ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
NR700 ACTIVITY PROGRESS REPORT

Reporting Period: 7/1/2023 - 12/31/2023
BRRTS No: 02-38-580694
Activity Name: JCI/TYCO FTC (PFAS)
Status: Site Investigation
Activity: Field Sampling/Monitoring
Comments: A Q2 2023 Project Status report was submitted on July 17. A Ditch A Semi-Annual Operation, Maintenance, and Optimization Progress Report #8 – Response to Comments was submitted on July 20. A Ditch B Semi-Annual Operation, Maintenance, and Optimization Progress Report #7 – Response to Comments was submitted on July 20. Ditch A and B Monthly WPDES Discharge Monitoring Reports (June 2023) were submitted on July 20. A Technical Assistance Meeting was held on July 24. A Marinette High School Irrigation IRR-02R Installation Technical Memo was submitted on July 26. A Potable Well Sampling Program Annual Summary Report – FTC Sampling Area was submitted on July 31. An FTC Materials Management Plan was submitted on August 17. Ditch A, Ditch B, and GETS Monthly WPDES Discharge Monitoring Reports (July 2023) were submitted on August 21. A 2023 Additional Site Investigation Work Plan was submitted on August 24. A Deep Aquifer Bedrock Well Design and Long-Term Monitoring – Interim Response Status Update was submitted on August 24. Ditch A, Ditch B, and GETS Monthly WPDES Discharge Monitoring Reports (August 2023) were submitted on September 21. A Revised Long-Term Potable Well Sampling Plan, Version 8 was submitted on October 2. A Q3 2023 Project Status was submitted on October 13. Ditch A, Ditch B, and GETS Monthly WPDES Discharge Monitoring Reports (September 2023) were submitted on October 20. A Ditch A Semi-Annual Operation, Maintenance, and Optimization Progress Report #9 was submitted on October 31. A Ditch B Semi-Annual Operation, Maintenance, and Optimization Progress Report #8 was submitted on November 2. A GETS Short-Term Monitoring – May 15, 2023 through November 12, 2023 was submitted on November 15. Ditch A, Ditch B, and GETS Monthly WPDES Discharge Monitoring Reports (October 2023) were submitted on November 21. Ditch A, Ditch B, and GETS Monthly WPDES Discharge Monitoring Reports (November 2023) were submitted on December 21. A Soil Interim Remedial Action and Removal Report was submitted on December 15. The site investigation work is ongoing. The Long-Term Potable Well Monitoring Plan is ongoing. Bottled water and/or Point-of-Entry Treatment (POET) systems have been offered to affected potable well owners within the private drinking water well investigation area. The Ditch A and Ditch B Surface Water, Groundwater Extraction and Treatment System, and Foam Interim Actions continued implementation during the reporting period. Routine communications were completed with the WDNR regarding the interim action and site investigation activities.
Submitted by Shauna Johnson on 01/25/2024