Watershed - East and West Branches Milwaukee River (MI06)
East and West Branches Milwaukee River Watershed

Details

The Milwaukee River East-West Watershed covers 266 square miles and is located in portions of Dodge, Fond du Lac, Ozaukee, Sheboygan, and Washington counties. The East and West Branches of the Milwaukee River meet the Milwaukee River mainstem near the Village of Kewaskum in Washington County. The Milwaukee River then runs south and east to western Ozaukee County where this watershed meets the Milwaukee River South Watershed. The East-West Branch Milwaukee River Watershed contains over 30 named lakes ranging in size from 427 acres (Long Lake) to two acres (Mallard Hole Lake), providing many recreational opportunities. Six lakes have active lake associations or districts. Rural uses cover most of the land area in this watershed. Agriculture is dominant, covering about 47 percent of the land area, followed by wetlands (19%), grasslands (16%) and forests (12%). Urban uses cover about three percent of the land area. The City of West Bend and the Villages of Campbellsport, Kewaskum and Newburg are the only incorporated areas in the watershed.

Date  2001

Details

Date  2001

Ecological Landscapes for East and West Branches Milwaukee River Watershed

Ecological Landscapes

The Southeast Glacial Plains Ecological Landscape makes up the bulk of the non-coastal land area in southeast Wisconsin. This Ecological Landscape is made up of glacial till plains and moraines. Most of this Ecological Landscape is composed of glacial materials deposited during the Wisconsin Ice Age, but the southwest portion consists of older, pre-Wisconsin till with a more dissected topography. Soils are lime-rich tills overlain in most areas by a silt-loam loess cap. Agricultural and residential interests throughout the landscape have significantly altered the historical vegetation. Most of the rare natural communities that remain are associated with large moraines or in areas where the Niagara Escarpment occurs close to the surface. Historically, vegetation in the Southeast Glacial Plains consisted of a mix of prairie, oak forests and savanna, and maple-basswood forests. Wet-mesic prairies, southern sedge meadows, emergent marshes, and calcareous fens were found in lower portions of the Landscape. End moraines and drumlins supported savannas and forests. Agricultural and urban land use practices have drastically changed the land cover of the Southeast Glacial Plains since Euro-American settlement. The current vegetation is primarily agricultural cropland. Remaining forests occupy only about 10% of the land area and consist of maple-basswood, lowland hardwoods, and oak. No large mesic forests exist today except on the Kettle Interlobate Moraine which has topography too rugged for agriculture. Some existing forest patches that were formerly savannas have succeeded to hardwood forest due to fire suppression.

Date  2010

Hydrologic Features

The Milwaukee River mainstem is the longest river in this watershed (53 miles). The Milwaukee River begins in wetlands in Fond du Lac County, and flows in a southeasterly direction until meeting the North Branch Milwaukee River near Waubeka. Upstream of Kewaskum, wetland drainage, river straightening, especially the smaller headwaters streams, dams and agricultural runoff are the major factors keeping the rivers from fully meeting their potential. Downstream of Kewaskum, the river is increasingly affected by urban land uses and five major dams, leading to degraded habitat and water quality from nutrient and sediment inputs. The headwaters for the Milwaukee River East Branch begin with Watercress Creek, a trout stream, in Sheboygan County. The Milwaukee River East Branch then flows south through Long Lake, Mauthe Lake and the New Fane Millpond until it reaches the Milwaukee River mainstem. Unlike the Milwaukee River mainstem, most of East Branch remains in a relatively natural, unchannelized condition. Agricultural runoff contributing nutrients and sediment are the major sources of water quality degradation in the East Branch. The West Branch Milwaukee River is located in the rolling glacial topography of Fond du Lac County. The river begins with wetlands and flows southeast through wetlands and Lake Bernice before reaching the Milwaukee River mainstem. This river has been greatly affected by channelization for agricultural purposes, especially in the headwaters. Nutrients and sediment from agricultural runoff and stream modification (channelization and dams) contribute to reduced water quality in the West Branch Milwaukee River.

Date  2001

Fisheries

Fish species found in this watershed range from intolerant species such as brook trout, mottled sculpin, blackchin shiner, Iowa darter, pearl dace and northern redbelly dace in the cool and cold water streams, to more tolerant species such as creek chub, central mudminnow, common shiner and white sucker in the more degraded streams. Other than brook trout, sport fish species found in the watershed include smallmouth bass, black bullhead, northern pike, pumpkinseed and bluegill. The state threatened pugnose shiner, greater redhorse and longear sunfish have also been documented in this watershed.

Date  2001

East and West Branches Milwaukee River Watershed At-a-Glance

Impaired Water in East and West Branches Milwaukee River Watershed
River and Stream QualityAll Waters in Watershed

The Milwaukee River East-West Watershed contains about 196 miles of perennial streams. Nearly all the stream miles in this watershed (98%) are partially meeting their biological uses, while two percent of the streams have not been evaluated. Even though general evaluations have been conducted on many of the streams in the watershed, thorough assessments have been conducted on just five percent of total stream miles within the last five years. No streams in this watershed are listed as impaired waters on the state’s 303(d) list. Portions of two rivers (Auburn Lake Creek and East Branch Milwaukee River) totaling six miles in length are considered exceptional resource waters.

Date  2001

Watershed Trout Streams
Watershed Outstanding & Exceptional Resources

Lakes and Impoundments

Impaired Waters

List of Impaired Waters
Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Control
Date
4/1/2005
Waters Involved
Kettle Moraine Lake
Status
Complete

Fond Du Lac County: Kettle Moraine Lake Long Term Exotic Species Control Study: Amend #2: The Fond du Lac County Land and Water Conservation Department, on behalf of the Kettle Moraine Lake Association, proposes to control Eurasian watermilfoil (EWM) through chemical treatment and preventative measures in Kettle Moraine Lake during the period 2005 - 2007. The project elements and deliverables are specified in the Fond du Lac County Land and Water Conservation Department's Aquatic Invasive Species Grant application, dated January 12, 2005, and the "Amendment to the Scope of the Aquatic Invasive Species grant proposal for Kettle Moraine Lake, Fond du Lac County", dated February 23, 2006. The project includes mapping the extent of EWM annually; treating EWM infested areas with aquatic herbicides;; and conducting volunteer activities to prevent further aquatic invasive species infestations, including distributing educational materials to lake users, conducting watercraft inspections and posting/maintaining informational signs at public access points. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the three-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
10/1/2008
Waters Involved
Kettle Moraine Lake
Status
Complete

Fond Du Lac County: Kettle Moraine Lake Ewm & Clp Management Project: The Fondulac County Land and Water Department proposes to control Curly-leaf pondweed (CLP) and Eurasian water-milfoil (EWM) through chemical treatment, EWM biological control methods, hand removal, and preventative measures in Kettle Moraine Lake during the period 2009 - 2011. The project elements and deliverables are specified in Fondulac County's Land and Water Department Aquatic Invasive Species Grant application, dated August 1, 2008. The project includes monitoring the extent and density of CLP and EWM annually through pre-treatment and post-treatment surveys of known infested areas, and monitoring other lake areas for the presence of aquatic invasive species (AIS); treating CLP infested areas with an aquatic herbicide; conducting hand-removal of CLP and EWM; and conducting volunteer activities to prevent further AIS infestations, including conducting watercraft inspections. Watercraft inspection records will be entered into the State's online Watercraft Inspection Database. Annual progress reports and a final report summarizing the five-year project will be provided to DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Control
Date
10/1/2012
Waters Involved
Kettle Moraine Lake
Status
Complete

Kettle Moraine Lake Association: Kettle Moraine Lake Ais Control & Prevention: Kettle Moraine Lake Association, Inc. proposes to continue the management of both curly-leaf pondweed (CLP) and Eurasian water milfoil (EWM) in Kettle Moraine Lake and prevent the spread of aquatic invasive species (AIS). Specifically, Kettle Moraine Lake Association will monitor CPL and EWM populations within Kettle Moraine Lake to create annual refined treatment strategies and determine program effectiveness, conduct large-scale herbicide treatments of CLP and smaller treatments of EWM, monitor herbicide concentrations, conduct whole-lake point-intercept and community mapping surveys, introduce native aquatic plants, and continue Clean Boats Clean Waters watercraft inspections and volunteer-based AIS monitoring and hand removal in Kettle Moraine Lake. An updated aquatic plant management plan will also be developed. The project elements and deliverables are specified in the grant application materials submitted to the Department dated August 1, 2012.


