WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-05-587486 THE SOLBERG CO - SITE 2
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
THE SOLBERG COMPANY, A DIVISION OF PERIMETER BROWN NORTHEAST
Address Municipality
1520 BROOKFIELD AVE HOWARD
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NW 1/4 of the SE 1/4 of Sec 03, T24N, R20E 44.5836374 -88.0563024 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
Electronic Only - No Hard File UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
405227020 2021-03-03
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  PFAS flag Underground Storage Tank Flag
Actions and Documents
Date Code Name File Comment
2024-03-14 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file PROPOSE INSTALLING 3 ADDITIONAL MONITORING WELLS FOR DELINEATION TO THE WEST
2024-02-20 43 Site Activity Status Update Received Download PDF file INSTALLED 3 ADDITIONAL MWS AND SAMPLED MW NETWORK; PLANNING TO INSTALL ADDITIONAL MWS
2024-01-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-09-20 99 Miscellaneous Download PDF file DNR REQUESTS SEMI-ANNUAL GROUNDWATER MONITORING
2023-09-05 43 Site Activity Status Update Received Download PDF file JULY 2023 GROUNDWATER MONITORING RESULTS
2023-08-28 43 Site Activity Status Update Received Download PDF file GW MONITORING RESULTS SENT TO OFF-SITE PROPERTY OWNER
2023-07-07 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-05-17 7 Environmental Consultant Hired Download PDF file CAROW LAND SURVEYING AND ENVIRONMENTAL
2023-04-03 43 Site Activity Status Update Received Download PDF file STATUS REPORT CONTAINING ALL SOIL AND GROUNDWATER PFAS SAMPLING RESULTS TO DATE
2023-01-12 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-09-14 43 Site Activity Status Update Received Download PDF file GROUNDWATER SAMPLING RESULTS FROM EXISTING AND NEW WELLS AND PIEZOMETERS INSTALLED ON & OFF-SITE
2022-07-25 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-05-12 43 Site Activity Status Update Received Download PDF file PFAS SOIL BORINGS/WELLS AND GROUNDWATER SAMPLING IS CURRENTLY SCHEDULED FOR JULY 11TH TO THE 13TH
2022-01-06 99 Miscellaneous Download PDF file DNR RESPONSE TO OFF-SITE ATTORNEY; OFF-SITE SAMPLING REQUIRED TO DEFINE DEGREE & EXTENT
2022-01-04 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2021-09-27 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) ATTACHED TO AC 35 DATED 9/16/2021
2021-09-16 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file UPDATED WORKPLAN TO INSTALL PIEZOMETER & COLLECT SOIL SAMPLES FROM MONITORING WELL LOCATIONS
2021-09-13 43 Site Activity Status Update Received Download PDF file UPDATE WITH MONITORING WELL INSTALLATION, GROUNDWATER SAMPLING & SOIL SAMPLING RESULTS FOR PFAS
2021-09-13 35 Site Investigation Workplan (SIWP) Received (non-fee) SEE AC 43 OF SAME DATE; INSTALL ADDITIONAL MONITORING WELLS & RESAMPLE GROUNDWATER
2021-07-07 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-07-01 99 Miscellaneous (MW1, MW2, MW3) WERE TRANSFERRED FROM THE SOLBERG CO (03-05-584180)
2021-04-22 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) SEE AC 35 DATED 4/5/2021 FOR DOCUMENTATION
2021-04-21 2 Responsible Party (RP) letter sent Download PDF file
2021-04-05 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file SIWP FOR ADDITIONAL MW & PZ INSTALLATION, GW SAMPLING & SHALLOW SOIL SAMPLING
2021-03-03 1 Notification of Hazardous Substance Discharge Download PDF file
2021-03-03 120 PFAS Sampling Completed - Actionable Levels Detected SEE AC 1 OF SAME DATE FOR DOCUMENTATION
2020-09-09 116 PFAS Sampling Required Download PDF file
2020-08-27 114 PFAS Scoping Statement Received Download PDF file SAFETY DATA SHEETS FOR AFFF (FOAM) TESTED AT FACILITY
Substances
Substance Type Amt Released Units
Per- and Polyfluoroalkyl Substances Industrial Chem
Responsible Party
PERIMETER SOLUTIONS DBA THE SOLBERG CO 1520 BROOKFIELD AVE,  HOWARD, WI 54313
DNR Project Manager
JOSIE SCHULTZ  josie.schultz@wisconsin.gov
587486 | 02-05-587486
BOTW Release 4.9 | 04/23/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages