Watershed - Fourteenmile Creek (CW07)
Fourteenmile Creek Watershed

Details

The Fourteen-mile Watershed is located in Adams, Wood, Portage and Waushara counties. A large portion of this area is referred to as the Leola Marsh. This area at one time was an extensive wetland that was ditched and drained for agricultural activities. There are several cranberry farms located in the watershed that utilize water for their operation. Water drawn from ditches reduces stream flow, decreases adult fish cover, reduces spawning areas for trout and likely exposes fish redds, and may result in an increase of water temperatures. Discharges from cranberry marshes can adversely affect water temperatures, deposit sediment, and release nutrients to the ditches. Periodic impounding of the ditches to flood marshes may prevent fish migration, increase water temperatures and de-water downstream reaches. This watershed was ranked using the Nonpoint Source Priority Selection Criteria. Based on surface and ground water data, the overall ranking is medium. This overall ranking establishes the watershed as a medium priority for future grant eligibility through the Nonpoint Source Program. The Adams County Soil Erosion Control plan identified the town of Leola as highest priority for conservation work to control wind erosion. This town is in the upper Fourteenmile Creek Watershed. Intense irrigation farming also occurs in the watershed leading to stream impacts from pesticides/herbicides and nutrients (Schultz). Many of the creeks have also been ditched for wetland drainage (Schultz).

Date  2002

Population, Land Use

The watershed mainly consists of farm fields and large parcels of grassland. Prairie chickens, an endangered species of Wisconsin, utilize grasslands, which need constant disturbance. These disturbances include prescribed burns, cuttings and summer cattle grazing. The large tracts of land are set-aside in Fourteenmile Creek watershed for maintaining grassland habitat which are state and partnership owned for the sole purpose of maintaining a prairie land habitat. Golden Sands Resource Conservation and Development Planning Agency studied wind erosion impacts on water quality in the watershed. The study found that wind eroded soil from agricultural crop fields is a source of sediment, nutrients and pesticides to surface waters in the watershed. Much of the agricultural activity includes potato and processing vegetable production. Typically, these farming activities result in smooth, flat seedbeds that are free of residues and are susceptible to wind erosion. Winter, late fall, and early spring are critical wind erosion periods. Wind erosion removes nutrient rich soils from fields depositing them into the ditches which increases sediment and nutrient loading to downstream lakes. The study recommends several practices that could be installed to protect the soils from being eroded by wind and thereby protect surface water quality. Some of these practices include; crop rotation, conservation tillage, cover crops, field wind breaks, nutrient management, pest management, crop residue management and wind barriers. These practices and others are explained further in the final report titled Wind Erosion Impacts on Water Quality in the Sand Plain of Central Wisconsin, 1993.

Date  2002

Ecological Landscapes for Fourteenmile Creek Watershed

Ecological Landscapes

The Fourteen Mile Creek Watershed is located primarily in the Central Sand Plains Ecological Landscape which is located in central Wisconsin, occurs on a flat, sandy lake plain, and supports agriculture, forestry, recreation, and wildlife management. The Ecological Landscape formed in and around what was once Glacial Lake Wisconsin, which contained glacial meltwater extending over 1.1 million acres at its highest stage. Soils are primarily sandy lake deposits, some with silt-loam loess caps. Sandstone buttes carved by rapid drainage of the glacial lake, or by wave action when they existed as islands in the lake, are distinctive features of this landscape. The historic vegetation of the area included extensive wetlands of many types, including open bogs, shrub swamps, and sedge meadows. Prairies, oak forests, savannas and barrens also occurred in the Ecological Landscape. An area of more mesic forest with white pine and hemlock was found in the northwest portion, including a significant pinery in eastern Jackson County. Today, nearly half of the Ecological Landscape is nonforested, in agriculture and grassland. Most of the historic wetlands were drained early in the 1900s and are now used for vegetable cropping. The forested portion is mostly oak-dominated forest, followed by aspen and pines. A minor portion is maple-basswood forest and lowland hardwoods.

Date  2010

Hydrologic Features

Much of the upper portion of the watershed has been ditched in the early 1900's for drainage of the land. The Drainage District continues to provide maintenance dredging in order to remove sediment and vegetation from the channel. According to the District, this practice promotes improved drainage of the adjacent agricultural fields. A recent decision by DATCAP requires maintenance dredging to go no deeper than the approved profile. The Department supports this because over-dredging removes critical in-stream habitat for trout and other aquatic organisms, creates deep, low velocity pools, increases sedimentation, increases in-stream habitat recovery time and reduces potential spawning areas. Fluctuating water levels and heavy siltation have reduced the trout population in the ditches. High nitrate values and streambank pasturing (sedimentation) can cause water quality problems in some of the streams in the watershed.

Date  2002

Watershed Documents
Watershed Grants
Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Tri-Lakes Signs: The Tri-Lakes Management District proposes to purchase and install signs promoting Clean Boats, Clean Water practices at the seven public boat landings on Arrowhead, Camelot and Sherwood Lakes in Adams County to help prevent the spread of aquatic invasive species.


Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Camelot Lake
Status
In_Progress

Tri-Lakes Management District: Tri-Lakes Cbcw, Monitoring 11-12: Tri-Lakes Management District proposes to continue its Clean Boats, Clean Water (CBCW) outreach and volunteer monitoring program on Camelot, Sherwood and Arrowhead lakes in Adams County. Major project elements to include: a) Funding for 2 summer interns, b) SLOH water analysis, c) UWSP water sampling and analysis, d) CBCW supplies.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Ais: The Tri-Lakes District proposes to continue Clean Boats Clean Waters activities, and water quality and aquatic invasives monitoring on Camelot, Sherwood, and Arrowhead lakes in Adams County. Major project elements to include: a) CBCW and AIS monitoring, b) water quality monitoring and testing, c) aquatic plant sampling, d) Purple Loosetrife control, e) education and outreach.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Signs: The Tri-Lakes Management District proposes to purchase and install signs promoting Clean Boats, Clean Water practices at the seven public boat landings on Arrowhead, Camelot and Sherwood Lakes in Adams County to help prevent the spread of aquatic invasive species.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, H20 Quality: The Tri-Lakes Management District proposes to hire two interns during the summer months to conduct Clean Boats Clean Waters activities on Camelot, Sherwood and Arrowhead Lakes in Adams County. Major project elements to include: 1) monitoring landings for removal of invasives, 2) distribution, collection and processing of zebra mussel substrate sampler platforms, 3) collection of aquatic plant samples for phosphorus level determination.


Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Water Quality: The Tri-Lakes Management District proposes to hire two interns to conduct Clean Boats, Clean Waters (CBCW) monitoring and outreach and water quality sampling on Arrowhead, Camelot and Sherwood lakes in Adams County. Major project elements to include: 1) Intern wages and benefits, 2) Per Diem allowances, 3) CBCW materials, 4) Sample materials and analysis.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Signs: The Tri-Lakes Management District proposes to purchase and install signs promoting Clean Boats, Clean Water practices at the seven public boat landings on Arrowhead, Camelot and Sherwood Lakes in Adams County to help prevent the spread of aquatic invasive species.


Grant Details
Aquatic Invasives Education
Date
10/1/2008
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, H20 Quality: The Tri-Lakes Management District proposes to hire two interns during the summer months to conduct Clean Boats Clean Waters activities on Camelot, Sherwood and Arrowhead Lakes in Adams County. Major project elements to include: 1) monitoring landings for removal of invasives, 2) distribution, collection and processing of zebra mussel substrate sampler platforms, 3) collection of aquatic plant samples for phosphorus level determination.


Grant Details
Aquatic Invasives Education
Date
10/1/2009
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Water Quality: The Tri-Lakes Management District proposes to hire two interns to conduct Clean Boats, Clean Waters (CBCW) monitoring and outreach and water quality sampling on Arrowhead, Camelot and Sherwood lakes in Adams County. Major project elements to include: 1) Intern wages and benefits, 2) Per Diem allowances, 3) CBCW materials, 4) Sample materials and analysis.


Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Lake Arrowhead
Status
In_Progress

Tri-Lakes Management District: Tri-Lakes Cbcw, Monitoring 11-12: Tri-Lakes Management District proposes to continue its Clean Boats, Clean Water (CBCW) outreach and volunteer monitoring program on Camelot, Sherwood and Arrowhead lakes in Adams County. Major project elements to include: a) Funding for 2 summer interns, b) SLOH water analysis, c) UWSP water sampling and analysis, d) CBCW supplies.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Ais: The Tri-Lakes District proposes to continue Clean Boats Clean Waters activities, and water quality and aquatic invasives monitoring on Camelot, Sherwood, and Arrowhead lakes in Adams County. Major project elements to include: a) CBCW and AIS monitoring, b) water quality monitoring and testing, c) aquatic plant sampling, d) Purple Loosetrife control, e) education and outreach.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
4/1/2008
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes Signs: The Tri-Lakes Management District proposes to purchase and install signs promoting Clean Boats, Clean Water practices at the seven public boat landings on Arrowhead, Camelot and Sherwood Lakes in Adams County to help prevent the spread of aquatic invasive species.


Grant Details
Aquatic Invasives Education
Date
4/1/2011
Waters Involved
Lake Sherwood
Status
In_Progress

Tri-Lakes Management District: Tri-Lakes Cbcw, Monitoring 11-12: Tri-Lakes Management District proposes to continue its Clean Boats, Clean Water (CBCW) outreach and volunteer monitoring program on Camelot, Sherwood and Arrowhead lakes in Adams County. Major project elements to include: a) Funding for 2 summer interns, b) SLOH water analysis, c) UWSP water sampling and analysis, d) CBCW supplies.


Grant Details
Aquatic Invasives Education
Date
10/1/2012
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Ais: The Tri-Lakes District proposes to continue Clean Boats Clean Waters activities, and water quality and aquatic invasives monitoring on Camelot, Sherwood, and Arrowhead lakes in Adams County. Major project elements to include: a) CBCW and AIS monitoring, b) water quality monitoring and testing, c) aquatic plant sampling, d) Purple Loosetrife control, e) education and outreach.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams Ais Specialist: Adams County proposes to fund a full-time Aquatic Invasive Species Specialist position within its Land and Water Conservation Dept. for the purpose of providing educational and technical assistance to the public and lake organizations seeking to prevent and control AIS infestations in Adams County Lakes. Major project elements to include: 1) Establishment of Clean Boats, Clean Waters program on 22 lakes, 2) Establishment of AIS monitoring program for 22 lakes, 3) Providing assistance in implementation of AIS education and control elements of individual lake management plans.


