ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
NR700 ACTIVITY PROGRESS REPORT

Reporting Period: 1/1/2019 - 6/30/2019
BRRTS No: 02-38-580694
Activity Name: JCI/TYCO FTC (PFAS)
Status: Site Investigation
Activity: Field Sampling/Monitoring
Comments: As discussed previously with WDNR, and as presented in a July 19, 2019 letter to WDNR, Tyco Fire Products LP is the appropriate legal entity for Responsible Party reference. Therefore, “JCI” should not appear in the Activity Name data field above or be referenced in future correspondence and documents. A Heath Land Area Groundwater Summary was submitted on January 16. Drinking water sampling results and a sample map were submitted on February 6. A Supplemental Site Investigation Work Plan was submitted on February 7. A Response to Comments on the September 2018 Site Investigation Review was submitted on February 7. A Data Summary Report was submitted on March 13. A Remedial Action Options Report for Long-Term Drinking Water Supply was submitted on May 16. Drinking water sampling results and a sample map were submitted on May 20. A Heath Lane Area Site Investigation Work Plan was submitted on June 5. An Informational Sign Posting correspondence as submitted on June 10. The supplemental site investigation was initiated in spring and the site investigation work is ongoing. The Long-Term Potable Well Monitoring Plan is ongoing. Bottled water and Point-of-Entry Treatment (POET) systems have been offered to affected potable well owners. The Ditch A Surface Water Interim Action was implemented during the reporting period. Routine communications were completed with the WDNR regarding the investigation activities.
Submitted by Ben Verburg on 07/30/2019