Grant Details
Aquatic Invasives Control
Date
10/1/2010
Waters Involved
Long Lake
Status
Complete

Fdl Long Lake Preservation Assn: Long Lake Habitat Restoration Project: The Long Lake Preservation Association proposes to: control Curly Leaf Pondweed (CLP) and Eurasian Watermilfoil (EWM) through chemical treatment in the waters of Long and Tittle Lakes, during the period 2011 - 2013. The project elements and deliverables are specified in the Long Lake Preservation Association\2019s Aquatic Invasive Species Grant application, dated July 29, 2010. The project includes: conducting pre- and post-treatment surveys to monitor the presence of CLP and EWM; treating CLP and EWM infested areas in waters of Long Lake and Tittle with aquatic herbicide(s); conducting watercraft inspections; participating in the Citizen Lakes Monitoring Network; and mailing educational information to Association members. Any persons conducting watercraft inspections or participating in the Citizen Lake Monitoring Network will enroll in a current Clean Boats Clean Waters workshop or Citizen Lake Monitoring Network workshop. Watercraft inspection and Citizen Lake Monitoring records will be entered into the State\2019s online Watercraft Inspection Database (SWIMS). Any publications or signs produced as part of this project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details are at http://www.protectyourwaters.org). Annual progress reports and a final report summarizing the three-year project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Control
Date
4/15/2015
Waters Involved
Long Lake
Status
Complete

Fdl Long Lake Preservation Assn: Fdl Long Lake Ais Monitoring & Control: FDL Long Lake Association proposes to continue to monitor and control aquatic invasive species (AIS) on a lake-wide basis in Long Lake through 2018. The project will include: qualitative evaluations where the entire littoral zone of Long Lake would be searched for AIS, quantitative evaluations before and after treatments, chemical treatment of AIS, two years of volunteer-based herbicide concentration monitoring, professional hand-harvesting of AIS, assessment of mechanical harvesting operation, acoustic survey, whole-lake point-intercept survey, stakeholders survey, 200 hours per year of Clean Boats/Clean Waters monitoring, public and committee meetings, annual AIS monitoring and control strategy assessment reports, and development of an updated aquatic plant management plan which will include a harvesting plan. Long Lake will submit a final report summarizing the project to the Department. The project elements and deliverables will be completed as described in the project proposal submitted to the Department and dated January 28, 2015.


Grant Details
Aquatic Invasives Early Detection and Response
Date
1/1/2011
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Hybrid Milfoil Treatment Project: The Forest Lake Improvement Association proposes to: control Hybrid Eurasian water-milfoil (HEWM) through chemical treatment in the waters of Forest Lake, during the period 2011 2014. The project elements and deliverables are specified in the Forest Lake Improvement Association\2019s project proposal dated December 6, 2010. The project includes: conducting pre- and post-treatment surveys according to established DNR Early Response protocols; treating HEWM infested areas in waters of Forest Lake with aquatic herbicide(s); and mailing educational information to Association members. Any publications or signs produced as part of this project will incorporate the \201CStop Aquatic Hitchhikers!\201D\2122 brand (partnership details are at http://www.protectyourwaters.org). Annual progress reports and a final report summarizing the four-year project will be provided to DNR. If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic .pdf copies of the final report along with, or prior to, submission of grantee\2019s final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
5/1/2007
Waters Involved
Long Lake
Status
Complete

Fond Du Lac County: Fond Du Lac County Long Lake Long Term Ais Control Project: The FonduLac County Land Water Conservation Department (LWCD) proposes to manage Eurasian water-milfoil (EWM) in Long Lake by implementing control and prevention measures during the period 2007-2009. Te project elements and deliverables are specified in the Long Lake FonduLac County Aquatic Invasive Species Rapid Response Grant application, dated May 1, 2007. The project includes conducting pre-and post-treatment surveys and mapping the extent of EWM; controlling EWM with aquatic herbicide treatments; training volunteers to conduct post-treatment assessments and conducting those assessments to determine treatment efficacy; training volunteers to monitor for aquatic invasive species (AIS) and conducting those surveys; educating volunteers about AIS prevention measures through "Clean Boats Clean Water" (CBCW) program; and educating residents about AIS prevention measures through newsletters, mailing, signage, and/or meetings. Annual progress reports and a final report summarizing the three year project will be provided to the DNR.

If consultant is to provide the final report, it is recommended the Grantee provide the DNR Aquatic Invasive Species Coordinator with a draft for comment on report adequacy prior to making final payment to the consultant. DNR to receive both paper and electronic.pdf copies of the final report along with, or prior to, submission of grantee's final payment request.


