2024-04-24
99
Miscellaneous
INJECTION DETERMINATION UPDATE REC'D
2024-03-08
43
Site Activity Status Update Received
REC'D PHASE I MONTHLY PROGRESS RPT
2024-02-21
99
Miscellaneous
XCEL ENERGY NOTIFICATION LTR
2024-02-09
99
Miscellaneous
WPDES SUBSTAINTIVE REQUIREMENTS
2024-02-07
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT
2024-02-01
43
Site Activity Status Update Received
GW MONITORING RPT REC'D
2023-12-08
99
Miscellaneous
MONTHLY PROGRESS RPT REC'D
2023-11-09
99
Miscellaneous
MONTHLY STATUS RPT REC'D
2023-10-06
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2023-10-06
99
Miscellaneous
ICIAP APPROVAL
2023-09-06
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2023-08-15
99
Miscellaneous
USEPA FIVE YEAR REVIEW START LETTER REC'D
2023-08-07
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2023-08-01
43
Site Activity Status Update Received
GW MONITORING RPT REC'D
2023-07-07
99
Miscellaneous
PHASE I MONTHLY PROGRESS REPORT - JUNE 2023
2023-06-08
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS RPT AND NAPL RECOVERY
2023-06-08
99
Miscellaneous
JUNE 2023 ENHANCED RECOVERY PROJECT
2023-05-05
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2023-04-10
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT AND NAPL RECOVERY RPT REC'D
2023-03-13
99
Miscellaneous
PHAS 1 MONTHLY PROGRESS RPT INCLUDING NAPL RECOVERY
2023-02-06
99
Miscellaneous
NAPL RECOVERY RPT - JAN 2023
2023-02-06
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2023-02-01
43
Site Activity Status Update Received
GW MONITORING RPT REC'D
2023-01-04
99
Miscellaneous
PHASE I MONTHLY PROGRES RPT REC'D
2023-01-04
99
Miscellaneous
NAPL RECOVERY DEC 2022 RPT
2022-12-01
99
Miscellaneous
NAPL RECOVERY NOVEMBER 2022
2022-12-01
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS RPT - NOV 2022
2022-11-09
99
Miscellaneous
NAPL RECOVERY OCTOBER 2022
2022-11-09
99
Miscellaneous
PHASE 1 MONTHLY STATUS RPT
2022-10-06
99
Miscellaneous
NAPL RECOVERY SEPTEMBER 2022
2022-10-06
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT SEPT 2022
2022-09-06
99
Miscellaneous
MONTHLY PROGRESS RPT - AUGUST 2022
2022-09-06
99
Miscellaneous
NAPL RECOVERY RPT - AUGUST 2022
2022-08-10
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS REPORT
2022-08-10
99
Miscellaneous
NAPL RECOVERY JULY 2022
2022-08-01
43
Site Activity Status Update Received
GW MONITORING RPT REC'D
2022-07-11
99
Miscellaneous
NAPL RECOVERY JUNE 2022
2022-07-11
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT JUNE 2022
2022-05-31
99
Miscellaneous
BOAT LAUNCH AGGREGATE CHANGE
2022-05-09
99
Miscellaneous
NAPL RECOVERY APRIL 2022
2022-05-09
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS RPT APRIL 2022
2022-04-11
99
Miscellaneous
PHASE I PROGRESS RPT REC'D
2022-04-11
99
Miscellaneous
NAPL RECOVERY RPT - MARCH 2022
2022-02-10
99
Miscellaneous
NAPL RECOVERY JANUARY 2022
2022-02-10
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS REPORT REC'D
2022-01-10
99
Miscellaneous
NAPL RECOVERY RPT DEC 2021
2022-01-10
99
Miscellaneous
PHASE I MONTLY PROGRESS RPT DEC 2021
2021-12-10
99
Miscellaneous
NAPL RECOVERY NOVEMBER 2021
2021-12-10
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT NOV 2021
2021-12-08
99
Miscellaneous
KREHER PARK UPDATE
2021-11-09
99
Miscellaneous
NAPL RECOVERY OCT 2021
2021-11-09
99
Miscellaneous
PHASE I MONTHLY REPORT OCT 2021
2021-10-26
99
Miscellaneous
KREHER PARK UPDATE FROM CITY OF ASHLAND
2021-10-08
99
Miscellaneous
NAPL RECOVERY SEPTEMBER 2021 REC'D
2021-10-08
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS REPORT SEPTEMBER 2021 REC'D
2021-10-01
43
Site Activity Status Update Received
GW MONITORING RPT REC'D
2021-09-28
99
Miscellaneous
KREHER PARK ASPHALT SCHEDULE
2021-09-10
99
Miscellaneous
NAPL RECOVERY AUGUST 2021
2021-09-10
99
Miscellaneous
KREHER PARK ASPHALT PLAN
2021-08-19
99
Miscellaneous
CITY OF ASHLAND KREHER PARK UPDATE
2021-08-10
99
Miscellaneous
NAPL RECOVERY JULY 2021
2021-08-10
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2021-07-01
43
Site Activity Status Update Received
GW MONITORING RPT REC'D
2021-06-23
99
Miscellaneous
KREHER PARK STATUS EPA EMAIL
2021-06-10
99
Miscellaneous
NAPL RECOVERY MAY 2021
2021-06-10
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS REPORT MAY 2021
2021-06-01
99
Miscellaneous
CITY OF ASHLAND UPDATE ON KREHER PARK DEVELOPMENT
2021-05-11
99
Miscellaneous
GW SAMPLING PLAN MOD REQUEST DNR COMMENTS
2021-05-10
99
Miscellaneous
PHASE 1 PROGRESS REPORT APRIL 2021
2021-05-10
99
Miscellaneous
NAPL RECOVERY APRIL 2021
2021-04-28
99
Miscellaneous
DNR COMMENTS TO EPA ON 12-15-20 KREHER PARK PLANS
2021-04-28
99
Miscellaneous
DNR INJECTION DETERMINATION
+
2021-04-28
99
Miscellaneous
EPA/DNR BOAT LAUNCH COMMENTS
20210428_99_DNR_Boat_Launch_Comments.pdf
20210428_99_EPA_Boat_Launch_Comments.pdf
2021-04-26
99
Miscellaneous
GROUNDWATER SAMPLING PLAN MODIFICATION REQUEST
2021-04-12
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS RPT
2021-04-12
99
Miscellaneous
NAPL RECOVERY MARCH 2021
2021-04-08
99
Miscellaneous
THANK YOU LETTER FROM EPA
2021-04-06
130
DNR Regulatory Reminder Sent
VAPOR INTRUSION AND TCE REMINDER LETTER
2021-04-01
99
Miscellaneous
CITY OF ASHLAND KREHER PARK AGREEMENT APPROVAL
2021-03-05
99
Miscellaneous
NAPL RECOVERY RPT - MARCH 2021
2021-03-05
99
Miscellaneous
MONTHLY PROGRESS RPT - PHASE I
2021-02-10
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2021-02-01
43
Site Activity Status Update Received
GW MONITORING RPT REC'D
2021-01-21
99
Miscellaneous
EPA PHASE 1 CONSTRUCTION COMPLETION
2021-01-11
99
Miscellaneous
NAPL RECOVERY DECEMBER 2020
2021-01-11
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS REPORT
2020-12-21
99
Miscellaneous
UPDATED KREHER PARK BOAT LAUNCH PLANS
2020-12-21
99
Miscellaneous
REVISED KREHER PARK BOAT LAUNCH PLANS
2020-12-17
99
Miscellaneous
EPA COOPERATIVE AGREEMENT REVIEW
2020-12-16
99
Miscellaneous
JFC OBJECTION LETTER
2020-12-15
99
Miscellaneous
DRAFT KREHER PARK BOAT LAUNCH PLANS AND SPECS
2020-12-10
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS REPORT REC'D
2020-12-10
99
Miscellaneous
NAPL RECOVERY NOVEMBER 2020
2020-12-02
99
Miscellaneous
ADDITIONAL MONITORING WELL CALL SUMMARY
2020-11-19
99
Miscellaneous
DRAFT DNR WORKING NAPL STRATIGRAPHIC INTERPRETATION SWIMM
2020-11-10
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2020-11-10
99
Miscellaneous
NAPL RECOVERY RPT OCTOBER 2020
2020-10-28
99
Miscellaneous
ADDITIONAL MONITORIG WELL EPA EMAIL
2020-10-23
99
Miscellaneous
O & M INJECTION REQUEST
2020-10-23
99
Miscellaneous
ORIN INJECTION PROPOSAL
2020-10-22
99
Miscellaneous
XCEL EMAIL CONCERNING ADDITIONAL MONITORING WELLS
2020-10-09
99
Miscellaneous
NAPL PRODUCT RECOVERY AUGUST 2020
2020-10-09
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS REPORT
2020-10-01
43
Site Activity Status Update Received
GW MONITORING RPT REC'D - JULY 2020
2020-10-01
43
Site Activity Status Update Received
GW MONITORING RPT REC'D - MAY 2020
2020-09-29
99
Miscellaneous
OM&M PLAN FINAL
+
2020-09-28
99
Miscellaneous
KREHER PARK CONSTRUCTION COMPLETION REVISED
20200928_99_Kreher_Park_Construction_Completion_Revised_ (1of2).pdf
20200928_99_Kreher_Park_Construction_Completion_Revised_(2of2).pdf
+
2020-09-28
151
Remedial Action (RA) Documentation Report Received (non-fee)
REVISED CONSTRUCTION COMPLETION RPT
20200928_151_Revised_Construction_Completion_1_of_3.pdf
20200928_151_Revised_Construction_Completion_2_of_3.pdf
20200928_151_Revised_Construction_Completion_3_of_3.pdf
2020-09-11
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS REPORT
2020-09-11
99
Miscellaneous
NAPL RECOVERY AUGUST 2020
2020-08-17
130
DNR Regulatory Reminder Sent
EMERGING CONTAMINANTS REMINDER LETTER
2020-08-10
99
Miscellaneous
MONTHLY PROGRESS RPT REC'D
2020-08-06
99
Miscellaneous
EPA FINAL INSPECTION AND CONSTRUCTION RPT
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 2 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 3 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 4 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 5 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 6 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 7 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 8 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 9 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 10 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 11 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 12 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 13 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 14 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 15 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 16 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 17 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 18 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 19 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 20 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 21 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 22 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 23 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 24 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 25 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 26 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 27 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 28 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 29 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 30 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 31 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 32 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 33 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 34 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 35 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 36 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 37 OF 38