Grant Details
Aquatic Invasives Education
Date
4/1/2014
Waters Involved
Unnamed
Status
Complete

Adams County: Adams Ais Spec. 5: Adams Co. LWCD proposes to continue providing AIS coordination for lakes and other waterways within the county. Major project elements to include: a) AIS control plan development, b) coordination of citizen monitoring and CBCW activities, c) aquatic plant surveys, d) biological control, e) AIS treatment residue testing, and f) final report.


Grant Details
Aquatic Invasives Education
Date
10/1/2006
Waters Involved
Wisconsin River
Status
Complete

Adams County: Adams Ais Specialist: Adams County proposes to fund a full-time Aquatic Invasive Species Specialist position within its Land and Water Conservation Dept. for the purpose of providing educational and technical assistance to the public and lake organizations seeking to prevent and control AIS infestations in Adams County Lakes. Major project elements to include: 1) Establishment of Clean Boats, Clean Waters program on 22 lakes, 2) Establishment of AIS monitoring program for 22 lakes, 3) Providing assistance in implementation of AIS education and control elements of individual lake management plans.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Castle Rock Lake
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Petenwell & Castle Rock Flowages: The Golden Sands RC&D is sponsoring a 2015 Clean Boats Clean Water project including 4 public landings on the Petenwell and Castle Rock Flowages.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Petenwell Lake
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Petenwell & Castle Rock Flowages: The Golden Sands RC&D is sponsoring a 2015 Clean Boats Clean Water project including 4 public landings on the Petenwell and Castle Rock Flowages.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2017
Waters Involved
Unnamed
Status
Complete

Tri-Lakes Management District: Tri-Lakes Management District 2017 Cbcw: Tri-Lakes Management District is sponsoring a Clean Boats Clean Waters project in 2017 at 3 single public boat landings and 0 public boat landing pairs on ARROWHEAD, CAMELOT, SHERWOOD.


Grant Details
Clean Boats, Clean Waters
Date
2/15/2015
Waters Involved
Wisconsin River
Status
Complete

Golden Sands Rc&D: Golden Sands Rc&D Petenwell & Castle Rock Flowages: The Golden Sands RC&D is sponsoring a 2015 Clean Boats Clean Water project including 4 public landings on the Petenwell and Castle Rock Flowages.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Amey Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Camelot Lake
Status
Complete

Adams County: Res-Camelot Lake Restoration: Adams Co. proposes to establish four shoreline protection/restoration sites for demonstration purposes on Camelot Lake, and to cost share on similar practices on 27 privately owned parcels. Major project elements include: 1) riprap and anchored log shoreline stabalization, 2) establishment and maintenance of 35' vegetated buffer strips, 3) stormwater management planning and implementation for structures.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Ditch
Status
Complete

Adams County Planning And Zoning: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Lake
Status
Complete

Adams County Planning And Zoning: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Castle Rock Lake
Status
Proposed

Adams County Planning And Zoning: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Chester Creek
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Crooked Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Deep Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Easton Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fawn Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fenner Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Res-Camelot Lake Restoration: Adams Co. proposes to establish four shoreline protection/restoration sites for demonstration purposes on Camelot Lake, and to cost share on similar practices on 27 privately owned parcels. Major project elements include: 1) riprap and anchored log shoreline stabalization, 2) establishment and maintenance of 35' vegetated buffer strips, 3) stormwater management planning and implementation for structures.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Res-Arrowhead Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Arrowhead lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Lupine seed to be purchased from Wild Seed Nursery for Karner Blue compatibility. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.



Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Fourteenmile Creek
Status
Complete

Adams County Planning & Zoning: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.

Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Friendship Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Goose Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Hill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Jordan Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Res-Arrowhead Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on Arrowhead lake. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation of individual stormwater management plans.

Special Conditions: 1) Lupine seed to be purchased from Wild Seed Nursery for Karner Blue compatibility. 2) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2010
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Lco-Shoreland Ordinance Rev.: Adams County proposes to amend or create a shoreland zoning ordinance that complies with the requirements of NR 115, Wisconsin Administrative Code (as revised effective February 1, 2010) and retain existing regulations that exceed the water resource protections of NR 115 or are specific or unique to local needs.

Project deliverables include: 1. Copies of any fact sheets or handouts created for public hearings. 2. A summary of the comments received at public hearings. 3. A certified copy of the County Board-approved updated shoreland ordinance or ordinance language (if integrated into other codes). 4. Any GIS maps of the shoreland zone or shoreland condition surveys related to the project.

Specific conditions for this Project: 1. The WDNR will be provided electronic and hard copies of all data and or reports or surveys generated as a result of this project.



Grant Details
Lake Protection Grant
Date
9/1/2013
Waters Involved
Lake Arrowhead
Status
Complete

Adams County Planning & Zoning: Lmi-Tri-Lakes Nutrient Mgmt. Plan: Adams County proposes to develop nutrient management plans for 4,470 acres of crop land within the Tri-Lakes Watershed. Major project elements to include: a) outreach to landowners, b) development of nutrient management plans, c) weekly water sampling, d) water quality analysis, and e) cost share payments.

Amended 1/22/15 to include installation of wind breaks, filter streps, residue and tillage management, and planting cover crops.


Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Lake Huron
Status
Complete

Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.


Grant Details
Lake Protection Grant
Date
3/15/1994
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Lakes Camelot/Sherwood Shoreland Zoning Audit: Adams County proposes to conduct a shoreline zoning audit of Lakes Camelot and Sherwood for the purposes of identification of suspected violations of the Adams County shoreline protection ordinance, establsihment of a current record of all current shoreland uses, and establishing a baseline for the assessment of the effectiveness of permitting and enforcement processes. Project activities will include the location and diagramming of structures within 75 feet of the ordinary highway mark, follow-up questionnaires, file review and the development of a public education on the importance of the shoreline protection ordinance.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Little Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
7/1/2011
Waters Involved
Long Lake
Status
Complete

Waushara County: Lco-Waushara County Lakes Study And Plan (Group A Lakes): Phase Two of this Lake Planning study will involve up to seventeen Waushara County lakes (Group A) : Alpine Lake, Beans Lake, Bughs Lake, Curtis Lake, Deer Lake, Fish Lake, Little Hills Lake, Irogami Lake, Lake Huron, Long Lake, Marl Lake, Pine Lake, Pleasant Lake, Silver Lake, West Branch Mill P.(White River), White River Fl (Lower Pond), Witters Lake. The goals are to characterize the existing aquatic plant communities, characterize existing water quality, develop tools for relating lake water quality to land use, predict sensitivity of water and habitat quality to future changes in land use, identify critical landscape features, provide a practical summary of these results for use by citizens and county staff, and characterize and map levels of shoreline development and determine any relationships between development and wildlife communities.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Mason Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McCall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McDougall Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Parker Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Patrick Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/10/1997
Waters Involved
Petenwell Lake
Status
Complete

Golden Sands: Lmi-Petenwell Flowage Water Quality Monitoring: Golden Sands Resource Conservation and Development Council, Inc. proposes to complete the second year of funding for water quality modeling of the Petenwell Flowage. The models being used in applying the methodology on Petenwell Flowage include: 1) the Flux Reservoir loading Model, 2) Profile Model, 3) Bathtub Model. Implementation of this plan will provide information on the following: 1) water/nutrient budget for the Petenwell Flowage, 2) sources of nutrients, 3) effects of nutrient reduction, and 4) prediction of the total maximum daily loads necessary to reach desired target nutrient levels. A working Model will be provided as well as a finel report will be available for interested parties.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Petenwell Lake
Status
Complete

Adams County Planning And Zoning: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Petenwell Lake
Status
Proposed

Adams County Planning And Zoning: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Rollers Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Silver Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Twin Lakes
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Unnamed
Status
Complete

Adams County: Res-Camelot Lake Restoration: Adams Co. proposes to establish four shoreline protection/restoration sites for demonstration purposes on Camelot Lake, and to cost share on similar practices on 27 privately owned parcels. Major project elements include: 1) riprap and anchored log shoreline stabalization, 2) establishment and maintenance of 35' vegetated buffer strips, 3) stormwater management planning and implementation for structures.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Unnamed
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
9/1/2006
Waters Involved
Wisconsin River
Status
Complete

Adams County: Res-Petenwell Restoration: Adams County proposes to provide up to 75% of the cost of shoreland restoration practices to lake front property owners on the Petenwell Flowage. Grant funds will be distributed to fund removal of sea walls, minor bank re-shaping, placement of rip-rap, establishment of vegetative buffers and implementation if individual stormwater management plans.

Special Conditions: 1) Lupine seed to be wild for compatibility with Karner Blues. 2) Soil to be filled in between rip-rap to facilitate turtle hatchlings access to water. 3) Permits to be secured by individual property owners prior to construction.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Wisconsin River
Status
Complete

Adams County Planning And Zoning: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
10/1/2013
Waters Involved
Wisconsin River
Status
Proposed

Adams County Planning And Zoning: Res-Adams Ord. Imp. 2: Adams County proposes to provide educational and technical assistance to the public and Adams County lake organizations for the installation of shoreline buffers on waterways so they comply with the Admas County Shorland, Wetland, and Habitat Protection Ordinance. Major project elements to include: a) outreach and education, b) review of plans, designs, and maintenance agreements, c) development of plans, designs, and agreements, d) inventory of public access points on all project waterways. Project will include notification of riparian property whose property is in conformance with the buffer standard and that the buffer must stay in compliance with the buffer standard. Signed maintenance agreements must be kept on record by Adams County.


Grant Details
Lake Protection Grant
Date
9/1/2003
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Classification - Phase 1: Adams County proposes to initiate a Lakes Classification effort to assist in comprehensive plan development for communities surrounding its lakes with public access. Phase 1 elements, to be funded with this grant, include: 1) delination of surface watersheds and flow patterns, 2) delineation of ground watersheds, 3) identification and mapping of land uses, 4) inventory and mapping of shoreline erosion and development problems, 5) identification and mapping of sensitive/critical areas and natural heritage habitats, 6) verification of wetland delineations, 7) delineations of lake watersheds, 8) development of lake maps.