Grant Details
Aquatic Invasives Early Detection and Response
Date
7/30/2015
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Washington County: Containment & Suppression Of Starry Stonewort: Washington County Planning and Parks Division, in partnership with the Silver Lake Protection and Rehabilitation District and the Wisconsin Department of Natural Resources, will undertake a rapid response project on Silver Lake to control and potentially eradicate Starry Stonewort, listed in NR 40 as a prohibited species. The project will include hand pulling by snorkeling and diving; DASH (Diver Assisted Suction Harvesting); Clean Boats, Clean Waters boat inspections at the public launch and the Yacht Club launch; a Fall 2015 P/I plant survey; meandering shoreline snorkel plant survey; extra signage at launches and potentially a chemical treatment. The project deliverable will be a report containing the results of each hand pulling event; results of the DASH event, results of any chemical treatments (if applicable), a summary of the Clean Boats, Clean Waters accomplishments, all raw data from plant surveys and maps from each of the plant surveys. All Clean Boats, Clean Waters data must be entered in the statewide SWIMS database.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Allis Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Allis Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Amy Bell Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Amy Bell Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Bark Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Bark Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Barton Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Barton Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Beaver Dam Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Beaver Dam Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Beck Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Beck Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Boltonville Millpond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Boltonville Millpond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Brickyard Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Brickyard Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Cedar Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Cedar Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Druid Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Druid Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Ehne Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Ehne Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Erler Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Erler Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Friess Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Friess Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Gilbert Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Gilbert Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Green Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Green Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Hartford Millpond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Hartford Millpond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Hasmer Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Hasmer Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Hawthorn Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Hawthorn Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Hickey Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Hickey Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Keowns Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Keowns Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Kohlsville Millpond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Kohlsville Millpond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lake Five
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lake Five
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lake Lenwood
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lake Lenwood
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lake Twelve
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lake Twelve
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lehner Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lehner Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lent Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lent Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Little Cedar Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Cedar Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Little Drickens Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Drickens Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Little Friess Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Little Friess Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lohr Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lohr Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Long Lake
Status
Complete

Fdl Long Lake Preservation Assn: Fdl Long Lake Pres. Ass. Mgmt Plan: Long Lake Preservation Association proposes to develop a comprehensive lake management plan including a harvesting plan for Long Lake, Fond du Lac County. The project elements and deliverables are specified in the Long Lake Aquatic Invasive Species grant application dated February 1, 2014. The project includes:
1. Provide for stakeholder participation and education by holding meetings and soliciting input via surveys.
2. Conducting at least 200 hours of boat landing watercraft inspections following CB/CW program.
3. Volunteer AIS surveillance monitoring with data entered in SWIMS.
4. Shoreland condition and coarse woody habitat assessment.
5. Watershed definition and phosphorus load modeling.
6. Water quality monitoring to assess lake condition.
7. Assess the aquatic plant community utilizing early-season and point-intercept surveys and aquatic plant community mapping.
8. Fisheries data integration into the final report.
9. Completion of a comprehensive lake management plan including a harvesting plan for Long Lake.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lowes Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lowes Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Lucas Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Lucas Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Malloy Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Malloy Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Mayfield Pond (Schwietzer)
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mayfield Pond (Schwietzer)
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
McConville Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
McConville Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Miller Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Miller Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Monches Millpond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Monches Millpond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Mud Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mud Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Mueller Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Mueller Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Murphy Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Murphy Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Newburg Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Newburg Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Paradise Valley Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Paradise Valley Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Pike Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Pike Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Proschinger Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Proschinger Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Quas Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Quas Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Radtke Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Radtke Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Rockfield Quarry Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Rockfield Quarry Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Schwietzer Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Schwietzer Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Smith Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Smith Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Tilly Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Tilly Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Unnamed
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Unnamed
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Wallace Lake
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Wallace Lake
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Aquatic Invasives Education
Date
5/1/2004
Waters Involved
Werner Pond
Status
Complete

Town Of Washington: Education Campaign To Collect Exotic Species At Boat Launch: The Town of Washington, in cooperation with the Eagle River Chain of Lake Association, is sponoring an education campaign on aquatic exotic species. This project includes the placement of signs, buckets, fenced in areas to store the buckets and designated collection areas at each of the 10 boat launch sites on the chain of lakes. The project also includes an education program including how to use the buckets to remove plant fragments from the lake, newsletters and news stories on aquaitc exotic species targeting lake users.

Project deliverables include:
* final report including a summary of the amount of public participation including fishing tournament participants;
* copies of newletters, newpaper articles and other media coverage.

The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2006
Waters Involved
Werner Pond
Status
Complete

Town Of Washington: Clean Boats Clean Waters Training: The Town of Washington is sponsoring an Aquatic Invasive Species Education, Prevention & Planning project which will focus on increasing AIS public awareness and preventing the introduction of AIS into Washington's lake through Clean Boat/CleanWaters training and watercraft inspections on township lakes.

