatic plant beds on the density and diversity of aquatic insects. The macroinvertebrate community structure for all samples shall be broken down to Lowest Paractical Taxonomic Unit LPTU using Hilsenhoff's most current taxonomic key for each habitat type (treated vs. untreated for the following: high density crispus beds, mixed beds, and native beds). A unit independent measure of the variability of samples coming from each specific habitat type (six in all) using the coefficient of variation reported in table format shall also be provided.

The methodology for the shoreline/riparian zone survey shall be submitted to Jim Cahow, by June 15, 2004 and summarized in the project final report. Recommendations to reduce shoreline development impacts to the lake will be made to the Lake District and property owners.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Water Quality & Biological Monitoring Project: The Bone Lake Protection and Rehabilitation District proposes to conduct monitoring to assess and characterize the water quality, phyoplankton and zooplankton community structure, and other related factors on Bone Lake in Polk County. Ongoing project activities will be disseminated via newsletter (s), meeting (s), and final report mailings.

Specific conditions for this grant project will include frequency of sampling, parameter lists and methodologies as identified and agreed to in correspondence between the Department and the Limnological Institute.

Specific deliverables for this grant project will include:
* A report describing the ecological significance and importance of algae and zooplankton populations;
* A copy of the quality assurance protocol for the multi-sensor probe;
* A final report compiling all information collected during the project activities listed above.

Ongoing project activities will be disseminated via newsletter (s), meeting (s), and final report mailings.


Grant Details
Large Scale Lake Planning
Date
4/1/2008
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Comprehensive Plan: Bone Lake Management District is sponsoring a project to complete a comprehensive lake management plan. This project will review historic studies, collect additional in-lake and tributary water quality information, and establish lake management goals. Public participation will drive goal and plan development.

Project activities include: update watershed land use and loading information; lake phosphorous response modeling (i.e. WiLMS modeling); wild rice mapping; shoreline assessment and development of shoreline restoration program.

The final deliverables for this project will be a comprehensive lake management plan with specific management recommendations.

This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Comprehensive Plan Committee Support, Phase 2: Bone Lake Management District is sponsoring a two-phase project to better understand phosphorous loading and develop implementation plans for lake protection projects. The final deliverable will be a single report that includes methodologies, results, and updated modeling, water quality, and management objectives. This report will also include specific lake improvement or protection strategies for implementation.

The specific Phase 2 (LPL-1307-10) project tasks include: 1) Lab testing and coordination from monitoring in Phase 1; 2) Implementation committee (e.g. cropland, waterfront runoff, water resources education, fisheries, communications, natural beauty & wildlife) facilitation and plan development.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
10/1/2009
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Comprehensive Plan Implementation Studies, Phase 1: Bone Lake Management District is sponsoring a two-phase project to better understand phosphorous loading and develop implementation plans for lake protection projects. The final deliverable will be a single report that includes methodologies, results, and updated modeling, water quality, and management objectives. This report will also include specific lake improvement or protection strategies for implementation.

The specific Phase 1 (LPL-1306-10) project tasks include: 1) Curlyleaf pondweed bed mapping, biomass calculations, and phosphorous sampling of plant tissues and surrounding water column; 2) Expanded tributary flow and nutrient monitoring in areas identified as contributing higher phosphorous loads; 3) Weekly temp/DO profiles; 4) Analyses of all data collected in 1 thru 3 and re-evaluation of watershed management objectives and water quality goals based on the results.

Special Conditions: 1) WDNR\2019s Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development; 2) Draft public surveys and shoreline inventory methods must be reviewed and approved by the Department before being initiated.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Large Scale Lake Planning
Date
2/15/2015
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Internal Load Study & Comprehensive Plan Update: The Bone Lake Management District is sponsoring a project to monitor fisheries, wildlife, and watershed and in lake water quality.

The final deliverables include all data collected, examples of education and outreach materials, agendas and minutes for planning meetings, watershed BMP designs, and an updated water quality strategy that includes results of the watershed and internal loads studies.

Specific project tasks include: 1) Watershed & in lake water quality monitoring; 2) Fish & wildlife monitoring; 3) Sediment core collection & analysis; 4) Watershed BMP design.

Special Conditions: 1) CLMN efforts should not be duplicated, and these data shall be included in the trends analysis and final reporting; 2) All data shall be entered into the SWIMS database as appropriate.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Camp Douglas Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Camp Douglas Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
East Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
East Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2001
Waters Involved
East Lake
Status
Complete

Polk County: Wild Goose Lake Planning - Phase I: The Polk County Land & Water Resources Department will conduct a comprehensive lake management planning project involving two phases of study and evaluation on Wild Goose and East Lakes in Polk County. Phase 1 project activities would include; delineating the watershed, compiling of historical data, conducting a comprehensive in-lake water quality survey, conducting a critical habitats survey, compiling a comprehensive land use and soils inventory with phosphorus loadings estimates, monitoring lake level and precipitation, conducting a lake bottom hydrographic survey update, conducting a shoreline video documentation survey, compiling fisheries census and management data, and conducting an on-going public participation, media involvement , and information and education program. The results of the Phase 1 and Phase 2 study projects will be combined to generate a comprehensive lake management plan for Wild Goose Lake and East Lake and the watershed.

Specific deliverables for this grant project include:
? Complete records of all phase 1 project activities listed above and in the application project description.

Specific deliverables for this phased grant project (Phase 1 and Phase 2) include:
? A comprehensive lake management plan for Wild Goose Lake and East Lake and the watershed.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.



Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Elkins Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Elkins Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Half Moon Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Half Moon Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Kenny Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Kenny Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Little Blake Lake
Status
Complete

Limnological Institute: Little Blake Aquatic Plant & Invertebrate Monitoring Project: The Limnological Institute will assess and characterize the current aquatic plant community structure, littoral aquatic macroinvertebrate community structure, and shoreline land use for Little Blake Lake in Polk County. An aquatic plant management plan will be developed including a comprehensive management strategy focusing on the control and prevention of exotic plants and enhancing the native plant community. All aquatic plant transect data including reporting the Relative Abundance & Frequency of Occurrence and other basic statistics including the Floristic Quality Index, will be summarized and reported in table format in the final report.