2020-07-22
99
Miscellaneous
PHASE II RA RPT REC'D - 38 OF 38
2020-07-21
151
Remedial Action (RA) Documentation Report Received (non-fee)
PHASE II RA RPT REC'D - 1 OF 38
2020-07-13
99
Miscellaneous
FORM 4400-202 ATTACHMENT C (9 OF 9)
2020-07-13
99
Miscellaneous
FORM 4400-202 ATTACHMENT C (8 OF 9)
2020-07-13
99
Miscellaneous
FORM 4400-202 ATTACHMENT C (7 OF 9)
2020-07-13
99
Miscellaneous
FORM 4400-202 ATTACHMENT C (6 OF 9)
2020-07-13
99
Miscellaneous
FORM 4400-202 ATTACHMENT C (5 OF 9)
2020-07-13
99
Miscellaneous
FORM 4400-202 ATTACHMENT C (4 OF 9)
2020-07-13
99
Miscellaneous
FORM 4400-202 ATTACHMENT C (3 OF 9)
2020-07-13
99
Miscellaneous
FORM 4400-202 ATTACHMENT C (2 OF 9)
2020-07-13
99
Miscellaneous
FORM 4400-202 ATTACHMENT C (1 OF 9)
2020-07-13
56
Continuing Obligation(s) Applied
INSTITUTIONAL CONTROL IMPLEMENTATION AND ASSURANCE PLAN
2020-07-13
222
Continuing Obligation - Maintain Cap Over Contaminated Area
2020-07-13
232
Continuing Obligation - Residual Soil Contamination
2020-07-13
236
Continuing Obligation - Residual GW Contamination
2020-07-13
66
Continuing Obligations (COs) Apply at Off-site Property(ies)
2020-07-13
46
Impacted Right-of-Way (ROW) Notification
ROW N 3RD AVE E, ST CLAIR ST, PRENTICE
2020-07-10
99
Miscellaneous
ICIAP; INSTITUTIONAL CONTROL IMPLEMENTATION AND ASSURANCE PLAN REC'D - 4400-202 CONTAINED WITHIN
2020-07-10
99
Miscellaneous
NAPL RECOVERY SUMMARY
2020-07-10
99
Miscellaneous
PHASE 1 MONTHLY STATUS REPORT
2020-06-15
151
Remedial Action (RA) Documentation Report Received (non-fee)
PHASE 2 REMEDIAL ACTION REPORT
2020-06-10
99
Miscellaneous
MAPL RECOVERY MAY 2020
2020-06-10
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS RPT
2020-06-01
99
Miscellaneous
NO-COST TIME EXTENSAION REQUEST
2020-05-29
99
Miscellaneous
CITY OF ASHLAND NOTIFICATION
2020-05-29
99
Miscellaneous
BLUE LION TRUST NOTIFICATION
2020-05-29
99
Miscellaneous
KABASA NOTIFICATION
2020-05-29
99
Miscellaneous
OBRIEN NOTIFICATION
2020-05-29
99
Miscellaneous
OUR LADY OF THE LAKE NOTIFICATION
2020-05-29
99
Miscellaneous
ROSSING NOTIFICATION
2020-05-29
99
Miscellaneous
CITY OF ASHLAND ROW NOTIFICATION
2020-05-28
99
Miscellaneous
KREHER PARK CAP FINAL INSPECTION REPORT
2020-05-14
99
Miscellaneous
DNR EPA ICIAP COMMENTS
2020-05-11
99
Miscellaneous
NAPL RECOVERY SUMMARY APRIL
2020-05-11
99
Miscellaneous
PHASE 1 MONTHLY PROGRESS REPORT
2020-05-07
99
Miscellaneous
BLUE LION TRUST OFF SITE LETTER DOCUMENTATION
2020-05-04
99
Miscellaneous
EPA CERTIFICATION OF COMPLETION OF PHASE 2 REMEDIAL ACTION
2020-04-10
99
Miscellaneous
MARCH 2020 NAPL RECOVERY SUMMARY
2020-04-10
99
Miscellaneous
PHASE I MONTHLY REPORT COVID-19 INFORMATION
2020-04-10
99
Miscellaneous
PHASE I MONTHLY PROJECT REPORT
2020-03-16
99
Miscellaneous
NSP PROPERTY OWNER NOFICIATIONS
2020-03-13
151
Remedial Action (RA) Documentation Report Received (non-fee)
PHASE II REMEDIAL ACTION EPA APPROVAL
2020-03-13
99
Miscellaneous
PHASE II CONSTRUCTION COMPLETION REPORT EPA APPROVAL
2020-03-10
99
Miscellaneous
EPA COMMENTS ON BOAT LAUNCH PLANS
2020-03-09
99
Miscellaneous
APRIL 2019 GW MONITORING RPT REC'D
2020-03-09
99
Miscellaneous
PHASE I MONTHLY STATUS RPT REC'D
2020-03-09
99
Miscellaneous
NAPL RECOVERY SUMMARY REC'D
2020-02-13
99
Miscellaneous
PHASE II PROGRESS RPT REC'D
2020-02-10
99
Miscellaneous
NAPL RECOVERY SUMMARY REC'D
2020-02-10
99
Miscellaneous
PHASE I MONTHLY STATUS RPT REC'D
2020-02-05
99
Miscellaneous
INSTITUTIONAL CONTROL IMPLEMENTATION & ASSURANCE PLAN REC'D
+
2020-01-31
99
Miscellaneous
KREHER PARK CONSTRUCTION COMPLETION
20200131_99_Kreher_Park_Construction_Completion_(1of2).pdf
20200131_99_Kreher_Park_Construction_Completion_(2of2).pdf
+
2020-01-31
151
Remedial Action (RA) Documentation Report Received (non-fee)
CONSTRUCTION COMPLETION RPT
20200131_151_Construction_Completion_Report_1_of_3.pdf
20200131_151_Construction_Completion_Report_2_of_3.pdf
20200131_151_Construction_Completion_Report_3_of_3.pdf
2020-01-15
99
Miscellaneous
PHASE II PROGRESS RPT REC'D
2020-01-10
99
Miscellaneous
PHASE I MONTHLY STATUS RPT REC'D
2020-01-10
99
Miscellaneous
NAPL RECOVERY SUMMARY REC'D
2019-12-16
99
Miscellaneous
NAPL RECOVERY SUMMARY REC'D
2019-12-16
99
Miscellaneous
PHASE I MONTHLY STATUS RPT REC'D
2019-12-16
99
Miscellaneous
PHASE II PROGRESS RPT REC'D
2019-12-05
151
Remedial Action (RA) Documentation Report Received (non-fee)
EPA PRELIMINARY CLOSEOUT RPT REC'D - PCOR
2019-11-11
99
Miscellaneous
PHASE I MONTHLY STATUS RPT & NAPL RECOVERY SUMMARY RPT REC'D
2019-11-08
99
Miscellaneous
INJECTION DETERMINATION
2019-11-05
99
Miscellaneous
INJECTION DETERMINATION REQ REC'D
2019-10-15
99
Miscellaneous
PHASE II PROGRESS RPT REC'D
2019-10-11
99
Miscellaneous
PHASE I MONTHLY STATUS RPT REC'D
2019-10-11
99
Miscellaneous
NAPL RECOVERY SUMMARY REC'D
2019-09-10
99
Miscellaneous
NAPL RECOVERY SUMMARY REC'D
2019-09-10
99
Miscellaneous
PHASE I MONTHLY STATUS RPT REC'D
2019-08-15
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT - JULY 2019
2019-08-12
99
Miscellaneous
FIVE YEAR REVIEW
2019-08-02
147
Remedial Action (RA) Design Report Received (non-fee)
PHASE I FINAL DESIGN RPT REC'D
2019-08-01
43
Site Activity Status Update Received
APRIL 2019 GROUNDWATER MONITORING RPT REC'D
2019-07-24
99
Miscellaneous
CITY REDEVELOPMENT PLAN AUTHORIZATION LTR REC'D
2019-07-24
99
Miscellaneous
EPA KREHER PARK REDVELOPMENT AUTHORIZATION
2019-07-15
43
Site Activity Status Update Received
PHASE II WET DREDGE PROGRESS RPT REC'D
2019-07-10
99
Miscellaneous
KREHER PARK CAP APPROVAL
2019-06-14
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT REC'D
2019-06-10
99
Miscellaneous
PHASE II MONTHLY PROGESS RPT REC'D - MAY 2019
2019-05-15
99
Miscellaneous
PHASE II MONTHLY PROGESS RPT REC'D - APRIL 2019
2019-04-15
99
Miscellaneous
NAPL RECOVERY RPT REC'D - MARCH 2019
2019-04-15
99
Miscellaneous
PHASE I PROGRESS RPT REC'D
2019-04-15
99
Miscellaneous
PHASE II PROGRESS RPT REC'D
2019-02-15
99
Miscellaneous
PHASE II WET DREDGE PROGRESS RPT REC'D
2019-02-11
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2019-02-11
99
Miscellaneous
NAPL RECOVERY DEC 2018 REC'D
2018-12-20
99
Miscellaneous
CAP PRELIMINARY DESIGN GEOTECHNICAL WORK PLAN EPA APPROVAL
2018-12-18
99
Miscellaneous
PHASE II WET DREDGE PROGRESS RPT REC'D
2018-12-11
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D
2018-12-11
99
Miscellaneous
NAPL RECOVERY NOV 2018 REC'D
2018-12-05
99
Miscellaneous
PRELIMINARY DESIGN FOR KREHER PARK CAPPING & RESTORATION
2018-11-15
99
Miscellaneous
PHASE II MONTHLY PROGRESS RPT REC'D - OCT 2018
2018-11-12
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D - OCT 2018
2018-10-17
99
Miscellaneous
LONG TERM OPTIMIZATION & LIMITED GW INVESTIGATION LTR
2018-10-10
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT - SEP 2018
2018-09-12
99
Miscellaneous
EPA CONFIRMATION OF PHASE II DEDGE WORK COMPLETED
2018-09-10
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D - AUG 2018
2018-08-31
99
Miscellaneous
AGENCY POST DREDGE SWAC CALCULATION
2018-08-15
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT - JUL 2018
2018-07-31
99
Miscellaneous
FINAL BASIS OF DESIGN - KERHER PARK
2018-07-14
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT - JUN 2018
2018-07-10
99
Miscellaneous
PHASE I MONTHLY PROGESS RPT REC'D - JUN 2018
2018-07-05
99
Miscellaneous
EPA APPR OF CLEANING & RECOATING SHEET PILE WALL
2018-07-02
99
Miscellaneous
EPA APPR FISH HABITATE & STRUCTURES FOR PHASE II
2018-06-20
99
Miscellaneous
SIGNED FINDINGS
2018-06-11
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT - MAY 2018
2018-06-11
-
Website URL
ASHLAND/NORTHERN STATES POWER EPA SUPERFUND NPL/SAA WEBSITE THIS EPA WEBSITE CONTAINS ADDITIONAL INFORMATION ABOUT THIS ACTIVITY.
2018-05-31
99
Miscellaneous
NAPL RECOVERY
2018-05-15
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT - APR 2018
2018-05-13
99
Miscellaneous
HYDROGEOLOGIC CONDITIONS AGENCY COMMENTS
2018-05-11
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT - APR 2018
2018-04-25
99
Miscellaneous
AGENCY FISH HABITAT STRUCTURES
2018-04-13
99
Miscellaneous
EPA COMMENTS TO HYDROGEOLOGIC CONDITIONS FOR PHASE I
2018-04-09
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT REC'D - MAR 2018
2018-04-09
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D - MAY 2018
2018-04-06
99
Miscellaneous
ALUM PERMITTING
2018-03-10
99
Miscellaneous
PHASE I MONTHLY PROGESS RPT REC'D - FEB 2018
2018-03-05
99
Miscellaneous
EPA APPR OF RAWP FOR PHASE II
2018-03-05
99
Miscellaneous
ENBRIDGE REDUCTION LTR
2018-02-18
99
Miscellaneous
WPDES MONITORING REQ
2018-02-16
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT - JAN 2018
2018-02-11
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D - JAN 2018
2018-01-20
99
Miscellaneous
NAPL RECOVERY
2018-01-12
99
Miscellaneous
PHASE II WET DREDGE MONTHLY PROGRESS RPT - DEC 2017
2018-01-10
99
Miscellaneous
PHASE I MONTHLY PROGRESS RPT REC'D - DEC 2017
2017-12-14