Project activities include:
1) Host CB/CW training on June 22, 2006.
2) Recruit volunteers and implement a CB/CW program at 18 public landings
3) Develop aquatic plant monitoring teams on each lake
4) Entry of inspection forms 3200-120 onto Dept website by Inspectors
5) Develop one AIS educational outreach project by high school biology students
6) Design a traveling AIS educational exhibit

Project deliverables include:
- Completed entry of inspection forms 3200-120 onto Dept website
- Outreach Project
- AIS educational exhibit
- Final report (contents listed in section VI of proposal)

Specific conditions for this project:
- Final report needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of final report, photograph of AIS educational exhibit and summary of educational outreach project.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2016
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R District: Silver Lake Protection And Rehabilitation District 2016 Clean Boats Clean Waters: The Silver Lake Protection and Rehabilitation District is sponsoring a Clean Boats Clean Waters project in 2016 at one public boat landing on Silver Lake.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Alderley Millpond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Allis Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Allis Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Amy Bell Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Amy Bell Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Bark Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Bark Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Barton Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Barton Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Beaver Dam Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Beaver Dam Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Beaver Dam Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Beck Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Beck Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Boltonville Millpond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Boltonville Millpond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Brickyard Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Brickyard Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Cedar Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Cedar Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Chub Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Collins Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Crystal Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Crystal Spring
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Danville Millpond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Druid Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Druid Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Ehne Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Ehne Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Erler Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Erler Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1999
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Res-Forest Lake Milfoil Biocontrol Project: The Forest Lake Improvement Assn proposes to utilize biological control of the Eurasian Water Milfoil by using the native beetle, Euhrychiopsis lecontei (milfoil weevil). This control will consequently help to prevent the spreading of EWM into the 10 nearby lakes. The project will include quantitative data measurements of the EWM areas where the weevils will be introduced and will include milfoil stems/m2, and weevils/m2, stem heights and plant contions. The cultured weevils will be introduced into Forest Lake in the form of eggs and larvae attached to healthy disease-free milfoil cuttings in all infested milfoil areas. the results of the project will be published mid-term and annually and will be provided to all property owners on the lake, the Association, DNR and other grant sources. Information will also be disseminated via newsletters, meetings and press releases.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Fox Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Friess Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Friess Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Gilbert Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Gilbert Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Green Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Green Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Hartford Millpond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Hartford Millpond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Hasmer Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Hasmer Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Hawthorn Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Hawthorn Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Hickey Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Hickey Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Kekoskee Millpond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Keowns Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Keowns Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Kohlsville Millpond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Kohlsville Millpond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lake Emily
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lake Five
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lake Five
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lake Lenwood
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lake Lenwood
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lake Twelve
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lake Twelve
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lehner Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lehner Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lent Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lent Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Little Cedar Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Cedar Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Little Drickens Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Drickens Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Little Friess Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Little Friess Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lohr Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lohr Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lomira Pond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lost Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lowell Millpond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Lower Mayville Pond 174
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lowes Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lowes Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Lucas Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Lucas Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Malloy Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Malloy Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Mayfield Pond (Schwietzer)
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Mayfield Pond (Schwietzer)
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
McConville Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
McConville Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Miller Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Miller Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Monches Millpond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Monches Millpond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Mud Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Mud Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Mud Lake
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Mueller Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Mueller Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Murphy Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Murphy Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Neosho Mill Pond
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Newburg Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Newburg Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Paradise Valley Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Paradise Valley Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Pike Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Pike Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Proschinger Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Proschinger Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Quas Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Quas Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Radtke Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Radtke Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Rockfield Quarry Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Rockfield Quarry Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Schwietzer Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Schwietzer Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Sinissippi Lake (Hustisford)
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Smith Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Smith Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Theresa Marsh Flowage
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Tilly Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Tilly Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Un Spring
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Unnamed
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Unnamed
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Unnamed
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
8/1/2002
Waters Involved
Upper Mayville Millpond 172
Status
Complete

Dodge County: Lco-Dodge Co. Waterway Classification Project: Dodge County Planning & Development Department is interested in revising the Dodge County Shoreland Zoning Regulations and adopting a "waterway" classification system to better regulate and manage the county's water resources.

A full description of the project scope and project deliverables is available in the grant application, which is a part of this aggreement.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant appllication.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Wallace Lake
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Wallace Lake
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Lake Protection Grant
Date
7/1/1998
Waters Involved
Werner Pond
Status
Complete

Washington County: Lco-Ordinance/Lake Classification Project: Through this project Washington County will develop a waterbody classification system; review and revise shoreland-wetland and floodplain ordinances; and refine the ordinance provisions governing shorelands, wetlands and floodlands, incorporating the waterbody classification into them.


Grant Details
Lake Protection Grant
Date
9/1/2001
Waters Involved
Werner Pond
Status
Complete

Washington County: Lco-Lake Classification Project-Washington County: Phase 3 of Lake Classification Project. Public Hearing and Ordinance revision adoption for the lakes in Washington County. Dissemination of proposed ordinance changes to the other local units of government. Enforcement of revised zoning provisions related to shorelands, wetlands, and floodlands through current channels. Information to public of changes in Washington County codes by meetings, publicity, pamphlets, and brochures.

