Watershed - Upper Peshtigo River (GB11)
Upper Peshtigo River Watershed

Details

The Upper Peshtigo River Watershed extends from the headwaters of the Peshtigo River in central Forest County southeast to Caldron Falls Reservoir in western Marinette County. A very small portion of the watershed lies in northeastern Oconto County. Wetlands are abundant in the eastern and central parts of the watershed. Soils around Caldron Falls are excessively drained and sandy. Soils in the northern and eastern portions of the watershed are poorly drained. Two dams have been built on the Peshtigo River in the southern part of the watershed.

Date  1993

Ecological Landscapes for Upper Peshtigo River Watershed

Ecological Landscapes

The North Central Forest Ecological Landscape occupies much of the northern third of Wisconsin. Its landforms are characterized by end and ground moraines with some pitted outwash and bedrock controlled areas. Kettle depressions and steep ridges are found in the northern portion. Two prominent areas in this Ecological Landscape are the Penokee-Gogebic Iron Range in the north extending into Michigan, and Timm's Hill, the highest point in Wisconsin (1,951 feet) in the south. Soils consist of sandy loam, sand, and silts. The vegetation is mainly forest, with many wetlands and some agriculture, though the growing season is not as favorable as it is in southern Wisconsin. Lake Superior greatly influences the northern portion of the Ecological Landscape especially during the winter season, producing greater snowfall than in most areas in Wisconsin. The historic vegetation was primarily hemlock-hardwood forest dominated by hemlock, sugar maple, and yellow birch. There were some smaller areas of white and red pine forest scattered throughout the Ecological Landscape, and individual white pines trees were a component of the hemlock-hardwood forest. Harvesting hemlock to support the tanneries was common at the turn of the century, and the species soon became a minor component of forests due to over-harvesting and lack of regeneration. Currently, forests cover approximately 80% of this Ecological Landscape. The northern hardwood forest is dominant, made up of sugar maple, basswood, and red maple, and also including some scattered hemlock and white pine pockets within stands. The aspen-birch forest type group is also relatively abundant, followed by spruce-fir. A variety of wetland community types also are present, both forested and non-forested.

Date  2010

Watershed Documents
Watershed Grants
Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bear Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Binder Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Birch Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Bullfrog Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Caldron Falls Reservoir*
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Chain Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Crab Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Forbes Spring
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hickey Springs
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Hidden Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lackawanna Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lake John
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Lincoln Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Little Bear Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Long Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Miriam Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Munger Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Pine Ridge Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sellin Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Sullivan Springs
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring - Fish Hatchery
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Un Spring -Fish Hatchery
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Unnamed
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Waubee Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Lake Protection Grant
Date
9/1/1998
Waters Involved
Wheeler Lake
Status
Complete

Town Of Lakewood: Lco-Town Of Lakewood Class/Ordinance Project: The Town of Lakewood proposes to conduct a county-wide lake classification and ordinance study. The project will be used as a component in the larger land use planning process to create a set of recommended ordinances, or recommended amendments to existing ordinances for better protection of county lake resources.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Armstrong Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Armstrong Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Bear Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Bear Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Bear Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Bear Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Big Cub Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Big Cub Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Bradley Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Brock Pond
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Bug Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Camp B Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Camp Six Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Camp Six Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Catwillow Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Catwillow Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Clark Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Coldwater Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Coldwater Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Coleman Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Crooked Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
DAmour Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Devils Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Donut Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Duck Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Dvorak Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Eds Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Goodman Millpond
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Goose Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Goose Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Ground Hemlock Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Halley Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Halley Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Harvey Pond
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Hilbert Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Hobachee Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Horseshoe Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Indian Springs
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Kazmier Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Kazmier Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Kokots Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Kokots Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
LaFaye Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lake Lucerne
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lily Pad Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Cub Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Little Cub Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lost Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Lost Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Metonga Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Michigan Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Michigan Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Mirror Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Moon Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Nadjak Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
North Pond
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Oneonta Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Otter Springs
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Peshtigo Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Peshtigo River
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Peshtigo River
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Petryk Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Porcupine Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Pothole Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Railroad Pond
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Rat River
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Rat River
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Revolver Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Revolver Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Rock Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Rock Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Round Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Second Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Shabodock Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Shabodock Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Shabodock Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Shabodock Lake
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Skunk Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Spencer Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Spencer Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Spring Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Stoney Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Stoney Creek
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Tee Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Trout Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Un Spring
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Un Spring
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Un Spring
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Un Spring
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Unnamed
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Unnamed
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Unnamed
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake Forest County, Phase 6: The Town of Blackwell is sponsoring a phased large scale lake planning grant project to study Bear Lake in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 6 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Crayfish and aquatic plant monitoring; 6) Develop LMP.

Project deliverables include: 1) Water chemistry, algae, crayfish, and aquatic plant data; 2) Hydrologic and Phosphorous budget; 3) LMP.

Specific conditions for this project: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality, algae sampling, and crayfish and aquatic plant monitoring, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2011
Waters Involved
Unnamed
Status
Complete

Town Of Blackwell: Algal & Water Quality Assessment & Aquatic Plant Survey For Bear Lake, Forest Co., Phase 5: The Town of Blackwell is sponsoring phased large scale lake planning grant project to study Bear Lake, in Forest County. Phases 1 and 2 were funded during the February 2010 grant cycle, phases 3 and 4 were funded in August 2010, and Phases 5 and 6 were funded in February 2011. Project partners include the US Forest Service and UW-Stevens Point. The project will focus on developing a Lake Management Plan (LMP) for Bear Lake.