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 12
2017-11-29
99
Miscellaneous
REC'D PHASE 2 BREAKWATER SETTLEMENT SURVEY - TWO YEARS POST CONSTRUCTION
2017-11-27
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 11
2017-11-08
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 10
2017-10-20
99
Miscellaneous
REC'D END OF CONSTRUCTION SEASON CONTIGENCY PLAN RPT
2017-10-18
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 9
2017-10-05
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 8
2017-09-22
99
Miscellaneous
FRM 02-02-177777 COMBINED WITH 02-02-000013
2017-09-14
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 7
2017-09-11
99
Miscellaneous
REC'D EROSION CONTROL & STORM WATER MANAGMENT PLAN AMENDMENT RPT
2017-08-30
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 6
2017-08-28
99
Miscellaneous
REC'D AMBIENT MONITORING PROCEDURES RPT
2017-08-11
99
Miscellaneous
REC'D ODOR EMISSON CONTROL SYSTEM RPT 5
2017-07-20
99
Miscellaneous
SELECTED SHEEN MANAGMENT OPTION RPT REC'D
2017-07-18
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 4
2017-07-11
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 3
2017-06-22
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 2
2017-06-14
99
Miscellaneous
REC'D ODOR EMISSION CONTROL SYSTEM RPT 1
2017-04-13
99
Miscellaneous
REC'D REMEDIAL ACTION WORK PLAN RPT - PHASE 2 WET DREDGE
2017-03-27
99
Miscellaneous
EPA APPROVAL OF FINAL DESIGN FOR PHASE II WET DREDGE
2017-03-24
99
Miscellaneous
PHASE II SEDIMENT DREDGING NOTICE OF MOBILIZATION TO PROPERTY OWNER - CITY OF ASHLAND
2017-03-24
99
Miscellaneous
PHASE II SEDIMENT DREDGING NOTICE OF MOBILIZATION TO PROPERTY OWNER - WI CENTRAL LTD
2017-03-22
99
Miscellaneous
PHASE II WET DREDGE GAP CLOSURE CONSTRUCTION DETAILS RPT REC'D
2017-03-21
99
Miscellaneous
HYDROGEOLOGY RPT REC'D
2017-03-20
43
Site Activity Status Update Received
PHASE II WET DREDGE MONTHLY PROGRESS RPT # 2
2017-03-17
99
Miscellaneous
EPA LTR - CONDITIONAL APPROVAL OF FINAL DESIGN FOR PHASE II
2017-03-15
99
Miscellaneous
OM & M PLAN MODIFICATION REQUEST REC'D
2017-03-13
43
Site Activity Status Update Received
PHASE I MONTLY PROGRESS RPT # 55
2017-03-01
99
Miscellaneous
AIR COMMENTS TO PHASE II DESIGN RPT
2017-03-01
99
Miscellaneous
ORDER ENTERING CONSENT DECREE
2017-02-27
99
Miscellaneous
EPA LTR - FOLLOW UP ON FINAL DESIGN FOR PHASE II WET DREDGE
2017-02-13
99
Miscellaneous
EPA COMMENTS ON FINAL DESIGN PHASE II
2017-02-10
99
Miscellaneous
DNR TO EPA - SWAC MEMO
2017-02-10
43
Site Activity Status Update Received
PHASE II WET DREDGE MONTLY PROGRESS RPT # 1
2017-01-17
99
Miscellaneous
EPA COMMENTS 95% PHASE II REMEDIAL DESIGN PLAN
2017-01-12
43
Site Activity Status Update Received
PHASE I MONTHLY PROGESS RPT # 53
2017-01-12
43
Site Activity Status Update Received
PHASE II WET DREDGE PILOT MONTHLY PROGRESS RPT # 9
2017-01-09
99
Miscellaneous
CONSENT DECREE
+
2016-12-22
99
Miscellaneous
95 PERCENT DESIGN FOR PHASE 2 WET DREDGE
20161222_99_Part_1_Phase_2_Wet_Dredge_95_Percent_Design.pdf
20161222_99_Part_2_Phase_2_Wet_Dredge_95_Percent_Design.pdf
20161222_99_Part_3_Phase_2_Wet_Dredge_95_Percent_Design.pdf
20161222_99_Part_4_Phase_2_Wet_Dredge_95_Percent_Design.pdf
20161222_99_Part_5_Phase_2_Wet_Dredge_95_Percent_Design.pdf
2016-12-19
99
Miscellaneous
PHASE II REMEDIAL DESIGN WP APPROVAL
2016-12-16
99
Miscellaneous
PHASE I WASTEWATER TREATMENT PLAN OM&M PLAN REV 2 PART 1 - REC'D
2016-12-16
99
Miscellaneous
PHASE I WASTE WATER TREATMENT PLAN OM&M PLAN REV 2 PART 2 - REC'D
2016-12-15
99
Miscellaneous
ESD RPT
2016-12-15
314
Superfund Decision Document (ROD or ESD) - See Description
EXPLANATION OF SIGNIFICANT DIFFERENCES
2016-12-13
43
Site Activity Status Update Received
PHASE I MONTHLY PROGRESS RPT #52
2016-11-15
43
Site Activity Status Update Received
PHASE II WET DREDGE PILOT MONTHLY PROGRESS RPT #7
2016-11-10
43
Site Activity Status Update Received
PHASE I MONTHLY PROGRESS RPT #51
2016-10-28
99
Miscellaneous
EPA COMMENTS TO 60% DESIGN FOR PHASE II WET DREDGE LTR
2016-10-13
43
Site Activity Status Update Received
PHASE II WET DREDGE PILOT MONTHLY PROGRESS RPT # 6
2016-10-10
43
Site Activity Status Update Received
PHASE I MONTHLY PROGRESS RPT #50
2016-09-30
99
Miscellaneous
60 PCT DESIGN FOR PHASE 2 WET DREDGE
2016-09-13
43
Site Activity Status Update Received
PHASE II WET DREDGE PILOT MONTHLY PROGRESS RPT #5
2016-09-12
43
Site Activity Status Update Received
PHASE I MONTHLY PROGRESS RPT #49
2016-08-10
99
Miscellaneous
PILOT STUDY DATA RPT REC'D
2016-08-10
99
Miscellaneous
EPA APPROVAL OF THE EXTENDED PILOT TEST
2016-07-08
99
Miscellaneous
REC'D SHEET PILE GLOBAL STABILITY REVISED ASSESSMENT RPT
2016-07-01
99
Miscellaneous
PHASE I PRE-FINAL INSPECTION RPT
2016-05-04
99
Miscellaneous
PRE-DREDGE SEDIMENT SAMPLING & ANALYSIS PLAN FOR WET DREDGE PILOT STUDY
2016-05-04
99
Miscellaneous
PUBLIC MEETING
2016-05-03
99
Miscellaneous
FINAL DESIGN WET DREDGE PILOT TEST SUBMITTAL
2016-04-15
99
Miscellaneous
PRE-DREDGE SAMPLING & ANALYSIS PLAN SUBMITTAL
2016-04-07
99
Miscellaneous
WET DREDGE PILOT TEST MOBILIZATION NOTIFICATION
2016-04-06
99
Miscellaneous
WET DREDGE MONITORING PLAN UPDATE
2016-04-06
99
Miscellaneous
WET DREDGE QAPP UDDATE
2016-03-21
99
Miscellaneous
FINAL CH 39 EQIVALENCY FOR WET DREDGE PILOT TEST
2016-03-01
99
Miscellaneous
EPA CONDITIONAL APPROVAL OF WET DREDGE PILOT TEST PLAN
2016-02-17
99
Miscellaneous
DNR COMMENTS TO FINAL WE DREDGE PLAN
2016-02-05
99
Miscellaneous
FINAL DESIGN WET DREDGE PILOT TEST SUBMITTAL
2015-12-14
99
Miscellaneous
FINAL BREAKWATER COMPLETION RPT SUMBITTED
2015-12-08
99
Miscellaneous
90% DESIGN WET DREDGE PILOT TEST PLAN SUBMITTED
2015-11-18
99
Miscellaneous
EPA SAP APPROVAL
2015-11-13
99
Miscellaneous
NOTICE OF PRE-DESIGN PILOT TEST SAMPLING
2015-11-12
99
Miscellaneous
PUBLIC MEETING
2015-11-04
99
Miscellaneous
CH 30 AMENDMENT
2015-10-15
99
Miscellaneous
TECHNICAL MEMO FOR PHASE 2 WET DREDGE PILOT STUDY
2015-09-29
99
Miscellaneous
PHASE I APPOVAL
+
2015-09-18
99
Miscellaneous
FINAL DESIGN FOR PHASE 1 REMEDIAL ACTION
20150918_99_Part_1_Phase_1_RA_Final_Design.pdf
20150918_99_Part_2_Phase_1_RA_Final_Design.pdf
20150918_99_Part_3_Phase_1_RA_Final_Design.pdf
20150918_99_Part_4_Phase_1_RA_Final_Design.pdf
2015-09-01
99
Miscellaneous
PHASE I FINAL DESIGN REC'D
2015-09-01
99
Miscellaneous
PHASE I AIR MANAGEMENT PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I NOISE MANAGEMENT PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I VIBRATION MANAGMENT PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I PERFORMANCE STANDARD VERIFICATION PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I REMEDIAL ACTION QUALITY ASSURANCE PROJECT PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I REMEDIAL ACTION WASTE MANAGMENT PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I CONSTRUCTION QUALITY ASSURANCE PLAN
2015-09-01
99
Miscellaneous
PHASE I QUALITY MANAGEMENT PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I DEMOLITION PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I EROSION CONTROL & STORM WATER MANAGEMENT PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I REMEDIAL ACTION SITE SPECIFIC HEALTH & SAFETY PLAN REC'D
2015-09-01
99
Miscellaneous
PHASE I FINAL DESIGN NAPL RPT REC'D
2015-08-04
99
Miscellaneous
BREAKWATER APPROVAL
2015-08-03
99
Miscellaneous
CH 30 APPROVAL
2015-07-24
99
Miscellaneous
CONDITIONAL APPROVAL FOR ROCK PLACEMENT
2015-07-21
99
Miscellaneous
PUBLIC HEARING - CH. 30 BREAKWATER
2015-07-21
99
Miscellaneous
BREAKWATER FINAL DESIGN
2015-07-15
305
Superfund Enforcement Documents - See Description
AOC ON CONSTRUCTION OF BREAKWATER
2015-07-09
99
Miscellaneous
CITY OF ASHLAND LETTER OF SUPPORT - BREAKWATER
2015-07-01
99
Miscellaneous
BREAKWATER WATER TEMP MODELING
2015-06-24
99
Miscellaneous
CONDITIONAL APPROVAL TO START SEDIMENT REMOVAL
2015-06-22
99
Miscellaneous
CH 30 EQUIVALENCY - DREDGE
2015-06-17
99
Miscellaneous
APPROVAL TO INSTALL SHALLOW MONITORING WELLS - KREHER PARK
2015-06-05
99
Miscellaneous
CH 30 APPLICATION - BREAKWATER
2015-06-01
99
Miscellaneous
APPROVAL FOR LAND BASED ACTIVITIES - BREAKWATER CONSTRUCTION
2015-05-28
99
Miscellaneous
AUTHORIZATION TO PROCEED - GEOTECH INVESTIGATION
2015-05-15
99
Miscellaneous
CONDITIONAL APPROVAL - ROCK
2015-05-13
99
Miscellaneous
CITY OF ASHLAND RESOLUTION
2015-04-21
99
Miscellaneous
GEO TECH WORK PLAN EAST PENINSULA
2015-04-10
99
Miscellaneous
BREAKWATER PREFINAL DESIGN
2015-03-30
99
Miscellaneous
BREAKWATER PRELIMINARY DESIGN TECH MEMO
2015-03-16
99
Miscellaneous
DUST COMPLAINT
2015-03-16
99
Miscellaneous
BREAKWATER PRELIMINARY DESIGN TECH MEMO
2015-03-01
99
Miscellaneous
PILOT TEST EXTENSION LETTER
2015-02-19
99
Miscellaneous
EPA - CONDITIONAL APPROVAL WET DREDGE PILOT TEST
2015-02-17
99
Miscellaneous
EXTENSION TO COMPLETE PILOT TEST
2015-01-30
99
Miscellaneous
WET DREDGE PILOT STUDY DESIGN PACKAGE
2015-01-29
99
Miscellaneous
NSPW MONTHLY PROGRESS RPT
2015-01-28
99
Miscellaneous
EPA COMMENTS TO COPPER FALLS DESIGN
2015-01-23
99
Miscellaneous
GEOTECHNICAL WORK PLAN FOR ASHLAND BREAKWATER
2015-01-23
99
Miscellaneous
PRELIMINARY DESIGN FOR ASHLAND BREAKWATER
2015-01-09
99
Miscellaneous
TCLP RESULTS
2015-01-07
99
Miscellaneous
NSPW MONTLY PROGRESS RPT
2014-12-12
99
Miscellaneous
EPA COMMENTS TO CONCEPTUAL CONTAINMENT DESIGN
2014-12-08
99
Miscellaneous
NSPW MONTHLY PROGRESS RPT
2014-11-06
99
Miscellaneous
NSPW MONTHLY PROGRESS RPT
2014-10-07
99
Miscellaneous