Aquatic macroinvertebrate monitoring will be conducted twice in 2004 to assess possible impacts of monotypic aquatic plant beds on the density and diversity of aquatic insects. The macroinvertebrate community structure for all samples shall be broken down to Lowest Paractical Taxonomic Unit LPTU using Hilsenhoff's most current taxonomic key for each habitat type (treated vs. untreated for the following: high density crispus beds, mixed beds, and native beds). A unit independent measure of the variability of samples coming from each specific habitat type (six in all) using the coefficient of variation reported in table format shall also be provided.

The methodology for the shoreline/riparian zone survey shall be submitted to Jim Cahow, by June 15, 2004 and summarized in the project final report. Recommendations on how to decrease negative impacts from existing shoreland management will be made to the Lake District and property owners. Shoreline restoration goals will be established, impacted shoreland areas contributing nonpoint source pollution will be prioritized and exotic species will be mapped.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Little Blake Lake
Status
Complete

Limnological Institute: Little Blake Water Quality & Plankton Monitoring Project: The Limnological Institute in cooperation with the Little Blake Lake Association and the Polk County LWCD proposes to conduct monitoring to assess and characterize the water quality, phyoplankton and zooplankton community structure, and other related factors on Little Blake Lake in Polk County.

Specific conditions for this grant project will include frequency of sampling, parameter lists and methodologies as identified and agreed to in correspondence between the Department and the Limnological Institute.

Specific deliverables for this grant project will include:
* A report describing the ecological significance and importance of algae and zooplankton populations;
* A copy of the quality assurance protocol for the multi-sensor probe;
* A final report compiling all information collected during the project activities listed above.

Ongoing project activities will be disseminated via newsletter (s), meeting (s), and final report mailings. The Department will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Little Pine Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Little Pine Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lost Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Lost Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2002
Waters Involved
Lost Lake
Status
Complete

Polk County: Lost Lake Assessment Study: The Polk County Land & Water Resources Department will conduct a comprehensive lake management planning project involving a study and evaluation of Lost Lake in Polk County. Project activities include; delineating the watershed, conducting a comprehensive in-lake water quality survey, conducting an exotic species inventory, compiling a land use and soils inventory, monitoring lake level and precipitation, conducting a lake sediment survey, conducting a biodiversity survey, and conducting a lake modeling assessment to determine hydrologic and nutrient budgets for the lake. The project data will be utilized to generate a final project report.

Specific deliverables for this grant project include:
1. A comprehensive final report, including the results of all of the project activities and the developed management strategies.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
North Pipe Lake
Status
Complete

Polk County: N. Pipe: Lake & Watershed Study & Management Plan: The Polk County Land Conservation Department will conduct a comprehensive lake water quality monitoring, sociological survey, watershed evaluation, lake modeling, etc. study of North Pipe Lake in Polk County. Project activities will include; compiling watershed map, conducting a landowner survey, digitizing watershed land uses and estimating P loadings, collecting lake water quality samples, monitoring and mapping groundwater, monitoring lake level and precipitation, monitoring tributary and outlet water quality, updating lake bottom topography, conducting a shoreline video survey, compiling fisheries census data, continuing a project information & education program via newsletter(s), meeting(s), and news release(s), and compiling a final report, including a comprehensive lake management plan.

Specific deliverables for this grant project will include:
1) A final report compiling all information collected during the project activities listed above.
2) A comprehensive lake management plan

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
North Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: North Pipe Lake Comprehensive Management Plan: The Pipe Lake Property Owners Association will conduct a comprehensive lake management planning project involving a study and evaluation of North Pipe Lake in Polk County. Project activities includes; conducting an in-lake water quality monitoring survey, conducting an aquatic plant survey, conducting a watershed runoff survey, conducting a shoreland habitat conditions survey, conducting a wildlife observation survey, conducting a watershed analysis and developing a nutrient budget, developing a model for calculating lake response to phosphorus loadings, conducting an information and education program, and the development of a comprehensive lake management plan.

Specific deliverables for this grant project include:
1. A final technical comprehensive lake management plan and report that covers all project activities.
2. A final non-technical summary report in a newsletter form that can be widely distributed to lake users and lake residents.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
North Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: Pipe & North Pipe Lakes-Lakeshore & Subwatershed Analysis-#1: Pipe and North Pipe Lakes Protection and Rehabilitation District is sponsoring a two-phase watershed, shoreline, and aquatic plant community assessment, action planning, and implementation project. The final deliverable will be a report containing collected data summaries, aquatic plant and shoreline assessments, nutrient loading and modeling results, public outreach summary and presentations, and an implementation plan that includes preliminary watershed best-management-practice designs, feasibility, and cost estimates/comparisons. The purpose of this project is to determine where and what lake protection activities are needed.

Phase 1 includes:

1. Field reconnaissance, photographing, and mapping of tributary, wetland, and erosion areas.
2. Groundtruthing of previous (sub )watershed delineation and refinement of water quanitity (HydroCAD) and quality models (WiLMS, etc.) using collected data and various land use predictions/scenarios.
3. Watershed BMP alternatives analysis and action planning, including estimated costs, funding sources, and schedules for prioritized recommendations.
4. Communications with landowners about easements for potential BMP implementation.
5. Stakeholder meetings and updates.

Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. The Department of Natural Resources will be provided with both a paper and an electronic copy of the final report.






Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
North Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: Pipe & North Pipe Lakes-Lakeshore & Subwatershed Analysis-#2: Pipe and North Pipe Lakes Protection and Rehabilitation District is sponsoring a two-phase watershed, shoreline, and aquatic plant community assessment, action planning, and implementation project. The final deliverable will be a report containing collected data summaries, aquatic plant and shoreline assessments, nutrient loading and modeling results, public outreach summary and presentations, and an implementation plan that includes preliminary watershed best-management-practice designs, feasibility, and cost estimates/comparisons. The purpose of this project is to determine where and what lake protection activities are needed.

