Parallel Cost PercentageClean Water Fund Program
"Parallel cost percentage" means the proportion of project costs eligible for below-market rate financing relative to the total project cost eligible for Clean Water Fund Program (CWFP) financing. The parallel cost percentage may include project costs eligible for a reduced interest rate (i.e., 55%, 65% or 70% of the market rate), and may include project costs eligible for a 0% rate (i.e., those incremental costs related to septage receiving and treatment). Before receiving a loan from the CWFP, a municipality must submit a parallel cost estimate to the DNR Bureau of Watershed Management. Typically, the municipality's engineer provides the information necessary for the DNR plan review engineer to review and approve a parallel cost percentage for the municipality's wastewater treatment or urban runoff project. CALCULATING THE PARALLEL COST PERCENTAGE Calculate the parallel cost percentage as follows: 1. Determine the total design capacity based on total flows and loadings, including septage, estimated for the project design year condition. 2. Calculate a reduced capacity condition by subtracting from the total design capacity the flows and loadings associated with each of the following as applicable:
3. Estimate the eligible project construction costs associated with each of the conditions in 1 and 2 above. Normally, not all capital costs for various project elements will be directly proportional to flow or loading. Therefore, the cost estimate for a reduced capacity typically cannot be estimated by simply applying a ratio of the two design flow conditions to the cost estimate for the total design flow. The Department does not require that a complete redesign be performed for the reduced capacity condition. Typically, the same unit processes identified for the total design flow project are used, but downsized as appropriate for the reduced capacity condition. The submitted cost estimates for both conditions should contain sufficient detail (itemized costs) and a narrative explanation to enable Department plan review engineers to fully assess the basis of the cost estimates. 4. Divide the cost of the reduced capacity condition by the costs of the total design capacity. Determine the parallel cost percentage as follows: PC = RC/DC Where: PC = the parallel cost percentage expressed as a decimal RC = construction costs associated with the reduced capacity condition DC = construction costs associated with the total design capacity CALCULATING THE SEPTAGE PERCENTAGE If the project includes costs for septage receiving facilities and/or septage treatment capacity, those costs may be eligible for a 0% loan rate. Information on what costs qualify for the 0% rate is available on the Wastewater Systems Plan Review site. In order to segregate the costs eligible for the 0% rate, estimate another design condition and associated cost (RC2). Calculate the percentage of costs eligible for the 0% rate as follows: SP = (RC-RC2) /DC Where: SP = septage percentage (percentage of project costs eligible for a 0% rate) RC2= construction costs associated with a capacity condition without market rate items and without septage receiving facilities or septage capacity APPLYING THE PARALLEL COST PERCENTAGE The costs identified in 2 above are eligible for market rate financing only. The DNR plan review engineer provides the approved parallel cost percentage and, if applicable, the approved septage percentage to the CWFP project manager. The project manager then applies the approved percentages to the total eligible project costs to determine the amount of costs the CWFP can fund at the market rate, the reduced rate and the 0% rate. In other words:
Note: There are a few other circumstances under which some project costs may be placed at the market rate: 1) when an MBE/WBE/SBRA sanction for non-compliance is applied, 2) when there are costs included in a project that are solely related to flood control, 3) when an urban runoff project includes areas that exclusively serve future development and 4) when costs of a project are for correcting violations of an effluent limit in a WPDES permit or of performance standards. Contact a DNR plan review engineer if you have questions regarding the parallel cost percentage estimate. Last Revised: Tuesday March 23 2010
|