NSPW MONTHLY PROGRESS RPT
2014-09-19
99
Miscellaneous
NSPW SUBMITTED REVISIONS TO STORMWATER OUTFALLS
2014-09-19
99
Miscellaneous
NSPW MEMO RE: STATUS OF TEMT WWTP
2014-09-18
99
Miscellaneous
NSPW SUBMITTED TECH MEMO RE: SHEET PILE ON THE UPPER BLUFF
2014-09-17
99
Miscellaneous
NSPW TECH MEMO OLD WWTP SHEETPILE WALL DEADMAN
2014-09-04
99
Miscellaneous
NSPW RESPONSE TO SHEET PILE ANCHOR SYSTEM COMMENTS
2014-08-28
99
Miscellaneous
EPA/DNR ADDITIONAL COMMENTS ON THE FINAL DESIGN
2014-08-25
99
Miscellaneous
EPA/DNR COMMENTS ON WPDES DISCHARGE PIPE DRAWINGS
2014-08-12
99
Miscellaneous
EPA/DNR COMMENTS TO SHEETPILE ANCHOR SYSTEM
2014-07-31
99
Miscellaneous
ASHLAND LAKEFRONT SUPERFUND SITE TECHNICAL SUBMITTAL WESTON
2014-07-28
99
Miscellaneous
NSPW SUBMITTED FINAL DESIGN DRAWINGS
2014-07-16
99
Miscellaneous
NSPW SUBMTTED MEMO DESIGN MODIFICATION SHORELINE BULKHEAD WALL
2014-07-03
99
Miscellaneous
NSPW SUBMIT DRAWING FOR WPDES EQ
2014-06-13
99
Miscellaneous
EPA/DNR COMMENTS TO THE FINAL DESIGN UB, FR, KP
2014-05-30
99
Miscellaneous
NSPW SUBMITTED RESPONSE TO EPA/DNR COMMENT TO THE FINAL DESIGN KP
2014-05-23
99
Miscellaneous
RPA/DNR COMMENTS TO THE FINAL DESIGN UB, FR, KP
2014-05-13
99
Miscellaneous
TECHNICAL SUBMITTAL LETTER FROM WESTON SOLUTIONS
2014-05-12
99
Miscellaneous
ASHLAND NSP BASAL HEAVE TECHNICAL SUBMITTAL WESTON SOLUTIONS
2014-05-01
99
Miscellaneous
EPA VERBAL APPROVAL TO PROCEED WITH UB, FR, KP REMEDIATION
2014-04-24
99
Miscellaneous
PRE-CONSTRUCTION MEETING
2014-04-21
99
Miscellaneous
NSPW SUBMITTED ICIAP FIGURES
2014-04-18
99
Miscellaneous
NSPW SUBMITTED TECH MEMO RE WPDES PERMIT EQ
2014-04-16
99
Miscellaneous
NSPW SUBMITTED PRELIMINARY DESIGN COPPER FALL AQUIFER REMEDY
2014-04-11
99
Miscellaneous
NSPW SUBMITTED FINAL DESIGN UP, FR, KP
2014-03-26
99
Miscellaneous
EPA/DNR LETTER COMMENTS TO THE SOILS MANAGEMENT PLAN & ICIAP
2014-03-19
99
Miscellaneous
EPA.DNR LETTER COMMENTS TO THE PRE-FINAL DESIGN UB, FR & KP
2014-03-04
99
Miscellaneous
NSPW ISSUED THE DRAFT ICIAP
2014-02-12
99
Miscellaneous
EPA/DNR LETTER CONDITIONAL APPROVAL OF SHEET;ILE BULKHEAD WALL CONSTUCTION
2014-01-30
99
Miscellaneous
NSPW SUBMITTED MALFUNCTION PLANNING & ABAITMENT PLAN
2014-01-20
99
Miscellaneous
NSPW SUBMITTED CONSOLIDATED PRE-FINAL DESIGN KREHER PARK CONTAINMENT & EXCAVATION & TREATMENT PLAN
2013-12-01
37
Site Investigation Report (SIR) Received (non-fee)
SHORELINE AND OFFSHORE GEOTECHNICAL EVALUATION REPORT
2013-11-22
99
Miscellaneous
DRAFT - SUBSURFACE NAPL ARCHITECTURE & MOBILITY REPORT
2013-11-22
99
Miscellaneous
NSPW SUBMITTED SHALLOW GW EXTRACTION PLAN
2013-11-21
99
Miscellaneous
DRAFT - PRELIMINARY DESIGN FOR KREHER PARK SHALLOW GW CONTAINMENT EXTRACTION & TREATMENT
2013-11-15
99
Miscellaneous
EPA/DNR COMMENTS TO PRE-FINAL SHORELINE BULKHEAD WALL DESIGN
2013-11-12
99
Miscellaneous
EPA/DNR COMMENT TO THE PROJECT SUPPORT PLAN
2013-11-12
99
Miscellaneous
OFFSHORE SAMPLING FINAL DATA REPORT
2013-11-12
99
Miscellaneous
OFFSHORE SAMPLING FINAL DATA REPORT APPENDICES
2013-10-21
99
Miscellaneous
NSPW RESPONSE TO EPA/DNR COMMENTS PRE-FINAL SOIL EXCAVATION & TREATMENT PLAN
2013-10-18
99
Miscellaneous
NSPW SUBMITTED PRELIMINARY DESIGN FOR KREHER PARK CONTAINMENT
2013-09-19
99
Miscellaneous
DRAFT - RA QUALITY ASSURANCE PROJECT PLAN - REVISION 1
2013-07-15
99
Miscellaneous
DRAFT - PHASE 1 PRE-DESIGN STUDEY WORK PLAN REVISION 1
2013-07-03
99
Miscellaneous
NSPW SUMITTED PRE-FINAL DESIGN FOR SHORELINE BULKHEAD WALL
2013-05-31
99
Miscellaneous
DRAFT - PRE-FINAL DESIGN FOR SOIL EXCAVATION & TREATMENT
2013-05-06
99
Miscellaneous
EPA/DNR COMMENT TO THE DRAFT SHORELINE BULKHEAD WALL
2013-05-02
99
Miscellaneous
EPA/DNR FORMAL COMMENTS ON THE SOIL EXCAVATION PLAN
2013-04-15
99
Miscellaneous
NSPW SUBMITTED DRAFT DESIGN FOR SHOELINE BULKHEAD WALL
2013-04-12
99
Miscellaneous
EPA/DNR PRELIMARY COMMENTS TO THE DRAFT SOIL EXCAVATION PLAN
2013-04-08
99
Miscellaneous
FINAL - QUALITY MANAGEMENT PLAN
2013-04-04
99
Miscellaneous
EPA/DNR COMMENT TO THE DRAFT CONSTRUCTION QUALITY ASSURANCE PLAN
2013-04-03
99
Miscellaneous
EPA/DNR COMMENTS TO DRAFT AIR MANAGEMENT PLAN
2013-04-03
99
Miscellaneous
EPA/DNR COMMENT TO THE DRAFT WASTE MANAGEMENT PLAN
2013-03-13
99
Miscellaneous
DRAFT - VIBRATION MANAGEMENT PLAN
2013-03-08
99
Miscellaneous
DRAFT - PRELIMINARY DESIGN FOR SOIL EXCAVATION & TREATMENT REPORT
2013-01-16
99
Miscellaneous
DRAFT - RA WASTE MANAGEMENT PLAN
2013-01-16
99
Miscellaneous
DRAFT - EROSION CONTROL & STORMWATER PLAN
2013-01-16
99
Miscellaneous
DRAFT - PERFORMANCE STANDARD VERIFICATION PLAN
2013-01-16
99
Miscellaneous
DRAFT - CONSTRUCTION QUALITY ASSURANCE PLAN
2013-01-16
99
Miscellaneous
DRAFT - AIR MANAGEMENT PLAN
2013-01-16
99
Miscellaneous
DRAFT - NOISE MANAGEMENT PLAN
2012-12-18
99
Miscellaneous
FINAL - RA QUALITY ASSURANCE PROJECT PLAN
2012-12-18
99
Miscellaneous
FINAL - GEOTECHNICAL SOIL BORING LOGS
2012-11-02
99
Miscellaneous
DRAFT - PHASE I PRE-DESIGN STUDY WORK PLAN
2012-11-01
99
Miscellaneous
FINAL - DEMOLITION PLAN
2012-08-08
99
Miscellaneous
PHASE I CONSENT DECREE ORDER
2011-09-07
130
DNR Regulatory Reminder Sent
Vapor Intrusion (VI) Assessment Notification Ltr Sent
2010-09-30
314
Superfund Decision Document (ROD or ESD) - See Description
RECORD OF DECISION.
2010-09-30
149
Remedial Action (RA) Design Report Approved
RECORD OF DECISION - RAP APPROVAL
2010-04-14
99
Miscellaneous
HARBOR EXPANSION STUDY SEH
2009-06-29
312
Superfund Proposed Plan Public Meeting
2009-06-15
311
Superfund Proposed Plan (PP) Issued
2009-03-24
203
DNR Cost Recovery Complete for Immediate Response Action
STATE FUNDED COST RECOVERY $1.3 MILLION
2008-12-04
310
Superfund Final Feasibility Study (FS) Submittal
2007-08-31
307
Superfund Final Remedial Investigation (RI) Approval
2006-06-16
99
Miscellaneous
SITE PROGRAM REQUEST/COOL-OX
2006-06-16
99
Miscellaneous
SITE NR 141 INJECTION/INFILTRATION REQUEST WITHOUT FEE.
2006-06-05
99
Miscellaneous
DRAFT - REMEDIAL INVESTIGATION REPORT - NOT APPROVED
2006-05-30
99
Miscellaneous
DRAFT - BASELINE ECOLOGICAL RISK ASSESSMENT - NOT APPROVED
2006-05-30
99
Miscellaneous
SEDIMENT STABILITY STUDY - NOT APPROVED
2006-04-07
99
Miscellaneous
DRAFT - HUMNA HEALTH RISK ASSESSMENT - NOT APPROVED
2006-03-13
99
Miscellaneous
SEDIMENT STABILITY ASSESSMENT
2005-09-05
206
Site Investigation End - State Lead
2005-05-19
43
Site Activity Status Update Received
MONTHLY PROGRESS REPORT NO. 18
2005-03-18
43
Site Activity Status Update Received
MONTHLY PROGRESS REPORT NO. 16
2005-02-21
43
Site Activity Status Update Received
MONTHLY PROGRESS REPORT NO. 15
2005-01-21
43
Site Activity Status Update Received
MONTHLY PROGRESS REPORT NO 14
2005-01-01
99
Miscellaneous
DNR GUIDANCE DOCUMENT - RR-726
2004-12-22
99
Miscellaneous
LETTER REQUEST FROM XCEL TO EPA FOR A MEETING ON NATURAL RESOURCE ISSUES
2004-12-15
43
Site Activity Status Update Received
AOC PROGRESS RPT #13
2004-12-10
99
Miscellaneous
RPT #92 RESPONSE COMMENTS TO 07/26/2004DRAFT RI/FS WORK PLAN
2004-12-08
99
Miscellaneous
OPEN RECORDS REQUEST - RIVKIN & RADLER
2004-12-08
99
Miscellaneous
OPEN RECORDS REQUEST - LORD BISSELL & BROOK
2004-12-03
99
Miscellaneous
URS/NEWFIELDS RELATIONSHIP RESPONSE LETTER
2004-11-16
99
Miscellaneous
JAMIE DUNN LETTER TO ASHLAND DAILY PRESS STATING THAT THE ARTESIAN WELLS WERE CLOSED AS A PRECAUTION
2004-11-15
43
Site Activity Status Update Received
RPT #91 AOC PROGRESS RPT #12
2004-11-10
23
Referral to Department of Justice (DOJ)
ORDER FOR A STAY TO RECOVER STATE COSTS - WDOJ
2004-11-01
99
Miscellaneous
COMMUNITY INVOLVEMENT PLAN - DNR GUIDANCE DOCUMENT
2004-10-22
99
Miscellaneous
LETTER NOTICE SENT TO XCEL CUSTOMERS THAT THE ARTESIAN WELLS WOULD BE CLOSED
2004-10-15
43
Site Activity Status Update Received
AOC PROGRESS RPT #11 - SEPTEMBER 2004
2004-09-22
99
Miscellaneous
COMMENTS ON SEH 09/02/2003 DRAFT RI WP
2004-09-15
43
Site Activity Status Update Received
AOC PROGRESS RPT #10
2004-09-01
99
Miscellaneous
DH&FC HEALTH CONSULTATION FOR THE SITE
2004-08-17
99
Miscellaneous
WDNR (DOUGLAS SCHULTZ) - WATER SUPPLY SYSTEM EVALUATION
2004-08-16
43
Site Activity Status Update Received
RPT #90 AOC PROGRESS RPT #9
2004-07-14
43
Site Activity Status Update Received
RPT #89 AOC PROGRESS RPT #8
2004-07-12
99
Miscellaneous
SMOA - SITE SPECIFIC SUPERFUND MEMORANDUM OF UNDERSTANDING
2004-07-02
99
Miscellaneous
WDNR SENT REIMBURSEMENT REQUEST FOR COSTS
2004-06-30
43
Site Activity Status Update Received
STATUS LETTER #4 - COMPLETION OF CONTRACT - FROM SEH
2004-06-22
99
Miscellaneous
STATE RESPONSE COST RECOVERY LETTER SENT ($1,408046.84)
2004-06-16
43
Site Activity Status Update Received
RI/FS PROGRESS REPORT #7
2004-06-08
99
Miscellaneous
WCL - EA - ASHLAND RR ABANDONEMENT EXEMPTION - STB DOCKET AB-303
2004-06-01
23
Referral to Department of Justice (DOJ)
COST RECOVERY
2004-05-21
43
Site Activity Status Update Received
RI/FS UPDATE # 6 - XCEL
2004-05-17
99
Miscellaneous
RPT #88 - AOC PROGRESS REPORT #6 - APR 2004 - XCEL
2004-05-14
99
Miscellaneous
BAD RIVER 'S COMMENTS TO XCEL WORK PLAN
2004-04-21
99
Miscellaneous
ACCESS AGREEMENT - DATA COLLECTION
2004-04-15
99
Miscellaneous
RI/FS UPDATE #5 - XCEL
2004-04-12
99
Miscellaneous
REVISED QAPP TABLES FOR WORKPLAN
2004-04-09
99
Miscellaneous
NOTICE OF EXEMPTION FOR RAIL ABANDONMENT TO NATL SURFACE TRANSPORTATION
2004-04-08
99
Miscellaneous
ASHLAND RAIL ABANDONMENT MEMO FROM DUNN TO GANTZ
2004-04-05
206
Site Investigation End - State Lead
2004-04-02
99
Miscellaneous
REQUEST TO COMPLETE WELL INSTALLATION
2004-03-15
43
Site Activity Status Update Received
RI/FS UPDATE #4 - XCEL
2004-02-18
35
Site Investigation Workplan (SIWP) Received (non-fee)
2004-02-13
205
Site Investigation Start - State Lead
2004-02-05
43
Site Activity Status Update Received
STATUS RPT #3 - SEH
2004-02-04
99
Miscellaneous
COOPERATIVE AGREEMENT DNR/EPA, ACCEPTED
2004-01-15
43
Site Activity Status Update Received
RPT #87 AOC PROGRESS REPORT #2 - JAN 2004 - XCEL
2004-01-14
99
Miscellaneous
MEETING SUMMARY OF WORK, TASKS & SCOPING FROM USEPA TO XCEL
2004-01-08
99
Miscellaneous
USEPA SUMMARY OF STATEMENT OF WORK, TASK 1, TECH SCOPE
2004-01-07
99
Miscellaneous
COMMENTS ON SEH & URS PROPOSED RI/FS WP - WDHFS
2004-01-07
99
Miscellaneous
DHFS COMMENTS ON RI/FS WORK PLANS
2004-01-07
99
Miscellaneous
WDHFS COMMENTS ON SEH & URS PROPOSED RI/FS WP
2004-01-07
99
Miscellaneous
DRAFT ASHLAND FORMULATION - PART I; EMAIL FROM BATTELLE TO WELDON BOSWORTH
2004-01-07
99
Miscellaneous
EMAIL RESPONSE FROM BOSWORTH TO BATTELLE ON ASHLAND PROBLEM FORMULATION
2003-12-19
35
Site Investigation Workplan (SIWP) Received (non-fee)
RPT #85 DRAFT - RI WORK PLAN - URS
2003-12-16
99
Miscellaneous
2ND CONTINGENCY FEE REQUEST - LIMITED INVESTIGATION - SEH
2003-12-15
99
Miscellaneous
TECHNICAL LETTER RPT - URS & SEH WORK PLAN COMPARISON
2003-12-12
43
Site Activity Status Update Received
RPT #86 AOC PROGRESS REPORT #1 - DEC 2003 - XCEL
2003-12-10
99
Miscellaneous
EXTENSION REQUEST FOR SUPERFUND COOP AGREEMENT
2003-12-09
99
Miscellaneous
STATE FUNDED RESPONSE COST RECOVERY
2003-12-01
99
Miscellaneous
WDNR CONTINGENCY REQUEST - 2 TASKS OF THE RI/FS WP
2003-11-20
99
Miscellaneous
1ST CONTINGENCY FEE REQUEST - LIMITED INVESTIGATION - SEH
2003-11-19
99
Miscellaneous
PIPE OBSERV/EXCAV - PO #NKD00000155 - SEH INVOICE #0108178
2003-11-14
302
Superfund: Site Investigation Federal Consent Order
SI FEDERAL CONSENT ORDER
2003-11-12
99
Miscellaneous
REUSE OF FORMER WASTE WATER TREATMENT PLANT - WDHFS
2003-10-31
35
Site Investigation Workplan (SIWP) Received (non-fee)
RPT #83 - RI WORK PLAN - SEH
2003-10-29
99
Miscellaneous
RI/FS - PO#9CME0000003 - SEH INVOICE #0107047 (MAR SERVICES)
2003-10-28
99
Miscellaneous
WDNR 2003 3RD QUARTER NARRATIVE - (JUL - SEP)
2003-10-24
99
Miscellaneous
SEH STATUS LTR #2 - 08-09/2003 ACTIVITIES UNDER WDNR PO 9CME0000036
2003-10-09
99
Miscellaneous
LIMITED INVEST-PO#9CME0000036 - SEH INVOICE #0105982 - (AUG - SEP SERVICES)
2003-10-03
99
Miscellaneous
FINAL ANALYTICAL REPORT FOR STOCKPILE SOIL SAMPLES - URS
2003-10-01
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #82 - IR COAL TAR RECOVERY SYS (011) - URS
2003-09-25
99
Miscellaneous
EPA'S CONDITIONAL APPROVAL - MINI QAPP
2003-09-25
99
Miscellaneous
RPT #84 WDHFS - PUBLIC HEALTH ASSESSMENT - II - ATSDR
2003-09-05
99
Miscellaneous
MEETING AGENDA FOR EPA OVERSIGHT 09/08/03 - 09/10/03
2003-09-04
99
Miscellaneous
ASHLAND'S DNR OVERSITE UPDATE LTR TO CITY COUNCIL
2003-09-03
99
Miscellaneous
ANALYTICAL REPORT FOR STOCKPILE SOIL SAMPLES - URS
2003-08-28
99
Miscellaneous
EPA COMMENTS ON DRAFT PROBLEM FORMULATION
2003-08-20
99
Miscellaneous
ASHLAND REQUEST LTR FOR WDNR STATE LEAD
2003-08-19
99
Miscellaneous
STATUS LTR #1 7/03 ACTIVITIES UNDER WDNR PO #9CME00000036
2003-08-13
99
Miscellaneous
SEH INVOICE #0104287 - LIMITED INVEST. - (JUL SERVICES)
2003-08-13
206
Site Investigation End - State Lead
2003-08-05
99
Miscellaneous
COOPERATIVE AGREEMENT AMENDMENT #2 - RI/FS PHASE
2003-08-02
99
Miscellaneous
RPT #81 - QAPP - VOLUME II - URS
2003-08-01
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #79 - IR COAL TAR RECOVERY SYS (010) - URS
2003-08-01
99
Miscellaneous
RPT #80 - QAPP - VOLUME I - URS
2003-07-26
99
Miscellaneous
RESPONSE LTR TO XCEL FOR CITY COUNCIL MTG - MAYOR
2003-07-23
99
Miscellaneous
CITY COUNCIL MEETING COMMENT LTR - XCEL
2003-07-22
99
Miscellaneous
STATUS LTR #10 06/03 ACTIVITIES - SEH
2003-07-16
99
Miscellaneous
RI/FS PO#9CME0000003 - SEH INVOICE # 0103221 (JUN SERVICES)
2003-06-25
99
Miscellaneous
CONSULTANT SERVICES CONTRACT - LIMITED INVESTIGATION
2003-06-18
99
Miscellaneous
SEH RI/FS STATUS LTR #9 - 5/03 ACTIVITIES
2003-06-13
99
Miscellaneous
SEH INVOICE #0101850 (MAY SERVICES)
2003-05-29
205
Site Investigation Start - State Lead
2003-05-22
99
Miscellaneous
WI CENTRAL RR - PROPOSED ABANDONMENT
2003-05-17
99
Miscellaneous
ASHLAND STORM SEWER RE-ROUTE LTR
2003-05-16
99
Miscellaneous
SEH RI/FS STATUS LTR #8 - 4/03 ACTIVITIES
2003-05-15
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #78 - IR COAL TAR RECOVERY SYS (009) - URS
2003-05-13
99
Miscellaneous
SEH INVOICE - RI/FS #0100434 (APR SERVICES)
2003-04-21
99
Miscellaneous
RPT #77 - PROPOSAL FOR LIMITED INVEST PROBLEM FORMULA
2003-04-18
99
Miscellaneous
SEH RI/FS STATUS LTR #7 - 3/03 ACTIVITIES
2003-04-15
99
Miscellaneous
SEH INVOICE - RI/FS #0099551 (MAR SERVICES)
2003-04-02
99
Miscellaneous
SEDIMENT GUIDENCE COMMENTS - XCEL
2003-04-01
99
Miscellaneous
WDNR PUBLIC OUTREACH SOW
2003-03-17
99
Miscellaneous
SEH RI/FS STATUS LTR #6 - 2/03 ACTIVITIES
2003-03-17
99
Miscellaneous
CHANGE ORDER #1 APPROVAL - RI/FS 9CME0000003
2003-03-13
99
Miscellaneous
XCEL "STRAWMAN" REPORT RECEIVED
2003-03-12
99
Miscellaneous
SEH INVOICE - RI/FS #0098004 (FEB SERVICES)
2003-03-02
99
Miscellaneous
SOW - LIMITED INVESTIGATION PROBLEM FORMULATION
2003-03-01
99
Miscellaneous
RI/FS QAPP APPROVAL FOR INITIAL REVISION - EPA
2003-02-27
99
Miscellaneous
RPT #75 - ADDENDUM, QAPP TASK SPEC - OU #4 - URS
2003-02-26
99
Miscellaneous
RI/FS QAPP REVIEW REQUEST FORM - EPA
2003-02-25
99
Miscellaneous
RPT #74 - QAPP TASK SPECIFIC - OU #4 WINTER - SEH
2003-02-25
99
Miscellaneous
CHANGE ORDER #1 REPLACEMENT - RI/FS 9CME0000003
2003-02-18
43
Site Activity Status Update Received
SEH RI/FS STATUS LTR #5 01/03 ACTIVITIES
2003-02-13
99
Miscellaneous
SEH INVOICE - RI/FS #0097165 (JAN SERVICES)
2003-02-03
99
Miscellaneous
WDNR INTERNAL COMMENTS/OVERVIEW OF XCEL QAPP
2003-01-27
99
Miscellaneous
BATTELLE INVOICE - FORENSIC ANALYSIS #9BME0000012
2003-01-22
99
Miscellaneous
MEETING SIGN-IN SHT - PROBLEM FORMULATION
2003-01-17
99
Miscellaneous
RESP LTR: FISH CONSUMPTION FROM THE BAY - BAD RIVER
2003-01-16
35
Site Investigation Workplan (SIWP) Received (non-fee)
AOC WORK PLAN #1 (SUPPLEMENTAL SI&PIEZ INSTALL) - URS
2003-01-15
99
Miscellaneous
COMMENTS ON EPA PROBLEM FORMULATION - URS
2003-01-13
43
Site Activity Status Update Received
SEH RI/FS STATUS LTR #4 12/02 ACTIVITIES
2003-01-13
99
Miscellaneous
SEH INVOICE - RI/FS #0095826 (DEC SERVICES)
2003-01-09
99
Miscellaneous
LTR: PROPOSED ADMIN. ORDER ON CONSENT
2003-01-06
99
Miscellaneous
MEETING MINUTES - ADD'L INVESTIGATION FOR OU'S
2003-01-03
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #73 - IR COAL TAR RECOVERY SYS (008) - URS
2003-01-03
99
Miscellaneous
TARGET ANALYTE RECOMMENDATIONS - BATTELLE
2003-01-02
99
Miscellaneous
SEH INVOICE - COMP FS, RA & ADD'L INVESTIGATION
2002-12-26
99
Miscellaneous
WDNR REQUEST FOR RI/FS CHANGE ORDER REQUEST #1
2002-12-20
99
Miscellaneous
SEH RI/FS STATUS REPORT #3 - 11/02 ACTIVITIES
2002-12-14
99
Miscellaneous
SEH'S - RI/FS INVOICE #0095100 (NOV SERVICES)
2002-12-01
99
Miscellaneous
RPT #72 - QAPP (QUALITY ASSURANCE PROJECT PLAN - URS
2002-11-29
206
Site Investigation End - State Lead
2002-11-21
99
Miscellaneous
SEH'S - RI/FS STATUS REPORT #2 - 10/02 ACTIVITIES
2002-11-19
206
Site Investigation End - State Lead
2002-11-18
99
Miscellaneous
SEH'S - RI/FS CHANGE ORDER REQUEST #1
2002-11-15
99
Miscellaneous
RI/FS SEH INVOICE #0094032 (OCT SERVICES)
2002-11-11
99
Miscellaneous
WDNR QUARTERLY REPORT - JULY - SEPT
2002-11-04
99
Miscellaneous
SSPSCA & B TESTING SEH INVOICE #0093067 (JAN-OCT SERVICES)
2002-10-24
99
Miscellaneous
SEH'S - RI/FS STATUS REPORT #1 - 7/02 -8/02 ACTIVITIES
2002-10-22
99
Miscellaneous
XCEL'S RESPONSES TO SELECTED CSTAG RECOMMENDATIONS
2002-10-16
99
Miscellaneous
WDNR'S COMMENTS TO CSTAG RECOMMENDATIONS
2002-10-15
99
Miscellaneous
CITY OF ASHLAND REFUSAL LTR FOR PROPOSED SETTLEMENT
2002-10-04
99
Miscellaneous
XCEL'S RESPONSE EPA TO SUPPORT NPL LISTING
2002-10-02
99
Miscellaneous
RI/FS AREA OF POTENTIAL ADD'L INVEST (TASK 2.3) - SEH
2002-09-26
99
Miscellaneous
WASTE MGMTS WASTE PROFILE FORM
2002-09-25
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #70 - IR COAL TAR RECOVERY SYS (007) - URS
2002-09-19
99
Miscellaneous
STAKEHOLDERS LTR SENT W/9/3/02 ATTACHMENT
2002-09-16
99
Miscellaneous
COMMENTS SCIENCE PLAN
2002-09-10
99
Miscellaneous
LTR RE: TO DOCUMENT NSP'S ATTEMPT'S TO RESOLUTION-MB&F
2002-09-05
99
Miscellaneous
SUPERFUND LISTED - US EPA
2002-09-05
301
Superfund NPL, NPL Proposed or Alternative Approach Site
301 DATE BASED ON FINAL NPL LISTING DATE
2002-09-03
99
Miscellaneous
CSTAG RECOMMENDATIONS
2002-08-21
37
Site Investigation Report (SIR) Received (non-fee)
RPT #69 - SEEP AREA INTERIM ACTION REPORT - URS
2002-08-01
99
Miscellaneous
RPT #68 - 5TH ADDENDUM TO REPORT: NAPL ANALYSIS - GTI
2002-07-23
99
Miscellaneous
WDNR'S APR-JUN QUARTERLY REPORT TO EPA
2002-07-01
205
Site Investigation Start - State Lead
2002-06-28
99
Miscellaneous
SEH'S CD DISTRIBUTION LIST FOR BKGRD REPORTS 1989-2000
2002-06-25
99
Miscellaneous
USEPA'S VERIFICATION LTR FOR 2-20 PAH CLEAN-UP GOALS
2002-06-21
99
Miscellaneous
COMMENTS ON PROPOSED SOW FOR PUBLIC OUTREACH-XCEL
2002-06-21
99
Miscellaneous
CONSULTANT SERVICES CONTRACT FOR RI/FS