Phase 2 includes:

1. Whole-lake shoreline assessment, including identification and mapping of areas of erosion and inadequate buffering.
2. Point-intercept aquatic plant surveys (one for each lake) and two voucher specimen collections, following WDNR's Aquatic Plant Management in Wisconsin guidance.
3. Early-season curlyleaf pondweed survey.
4. Written summary of aquatic plant survey, results, and recommendations, including a comparison to historic surveys.
5. Stakeholder meetings and updates.

Special Condition: Shoreline assessment methodology must be approved by the Department before survey takes place.

Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. The Department of Natural Resources will be provided with both a paper and an electronic copy of the final report.


Grant Details
Large Scale Lake Planning
Date
2/15/2015
Waters Involved
North Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: Water Quality Monitoring & Comprehensive Plan Update: The Pipe and North Pipe Lakes P&R District is sponsoring a project to develop a Comprehensive Lake Management Plan for Pipe and North Pipe Lakes.

The final deliverables include all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project tasks include: 1) In-Lake water quality & phytoplankton monitoring; 2) Sediment core collection & analysis; 3) Lake level & precipitation monitoring; 4) Conduct sociologic survey; 5) Shoreline inventory/mapping; 6) Watershed & land use delineation; 7) Management planning meetings.

Special Conditions: 1) CLMN efforts should not be duplicated, and these data shall be included in the trends analysis and final reporting; 2) All data shall be entered into the SWIMS database; 3) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Large Scale Lake Planning
Date
4/16/1991
Waters Involved
North Twin Lake
Status
Complete

Amery Lakes P & R District: North Twin Lake Water Qual Monitoring & Topographic Mapping: 1) Develop topographic mapping. 2) Conduct water quality monitoring at 4 sites as described in application.3) Include 1980 study data. 4) Disseminate information to the public through public meetings, local media, and a permanent display as part of the city records.


Grant Details
Large Scale Lake Planning
Date
4/1/2002
Waters Involved
North Twin Lake
Status
Complete

Amery Lakes P & R District: Amery Lakes Planning Project - North Twin Lake: Amery Lakes Planning Project - North Twin Lake

The Amery Lakes Protection District will conduct a comprehensive lake management planning project involving a study and evaluation of the three Amery Lakes (Pike L., No. Twin L. and, So. Twin L.) in Polk County. This 3-phase project includes the following activities: Phase I - Project kick-off, news release and meetings; lake sediment and water quality sampling; and watershed data review & mapping. Phase II - Field data collection, septic system survey, watershed delineation and evaluation, macrophyte survey, sensitive area survey, lake modeling, and compilation of draft lake management plan. Phase III - Preparation of final project results and best management practice recommendations, preparation of Final Lake Management Plan and, release of project results.

Specific deliverables for this grant project include:
1. A comprehensive final report, including the results of all of the project activities and the developed management strategies.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/16/1991
Waters Involved
Pike Lake
Status
Complete

Amery Lakes P & R District: Pike Lake Water Quality Monitoring And Topographic Mapping: TOPOGRAPHIC MAPPING OF CITY OF AMERY INCLUDING AERIAL PHOTOGRAPHY, COMPUTERIZED TOPOGRAPHY, GROUND CONTROL. WATER QUALITY MONITORING. FINAL REPORT AND INFORMATION DISSEMINATION.


Grant Details
Large Scale Lake Planning
Date
4/1/2002
Waters Involved
Pike Lake
Status
Complete

Amery Lakes P & R District: Pike Lake - Amery Lakes Planning Project: Amery Lake Planning Project - Pike Lake

The Amery Lakes Protection District will conduct a comprehensive lake management planning project involving a study and evaluation of the three Amery Lakes (Pike L., No. Twin L. and, So. Twin L.) in Polk County. This 3-phase project includes the following activities: Phase I - Project kick-off, news release and meetings, lake sediment and water quality sampling, and watershed data review & mapping. Phase II - field data collection, septic system survey, watershed delineation and evaluation, macrophyte survey, sensitive area survey, lake modeling, and compilation of draft lake management plan. Phase III - preparation of final project results and best management practice recommendations, preparation of Final Lake Management Plan and, release of project results.

Specific deliverables for this grant project include:
? A comprehensive final report, including the results of all of the project activities and the developed management strategies.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.



Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Pipe Lake
Status
Complete

Polk County: Pipe: Lake & Watershed Study, Lake Management Plan: The Polk County Land Conservation Department will conduct a comprehensive lake water quality monitoring, sociological survey, watershed evaluation, lake modeling, etc. study of Pipe Lake in Polk County. Project activities will include; compiling watershed map, conducting a landowner survey, digitizing watershed land uses and estimating P loadings, collecting lake water quality samples, monitoring and mapping groundwater, monitoring lake level and precipitation, monitoring tributary and outlet water quality, updating lake bottom topography, conducting a shoreline video survey, compiling fisheries census data, continuing a project information & education program via newsletter(s), meeting(s), and news release(s), and compiling a final report, including a comprehensive lake management plan.

Specific deliverables for this grant project will include:
1) A final report compiling all information collected during the project activities listed above.
2) A comprehensive lake management plan

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2003
Waters Involved
Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: Pipe Lake Comprehensive Management Plan: The Pipe Lake Property Owners Association will conduct a comprehensive lake management planning project involving a study and evaluation of Pipe Lake in Polk County. Project activities include; conducting an in-lake water quality monitoring survey, conducting an aquatic plant survey, conducting a watershed runoff survey, conducting a shoreland habitat conditions survey, conducting a wildlife observation survey, conducting a watershed analysis and developing a nutrient budget, developing a model for calculating lake response to phosphorus loadings, conducting an information and education program, and the development of a comprehensive lake management plan.