Phase 5 project activities include: 1) Algal assessment; 2) Information and education activities and planning meetings; 3) Water quality sampling and analysis; 4) Develop hydrologic and phosphorous budget; 5) Develop LMP.

Project deliverables include: Water chemistry and algae data.

Specific project conditions: LMP needs Dept review and approval.

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) copy of LMP, data from water quality and algae sampling, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Vic Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Woods Lake
Status
Complete

Town Of Goodman: Town Of Goodman Lake & Land Management Plan: The Town of Goodman proposes a project as the first step in the development of a comprehensive plan for land use for the Town of Goodman. It will be used as a pilot project that will be applied to similar lakes in Marinette County that have a low rate of second home development and that are located in areas that are very rural in nature. This project will collect and assess the types of social, physical and regulatory data that are available for the lakes and their watersheds. The project will identify deficiencies in data and make recommendations for additional data collection that will be the subject of future grant app,ications.


Grant Details
Large Scale Lake Planning
Date
4/1/1999
Waters Involved
Wyman Lake
Status
Complete

Town Of Lincoln: Town Of Lincoln - Forest Co. Waterr Quality & Land Use Plan: The Town of Lincoln is undertaking a town-wide land use and water quality planning initiative. The Land Use and Water Qualtiy Management Plan to be developed will consist of two components (a Poster Plan and a Resource Document) intended to guide Town growth and establish future ordinances and regualtions to properly manage land use and water quality within the Town.

Project deliverables include a Land Use and Water Quality Management Poster Plan, a Land Use and Water Qualtiy Management Plan Resource Document, and Maps.

A copy of the plan and maps will be provided to the Department along with an electronic copy of the plan.


Grant Details
River Planning Grant
Date
7/1/2009
Waters Involved
South Branch Peshtigo River
Status
Complete

Northwoods Land Trust, Inc.: Forest County River Conservation Project: Northwood\2019s Land Trust, Inc. proposes to conduct a direct mail education campaign with all property owners on the priority river and stream segments in Forest County that were identified by the DNR Northern Rivers Initiative. An information packet will be provided highlighting voluntary conservation options those property owners can utilize to protect the priority stream corridors. Those options include conservation easements, land donation, land registry and conservation buyer programs. Individual on site property assessments and conservation planning will be conducted with any landowners who express interest.

The project includes the following goals: 1) Direct mail information packets describing voluntary conservation options private landowners can utilize to protect their properties. This information will include how the options can protect land while also providing income, estate and other tax benefits to landowners. The mailing will include all private property owners with at least 500 feet of natural shoreline on these priority river segments; 2) Conduct on-site follow-up contacts with interested landowners as generated by mailing and media publicity; 3) Encourage interested landowners to voluntarily enter into perpetual land protection agreements or utilize other land protection tools to protect their priority river/stream segments.

Project deliverables include: 1) Copies of color GIS maps of each of the towns with digitized parcel maps will be provided to illustrate the parcels/landowners identified within 500 + feet of existing natural shoreline frontage; 2) A generalized listing of Forest County landowner follow-up contacts by program type will be provided.

The WDNR will be provided electronic and hard copies of all data and or reports/plans generated as a result of this project.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Upper Peshtigo River Watershed
Watershed Recommendations
Hire County Aquatic Invasives Coordinator
 
Date
Status
Hire Aquatic Invasives (AIS) County Coordinator - Oconto
1/1/2011
Not Proposed
Projects
 
Upper Peshtigo River WatershedWatershed History Note

The Towns of Argonne, Armstrong Creek and Blackwell are located in the Upper Peshtigo River Watershed in Forest County. The Town of Argonne experienced the same pattern of growth as many other northern Wisconsin communities. First, the lumberjacks came, then small businesses opened in the area to support the logging industry, then the railroad came, which allowed for greater services in the community and a wider connection to the outside world. The Town of Argonne had many names before Argonne was chosen in 1921 as a result of the patriotic fervor after the World War I Battle of Argonne in eastern France. The Town of Armstrong Creek received an influx of settlers in the early 1900s when the Grimmer Land Company published ads in the Chicago and Pittsburgh area newspapers, targeting Polish immigrants. These settlers brought much of their culture, such as dance, food and crafts to the northwoods and Polish Heritage Days are still celebrated today. The Town of Blackwell once had 800 - 1000 residents, many of whom worked for the Flanner family in the hardwood mill. The Flanner home, one of the finest in northern Wisconsin, had a walnut paneled living and dining room, birds eye maple flooring, and several fieldstone fireplaces. Today this home is still in use as a nursing home. Blackwell is also home to the Blackwell Civilian Conservation Job Corps Center, which recently participated in the restoration project for the Red Bridge, a historic red steel "Pratt pony truss" design which was constructed in 1908. It replaced an earlier wooden bridge that served as a stream crossing along Old 101 Road, originally a 19th century wagon trail connecting the city of Shawano with logging camps and mines to the north.

Date  2011