2002-06-19
99
Miscellaneous
NOTIFY 6/14/02 LTR TO VAUGHN LIBRARY RECORDS - MB&F
2002-06-14
99
Miscellaneous
CSTAG - MANAGING CONTAMINATED SEDIMENT RISKS - XCEL LTR
2002-06-02
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #71 - IR COAL TAR RECOVERY SYS (006) - URS
2002-05-21
36
Site Investigation Workplan (SIWP) Approved
WORK PLAN APPROVAL - FORMER GAS HOLDER - WDNR LTR
2002-05-14
99
Miscellaneous
WDNR'S JAN-MAR QUARTERLY REPORT TO EPA
2002-05-08
99
Miscellaneous
XCEL'S COMMENTS ON ERA SUPPLEMENT REPORT
2002-05-06
35
Site Investigation Workplan (SIWP) Received (non-fee)
WORK PLAN - FORMER GAS HOLDER - URS
2002-05-01
99
Miscellaneous
RPT #76 - PROPOSAL FOR RI/FS
2002-05-01
99
Miscellaneous
RPT #76 - SEH RI/FS PROPOSAL - MAY 2002
2002-04-24
36
Site Investigation Workplan (SIWP) Approved
SEEP AREA WORK PLAN APPROVAL - WDNR
2002-04-23
99
Miscellaneous
PARTICIPATION REQUEST IN RI DEVELOPMENT - WDNR
2002-04-22
99
Miscellaneous
RI/FS SOW CONSULTANT QUALIFICATION NOTICE - WDNR
2002-04-18
99
Miscellaneous
DATA QUALITY UPDATE URS SAMPL & ANAL - URS
2002-04-10
35
Site Investigation Workplan (SIWP) Received (non-fee)
RPT #67 - SEEP AREA INTERIM ACTION WORK PLAN - URS
2002-04-04
99
Miscellaneous
COMMENTS ON DRAFT RI/FS SOW - ASHLAND
2002-04-02
99
Miscellaneous
RESPONSE TO ASHLAND REQUEST EXPOSURE - WDHF
2002-03-26
99
Miscellaneous
ADD'L BACKUP OF ECO RISK SUPP REVIEW - URS
2002-03-21
99
Miscellaneous
DRAWING "SEEP AREA SITE PLAN EXIST COND" - SEH
2002-03-19
99
Miscellaneous
NSP/EXCEL RR COSTS THRU JAN 2002 - WDNR
2002-03-01
99
Miscellaneous
SUPERFUND COOP AGREEMENT V975604-01-ST SEC
2002-02-28
99
Miscellaneous
RESPONSE TO CLAY TILE DISCHARGE - XCEL
2002-02-28
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #66 - IR COAL TAR RECOVERY SYS (005) - URS
2002-02-25
99
Miscellaneous
COMMENTS ON PROPOSED SOW - XCEL
2002-02-19
37
Site Investigation Report (SIR) Received (non-fee)
RPT #64 - CLAY TILE INVESTIGATION - URS
2002-02-19
99
Miscellaneous
RPT #65 ECOLOGICAL RISK ASSESSMENT SUPPLMT - SEH
2002-02-14
99
Miscellaneous
DRAFT RI/FS SCOPE OF WORK - WDNR
2002-02-05
35
Site Investigation Workplan (SIWP) Received (non-fee)
ADD'L PIZEOMETER INSTALLATION.URS
2002-02-01
43
Site Activity Status Update Received
OCT - DEC QUARTERLY REPORT CA-V975604-01.WDNR
2002-01-30
99
Miscellaneous
LTR RE: ADD'L SERVICES.SEH
2002-01-30
99
Miscellaneous
LTR RE: REQUEST FOR CHANGE ORDER.SEH
2002-01-30
99
Miscellaneous
LTR RE: 5 GAL STUDY SAMPLE REQUEST.GTI
2002-01-29
99
Miscellaneous
LTR RE: CLARIFICATION LIABILITY FOR W.C.L.WDNR
2002-01-24
36
Site Investigation Workplan (SIWP) Approved
LTR RE: CONDITIONAL PEZEOMETER INSTALLATION.WDNR
2002-01-22
37
Site Investigation Report (SIR) Received (non-fee)
RPT #62 - ENVIRO. FORENSIC INVEST. PIPE TRACE.BATTELLE
2002-01-15
99
Miscellaneous
RPT #61 - 4TH ADDENDUM TO REPORT: NAPL ANALYSIS.GTI
2002-01-15
35
Site Investigation Workplan (SIWP) Received (non-fee)
PIZEOMETER INSTALLATION.URS
2002-01-11
99
Miscellaneous
RE: FORMER SCHROEDR/KREGR PHASE I & II SOW.WDNR
2002-01-03
43
Site Activity Status Update Received
JUL - SEPT QUARTERLY REPORT CA-V975604-01.WDNR
2002-01-01
99
Miscellaneous
RPT #63 - FORMER SCHDR/KREHR PHASE II ESA WORK PLAN.MSA
2001-12-20
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #59 - IR COAL TAR RECOVERY SYS (004).URS
2001-12-07
37
Site Investigation Report (SIR) Received (non-fee)
RPT #58 AIR MON - PIPE TRACE.URS
2001-11-30
99
Miscellaneous
ARTETIAN WELL SAMPLE RESULTS.WDNR
2001-11-26
99
Miscellaneous
EMAIL: CONF CALL OBSERVATIONS.WDNR
2001-11-13
99
Miscellaneous
LTR RE: REVIEW/RECOMEND BASELINE HHRA.AFSCME
2001-11-02
99
Miscellaneous
LTR RE: REQUEST FOR SPLIT SAMPLING.URS
2001-11-01
35
Site Investigation Workplan (SIWP) Received (non-fee)
PIPE EXCAVATION OBSERVATION & SAMPLING.SEH
2001-10-29
99
Miscellaneous
DEPOSITION TRANSCRIPTS FROM 10/16/01.WDOJ
2001-10-25
151
Remedial Action (RA) Documentation Report Received (non-fee)
IR COAL TAR RECY SYS FIELD NOTES, PHOTOS ECT. URS
2001-10-22
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #56 - IR COAL TAR RECOVERY SYS (003).URS
2001-10-22
99
Miscellaneous
LTR RE: VOL EST UPDATE RESULTS REVIEW.URS
2001-10-18
36
Site Investigation Workplan (SIWP) Approved
CONDITIONAL COURTYARD PIPE INVEST.WDNR
2001-10-17
99
Miscellaneous
LTR RE: VOL EST UPDATE RESPONSE TO WDNR COMMENTS.GTI
2001-10-15
35
Site Investigation Workplan (SIWP) Received (non-fee)
COURT YARD INVESTIGATION.URS
2001-10-02
99
Miscellaneous
RPT #60 - FORMER SCHDR/KREHR PHASE I ESA REPORT.MSA
2001-10-02
99
Miscellaneous
RPT #29 - FORMER SCHDR/KREHR PHASE II ESA REPORT - MSA
2001-10-01
39
Remedial Action Options Report (RAOR) Received (non-fee)
RPT #57 - INTERIM.SEH
2001-09-27
99
Miscellaneous
2ND REQT FOR CD - ROM ADMIN RECORDS.MBF
2001-09-21
99
Miscellaneous
LTR RE: EXCAVATION ON XCEL PRPTR. MBF
2001-09-19
99
Miscellaneous
LTR RE: DEPOSITION CONFOMATION 10/16.MBF
2001-09-18
99
Miscellaneous
LTR RE: EXCAVATION ON XCEL PRPTY.WDOJ
2001-09-18
99
Miscellaneous
SITE VISIT ON 9/17 FIELD NOTES.WDNR
2001-09-14
99
Miscellaneous
NEIGHBORHOOD NOTICE EXCAVATE STORAGE YARD.XCEL
2001-09-13
99
Miscellaneous
ASHLAND NEWS ARTICLE - PIPE SOURCE INVEST.ADP
2001-09-12
99
Miscellaneous
LTR RE: RESPONSE TO 8/21 WDNR SEEP.XCEL
2001-09-12
99
Miscellaneous
LTR RE: RESPONSE TO 9/5 WP PIPE TRACE.XCEL
2001-09-05
36
Site Investigation Workplan (SIWP) Approved
PIPE INVESTIGATION.WDNR
2001-08-30
99
Miscellaneous
LTR RE: LIABILITY CLARIFICATION FOR CITY ASHLAND.WDNR
2001-08-29
99
Miscellaneous
SI MGMT OF AIR AMBIENT ADVICE.DHFS
2001-08-21
43
Site Activity Status Update Received
LTR RE: SEEP INTERIM ACTION.WDNR
2001-08-21
99
Miscellaneous
LTR RE: DNAPL REVISED COMMENTS.WDNR
2001-08-20
37
Site Investigation Report (SIR) Received (non-fee)
PIPE SOURCE INVESTIGATION & SAMPLING.SEH
2001-08-17
35
Site Investigation Workplan (SIWP) Received (non-fee)
PIPE INVESTIGATION - CLAY PIPE.URS
2001-08-13
99
Miscellaneous
ACCEPTANCE SUPERFUND COOP AGGREEMENT.WDNR
2001-08-09
99
Miscellaneous
LTR RE: NOTIFICATION FOR DEPT APPROVAL FUTURE SI.WDOJ
2001-08-03
43
Site Activity Status Update Received
DNAPL REVISED ESTIMATES OF TAR IN BAY.GTI
2001-08-01
99
Miscellaneous
ORPHAN SHARE WHITE PAPER INFO
2001-07-16
99
Miscellaneous
ENVIRONMENTAL FORENSIC ANALYSES CONTRACT.WDNR
2001-07-16
99
Miscellaneous
PIPE SOURCE INVESTIGATION & SAMPLING.WDNR
2001-07-16
99
Miscellaneous
BATTELLE'S FORENSIC ANALYSIS CONTRACT.WDNR
2001-07-11
99
Miscellaneous
STATES NOTICE OF APPEARANCE.DOJ
2001-07-08
99
Miscellaneous
LTR RE: RESPONSE TO ERA.WDNR
2001-07-03
99
Miscellaneous
PETITION TESTIMONY BY DEPOTION.NSP/MFB
2001-07-01
35
Site Investigation Workplan (SIWP) Received (non-fee)
RPT #54 - PIPE SOURCE INVESTIGATION. SEH
2001-07-01
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #55 - IR COAL TAR RECOVERY SYS (002).URS
2001-06-21
99
Miscellaneous
LTR FROM XCEL FOLLOWING UP ON MAY 25,2001 LTR
2001-06-18
99
Miscellaneous
RPT # 52 - 3RD ADDENDUM TO REPORT: NAPL ANALYSIS.GTI
2001-06-11
99
Miscellaneous
SUPERFUND QUALITY ASSURANCE PROTECTION PLAN
2001-06-09
43
Site Activity Status Update Received
RPT #51 - SEDIMENT SAMPLE RESULTS - VOL III - URS
2001-06-08
43
Site Activity Status Update Received
RPT #50 - SEDIMENT SAMPLE RESULTS - VOL II - URS
2001-06-07
43
Site Activity Status Update Received
RPT #49 - SEDIMENT SAMPLE RESULTS - VOL I - URS
2001-05-25
43
Site Activity Status Update Received
LTR FROM XCEL RE: WORK PLAN
2001-05-04
99
Miscellaneous
LTR FROM DNR TO JERRY WINSLOW RE: HIS MARCH 28, 2001 LTR
2001-03-28
99
Miscellaneous
WINSLOW'S LETTER RE: DNR LTR OF MARCH 22, 2001
2001-03-02
99
Miscellaneous
EPA'S COMMENTS ON CA APPLICATION
2001-02-23
99
Miscellaneous
LETTER FROM DAVID CRASS RE: SUPPLEMENTAL SED. INVEST
2001-02-16
99
Miscellaneous
XCEL ENERGYS COMMENTS ON WCL REQUEST FOR NFA REQUEST
2001-02-14
135
Site Investigation Workplan (SIWP) Received (fee)
RPT #42 - SEEP INVESTIGATION WORK PLAN - SEH
2001-02-14
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #45 IR COAL TAR RECOVERY SYS (001) - URS
2001-02-13
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #44 - IR COAL TAR RECOVERY - VOL II - URS
2001-02-12
92
Operation & Maintenance (O&M) Report Received (non-fee)
RPT #43 - IR COAL TAR RECOVERY - VOL I - URS
2001-02-06
99
Miscellaneous
LETTER FROM DAVID CRASS RE: REQUEST FOR NFA
2001-01-26
99
Miscellaneous
LETTER RE: WORK PLAN CONCURRENT SEDIMENT SAMPLING
2001-01-23
99
Miscellaneous
PRELIMINARY FINDINGS OF HUMAN HEALTH CONCERNS RE: CYANIDE
2001-01-10
99
Miscellaneous
SIGNED INVESTIGATION OF SEEP AREA CONTRACT
2001-01-10
205
Site Investigation Start - State Lead
2001-01-04
99
Miscellaneous
RPT #41 - RESPONSE REPORT TO NAPL - META
2000-11-22
43
Site Activity Status Update Received
GTI'S REPORT: VOLUMETRIC ESTIMATES OF DNAPL
2000-09-11
99
Miscellaneous
REC'D ACCESS PERMISSION FORM
2000-09-07
43
Site Activity Status Update Received
REC'D GW MON. PLAN FROM URS
2000-08-16
99
Miscellaneous
LTR FROM MAYOR THOMPSON
2000-07-24
183
No Further Action per NR 708.09 Request (fee)
$250. DUNN - ASSOCIATED WITH 02-02-177777
2000-07-18
99
Miscellaneous
RPT #38 - OFF-SITE DISCH. EXEMPTION REQUEST APPLICATION - STS
2000-07-17
99
Miscellaneous
RPT #37 - REQUEST FOR NO FURTHER ACTION DETERMINATION - STS
2000-07-10
99
Miscellaneous
MEMO RE: CHAEQUAMEGON BAY COMMON TERN NESTING
2000-07-07
99
Miscellaneous
REC'D JIM MUSSO COMMENTS ON IGT'S PROP. FOR EST. TAR QUANT.