Specific deliverables for this grant project include:
l. A final technical comprehensive lake management plan and report that covers all project activities.
2. A final non-technical summary report in a newsletter form that can be widely distributed to lake users and lake residents.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: Pipe & North Pipe Lakes-Lakeshore & Subwatershed Analysis-#1: Pipe and North Pipe Lakes Protection and Rehabilitation District is sponsoring a two-phase watershed, shoreline, and aquatic plant community assessment, action planning, and implementation project. The final deliverable will be a report containing collected data summaries, aquatic plant and shoreline assessments, nutrient loading and modeling results, public outreach summary and presentations, and an implementation plan that includes preliminary watershed best-management-practice designs, feasibility, and cost estimates/comparisons. The purpose of this project is to determine where and what lake protection activities are needed.

Phase 1 includes:

1. Field reconnaissance, photographing, and mapping of tributary, wetland, and erosion areas.
2. Groundtruthing of previous (sub )watershed delineation and refinement of water quanitity (HydroCAD) and quality models (WiLMS, etc.) using collected data and various land use predictions/scenarios.
3. Watershed BMP alternatives analysis and action planning, including estimated costs, funding sources, and schedules for prioritized recommendations.
4. Communications with landowners about easements for potential BMP implementation.
5. Stakeholder meetings and updates.

Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. The Department of Natural Resources will be provided with both a paper and an electronic copy of the final report.






Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: Pipe & North Pipe Lakes-Lakeshore & Subwatershed Analysis-#2: Pipe and North Pipe Lakes Protection and Rehabilitation District is sponsoring a two-phase watershed, shoreline, and aquatic plant community assessment, action planning, and implementation project. The final deliverable will be a report containing collected data summaries, aquatic plant and shoreline assessments, nutrient loading and modeling results, public outreach summary and presentations, and an implementation plan that includes preliminary watershed best-management-practice designs, feasibility, and cost estimates/comparisons. The purpose of this project is to determine where and what lake protection activities are needed.

Phase 2 includes:

1. Whole-lake shoreline assessment, including identification and mapping of areas of erosion and inadequate buffering.
2. Point-intercept aquatic plant surveys (one for each lake) and two voucher specimen collections, following WDNR's Aquatic Plant Management in Wisconsin guidance.
3. Early-season curlyleaf pondweed survey.
4. Written summary of aquatic plant survey, results, and recommendations, including a comparison to historic surveys.
5. Stakeholder meetings and updates.

Special Condition: Shoreline assessment methodology must be approved by the Department before survey takes place.

Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. The Department of Natural Resources will be provided with both a paper and an electronic copy of the final report.


Grant Details
Large Scale Lake Planning
Date
2/15/2015
Waters Involved
Pipe Lake
Status
Complete

Pipe & N Pipe Lake P&R District: Water Quality Monitoring & Comprehensive Plan Update: The Pipe and North Pipe Lakes P&R District is sponsoring a project to develop a Comprehensive Lake Management Plan for Pipe and North Pipe Lakes.

The final deliverables include all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project tasks include: 1) In-Lake water quality & phytoplankton monitoring; 2) Sediment core collection & analysis; 3) Lake level & precipitation monitoring; 4) Conduct sociologic survey; 5) Shoreline inventory/mapping; 6) Watershed & land use delineation; 7) Management planning meetings.

Special Conditions: 1) CLMN efforts should not be duplicated, and these data shall be included in the trends analysis and final reporting; 2) All data shall be entered into the SWIMS database; 3) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Rice Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Rice Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/16/1991
Waters Involved
South Twin Lake
Status
Complete

Amery Lakes P & R District: South Twin Lake Water Quality Monitoring And Topographic Map: TOPOGRAPHIC MAPPING OF CITY OF AMERY INCLUDING AERIAL PHOTOGRAPHY, COMPUTERIZED TOPOGRAPHY, GROUND CONTROL. WATER QUALITY MONITORING. FINAL REPORT AND DISSEMINATION.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
South Twin Lake
Status
Complete

Amery Lakes P & R District: Amery Lakes Comprehensive Mgt Plan Development Project: The Amery Lakes Protection District will conduct a comprehensive lake management planning project involving a study and evaluation of the three Amery Lakes (Pike L., No. Twin L. and, So. Twin L.) in Polk County. This 3-phase project includea the following activities; Phase I - project kick-off news release and meetings, lake sediment and water quality sampling, and watershed data review & mapping; Phase II - field data collection, septic system survey, watershed delineation and evaluation, macrophyte survey, sensitive area survey, lake modeling, and compilation of draft lake management plan; Phase III - preparation of final project results and best management practice recommendations, preparation of Final Lake Management Plan and, release of project results.

Specific deliverables for this grant project include:
? A comprehensive final report, including the results of all of the project activities and the developed management strategies.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Straight River
Status
Complete

Blake Lake Protection & Rehabilitation Dist: Big Blake Aquatic Plant & Invertebrate Monitoring Project: The Blake Lake Protection and Rehabilitation District will assess and characterize the current seasonal changes in the aquatic plant community structure, littoral aquatic macroinvertebrate community structure, and shoreline land use for Blake Lake in Polk County. The current aquatic plant community will be compared with previous data. An updated aquatic plant management plan will be developed including a comprehensive management strategy focusing on the control and prevention of exotic plants and enhancing the native plant community. All aquatic plant transect data including reporting the Relative Abundance & Frequency of Occurrence and other basic statistics including the Floristic Quality Index, will be summarized and reported in table format in the final report.

Aquatic macroinvertebrate monitoring will be conducted twice in 2004 to assess possible impacts of monotypic aquatic plant beds on the density and diversity of aquatic insects. The macroinvertebrate community structure for all samples shall be broken down to Lowest Paractical Taxonomic Unit LPTU using Hilsenhoff's most current taxonomic key for each habitat type (treated vs. untreated for the following: high density crispus beds, mixed beds, and native beds). A unit independent measure of the variability of samples coming from each specific habitat type (six in all) using the coefficient of variation reported in table format shall also be provided.

The methodology for the shoreline/riparian zone survey shall be submitted to Jim Cahow, by June 15, 2004 and summarized in the project final report. Recommendations on how to decrease negative impacts from existing shoreland management will be made to the Lake District and property owners. Shoreline restoration goals will be established, impacted shoreland areas contributing nonpoint source pollution will be prioritized and exotic species will be mapped.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Twenty-Ninth Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Twenty-Ninth Lake
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Unnamed
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan-Phase 2, Inventory & Research: Town of Milltown Comprehensive Land Use Plan - Phase 2: Inventory & Research Existing Conditions Project

The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway.

This grant involves the proposal of the Town of Milltown to conduct Phase 2 of this Comprehensive Land Use Plan - Inventory and Research Existing Conditions. Specific activities of this Phase 2 project include, (1) Analysis of township demographic structure, (2) Evaluation of Physical and Biological characteristics, including wetlands, lakes, watersheds, sensitive areas, etc., (3) Review of county, state and federal resource management programs to determine current and potential town impact, and (4) Update land use map to current conditions.

Specific deliverables for this grant project will include:
? maps of existing land uses, land and resource protection programs and natural areas, and physical and biological characteristics.
? statistical data presented as tables and graphs.
? narrative text.
? charts and presentation materials from public information meetings.
? a public informational meeting.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Unnamed
Status
Complete

Town Of Milltown: Milltown Comp. Land Use Plan, Phase 3 Analysis & Recommond.:
The Town of Milltown Proposes to conduct a three phase project to develop a comprehensive land use plan. Phase 1 of the project is currently underway. Phase 2 of the project - Inventory and Research Existing Conditions, is proposed to be conducted under a concurrent lake planning grant application.

This grant involves the proposal of the Town of Milltown to conduct Phase 3 of this Comprehensive Land Use Plan - Analysis & Recommendations for Preferred Future Conditions. Specific activities of this Phase 3 project include, (1) Analysis of the products of the phase 1 & 2 projects, (2) Designation of land uses necessary to implement water quality protection recommendations, (3) Identification of land uses needed for future developmental demand, and (4) Recommendation of implementation strategies and tools.

Specific deliverables for this grant project will include:
* A comprehensive land use plan document, complete with maps, recommendations, and an implementation strategy.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Pipe & N Pipe Lake P&R District: Pipe & North Pipe Lakes-Lakeshore & Subwatershed Analysis-#1: Pipe and North Pipe Lakes Protection and Rehabilitation District is sponsoring a two-phase watershed, shoreline, and aquatic plant community assessment, action planning, and implementation project. The final deliverable will be a report containing collected data summaries, aquatic plant and shoreline assessments, nutrient loading and modeling results, public outreach summary and presentations, and an implementation plan that includes preliminary watershed best-management-practice designs, feasibility, and cost estimates/comparisons. The purpose of this project is to determine where and what lake protection activities are needed.

Phase 1 includes:

1. Field reconnaissance, photographing, and mapping of tributary, wetland, and erosion areas.
2. Groundtruthing of previous (sub )watershed delineation and refinement of water quanitity (HydroCAD) and quality models (WiLMS, etc.) using collected data and various land use predictions/scenarios.
3. Watershed BMP alternatives analysis and action planning, including estimated costs, funding sources, and schedules for prioritized recommendations.
4. Communications with landowners about easements for potential BMP implementation.
5. Stakeholder meetings and updates.

Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. The Department of Natural Resources will be provided with both a paper and an electronic copy of the final report.






Grant Details
Large Scale Lake Planning
Date
4/1/2007
Waters Involved
Unnamed
Status
Complete

Pipe & N Pipe Lake P&R District: Pipe & North Pipe Lakes-Lakeshore & Subwatershed Analysis-#2: Pipe and North Pipe Lakes Protection and Rehabilitation District is sponsoring a two-phase watershed, shoreline, and aquatic plant community assessment, action planning, and implementation project. The final deliverable will be a report containing collected data summaries, aquatic plant and shoreline assessments, nutrient loading and modeling results, public outreach summary and presentations, and an implementation plan that includes preliminary watershed best-management-practice designs, feasibility, and cost estimates/comparisons. The purpose of this project is to determine where and what lake protection activities are needed.

Phase 2 includes:

1. Whole-lake shoreline assessment, including identification and mapping of areas of erosion and inadequate buffering.
2. Point-intercept aquatic plant surveys (one for each lake) and two voucher specimen collections, following WDNR's Aquatic Plant Management in Wisconsin guidance.
3. Early-season curlyleaf pondweed survey.
4. Written summary of aquatic plant survey, results, and recommendations, including a comparison to historic surveys.
5. Stakeholder meetings and updates.

Special Condition: Shoreline assessment methodology must be approved by the Department before survey takes place.

Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. The Department of Natural Resources will be provided with both a paper and an electronic copy of the final report.


Grant Details
Large Scale Lake Planning
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

Pipe & N Pipe Lake P&R District: Water Quality Monitoring & Comprehensive Plan Update: The Pipe and North Pipe Lakes P&R District is sponsoring a project to develop a Comprehensive Lake Management Plan for Pipe and North Pipe Lakes.

The final deliverables include all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

Specific project tasks include: 1) In-Lake water quality & phytoplankton monitoring; 2) Sediment core collection & analysis; 3) Lake level & precipitation monitoring; 4) Conduct sociologic survey; 5) Shoreline inventory/mapping; 6) Watershed & land use delineation; 7) Management planning meetings.

Special Conditions: 1) CLMN efforts should not be duplicated, and these data shall be included in the trends analysis and final reporting; 2) All data shall be entered into the SWIMS database; 3) Draft sociological/user surveys and shoreline assessments must be reviewed and approved by the Department before being initiated.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
White Ash Lake
Status
Complete

White Ash Lake P & R District: North White Ash Lake Macrophyte Management Planning: White Ash Lake Protection and Rehabilitation District proposes to develop a macrophyte management plan for North White Ash Lake. Project activities also include a macrophyte survey and a lake district membership survey.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
White Ash Lake
Status
Complete

White Ash Lake P & R District: White Ash Lake Macrophyte Management Planning: The White Ash Lake Protection and Rehabilitation District proposes to develop a macrophyte management plan for White Ash Lake. Project activities include a macrophyte survey and a lake district membership survey.


