ACTIVITY DETAILS

 
02-05-564043 ASHVIEW TERRACE APARTMENTS
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
ASHVIEW TERRACE APARTMENTS BROWN NORTHEAST
Address Municipality
988-1020 WILLARD DR ASHWAUBENON
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
SE 1/4 of the SE 1/4 of Sec 04, T23N, R20E 44.4893009 -88.0720701 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
Electronic Only - No Hard File UNKNOWN
Facility ID PECFA No. EPA ID Start Date End Date
2015-02-12
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
  PFAS flag
Actions and Documents
Date Code Name File Comment
2024-01-30 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-07-21 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-02-27 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file NTP FOR THE PROPOSED SOIL SAMPLING TO DEFINE PCB CONTAMINATION
2023-02-06 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file SUPPLEMENTAL SIWP FOR PCBS
2023-01-27 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-10-21 43 Site Activity Status Update Received Download PDF file RESPONSE TO REQUEST FOR ADDITIONAL INFO; INCLUDES PROPOSAL TO USE SOIL AVERAGING AND SOIL SAMPLING
2022-07-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2022 - 6/30/2022
2022-04-12 43 Site Activity Status Update Received Download PDF file RP RESPONSE TO PFAS RELATED QUESTIONS FROM DNR
2022-04-12 114 PFAS Scoping Statement Received SUBMITTED TO MEET REQUIREMENTS OF NR716.07; PFAS SAMPLING PREVIOUSLY REQUIRED;SEE AC 43 OF SAME DATE
2022-02-11 99 Miscellaneous Download PDF file DNR RESPONSE TO PFAS DATA
2021-12-06 43 Site Activity Status Update Received Download PDF file PFAS GROUNDWATER CONFIRMATION SAMPLING SUMMARY REPORT
2021-10-26 43 Site Activity Status Update Received Download PDF file PFAS GROUNDWATER SAMPLING RESULTS; PROPERTY OWNER NOTIFICATION INCLUDED
2021-09-10 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file 2021 SUPPLEMENTAL SITE INVESTIGATION FOR PCBS & METALS
2021-07-26 43 Site Activity Status Update Received Download PDF file SOIL ANALYTICAL RESULTS FOR PCBS & METALS; PROPERTY OWNER NOTIFICATION INCLUDED
2021-07-22 43 Site Activity Status Update Received Download PDF file PFAS INVESTIGATION SUMMARY REPORT
2021-06-14 43 Site Activity Status Update Received Download PDF file PFAS SOIL & GROUNDWATER SAMPLING RESULTS. PROPERTY OWNER NOTIFICATION INCLUDED.
2021-06-14 120 PFAS Sampling Completed - Actionable Levels Detected PFAS IDENTIFIED IN GROUNDWATER @ MW21-01, MW21-02 & MW21-03 ABOVE THE PROPOSED ES OR PAL
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-03-02 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file FOR INVESTIGATION OF PCBS & METALS
2021-02-03 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file NOTICE TO PROCEED WITH PFAS SIWP
2020-11-17 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file PFAS INVESTIGATION
2020-11-17 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file PCBS & METALS INVESTIGATION
2020-11-17 116 PFAS Sampling Required PFAS SIWP PREPARED BY RP WITHOUT PREVIOUS DNR EVALUATION OF A EC SCOPING STATEMENT
2020-10-16 99 Miscellaneous Download PDF file DNR APPROVAL OF EXTENSION TO SUBMIT PFAS SCOING STATEMENT/WORK PLAN
2020-10-13 43 Site Activity Status Update Received Download PDF file REQUEST FOR EXTENSION OF TIME LINE FOR SUBMITTAL OF PFAS SCOPING STATEMENT/WORK PLAN
2020-09-14 81 Site Investigation Workplan (SIWP) Not Approved Download PDF file
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-07-23 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-06-08 135 Site Investigation Workplan (SIWP) Received (fee) Download PDF file
2020-01-02 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-09-18 99 Miscellaneous Download PDF file RISK ANALYSIS REVIEW COMMENTS
2019-09-18 99 Miscellaneous PEER REVIEW OF RISK ANALYSIS
2019-07-31 43 Site Activity Status Update Received Download PDF file RISK ANALYSIS BY WOOD
2019-07-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2019 - 6/30/2019
2019-05-02 43 Site Activity Status Update Received Download PDF file 2017 DRAFT RAP REVIEW DOCUMENTS
2019-04-24 99 Miscellaneous Download PDF file DRAFT RAP REVIEW
2019-01-30 43 Site Activity Status Update Received Download PDF file SEMI-ANNUAL UPDATE (VIA EMAIL)
2019-01-18 99 Miscellaneous Download PDF file CHANGE OF PROJECT MANAGER (LEROY)
2018-07-13 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2018 - 6/30/2018
2018-01-18 99 Miscellaneous Download PDF file SITE INVESTIGATION COMPLETE APPROVAL
2018-01-17 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2018-01-17 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file ADDENDUM REPORT
2017-06-21 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file
2017-06-21 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2017-05-11 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file
2017-04-24 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file WORK PLAN FOR ADDT'L INVESTIGATION ACTIVITIES
2016-12-22 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file SI/PHASE II
2016-06-20 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file
2016-04-06 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file
2016-02-11 99 Miscellaneous Download PDF file NOTICE OF INTENT TO RECOUP EXPENSES
2016-02-09 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file DRAFT WORK PLAN TO CONDUCT PHASE II ESA
2015-09-16 99 Miscellaneous Download PDF file OCP PCB NOTICE #1, NOTIFICATION OF A PCB CONTAMINATION SITE SENT TO EPA
2015-08-24 43 Site Activity Status Update Received Download PDF file RP REQUEST FOR ADDT'L RESPONSE TIME
2015-08-10 2 Responsible Party (RP) letter sent Download PDF file GEORGIA-PACIFIC LLC
2015-08-10 99 Miscellaneous Download PDF file DNR COMMUNICATIONS WITH ADJACENT CHILD CARE PROPERTY
2015-08-10 2 Responsible Party (RP) letter sent Download PDF file RESPONSIBILITY PARTY LETTER; POSSESSOR
2015-05-18 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file SUPPLEMENTAL REPORT REC'D
2015-05-18 206 Site Investigation End - State Lead
2015-04-05 99 Miscellaneous ACCESS DOCUMENTS & CONSULTANT PROPOSAL
2015-02-23 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file INITIAL REPORT
2015-02-21 205 Site Investigation Start - State Lead
2015-02-12 1 Notification of Hazardous Substance Discharge STATE LEAD INVESTIGATION
Substances
Substance Type Amt Released Units
Per- and Polyfluoroalkyl Substances (PFAS ADDED FROM AC120) Industrial Chem
Polychlorinated Biphenyl PCB
DNR Project Manager
KELD LAURIDSEN  keld.lauridsen@wisconsin.gov
564043 | 02-05-564043