The DNR will be provided with both a paper copy and an electronic copy of the final report.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Alderley Millpond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Beaver Dam Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Chub Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Collins Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Crystal Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Crystal Spring
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Danville Millpond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
4/21/1993
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Management Planning: Conduct water quality monitoring in 1994-96. Prepare a watershed management plan which will include a watershed map location of septic systems, an estimate of sediment and nutrient loading to the lake, and recommendations for non-point pollution controlmeasures. Conduct an aquatic plant survey. Conduct an experiment involving the removal of Eurasian watermilfoil and planting of Najas.conduct an opinion survey of property owners on and around the lake.Information will be disseminated to the public by newsletter, local newspaper articles, public meetings, and report mailings.


Grant Details
Large Scale Lake Planning
Date
3/31/1995
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Eurasian Watermilfoil Elimination Study: Test the feasibility of using portable plant screens to eliminate Eurasian Milfoil islands. Information will be disseminated to the public by newsletter, public meetings, and summary report mailings.


Grant Details
Large Scale Lake Planning
Date
4/1/1996
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Eurasian Watermilfoil Eradication Study: The Forest Lake Improvement Association proposes to expand a research project involving submersible frame assemblies to eradicate Eurasian Watermilfoil. Project activities will include treatment of an area of Eurasian Watermilfoil followed by transplanting area treated with native aquatic plants. The project will include 400 hours of donated labor ($2,000) as part of the local cost share. A final report will be prepared detailing 1) the methodology used, including construction design, time required for execution, application of screen and plant units, transplanting methods, 2) results obtained, including pre and post treatment plant species and densities (stem density) on test plots, 3) site descriptions, including depth and sediment type in test plots, and 4) problems encountered and recommendations to improve the overall process. A paper copy and an electronic copy of the final report will be provided to the Department of Natural Resources. Information about the project's results will be disseminated to the public by newsletter, entire report mailing, and public meeting. end.


Grant Details
Large Scale Lake Planning
Date
4/1/2001
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake High Ph & Weevil Egg Stugy: The Forest Lake Improvement Association proposes to conduct an investigation as to whether sudden exposure of weevil eggs to elevated pH is the limiting factor preventing successful biological control of Eurasian Watermilfoil. The aquatic weevil Euhrychiopsis lecontei will be used. The project's goals will be to accurately measure pH levels in Forest Lake within all milfoil beds throughout the growing season; conduct lab analysis of lake water and milfoil plants; conduct lab cultures of weevils utilizing lake water and milfoil plants; and conduct weekly lab analysis of weevils in all life forms, after introduction into the lake. A final report of the project results will be submitted to all property owners on Forest Lake, the Association members, and the DNR. The gathered data and final report will also be provided in electronic form and on computer disc. Results will also be disseminated via newsletters, at meetings, and press releases.


Grant Details
Large Scale Lake Planning
Date
4/1/2004
Waters Involved
Forest Lake
Status
Complete

Forest Lake Improvement Association: Forest Lake Watershed & Lake Management Plan: The Forest Lake Improvement Assn proposes to conduct a project focused on developing a comprehensive appraisal and plan document, to include:

1. 2 year Water Quality appraisal via USGS procedure
2. An aquatic plant survey including mapping of EWM and ID of all species
3. Nutrient Budget including watershed modeling for P delivery
4. Lake sediment characterization
5. Community survey of shore owners and lake users
6. Prepare a final report (Lake Management Plan) .
Specific actions are identified within the original planning grant proposal


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Fox Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Kekoskee Millpond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Emily
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lomira Pond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
4/16/1992
Waters Involved
Long Lake
Status
Complete

Long Lake Fishing Club, Inc.: Long Lake Management Plan: Collect existing lake data and reports on lake. Incorporate recommendations of previouslu completed reports into a lake management plan.Information will be disseminated to the public by newsletter, local newspaper articles, summary report, and the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Long Lake
Status
Complete

Long Lake Fishing Club, Inc.: Long Lake Aquatic Plant Protection Study: The Long Lake Fishing Club proposes to study the effect of an extended no wake zone and no motor zones on protecting the aquatic plant community in Long Lake.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lost Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lowell Millpond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Lower Mayville Pond 174
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Mud Lake
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Neosho Mill Pond
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/18/1994
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R District: Silver Lake Management Planning: Identify citizen concerns and lake usage by a questionnaire survey of lake residents. Conduct water chemistry analysis, an aquatic plant survey, groundwater quality analysis and an inventory of sediment type and distribution. Assess lake usage and landusage and develop a lake management plan based on the information obtained in tasks listed above. The grantee will disseminate information to the public by newsletter, fact sheets, entire report mailings, and public meetings. Project results will bereposited at the Town of West Bend Town Hall and the West Bend Public Library.