2000-06-29
99
Miscellaneous
LETTER FROM NSP RE: NFA FOR CITY OF ASHLAND
2000-06-27
99
Miscellaneous
LETTER TO DNR RE: COMPLIANCE ISSUES
2000-06-22
99
Miscellaneous
LETTER FROM EPA RE: COMPARATIVE ANALYSIS OF NAPL
2000-06-20
43
Site Activity Status Update Received
SCHEDULE UPDATE FOR ITERIM ACTION CONSTRUCTION
2000-06-16
99
Miscellaneous
LETTER FROM GOVERNOR RE: CONCURANCE ISSUES
2000-06-15
99
Miscellaneous
LETTER TO NSP RE: COMPLIANCE ISSUES
2000-06-14
99
Miscellaneous
LETTER RE: PROPSAL TO GLNPO FROM TOSC
2000-06-13
99
Miscellaneous
LETTER TO NSP RE: IGTS PROPOSAL FOR ESTIMATED TAR QUANTITIES
2000-05-19
99
Miscellaneous
LETTER RE: COAL TAR REMEDIATION PLAN TO JIM MUSSO
2000-05-12
99
Miscellaneous
PROPERTY OWNERSHIP INFO FM WI RR
2000-05-05
99
Miscellaneous
RESPONSE TO IGT'S FEB. 2000 RPT
+
2000-05-02
313
Superfund Site Assessment Pre-CERCLA Screening (PCS)
SUPERFUND PRE-CERCLA PROGRAM SAMPLING REPORT
20000502_313_SFSA_PCS_1.pdf
20000502_313_SFSA_PCS_2.pdf
2000-04-13
99
Miscellaneous
GW SAMPLE RESULTS FM WELL IN KREHER PARK
2000-04-06
99
Miscellaneous
WATER SEEPAGE EVALUATION RPT
2000-03-24
99
Miscellaneous
GW SAMPLE RESULTS
2000-03-16
99
Miscellaneous
COPPER FALLS AQUIFER PRESENTATION, QUANTITATION RPT RECVD
2000-03-14
99
Miscellaneous
EXECUTIVE SUMMARY OF INTERIM MEASURES
2000-02-28
99
Miscellaneous
LETTER RE: DRINKING WATER ANALYTICAL RESULTS
2000-02-19
99
Miscellaneous
LETTER RE: ATTESTING DATA VALIDITY FOR ANALYTICAL RESULTS
2000-02-18
99
Miscellaneous
COMPARATIVE ANALYSIS OF NAPL RESIDUES
2000-02-17
99
Miscellaneous
LETTER RE: PRELIMINARY REVIEW OF HUMAN HEALTH RISK ASSESS
2000-02-14
99
Miscellaneous
INVITATION TO PUBLIC MEETING
2000-02-09
99
Miscellaneous
ORGANIC TEST REQUEST FROM JAMIE DUNN
2000-02-01
99
Miscellaneous
ASHLAND LAKEFRONT USEPA BRIEFING BY NSP
2000-01-25
35
Site Investigation Workplan (SIWP) Received (non-fee)
SEDIMENT SAMPLING. DAMES & MOORE
2000-01-23
43
Site Activity Status Update Received
PRELIMINARY FINDINGS OF HUMAN HEALTH CONCERNS RE: CYANIDE
2000-01-18
99
Miscellaneous
TABULATED GW RESULTS
2000-01-12
99
Miscellaneous
FISH TISSUE DATA
2000-01-01
99
Miscellaneous
TOSC ECOLOGICAL RISK ASSESSMENT
1999-11-30
99
Miscellaneous
GROUNDWATER MONITORING RESULTS
1999-11-17
99
Miscellaneous
PUBLIC MTG AGENDA W/ NOTES
1999-11-12
99
Miscellaneous
CONDITIONAL APPROVAL FOR CONCEPTUAL INTERIM MEASURE
1999-10-27
99
Miscellaneous
FISH TISSUE EXPOSURE INVESTIGATION.WDHF
1999-10-22
99
Miscellaneous
RPT #35 - 1999 SUPPLEMENTAL SITE INVESTIGATION
1999-10-20
350
Superfund Site Assessment Preliminary Assessment (PA)
1999-10-20
351
Superfund Site Assessment Site Inspection (SI)
1999-08-20
99
Miscellaneous
NOTES FM CONFERENCE CALL
1999-07-27
99
Miscellaneous
AFFIDAVITS OF JOHN SELNER & TOM ROY
1999-07-21
99
Miscellaneous
SUPPLEMENTAL PCB SITE INVESTIGATION RESULTS
1999-07-20
99
Miscellaneous
ASSESSMENT OF KREHER PARK FOR SUPERFUND FUNDING
1999-06-30
99
Miscellaneous
DRAFT REMEDY SELECTION CRITERIA
1999-05-18
99
Miscellaneous
REMEDIAL PROJECT APPROVAL SCOPE RECOMMENDATIONS
1999-05-01
205
Site Investigation Start - State Lead
1999-04-29
99
Miscellaneous
PCB TESTING WORKPLAN
1999-04-19
99
Miscellaneous
REVIEW OF POTENTIAL CHEMICAL ACTION SPECIFIC ARARS
1999-04-12
99
Miscellaneous
LETTER RE: COLLECTION OF WATER SAMPLES BY BAY AREA NORTH GUARD
1999-04-02
99
Miscellaneous
REBUTTAL TO WDNR; ASSESSMENT COMMENTS
1999-04-01
99
Miscellaneous
PCB TESTING WORKPLAN
1999-03-31
99
Miscellaneous
BRAINSTORM SESSION @ PUBLIC MTG
1999-03-30
99
Miscellaneous
PEER REVIEW OF MGP CALCULATIONS
1999-03-29
99
Miscellaneous
REQUEST FOR CRITERIAFOR BASELINE HUNAN HEALTH RISK ASSESS.
1999-03-24
99
Miscellaneous
$750 FEASIBILITY STUDY & TECH ASSISTANCE
1999-03-01
99
Miscellaneous
RPT #32 - FINAL DRAFT: ECOLOGICAL RISK ASSESSEMENT - D&M
1999-03-01
37
Site Investigation Report (SIR) Received (non-fee)
RPT #34 - SUPPLEMENTAL FACILITY SITE INVESTIGATION & RAOR - D&M
1999-03-01
39
Remedial Action Options Report (RAOR) Received (non-fee)
RPT #33 - REMEDIAL ACTION OPTIONS FEASIBILITY STUDY FINAL - D&M
1998-12-22
99
Miscellaneous
MEMO: RESPONSE COMMENTS TO NSP
1998-12-10
39
Remedial Action Options Report (RAOR) Received (non-fee)
RPT #31 - REMEDIATION ACTION OPTIONS FEASABILITY STUDY - SEH
1998-10-07
99
Miscellaneous
RPT #30 - ECOLOGICAL RISK ASSESSMENT REPORT - SEH
1998-06-28
99
Miscellaneous
RPT #28 - BASELINE HUMAN HEALTH RISK ASSESSMENT REPORT - SEH
1998-04-23
99
Miscellaneous
RPT #27 - ECOLOGICAL RISK ASSESSMENT, PROBLEM FORMULATION - SEH
1998-04-08
39
Remedial Action Options Report (RAOR) Received (non-fee)
RPT #26 - REMEDIAL ACTION PLAN: LOWER COPPER FALL AQUIFER - D&M
1998-03-27
206
Site Investigation End - State Lead
1998-03-16
37
Site Investigation Report (SIR) Received (non-fee)
RPT #24 - SUPPLEMENTAL INVESTIGATION REPORT - SEH
1998-03-01
99
Miscellaneous
RPT #25 - EXPLORATION TRENCH ACTIVITES AND FINDING - D&M
1998-02-09
99
Miscellaneous
MEMO: PLAN SHEETS AND PLATS
1997-12-03
2
Responsible Party (RP) letter sent
1997-12-01
35
Site Investigation Workplan (SIWP) Received (non-fee)
RPT #23 - ADDITIONAL INVESTIGATION WORKPLAN - SEH
1997-11-25
99
Miscellaneous
LETTER: REVIEW OF RCORDS
1997-11-24
99
Miscellaneous
LETTER: COPIES OF CORRESPONDENCE AND DOCUMENTS
1997-11-20
2
Responsible Party (RP) letter sent
TO WI CENTRAL LTD
1997-11-13
99
Miscellaneous
LETTER: VIEW OF CORRESPONDENCE & DOCUMENTS
1997-10-30
99
Miscellaneous
RPT #22 - AQUIFER PERFORMANCE TEST AND GW RESULTS - D&M
1997-08-14
99
Miscellaneous
PROPOSAL FOR ENVIRONMENTAL SERVICES
1997-08-04
99
Miscellaneous
AMENDMENT TO PROPOSAL
1997-07-03
99
Miscellaneous
MEMO: SOURCES OF INFORMATION
1997-07-02
99
Miscellaneous
E-MAIL: INFORMATION ON ASHLAND HARBOR
1997-06-25
99
Miscellaneous
MEMO: FEASIBILITY STUDY WORK PLAN MEETING
1997-06-23
99
Miscellaneous
LETTER RE: OLD WASTEWATER TREATMENT PLANT DISCHARGE
1997-06-16
99
Miscellaneous
MEMO: WATER SURFACING AT OLD WW TREATMENT PLANT
1997-05-23
99
Miscellaneous
LETTER: RESPONSE COMMENTS
1997-05-19
37
Site Investigation Report (SIR) Received (non-fee)
RPT#20 - COMPREHENSIVE ENVIRONMENTAL INVESTIGATIVE - SEH
1997-05-16
99
Miscellaneous
LETTER
1997-05-13
99
Miscellaneous
LETTER: ASHLAND MGP SITE
1997-04-25
99
Miscellaneous
LETTER RE: REQUEST FOR TIME EXTENSION
1997-04-17
99
Miscellaneous
MEMO RE: SHORT AND LONG TERM ISSUES
1997-04-14
99
Miscellaneous
MEMO: COAL GAS INFORMATION
1997-04-11
99
Miscellaneous
LETTER RE: DRAFT REPORT FROM SEH
1997-04-04
99
Miscellaneous
LETTER RE: EVALUATION OF NAPL IN MWS
1997-04-02
99
Miscellaneous
LETTER: REQUEST FOR COPY OF DRAFT REPORT
1997-03-20
99
Miscellaneous
MEMO RE: NSP SITE UPDATE
1997-03-17
99
Miscellaneous
E-MAIL RE: UPDATE MAEETING
1997-03-13
99
Miscellaneous
E-MAIL: 3/14 CONFERENCE CALL
1997-03-12
99
Miscellaneous
RPT #19 - PROPOSAL FOR ENVIRONMENTAL SERVICES - SEH
1997-03-06
99
Miscellaneous
SEDIMENT INVESTIGATIONS FOR MGP SITES
1997-03-04
99
Miscellaneous
GW INVESTIGATION REPORT
1997-02-28
99
Miscellaneous
LETTER RE: SEDIMENT ANALYSIS
1997-02-27
37
Site Investigation Report (SIR) Received (non-fee)
RPT #18 - COPPER FALLS AQUIFER GW INVESTIGATION - D&M
1997-02-18
99
Miscellaneous
ASHLAND LAKEFRONT SUMMARY
1997-02-12
99
Miscellaneous
INVOICE FROM SEH FOR SEDIMENT STUDY
1997-02-01
99
Miscellaneous
SEH DRAFT STANDARD OPERATING PROCEDURE
1997-01-31
99