DNR will be provided with both hard copy and electronic versions of a final report on this project. Results will be shared with partner agencies, town boards, lake districts and associations and members of the public through public meetings, individual lake summaries, a powerpoint presentation and development of a Lakes Protection Plan. Copies ofthe final report will also be made available to local libraries.


Grant Details
Lake Protection Grant
Date
9/1/2004
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co. Lakes Class Phase 2: Adams County proposes to continue it's lake classification efforts through collecting and assessing chemical and biological data on all lakes within the county that afford public access. Major project componants to include: 1) collection and assessment of chemical and biological data, 2) development of a "library" of information for public use, 3) development of management recommendations, 4) I&E for riparians and lake users.


Grant Details
Lake Protection Grant
Date
9/1/2005
Waters Involved
Wolf Lake
Status
Complete

Adams County: Lco-Adams Co Lakes Class - Phase 3: Adams County proposes to wrap up its county-wide lake classification effort. Major project elements to include: 1) completion of water sampling, 2) development of lakes classification report and individual lake summaries, 3) development of a powerpoint presentation, 4) four public meetings, 5) expansion of shoreline restoration packet.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Amey Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
10/1/1997
Waters Involved
Camelot Lake
Status
Complete

Town Of Rome: Camelot Lake - Tri Lakes Sanitary Survey: The Town of Rome proposes to complete a sanitary survey on Lake Camelot in cooperation with the Tri-Lakes Management District and Adams County. The project activities include: 1) Compile data on existing septic systems, 2) assess septic systems impact on Camelot Lake's water quality, 3) assess alternatives, 4) work with all governmental units to develop management strategies including new possible town sanitary district. The Department of Natural Resources will be provided with both a paper copy and an electronic copy of the final report. The project results will be dissemeinated to the public by newsletter and, public meeting(s), local radio/TV promotions and local newspaper articles. A final comprehensive management plan will be completed and available to the public for review.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Camelot Lake
Status
Complete

Town Of Rome: Lake Camelot Hydro Budget/Nutrient Load: The Town of Rome proposes to contract with the Army Corps of Engineers to conduct a limnological assessment of Arrowhead, Camelot, and Sherwood Lakes (Tri-Lakes Region, 14 Mile Creek Watershed), with federal costsharing to cover approximately 40% of total project costs. Major project elements to include: 1) Flow monitoring to establish hydrological budget, 2) Water, aquatic plant and sediment sampling to assess nutrient loading, 3) Groundwater inflow-outflow study, 4) Toxics monitoring, and 5) development of a Comprehensive Management Plan. The Department of Natural Resources will be provided both written and electronic copies of the reports generated. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and broad public distribution of the Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Camelot Lake
Status
Complete

Town Of Rome: Lake Camelot Complete Groundwater Study: The Town of Rome proposes to study groundwater inflow and outflow associated Adams County's Tri-Lakes through monitoring on Lake Camelot. Project activities would include: 1) Minipiezometer sampling, 2) lab analysis, and 3) completion of maps and reports. The Department of Natural Resources will be provided both a paper and electronic copy of the final report. Project results will be disseminated through newsletter mailings, distribution of a fact sheet, public meetings, local newspaper articles and development of a Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Camelot Lake
Status
Complete

Town Of Rome: Lake Camelot Toxics Study/Monitoring: The Town of Rome proposes to investigate the presence of toxins in the water and sediments of Adams County's Tri-Lakes through studies conducted on Lake Camelot. Project activities would include: 1) sediment and water sampling, 2) sample analysis, and 3) summarization of data for inclusion in Tri-Lakes grant series final report and Comprehensive Management Plan. The Department of Natural Resources will be provided both paper and electronic copies of the report. Project results will be disseminated through newsletter mailings, fact sheet distribution, public meetings, local newspaper articles and development of a Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Castle Rock Ditch
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Crooked Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Cruson Slough
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Deep Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Easton Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fawn Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Fenner Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Friendship Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Goose Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Hill Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Jordan Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/2/1991
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Lake Arrowhead Water & Nutrient Budgets And Management Plan: WATER BUDGET TO BE DETERMINED BY SAMPLING STATION SETUP, GROUNDWATER INFLOW ESTIMATE, NYDRAULIC CONDUCTIVITY TO BE INVESTIGATED, WEEKLY RAINFALL AND EVAPORATION DATA WILL BE COLLECTED. SEASONAL NUTRIENT BUDGET WILL BE ESTABLISHED. WATER GAIN AND LOSS FOR THE LAKES WILL BE CALCULATED. MANAGEMENT PLAN WILL BE DEVELOPED AND DISSEMINATED.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Lake Arrowhead
Status
Complete

Town Of Rome: Lake Arrowhead Sanitary Survey: The Town of Rome proposes to complete the following sanitary survey activies, in cooperation with the Tri-Lakes Management District, and Adams County, on the area adjacent to Lake Arrowhead; 1) Compile exsisting data on the septic systems. 2) Assess septic systems impact on the watershed and on Lake Arrowhead's water quality. 3) Assess alternative options. 4) Working with all government units develop management strategies including new possible town sanitary district.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Lake Arrowhead
Status
Complete