Grant Details
Large Scale Lake Planning
Date
11/1/1999
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R District: Silver Lake Groundwater Investigation: Silver Lake Protection & Rehabilitation District proposes a groundwater study to determine if groundwater is contributing significantly to the sediment loading in Silver Lake. USGS will do the study with SEWRPC support. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.

Scope Change 10-31-03: With the above report from SEWRPC combine it with an Aquatic Plant Study and SEWRPC Memorandum Report No. 123 ( A Lake Protection & Recreation Use Plan for Silver Lake) into a new combined plan at no additional costs to the present grant.


Grant Details
Large Scale Lake Planning
Date
2/15/2015
Waters Involved
Silver Lake (Paradise Valley)
Status
Complete

Silver Lake P & R District: Lake Protection Plan For Silver Lake: The Silver Lake P&R District will hire a contractor to conduct a point intercept plant survey and update the aquatic plant management plan. The project deliverable will be a plan that contains the following elements: 1) Raw data from the plant survey (to be provided electronically) ; 2) maps showing the distribution and density of each aquatic plant found in the survey; 3) an updated aquatic plant management plan discussing chemical, manual harvesting and appropriate mechanical harvesting options; 4) watershed analysis; 5) ground-watershed analysis; 6) water quality assessment; 7) sediment depth mapping; 8) summary air photo with specific recommendations for watershed and ground-watershed projects and 9) a specific action plan to implement recommendations. Additional details regarding the project deliverables are outlined in section E of the project grant application. A draft report should be provided to the Department for review before finalizing the plan. Two paper copies and 1 electronic copy of the final plan should be provided to the Department upon project completion.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Sinissippi Lake (Hustisford)
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Theresa Marsh Flowage
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Un Spring
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Unnamed
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Upper Mayville Millpond 172
Status
Complete

Dodge County: Dodge County Lakes Survey: Dodge County will collect information utilizing a public survey questionnaire in order to determine public opinion about the waters in the county and to see if there is need to conduct a Waterway (Lake & Stream) Classification Project in the future.

A full description of project scope and deliverables is available in the grant application, which is part of this agreement. The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Small Scale Lake Planning
Date
4/1/2003
Waters Involved
Kettle Moraine Lake
Status
Complete

Kettle Moraine Lake Association: Kettle Moraine Lake Apm Study: The Kettle Moraine Lake Association proposes to conduct an aquatic plant appraisal and plan development with emphasis on the effects of a scheduled treatment of Eurasion Water Milfoil . This aquatic plant appraisal will include the following: Watershed overview; overview discussion of plant ecology; lake specific overview of practical techniques for plant managaement; issue, problems, and challenges; goals and objectives; strategy; plant mapping; information and education; plant surveys;and a contingency plan.

A final report will be provided both in hard copy form and electronic form. Refer to grant application and lake coordinator for further requirements.


Grant Details
Targeted Runoff - Urban Construction
Date
1/1/2002
Waters Involved
Milwaukee River
Status
Complete

City Of West Bend Engineering: Municipal Garage Snow Storage Lot: to provide 70% c-s for constructing a snow storage lot and wet detention pond at the Municipal Garage lot.


Grant Details
Urban Nonpoint - Stormwater Construction
Date
1/1/2002
Waters Involved
Quas Creek
Status
Complete

City Of West Bend Engineering: Quaas Creek Pollution Reduction Project: To cost-share @ 50% retrofit of dry pond to wet detention basin


Grant Details
River Planning Grant
Date
7/1/2006
Waters Involved
Milwaukee River
Status
Complete

Ozaukee Washington Land Trust: Communication, Outreach Planning & Development: The planning grant is to increase organizational capacity and improve their products and services. The mission is to protect, restore, and sustain the ecosystem in the watershed through funding and facilitation of a regional network of locally initiated projects. The river grant money will be used to market and develop long-term financial independence. Future funds will be used to supply grant money to other organizations for watershed improvements projects.

The DNR will be provided with two paper copies and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
River Planning Grant
Date
7/1/2002
Waters Involved
Quas Creek
Status
Complete

Washington County Lcd: Quass Creek Watershed Education Program: Washington County will assist in development of a new river organization. Funds will lead the effort to create a private, non-profit Quaas Creek Watershed Protection Group, either as a stand-alone entity or by expanding an existing non-profit group. Information and education efforts for pollution control and land use planning in the watershed will be the primary focus.
Scope change 9/17/02: The Washington County Land Conservation Dept. will coordinate the implementation of a Quass Creek Watershed Education Program. This education program is part of a larger Watershed Protection Plan being developed by an intergovernmental committee called the Quass Creek Watershed Protection Committee. Information and education efforts for pollution control and land use planning in the watershed will be the primary focus. As a result of the project and its success, Washington Co. will assist in the development of a new river organization.. Funds will lead the effort to create a private, non-profit Quass Creek Watershed Protection Group, either as a stand-alone entity or by expanding an existing non-profit group.
The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
East and West Branches Milwaukee River Watershed
Watershed Recommendations
Citizen-Based Stream Monitoring
 
