ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
NR700 ACTIVITY PROGRESS REPORT

Reporting Period: 7/1/2022 - 12/31/2022
BRRTS No: 02-38-580694
Activity Name: JCI/TYCO FTC (PFAS)
Status: Site Investigation
Activity: Field Sampling/Monitoring
Comments: A Q2 2022 Project Status report was submitted on July 15. A GETS Pre-Startup Monitoring Data Package was submitted on July 15. Ditch A/B Monthly WPDES Reports (June 2022) were submitted on July 21. A Potable Well Sampling Program Annual Summary Report - FTC Sampling Area for the Period April 1, 2021, through March 31, 2022, was submitted on August 8. An email with Public Notifications Requirements for GETS – Documentation of Activities was submitted on August 19. Ditch A/B Monthly WPDES Reports (July 2022) were submitted on August 21. An Updates to Advisory Signs and Public Notification Methods was submitted on August 25. Ditch A/B Monthly WPDES Reports (August 2022) were submitted on September 21. A GETS Pre-Startup Monitoring Data Package Addendum was submitted on September 23. A Response to the Request for Information on Deep Wells was submitted on September 26. A Deep Aquifer Bedrock Well Design and Long-Term Monitoring Work Plan was submitted on September 27. A PWSA Drinking Water Update was submitted on September 27. A Revised Long-Term Potable Well Sampling Plan was submitted on October 3. A Response to the Deep Well Approach was submitted on October 3. A Q3 2022 Project Status report was submitted on October 17. A Response to Potable Well Sampling Program Annual Summary Report and Revised Long-Term Potable Well Sampling Plan was submitted on October 18. A Marinette High School Irrigation Well Profiling Results was submitted on October 20. Ditch A/B Monthly WPDES Reports (September 2022) were submitted on October 21. A Semi-Annual Operation, Maintenance, and Optimization Progress Reports (January 1 through June 30, 2022) #6 for Ditch B was submitted on October 27. A Semi-Annual Operation, Maintenance, and Optimization Progress Reports (January 1 through June 30, 2022) #7 for Ditch A was submitted on November 9. Ditch A/B Monthly WPDES Reports (October 2022) were submitted on November 21. Ditch A/B Monthly WPDES Reports (November 2022) were submitted on December 21. The site investigation work is ongoing. The Long-Term Potable Well Monitoring Plan is ongoing. Bottled water and/or Point-of-Entry Treatment (POET) systems have been offered to affected potable well owners within the private drinking water well investigation area. The Ditch A and Ditch B Surface Water, Groundwater Extraction and Treatment System, and Foam Interim Actions continued or began implementation during the reporting period. Routine communications were completed with the WDNR regarding the interim action and site investigation activities.
Submitted by Ben Verburg on 01/19/2023