Grant Details
Large Scale Lake Planning
Date
4/1/2001
Waters Involved
Wild Goose Lake
Status
Complete

Polk County: Wild Goose Lake Planning - Phase Ii: The Polk County Land & Water Resources Department will conduct a comprehensive lake management planning project involving two phases of study and evaluation on Wild Goose Lake and East Lake in Polk County. Phase 2 project activities will include; conducting a watershed biodiversity survey, conducting an exotic species inventory, conducting a sociological landowner survey, conducting a watershed inflow storm event sampling survey, developing hydrologic and nutrient budgets and a computer lake response model, conducting a lake sediment dredge sample and analysis survey, conducting an on-going public participation, media involvement, and information and education program, and completing a comprehensive lake management plan. The results of the Phase 1 study project will be combined with this Phase 2 study project to generate a comprehensive lake management plan for Wild Goose Lake and East Lake and the watershed.

Specific deliverables for this grant project will include:
? Complete records of all phase 2 project activities listed above and in the application project description.
? A comprehensive lake management plan for Wild Goose Lake and East Lake and the watershed.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Large Scale Lake Planning
Date
4/1/2008
Waters Involved
Wild Goose Lake
Status
Complete

Polk County Lwrd: Wild Goose Lake Water Quality & Biological Monitoring: The Polk County Land and Water Resources Department is completing a second appraisal study and report on Wild Goose Lake. This project will compare results to the 2003 appraisal project.

Project activities include: water quality trend monitoring; phytoplankton and zooplankton community snapshots; macrophyte point-intercept monitoring and mapping; macroinvertebrate assessment; lake level and precipitation monitoring; and watershed mapping and WiLMS modeling.

The final deliverable for this project will be a compilation of results from the various studies and a comprehensive report with specific management recommendations. Historic monitoring data, including Citizen Lake Monitoring Network information, must be included in the trends analyses. The draft report must be submitted to regional Lake Coordinator for review before finalization.

This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Apple River
Status
Complete

Apple River P & R District: Apm Plan, Background Studies: The Apple River Flowage Protection and Rehabilitation District is sponsoring a grant to gather and integrate background information into the development an Aquatic Plant Management Plan for the Apple River Flowage.

Final deliverable is an Aquatic Plant Management Plan that includes the necessary background information to support the implementation plan and is approvable for future AIS Control grant projects.

Special Conditions: WDNR\2019s Aquatic Plant Management in Wisconsin guidance must be followed for point-intercept survey monitoring and aquatic plant management plan development. The NOR Native Plant Protection Strategy must be integrated in the APM plan.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2003
Waters Involved
Apple River Flowage
Status
Complete

Polk County: Apple River Flowage Aquatic Plant Management Study: The Polk County Land and Water Resources Department, in cooperation with the Apple River Protection & Rehabilitation District, will conduct an Aquatic Macrophyte Plant Survey, and conduct a public education workshop, and develop an Aquatic Macrophyte Management Plan on and for the Apple River Flowage in Polk County.

Activities involved with this project include; two aquatic plant distribution surveys during the summer of 2003, an aquatic plant education workshop, an on-going information and education program, and a project report including a plant management plan.

Specific deliverables for this project include;
* Final report that addresses the findings of the lake macrophyte surveys and an aquatic plant management plan.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Apple River Flowage
Status
Complete

Apple River P & R District: Apm Plan, Background Studies: The Apple River Flowage Protection and Rehabilitation District is sponsoring a grant to gather and integrate background information into the development an Aquatic Plant Management Plan for the Apple River Flowage.

Final deliverable is an Aquatic Plant Management Plan that includes the necessary background information to support the implementation plan and is approvable for future AIS Control grant projects.

Special Conditions: WDNR\2019s Aquatic Plant Management in Wisconsin guidance must be followed for point-intercept survey monitoring and aquatic plant management plan development. The NOR Native Plant Protection Strategy must be integrated in the APM plan.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
9/28/2006
Waters Involved
Big Round Lake
Status
Complete

Big Round Lake Protection And Rehab District: Sediment & Core Analysis Project: The Big Round Lake Protection and Rehabilitation District will conduct a project to analyze a sediment core from the deep area of Big Round Lake. The analysis of this sediment core may help to evaluate the history of water quality in the lake and possibly help in making the following determinations: 1) Determine impact of installation of the dam on the lake's ecosystem. 2) Determine changes in nutrients during the last 130 yrs. 3) Determine if the frequency of algal blooms has increased during the last century, and 4) Determine if the macrophyte growth has changed during the last century.

Project deliverables include a final report detailing the findings of the core analyses and a listing of any past significant water quality or lake ecosystem "changes" that are revealed from this analyses. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant shall provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2007
Waters Involved
Big Round Lake
Status
Complete

Big Round Lake Protection And Rehab District: Sediment & Core Analysis Project: The Big Round Lake Protection and Rehabilitation District will conduct a project to analyze a sediment core from the deep area of Big Round Lake. The analysis of this sediment core may help to evaluate the history of water quality in the lake and possibly help in making the following determinations: 1) Determine impact of installation of the dam on the lake's ecosystem. 2) Determine changes in nutrients during the last 130 yrs. 3) Determine if the frequency of algal blooms has increased during the last century, and 4) Determine if the macrophyte growth has changed during the last century.

Project deliverables include a final report detailing the findings of the core analyses and a listing of any past significant water quality or lake ecosystem "changes" that are revealed from this analyses. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant shall provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Big Round Lake
Status
Complete

Big Round Lake Protection And Rehab District: Big Round Lake Comprehensive Lake Mangement Plan Update: Big Round Lake District is sponsoring a project to develop a Comprehensive Lake Management Plan for Big Round Lake.

