NR700 ACTIVITY PROGRESS REPORT

Reporting Period: 1/1/2014 - 6/30/2014
BRRTS No: 02-13-558625
Activity Name: MADISON KIPP CORP
Status: Remediation
Activity: Active Remediation
Comments: The following reports were submitted for the Madison Kipp facility during the reporting period (January 1 - June 30, 2014): • Summary of Activities Related to Polychlorinated Biphenyl (PCB) Investigation, 237 Waubesa Street – January 8, 2014 • 2014 Madison-Kipp Pump Test – Discharge Monitoring and Hose Protection Plan – January 15, 2014 • Results of Sub-Slab Depressurization System Inspection, 150 S. Marquette Street – January 24, 2014 • Results of Sub-Slab Depressurization System Inspection, 162 S. Marquette Street – January 24, 2014 • Results of Sub-Slab Depressurization System Inspection, 166 S. Marquette Street – January 24, 2014 • Soil Vapor Extraction (SVE) System Progress Report, November through December 2013 – January 30, 2014 • Interior Manufacturing Modifications – February 3, 2014 • Polynuclear Aromatic Hydrocarbons (PAHs) Background Study – February 7, 2014 • Results of Sub-Slab Depressurization System Inspection, 146 S. Marquette Street – February 13, 2014 • Results of Sub-Slab Depressurization System Inspection, 154 S. Marquette Street – February 13, 2014 • Request for a Temporary Exemption for Injection of Remedial Materials for an In-Situ Chemical Oxidation Groundwater Treatment – February 21, 2014 • Summary of Office Indoor Air Sampling Activities – February 24, 2014 • Groundwater Extraction Step Test Results – March 18, 2014 • Soil Vapor Extraction (SVE) System Progress Report, January through February 2014 – March 31, 2014 • 2013 Annual Report – March 31, 2014 • Interior Building Maintenance – April 2014 • Basis of Design for Proposed Groundwater Extraction and Treatment System – April 1, 2014 • Discharge Monitoring Report – In-Site Chemical Oxidation Groundwater Treatment – April 7, 2014 • Supplemental Building Interior Polychlorinated Biphenyl Work Plan Subsurface Investigation Summary – April 22, 2014 • Discharge Monitoring Report – In-Site Chemical Oxidation Groundwater Treatment – May 15, 2014 • Evaluation of Plume Stability and Fate and Transport Modeling for PCE in Bedrock Groundwater – May 19, 2014 • Interior Building Maintenance North of Center Aisle – May 29, 2014 • Interior Building Maintenance – Center Aisle – June 3, 2014
Submitted by Jennine Trask on 09/19/2014