Town Of Rome: Lake Arrowhead Monit./Internal Nut. Load Tri Lake: The Town of Rome proposes to contract with the Army Corps of Engineers to conduct a limnological assessment of Arrowhead, Camelot, and Sherwood Lakes (Tri-Lakes Region, 14 Mile Creek Watershed), with federal costsharing to cover approximately 40% of total project costs. Major project elements to include: 1) Flow monitoring to establish hydrological budget, 2) Water, aquatic plant and sediment sampling to assess nutrient loading, 3) Groundwater inflow-outflow study, 4) Toxics monitoring, and 5) development of a Comprehensive Management Plan. The Department of Natural Resources will be provided both written and electronic copies of the reports generated. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and broad public distribution of the Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
10/1/2000
Waters Involved
Lake Arrowhead
Status
Complete

Town Of Rome: Lake Arrowhead Modeling & Report: The Town of Rome proposes to produce a report describing the results of the first three tasks in this series of studies associated with the Adams Counties Tri Lakes (including Lake Arrowhead). Project activities would include generation and distribution of a report. The Department of Natural Resources will receive both a paper and electronic copy of the report. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and distribution of a Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
10/1/2003
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Tri-Lakes Management Plan: The Adams Co. Land Conservation Department proposes to develop a watershed management plan for the Tri-Lakes (Arrowhead, Sherwood, Camelot) area of Adams County. Major project elements to include: 1) meetings with stakeholder groups, 2) review existing data, 3) plan development, 4) public meetings, 5) plan distribution. The DNR will be provided both paper and electronic (PDF) files of the final report.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Lake Du Bay
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2005
Waters Involved
Lake Huron
Status
Complete

Lake Huron Assn: Lake Huron Comprehensive Lake Study: The scope of this project includes multiple components with appraisal objectives. Baseline data will be collected on several areas including aquatic plants, groundwater flow, lake water quality, watershed features and water levels. The aquatic plant survey will incorporate line intercept methods and include 10 shore transects for emergent/wetland species. A water quality appraisal will include April, June, July, Aug, and October events with parameters listed in application scope. (pesticide analysis not to be funded) Watershed appraisal will include definition of boundary, land use, sensitive areas, and likely sources of sediment/nutrients with strategic recommendations.

Water level and groundwater appraisal will include piezometer install and monitoring to define flow paths and water level impacts.


Deliverables: 1. A summary report will be prepared to include all indicated appraisal components.

This scope is intended to summarize the more specific scope as provided in the grant application and does not supersede the specific scope elements described within the application.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/1997
Waters Involved
Lake Sherwood
Status
Complete

Town Of Rome: Lake Sherwood - Tri-Lakes Septic System Inventory: The Town of Rome proposes to complete the following sanitary survey activities, in cooperation with the Tri-Lakes Mangaement District, and Adams County, on the areas adjacent to Lake Sherwood: 1) Compile existing data on the septic systems. 2) Assess septic systems impact on the watershed and on Lake Sherwood's water quality. 3) asses alternative options. 4) working with all governmental units develop management strategies including new possible town sanitary district.


Grant Details
Large Scale Lake Planning
Date
10/1/1999
Waters Involved
Lake Sherwood
Status
Complete

Town Of Rome: Lake Sherwood H2o Monitor/Internal Load: The Town of Rome proposes to contract with the Army Corps of Engineers to conduct a limnological assessment of Arrowhead, Camelot, and Sherwood Lakes (Tri-Lakes Region, 14 Mile Creek Watershed), with federal costsharing to cover approximately 40% of total project costs. Major project elements to include: 1) Flow monitoring to establish hydrological budget, 2) Water, aquatic plant and sediment sampling to assess nutrient loading, 3) Groundwater inflow-outflow study, 4) Toxics monitoring, and 5) development of a Comprehensive Management Plan. The Department of Natural Resources will be provided both written and electronic copies of the reports generated. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and broad public distribution of the Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
4/1/2000
Waters Involved
Lake Sherwood
Status
Complete

Town Of Rome: Lake Sherwood Groundwater Inflo & Plant Study: The Town of Rome proposes to study causes of algae and weed growth in Lake Sherwood, Adams Co., by studying groundwater inflow into both Lake Sherwood and Lake Camelot. Major elements would include: 1) Minipiezometer sampling around backwaters and bays, 2) Infield analysis for choride and phosphorus, 3) Development of report, 4) Interstitial water sampling and analysis from acquatic plant beds, 5) Acquatic plant analysis for nitrogen and phosphorus, 6) Algal identification/qualification. The Department of Natural Resources will be provided both paper and electronic copies of the final report. Project results will be disseminated to the public through newsletter mailings, fact sheet distributions, public meetings, local newspaper articles and development of a comprehensive management plan.