The final deliverables include all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Small Scale Lake Planning
Date
4/1/2007
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Management Plan-Finalization Project: Bone Lake Management District is sponsoring a project to complete an aquatic plant survey and management plan. The APM Plan will become a significant component of a future comprehensive lake management study and plan.

Special Conditions:
1. WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development.
2. Draft public surveys must be reviewed and approved by the Department before being initiated.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant will provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.

DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2008
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Aquatic Plant Management Public Outreach: Bone Lake Management District is sponsoring a project to expand public outreach and participation in development of its aquatic plant management plan.

Project activities include: providing a draft plan summary to all lake residents, advertising/noticing the draft plan in local media, and making the draft plan widely available via website, CD, or in print. The project also includes public meetings and newsletter articles about native plants and aquatic plant management strategies.

The final deliverables for this project will be a draft and final aquatic plant management plan (in print & CD format), a plan summary, and documentation of the public outreach and participation.

This scope is intended to summarize the detailed scope provided in the grant application and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.

Special Conditions: 1) WDNR's Aquatic Plant Management in Wisconsin guidance should be followed for point-intercept survey monitoring and aquatic plant management plan development; 2) The WDNR Aquatic Plant Management Strategy (2007) will be utilized in plan development.


Grant Details
Small Scale Lake Planning
Date
4/1/2009
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Internal Loading Study: The Bone Lake Management District will support a study to asses the release of phosphorous from Bone Lake sediment. This information will be used to supplement data from a 2008 study to estimate internal phosphorous loading. In addition, the project includes the purchase a dissolved oxygen meter for use in determining anoxic areas.

Activities include: 1) Purchase Dissolved Oxygen Meter; 2) Conduct nutrient sampling during anoxic conditions; 3) Analyze results to determine internal phosphorous loading.

Specific deliverables for this grant include: 1) Final Project Report (paper and electronic copies) including summary of accomplishments including description of the phosphorous profile study and phosphorous loading analysis. The report will also include a description of the D.O. meter and any accessories purchased; 2) Data from nutrient sampling will be entered into WILMS; 3) AIS related materials generated or paid for by this grant.

Special conditions for this project: The project sponsor shall immediately contact the DNR in the event of a new aquatic invasive species infestation.

This scope is intended to summarize the grant application scope and does not supersede grant application specifics. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the Lake Coordinator. It is recommended that Grantee provide Lake Coordinator with a draft final report. The DNR shall receive a paper and electronic copy of the final report. If consultant is to provide final report, it is recommended that Grantee provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant.


Grant Details
Small Scale Lake Planning
Date
10/1/2010
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Habitat Study: Bone Lake Management District is sponsoring a project to identify, protect and/or improve fish and wildlife habitat. Project activities include: identification of natural shorelines and habitat types with landownership information; fish and wildlife surveys; compilation of existing habitat information/reports from multiple agencies and sources; and identification of habitat stressors.

The final deliverables for this project will be a fish and wildlife habitat study report with specific recommendations for implementation projects (in print & CD format), survey/monitoring results, and any information and education materials developed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, reports, and education materials, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional lake coordinator.


Grant Details
Small Scale Lake Planning
Date
4/1/2012
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Frog Survey & Habitat Mapping: Bone Lake Management District is sponsoring a project to identify and map important frog habitat. Activities include conducting a frog calling survey and mapping these areas on the Bone Lake Habitat Map.

Specific deliverables for this project include a summary report including evaluation results and examples of educational tools, publications, and/or presentations developed.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Bone Lake
Status
Complete

Bone Lake Management District: Bone Lake Management Plan Update: Bone Lake Management District is sponsoring a project to develop a Comprehensive Lake Management Plan for Bone Lake.

The final deliverables include all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
Small Scale Lake Planning
Date
9/28/2006
Waters Involved
Straight River
Status
Complete

Big Round Lake Protection And Rehab District: Sediment & Core Analysis Project: The Big Round Lake Protection and Rehabilitation District will conduct a project to analyze a sediment core from the deep area of Big Round Lake. The analysis of this sediment core may help to evaluate the history of water quality in the lake and possibly help in making the following determinations: 1) Determine impact of installation of the dam on the lake's ecosystem. 2) Determine changes in nutrients during the last 130 yrs. 3) Determine if the frequency of algal blooms has increased during the last century, and 4) Determine if the macrophyte growth has changed during the last century.

Project deliverables include a final report detailing the findings of the core analyses and a listing of any past significant water quality or lake ecosystem "changes" that are revealed from this analyses. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant shall provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
4/1/2007
Waters Involved
Straight River
Status
Complete

Big Round Lake Protection And Rehab District: Sediment & Core Analysis Project: The Big Round Lake Protection and Rehabilitation District will conduct a project to analyze a sediment core from the deep area of Big Round Lake. The analysis of this sediment core may help to evaluate the history of water quality in the lake and possibly help in making the following determinations: 1) Determine impact of installation of the dam on the lake's ecosystem. 2) Determine changes in nutrients during the last 130 yrs. 3) Determine if the frequency of algal blooms has increased during the last century, and 4) Determine if the macrophyte growth has changed during the last century.

Project deliverables include a final report detailing the findings of the core analyses and a listing of any past significant water quality or lake ecosystem "changes" that are revealed from this analyses. The project results will be disseminated to the public by newsletter(s), public meeting(s), and local newspaper articles.

This scope is intended to summarize the detailed project scope provided in the application and does not supersede those application tasks/deliverables. Data, records, and reports, including GIS-based maps and digital images, must be submitted to the Department in a format specified by the regional Lake Coordinator. Grantee or consultant shall provide DNR Lake Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR shall receive both paper and electronic copies of the final report along with, or prior to submission of grantee's final payment request.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Straight River
Status
Complete

Big Round Lake Protection And Rehab District: Big Round Lake Comprehensive Lake Mangement Plan Update: Big Round Lake District is sponsoring a project to develop a Comprehensive Lake Management Plan for Big Round Lake.

The final deliverables include all data collected, agendas and minutes for planning meetings, and a lake management plan that includes methodologies, results, and management alternatives discussion with an implementation plan.

This scope summarizes the project detail provided in the application and does not negate tasks/deliverables described therein. Data, records, and reports, including GIS-based maps, and digital images, must be submitted to the Department in a format specified by the regional Lake Biologist.


Grant Details
River Planning Grant
Date
10/18/2000
Waters Involved
Apple River
Status
Complete

Polk County: Apple River Association Development & I&E Project: The Polk County Land & Water Resources Department will conduct an organizational development and informational & educational project in the Apple River watershed in Polk County. Activities involved with this project include; organization of a Citizen Forum to collect local input on river threats, etc., assist in the creation of an Apple River Association, development of outreach materials and assist in the development of an Apple River Association newsletter, conduct a sociological land owner survey, conduct public meetings and generate news releases on project status and results, and conduct a shoreline video survey. Reports of ongoing project activities will be disseminated via brochures(s), meeting(s) and workshop(s), and the preparation of a final report.

Specific deliverables for this grant project include:
? A final report that summarizes the grant project activities and includes examples of outreach materials that were developed.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by brochure(s), public meeting(s), and local newspaper articles.


Grant Details
River Planning Grant
Date
10/18/2000
Waters Involved
Apple River Flowage
Status
Complete

Polk County: Apple River Association Development & I&E Project: The Polk County Land & Water Resources Department will conduct an organizational development and informational & educational project in the Apple River watershed in Polk County. Activities involved with this project include; organization of a Citizen Forum to collect local input on river threats, etc., assist in the creation of an Apple River Association, development of outreach materials and assist in the development of an Apple River Association newsletter, conduct a sociological land owner survey, conduct public meetings and generate news releases on project status and results, and conduct a shoreline video survey. Reports of ongoing project activities will be disseminated via brochures(s), meeting(s) and workshop(s), and the preparation of a final report.

Specific deliverables for this grant project include:
? A final report that summarizes the grant project activities and includes examples of outreach materials that were developed.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be disseminated to the public by brochure(s), public meeting(s), and local newspaper articles.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Volunteer Monitoring

There are no citizen monitors in the SC06-Upper Apple River Watershed. For information on how to become a Volunteer Stream Monitor, visit-http://watermonitoring.uwex.edu/index.html

Date  2012

Grants and Management Projects
Upper Apple River Watershed
Watershed Recommendations
Aquatic Plant Management Plan
White Ash Lake Plant Mgmt, Monitoring
Date
Status
The lake needs to be managed properly to maintain the macrophyte-driven system and prevent it from converting to an algae-driven system. Since extensive harvesting programs have been initiated on North White Ash, monitoring to determine whether Secchi & chlorophyll concentrations have changed post-harvesting would also be beneficial. KLM
6/3/2011
Proposed
 
Hire County Aquatic Invasives Coordinator
 
Date
Status
Hire Aquatic Invasives (AIS) County Coordinator - Barron
1/1/2011
Not Proposed
Projects
 
Install Kiosk or Sign
Install Aquatic Invasive Species Signage at Big Round Lake
Date
Status
10/1/2011
In Progress
Projects
 
Lakes Planning Grant
Big Round Lake District
Date
Status
WRM should assist the Big Round Lake District in a Lakes Planning Grant application to pursue a long range lake management plan and help them to implement the recommenda tions of the 1980 study.
1/1/2010
Proposed
 
Lakes Planning Grant
Apple River
Date
Status
WRM should assist the Apple River Flowage District in completing their current Lakes Planning Grants project and pursuing any recommendations for implementation practices from this or the 1979 study.
1/1/2010
Proposed
 
Monitor Fish Tissue
Confirm FCA: IW listed from pre-year 2000 FCA data
Date
Status
11/4/2011
Proposed
 
Monitor Fish Tissue
Confirm FCA: IW listed from pre-year 2000 FCA data
Date
Status
10/28/2011
Proposed
 
Monitor Invasive Species
Monitor Invasive Species at Big Round Lake
Date
Status
10/1/2011
Proposed
Projects
 
Monitor or Propose 303(d) Listing
White Ash Lake TP Background Monitoring
Date
Status
Conduct Monitoring on White Ash Lake to determine TP in background for proposed actions on this water to be listed in 2012 based on criteria exceedances.
6/7/2011
Proposed
 
Watercraft Inspections - Clean Boats, Clean Waters
Watercraft Inspections on Big Round Lake
Date
Status
10/1/2011
Proposed
Projects
 
Upper Apple River WatershedWater Plans and PartnershipsRead the Watershed Plan

Watershed Partners Blake Lake Protection & Rehabilitation District, Bone Lake Management District, Amery Lakes Protection & Rehabilitation District, White Ash Lake Protection & Rehabilitation District, Pipe & N. Pipe Lake Protection & Rehabilitation District, Big Round Lake Protection And Rehab District, Apple River Protection & Rehabilitation District

Date  2011

Watershed History Note

The City of Amery is located in the Upper Apple River watershed in Lincoln Township, Polk County. The origin of Amery is closely associated with the lumbering industry. The first two settlers to arrive in the area (after following the Apple River) cut the first logs in the township of Lincoln and then floated them down the Apple River to Stillwater. In order to assure sufficient water for the drives, a big dam was built across the river just south of where County Highway F now crosses it. Traces of the dam can still be seen. The community was known as Big Dam, and soon after the community was established, a store opened, followed by a saw mill, the railroad and a depot. This development brought more settlers and the first hotel. A number of these early buildings are still in use today. In 1887, the community took the name of Amery, after William Amery who served as treasurer of Polk County. Between 1888 and 1893, the village grew and in 1919 the village became a city.

Date  2010