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
4/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
 
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
4/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Hire County Aquatic Invasives Coordinator
 
Date
Status
Hire Aquatic Invasives (AIS) County Coordinator - Sheboygan
1/1/2011
Not Proposed
Projects
 
Hire County Aquatic Invasives Coordinator
 
Date
Status
Hire Aquatic Invasives (AIS) County Coordinator - Fond du Lac
1/1/2011
Not Proposed
Projects
 
Hire County Aquatic Invasives Coordinator
 
Date
Status
Hire Aquatic Invasives (AIS) County Coordinator - Ozaukee
1/1/2011
Not Proposed
Projects
 
Hire County Aquatic Invasives Coordinator
 
Date
Status
Hire Aquatic Invasives (AIS) County Coordinator - Dodge
1/1/2011
Not Proposed
Projects
 
Monitor Fish Tissue
Confirm FCA: IW listed from pre-year 2000 FCA data
Date
Status
11/7/2011
Proposed
 
Monitor Fish Tissue
Confirm FCA: IW listed from pre-year 2000 FCA data
Date
Status
10/24/2011
Proposed
 
Monitor Water Quality or Sediment
East Branch Milwaukee River Temp
Date
Status
More data collect, continuous monitoring, biology not showing impairment. AU: 5534185; ID: 10029682
5/1/2018
Proposed
 
Monitor Water Quality or Sediment
Milwaukee River TP
Date
Status
Category 5A. Biology is not being impacted based on data just upstream of this site. 2018 TP Results: May Exceed. Station: 10037390 AU: 481605.
1/1/2018
Proposed
 
Monitor Water Quality or Sediment
Kewaskum Creek TP
Date
Status
New Category 2 based on temperature. 2018 TP Results: may exceed. Station: 673125. AU: 10113.
1/1/2018
Proposed
 
Monitor Water Quality or Sediment
West Branch Milwaukee River
Date
Status
Monitor stream for temperature to confirm that it should not be listed.
5/1/2016
Proposed
 
Navigability Determination
 
Date
Status
NW S31 T14N R18E; West Branch Milw River, trib;
2/22/2005
Verify
Projects
 
TMDL Implementation
Cedar Creek & Milwaukee TMDL
Date
Status
Cedar Creek is a 28-mile, warm water stream that runs through Washington and Ozaukee Counties of Southeastern Wisconsin and flows into the Milwaukee River at river mile 28. The land use in the Cedar Creek Watershed is primarily rural including agriculture (49%), wetlands(16%), grasslands and forest (26%), while urban areas cover about 3.5% of the watershed (WDNR 2001). The Wisconsin Department of Natural Resources (WDNR) placed the first 5 miles of Cedar Creek upstream of the confluence with the Milwaukee River on Wisconsin’s.
3/25/2007
In Progress
Projects
 
Train Volunteers To Monitor Lakes for Invasive Species
 
Date
Status
7/28/2011
Proposed
Projects
 
Train Volunteers to Do Watercraft Inspections
 
Date
Status
7/28/2011
Proposed
Projects
 
East and West Branches Milwaukee River WatershedWatershed History Note

The Village of Kewaskum and the City of West Bend are located in the Watershed of the East and West Branches of the Milwaukee River. Before the arrival of European settlers in southeastern Wisconsin, the Potawatomi and Menominee Indians inhabited this area. The Village of Kewaskum was named for Chief Kewaskum of the Potowatomi tribe. In 1845, the Wisconsin Territorial Legislature authorized the building of a road to connect Fond du Lac and Milwaukee. Byron Kilbourn, one of the highway commissioners, and Jasper Vliet, a surveyor, were put in charge of determining the route the road would take and of identifying a good halfway point for travelers. The path they chose is now U.S. Route 45 and the rest stop is present-day West Bend. Because many people used the resting place, it evolved into a popular area. The Milwaukee River running through the town eventually played a major role in the city's history. It was because of the western bend in the river that West Bend got its name. The river also produced enough energy to power saw mills and gristmills. The railroad arrived in 1873, bringing with it more settlers and industrialization. At this time, West Bend saw a growth spurt, and in 1885 the city officially became an incorporated Wisconsin community. Today Kewaskum and West Bend are known at the Gateway to, and the Heart of, the Kettle Morraine State Forest.

Date  2011