Grant Details
Large Scale Lake Planning
Date
10/1/2000
Waters Involved
Lake Sherwood
Status
Complete

Town Of Rome: Lake Sherwood Nutrient Budget & Water Quality Conditions: The Town of Rome proposes to complete tasks begun under LPLs 638 and 640, studying stage elevations and flow velocities, sampling water quality, and estimating loadings in Lakes Camelot and Sherwood of the Adams County Tri-Lakes. Major project elements to include: 1) Flow monitoring to establish hydrological budget, 2) and water sampling to assess nutrient loading. The Department of Natural Resources will be provided both written and electronic copies of the reports generated. Results of the studies will be disseminated to the public through newsletters, fact sheets, public meetings, local newspaper articles and broad public distribution of the Comprehensive Management Plan.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Little Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Little Pine Creek
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
10/1/2001
Waters Involved
Long Lake
Status
Complete

Long Lake District: Long Lake Comprehensive Study Phase I: The Long Lake District proposes to conduct a comprehensive lake study to evaluate the chemical, biological and physical factors affecting Long Lake and their relationship to nuisance Aphanothece growth. Project deliverables include inlake water testing; groundwater testing; groundwater flow monitoring; lake mapping and plant surveys. See consultant's proposal in the application for more detail.

The DNR will be provided with both a paper copy and an electronic copy of the final report. Information will be disseminated to the public as described in the grant application.


Grant Details
Large Scale Lake Planning
Date
10/1/2002
Waters Involved
Long Lake
Status
Complete

Long Lake District: Long Lake Comprehensive Study Ph 2: Long Lake District proposes to implement Phase 2 of a study that will culminate in the development of a long-term comprehensive lake management plan for Long Lake. Phase 2 will consist of in-lake water testing, groundwater testing, septic system testing, water table investigations, and the development of a lake management plan. Sample results from both Phase 1 and 2 will be used to develop the comprehensive lake management plan. The Department of Natural Resources will be provided with both a paper copy and electronic copy of the final plan.

Amendment #1: The Long Lake District proposes to include a county-wide educational outreach task to develop and distribute informational packets to new lake residents concerning lake stewardship. Their final report will include an example of this informational packet and a summary of this outreach effort's activities and outcomes.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Mason Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McCall Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McDougall Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Parker Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Patrick Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
3/28/1996
Waters Involved
Petenwell Lake
Status
Complete

Golden Sands: Petenwell Flowage Water Quality Modeling: Golden Sands proposes to conduct water quality modeling on the Petenwell Flowage to identify nutrient loads. Project activities include 1)applying the FLUX, BATHTUB, and PROFILE models, resulting in model outputs and data summaries; 2) determining water and nutrient budgets, resulting in a report; 3) predicting the effects of nutrient reductions on other in-lake environmental variables, resulting in a report; and 4) specifying the total maximum daily loads needed to reach target nutrient levels, resulting in a report. The sponsor will disseminate information to the public about the results of the project by public meeting and summary report mailing. The sponsor will also provide the Department of Natural Resources with a paper copy of the final report. End.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Rollers Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Silver Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Twin Lakes
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Unnamed
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Unnamed
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
4/1/2010
Waters Involved
Wisconsin River
Status
Complete

Lake Alice Association, Inc: Lake Alice Stewardship Program Phase Ii - Understanding The Biota Of Lake Alice: Lake Alice Association is sponsoring phased large scale lake planning grants to study Lake Alice, in Lincoln County. The project will focus on developing and updating an Adaptive Lake Management Plan (LMP) for Lake Alice. Phase 2 was funded in this grant cycle and Phases 3-5 will be submitted for funding starting in 2011.

Project activities for Phase 2 include: 1) Educational program, meetings and educational events with lake association and Tomahawk High School students, written educational materials, news releases, and website updates; 2) Point-intercept (PI) aquatic plant survey; 3) Aquatic plant community and substrate mapping; 4) Water quality assessment; 5) Volunteer amphibian monitoring and angler survey; 6) Update LMP.

Project deliverables include: 1) Educational materials and news releases; 2) Aquatic plant community and substrate maps; 3) PI, water quality, amphibian, and angler data; 4) LMP.

Specific conditions for this project: LMP needs Dept review and approval

WDNR Lakes Management Coordinator will be provided with an electronic (pdf or word) and hard copy of LMP, news releases, any other educational materials/products, all data, all maps from project, and all GIS data.


Grant Details
Large Scale Lake Planning
Date
5/5/1995
Waters Involved
Wolf Lake
Status
Complete

Adams County: Adams County Lakes Shoreline Development Audit: 1) Conduct a shoreland audit for the balance of Adams County. 2) Map locations of non-compliant structures. 3) Video tape audit sites. Research and determine permit issuance histories. 5) Process permits and site plans for new construction ofshoreland structures. 6) Field check new construction specifications. 7) Prepare a final report which will include the tasks listed above. 8) The grantee will disseminate information to the public by public meetings, summary report mailings, andlocal newspaper articles. The grantee will provide the Department od Natural Resources with a paper copy and an electronic copy of the final report. Project results will be reposited the the City of Adams Library.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Amey Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Arkdale Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Roche a Cri
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Big Spring Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Camelot Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Camelot Lake
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Castle Rock Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Crooked Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Deep Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Dorro Couche Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Easton Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fawn Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Fenner Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Fourteenmile Creek
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Friendship Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Goose Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Hill Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Jordan Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Arrowhead
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Lake Arrowhead
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Lake Sherwood
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Lake Sherwood
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Little Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Mason Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McCall Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McDougall Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
McGinnis Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Parker Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Patrick Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Peppermill Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Petenwell Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Risk Creek Pond
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Rollers Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Silver Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Twin Lakes
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Unnamed
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
Small Scale Lake Planning
Date
2/15/2015
Waters Involved
Unnamed
Status
Complete

Tri-Lakes Management District: Tri-Lakes Cbcw, Sampling: Tri-Lakes Management District proposes to continue Clean Boats Clean Waters and water quality sampling efforts on Lakes Camelot, Sherwood, and Arrowhead in Adams Co. Major project elements to include: 1) CBCW, 2) Water quality sampling, 3) SWIMS data entry, 4) Final Report.


