Dredging - How did they do that?At the beginning of the field season during the "mobilization" period, the dredge is launched using a large crane. The dredge was transported to the site on a flatbed truck. This is a good picture of the dredge´s "ladder", which has the "cutter-head" at the end. The ladder allows the dredger to accurately move the cutter-head up and down and left to right so that only targeted (contaminated) sediment is removed. ![]() This picture shows the dredge in action. While there is not much to see above the water surface there are a few items of note here.
![]() Below is one of two types of cutter heads used. The cutter head disturbs the sediment in the low-pressure zone created by the dredge pump, or vacuum, and all of that material is pumped by pipeline to the dewatering facility. ![]() A "booster station" pump is placed on a barge when the dredge is operating at large distances from the dewatering facility. Notice the backhoe on the platform. It is used by the dredging contractor for removal of rocks and debris from the area to be dredged to prevent clogging the cutterhead. ![]() Last Revised: Wednesday October 01 2008
|