Wisconsin River TMDL

Purpose

The Wisconsin TMDL is in development. This large, multi-basin project involves a tremendous effort to gather loading and impact data and modeling to determine sustainable loading rates.

QA Measures

Run Project Summary Report

TMDL/303d Projects
TMDL Development
Wisconsin TMDL
2012
Active
 
Reports and Documents
Nov 2015 newsletter for the Wisconsin TMDL project.
May newsletter for the Wisconsin TMDL project.
February newsletter for the Wisconsin TMDL project.
November 2014 newsletter for the Wisconsin TMDL project.
Dam on the Wisconsin River below Stevens Point, 1973.
Rock formations along the upper Wisconsin River at Wisconsin Dells.
Wisconsin River from Wyalusing State Park - Taken May 19, 2012.
Photo by the River Alliance of Wisconsin for the RIVER ALLIANCE OF WISCONSIN: Project RED Prevent the Spread & Lwr WI AIS Plan
List of USGS gauging stations funded by this project.
A winter scene along the Lower Wisconsin River.
Backwaters of the Lower Wisconsin River.This photo was taken on October 30, 2010 in Lone Rock, Wisconsin, US.
The Wisconsin River near Dekorra, upriver from Lake Wisconsin, 1953.
Eagles fishing open water on the lower Wisconsin River in winter. This photo was taken on October 30, 2010 in Helena, Wisconsin, US.
Summer scene along the Lower Wisconsin River. This photo was taken on October 30, 2010 in Helena, Wisconsin, US.
This photo was taken on October 30, 2010 in Helena, Wisconsin, US.
This photo was taken on October 30, 2010 in Helena, Wisconsin, US.
Lower Wisconsin River near Muscoda. This photo was taken on October 30, 2010 in Muscoda, Wisconsin, US.
This report is the culmination of several years of effort to develop wasteload allocations for water quality limited segments and seasons on Segment D of the Wisconsin River. The report is structured to give an overview of the segment of river modeled, a general description of the model, the calibration, the verification, and a sensitivity analysis of the verified model.
This report is the culmination of ten years of effort to develop wasteload allocations for water quality limited segments and seasons on Segment BC of the Wisconsin River. The report is structured to give an overview of the segment of river modeled, a general description of the model, the calibration and verification of the model, and a sensitivity analysis of the calibrated model.
Methods and Results of Field Surveys Collected in 1977 and 1978 on the Upper Wisconsin River for the Development of a water quality computer model-Water Quality Modeling of the Upper Wisconsin River for Wasteload Allocation Development
 
Activities & Recommendations
TMDL Development
The Wisconsin TMDL is in development. This large, multi-basin project involves a tremendous effort to gather loading and impact data and modeling to determine sustainable loading rates.