Grant Details
Small Scale Lake Planning
Date
10/1/2001
Waters Involved
Wolf Lake
Status
Complete

Adams County: Adams County Shoreline Restoration Workshop For Professionals: The Adams County Land Conservation Department proposes to work with local lake associations, UWEX and other interest groups on producing a workshop for local professionals. This workshop is designed to: 1) Establish an informed network of professionals who will be qualified to share information, 2) To educate others, and 3) Assist lakefront property owners with their lakeshore restoration efforts so that water quality of the major watersheds of Adams County will be protected and improved.

The Department of Natural Resources will be provided with both a paper and electronic copy of the final report. Project results will be disseminated to the public through local newspapers, radio stations and local newsletters.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Castle Rock Lake
Status
Complete

Petenwell & Castle Rock Stewards: Pacrs Edu-Outreach: The Petenwell and Castle Rock Stewards (PACRS) propose to initiate a public education campaign to inform members of the public about the organization's work on behalf of improved water quality on the Petenwell and Castle Rock flowages in Adams and Juneau counties. Major project elements to include: a) signage at public boat landings, b) distribution of informative place mats to area restaurants, c) development of future communications planning, d) water quality monitoring, and e) development of an annual report.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Petenwell Lake
Status
Complete

Petenwell & Castle Rock Stewards: Pacrs Edu-Outreach: The Petenwell and Castle Rock Stewards (PACRS) propose to initiate a public education campaign to inform members of the public about the organization's work on behalf of improved water quality on the Petenwell and Castle Rock flowages in Adams and Juneau counties. Major project elements to include: a) signage at public boat landings, b) distribution of informative place mats to area restaurants, c) development of future communications planning, d) water quality monitoring, and e) development of an annual report.


Grant Details
River Planning Grant
Date
7/1/2013
Waters Involved
Wisconsin River
Status
Complete

Petenwell & Castle Rock Stewards: Pacrs Edu-Outreach: The Petenwell and Castle Rock Stewards (PACRS) propose to initiate a public education campaign to inform members of the public about the organization's work on behalf of improved water quality on the Petenwell and Castle Rock flowages in Adams and Juneau counties. Major project elements to include: a) signage at public boat landings, b) distribution of informative place mats to area restaurants, c) development of future communications planning, d) water quality monitoring, and e) development of an annual report.


Monitoring & Projects

Projects including grants, restoration work and studies shown below have occurred in this watershed. Click the links below to read through the text. While these are not an exhaustive list of activities, they provide insight into the management activities happening in this watershed.

Grants and Management Projects
Fourteenmile Creek Watershed
Watershed Recommendations
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Citizen-Based Stream Monitoring
Citizen Stream Monitoring
Date
Status
Collect chemical, physical, and/or biological water quality data to assess the current overall stream health. The data can inform management decisions and may be used to identify impaired waters for biennial lists.
1/1/2012
In Progress
Projects
 
Habitat Restoration - Shoreland
 
Date
Status
10/1/2013
Proposed
Projects
 
Hire County Aquatic Invasives Coordinator
 
Date
Status
Hire Aquatic Invasives (AIS) County Coordinator - Juneau
1/1/2011
Not Proposed
Projects
 
Hold Workshops
 
Date
Status
5/22/2010
Proposed
Projects
 
Lakes Protection Grant
 
Date
Status
Adams County has a successful Citizen Monitoring program established. Adams County is encouraged to seek grant opportunities to continue their Citizen Lake Monitoring work.
9/30/2010
Proposed
 
Fourteenmile Creek WatershedWatershed History Note

The Fourteenmile Creek Watershed is home to the Leola Marsh Wildlife Area, an 1,860 acre property located 15 miles southeast of Wisconsin Rapids. The wildlife area is predominately non-native cool season grassland that formerly was marsh that had been drained for agricultural purposes in the first part of the 1900's. The wildlife area sits in the heart of the area first studied by the Hamerstroms on the prairie chicken. It is in the southern portion of Wisconsin's prairie chicken range. The property was purchased to protect the grassland habitat for the prairie chicken. Frederick and Frances Hamerstrom attended the University of Wisconsin to study wildlife management under Aldo Leopold. Frederick Hamerstrom was one of only three men awarded a doctorate under Leopold and Frances was the only woman graduate student under Leopold to earn a master's degree. Leopold started the Hamerstroms on a study of the imperiled greater prairie chicken, an endangered species in Wisconsin. The Hamerstroms focused on the habitat needs of the greater prairie chicken and initiated a management plan based on the assumption the prairie chicken required a "checkerboard" pattern of habitat. The Hamerstroms were recognized in 1970 with the National Wildlife Federation Award for Distinguished Service to Conservation for their innovative management plan and work with the prairie chicken. The Hamerstroms are credited by naturalists for saving the prairie chicken from extirpation in Wisconsin.

Date  2011