Miscellaneous
INVOICE FROM SEH FOR SEDIMENT INVESTIGATION
1997-01-22
99
Miscellaneous
MEMO RE: NSP RESPONSE
1997-01-21
99
Miscellaneous
DRAFT SCOPE OF WORK
1996-12-31
99
Miscellaneous
INVOICE FOR SEDIMENT INVESTIGATION
1996-12-11
99
Miscellaneous
RESPONSE TO WDNR COMMENTS ON GW INVESTIGATION
1996-11-29
99
Miscellaneous
INVOICE FROM SEH FOR SEDIMENT INVESTIGATION
1996-10-31
99
Miscellaneous
INVOICE FROM SEH FOR SEDIMENT INVESTIGATION
1996-10-28
99
Miscellaneous
LETTER RE: SUPPLEMENTAL GW INVESTIGATION COMMENTS
1996-10-02
99
Miscellaneous
LETTER RE: REVIEW OF GW INVESTIGATION
1996-09-30
99
Miscellaneous
INVOICE FROM SEH FOR SEDIMENT INVESTIGATION
1996-09-27
99
Miscellaneous
RESPONSE TO COMMENTS ON SUPPLEMENTAL GW INVESTIGATION
1996-09-27
35
Site Investigation Workplan (SIWP) Received (non-fee)
PROPOSED WORK PLAN
1996-09-24
99
Miscellaneous
LETTER: CHANGE ORDER
1996-09-16
99
Miscellaneous
INFORMATION NOT PREVIOUSLY PROVIDED
1996-09-09
99
Miscellaneous
LETTER: SUPPLEMENTAL INFO TO SUPPORT CHANGE ORDER
1996-08-31
99
Miscellaneous
INVOICE FROM SEH RE: INVESTIGATION
1996-08-30
99
Miscellaneous
INVOICE FROM SEH RE: SEDIMENT INVESTIGATION
1996-08-28
99
Miscellaneous
MEMO RE: TECHNICAL MEETING
1996-08-23
99
Miscellaneous
MEMO RE: CHANGE ORDER
1996-08-22
99
Miscellaneous
LETTER RE: TECHNICAL REPORTS
1996-08-12
99
Miscellaneous
MEMO RE: CHANGE ORDER
1996-08-07
99
Miscellaneous
LETTER RE: SUPPLEMENTAL GW INVESTIGATION
1996-08-07
37
Site Investigation Report (SIR) Received (non-fee)
RPT#17 - SUPPLEMENTAL GW INVESTIGATION FINAL REPORT - D&M
1996-08-05
99
Miscellaneous
LETTER RE: SEDIMENT STUDY
1996-07-02
99
Miscellaneous
LETTER RE: SAMPLING RESULTS AT KREHER PARK
1996-07-01
37
Site Investigation Report (SIR) Received (non-fee)
RPT #16 - SEDIMENT INVESTIGATION REPORT - SEH
1996-06-30
99
Miscellaneous
INVOICE FROM SEH RE: INVESTIGATION
1996-06-20
99
Miscellaneous
MEMO RE: CLOSING SWIMMING AREA
1996-06-14
99
Miscellaneous
NEWS RELEASE
1996-06-10
99
Miscellaneous
LETTER: REQUEST TO ESTABLISH SAFETY ZONE
1996-06-06
99
Miscellaneous
NEWS RELEASE RE: SIGNS WARNING OF CONTAMINATION
1996-06-05
99
Miscellaneous
MEMO RE: HEALTH EFFECTS
1996-06-01
99
Miscellaneous
COAST GUARD FINAL RULE
1996-05-31
99
Miscellaneous
FINAL RULE RE: SAFETY ZONE
1996-05-30
99
Miscellaneous
MEMO RE: SAMPLE SIGN
1996-05-29
43
Site Activity Status Update Received
WATERFRONT BEING DESIGNATED A FEDERAL SAFETY ZONE
1996-05-29
99
Miscellaneous
LETTER
1996-05-24
99
Miscellaneous
MEMO: REQUEST ORDER OF SIGNS AND POSTS
1996-05-22
43
Site Activity Status Update Received
SOIL REMEDIATION UPDATE
1996-05-21
99
Miscellaneous
ONTARIO GUIDELINES
1996-05-15
99
Miscellaneous
MEMO RE: WARNING SIGNS AND PRIVATE AID TO NAVIGATION
1996-05-09
99
Miscellaneous
RESPONSE TO NSP'S 4/30/96 LETTER
1996-05-09
36
Site Investigation Workplan (SIWP) Approved
CONDITIONAL APPROVAL
1996-05-08
99
Miscellaneous
MEMO REQUESTING CLARIFICATION OF AGREEMENTS
1996-05-01
39
Remedial Action Options Report (RAOR) Received (non-fee)
RPT #15 - REMEDIAL ACTION OPTIONS - SEH
1996-04-30
99
Miscellaneous
MEMO RE: MEETING TO DISCUSS SAFETY ZONE
1996-04-30
35
Site Investigation Workplan (SIWP) Received (non-fee)
SUPPLEMENTAL SI WORKPLAN
1996-04-23
99
Miscellaneous
RESOIBSE TO REQUEST FOR COPY OF DRAFT REPORT
1996-04-15
99
Miscellaneous
LETTER RE: FURTHER INVESTIGATION OF SOME MON WELLS
1996-04-03
99
Miscellaneous
LETTER: LATE PAYMENT DUE TO INCORRECT INVOICE
1996-03-31
99
Miscellaneous
INVOICE FROM SEH RE: FEASIBILITY STUDY AND DRAWING
1996-03-27
99
Miscellaneous
LETTER RE: REQUEST FOR COPY OF PRELIMINARY DRAFT REPORT
1996-03-26
99
Miscellaneous
NOTE AND INVOICES
1996-03-13
99
Miscellaneous
MEMO RE: SEDIMENT SAMPLING
1996-03-08
99
Miscellaneous
REPORT: PRELIMINARY FIELD OBSERVATIONS
1996-03-07
99
Miscellaneous
LETTER RE: PRELIMINARY RESULTS OF RADAR WORK
1996-03-06
99
Miscellaneous
LETTER
1996-03-04
99
Miscellaneous
LETTER RE: SEDIMENT SAMPLING INVESTIGATION
1996-03-01
99
Miscellaneous
LETTER RE: SEDIMENT SAMPLING INVESTIGATION
1996-03-01
37
Site Investigation Report (SIR) Received (non-fee)
DNR SUPPLEMENTAL INVESTIGATION REPORT
1996-02-29
99
Miscellaneous
INVOICES FROM SEH FOR SPLIT SAMPLES OF GROUNDWATER
1996-02-25
99
Miscellaneous
MEMO RE: MAPS FOR GPR SURVEY
1996-02-22
99
Miscellaneous
MEMO RE: PURCHASE ORDER PROCESS
1996-02-19
99
Miscellaneous
MEMO RE: PURCHASE REQUISITIONS
1996-02-19
205
Site Investigation Start - State Lead
1996-02-02
35
Site Investigation Workplan (SIWP) Received (non-fee)
REVISED PROPOSAL FOR SEDIMENT INVESTIGATION
1996-02-02
99
Miscellaneous
REVISED PROPOSAL FOR ENVIRONMENTAL SERVICES
1996-02-01
37
Site Investigation Report (SIR) Received (non-fee)
RPT #14 - DNR SEDIMENT INVESTIGATION WORKPLAN - SEH
1996-02-01
39
Remedial Action Options Report (RAOR) Received (non-fee)
RPT #13 - DRAFT REMEDIATION ACTION OPTIONS FEASIBILITY STUDY - D&M
1996-01-18
99
Miscellaneous
NEWSPAPER AD
1996-01-17
99
Miscellaneous
MEMO RE: USE OF GROUND PENETRATING RADAR
1996-01-12
99
Miscellaneous
PROPOSAL FOR ENVIRONMENTAL SERVICES
1996-01-10
43
Site Activity Status Update Received
UPDATE ON INVESTIGATION
1996-01-10
99
Miscellaneous
E-MAIL RE: SEDIMENT MAPPING
1996-01-09
35
Site Investigation Workplan (SIWP) Received (non-fee)
SUGGESTED REVISIONS
1996-01-09
99
Miscellaneous
PRESS RELEASE
1996-01-05
99
Miscellaneous
MEMO RE: GROUND PENETRATING RADAR SEDIMENT SURVEY
1996-01-04
99
Miscellaneous
MEMO RE: SEDIMENT INVESTIGATON
1995-12-26
99
Miscellaneous
DRAFT SEDIMENT INVESTIGATION SCOPE OF WORK
1995-12-13
99
Miscellaneous
MEMO: COMMENTS ON SCOPE OF WORK
1995-12-08
99
Miscellaneous
MEMO: PROPOSALS FOR SMART DEMONSTRATION
1995-12-06
99
Miscellaneous
E-MAIL RE: SCOOT
1995-12-04
99
Miscellaneous
SCOOT PROCESS
1995-11-29
99
Miscellaneous
MEMO RE: SCOPE OF WORK - SEDIMENT SAMPLING
1995-11-16
99
Miscellaneous
LETTER
1995-11-08
99
Miscellaneous
ANALYTICAL RESULTS
1995-10-30
99
Miscellaneous
LETTER: INTERIM ACTION
1995-10-26
99
Miscellaneous
MEMO: DATA SUMMARIES FOR VOCS AND SVOCS
1995-10-23
99
Miscellaneous
MEMO: HELATH CONSULTATION ON EXPOSURE TO COAL TAR
1995-10-19
99
Miscellaneous
LETTER: CONFIRMING TELEPHONE CONVERSATION
1995-10-18
99
Miscellaneous
LETTER RE: LIABILITY ISSUES
1995-10-12
99
Miscellaneous
PHONE CONVERSATION RECORD
1995-10-10
99
Miscellaneous
FAX: BORING LOGS
1995-10-04
99
Miscellaneous
LETTER RE: EXPERIENCE WORKING WITH MGPS
1995-09-29
99
Miscellaneous
LETTER: CONDITIONAL APPROVAL OF INTERIM ACTION
1995-09-28
99
Miscellaneous
LETTER AND MAP
1995-09-27
99
Miscellaneous
LETTER RE: WATER SAMPLES COLLECTED
1995-09-26
99
Miscellaneous
LETTER
1995-09-25
99
Miscellaneous
LETTER:
1995-09-22
99
Miscellaneous
LETTER: PROPOSED INTERIM REMEDIAL ACTION
1995-09-13
99
Miscellaneous
DRAFT: REPORT ON SEDIMENT INVESTIGATION RESULTS
1995-09-04
99
Miscellaneous
FAX: RESULTS
1995-09-01
99
Miscellaneous
MEMO: SEDIMENT SAMPLING
1995-08-25
99
Miscellaneous
CHANGE ORDER RE: CREOSOTE PIT INVESTIGATION
1995-08-24
147
Remedial Action (RA) Design Report Received (non-fee)
RPT #10 - DESIGN REPORT, BIDDING DOCUMENTS, PLANS & SPECS - D&M
1995-08-18
99
Miscellaneous
LETTER: CHANGE ORDER NO 3
1995-08-15
99
Miscellaneous
FINDINGS OF FACT, CONCLUSIONS OF LAW AND ORDER
1995-08-09
99
Miscellaneous
MEMO: NAVIGATION EXCLUSION ZONES LETTER
1995-08-04
99
Miscellaneous
ALTERNATIVE CONTAINMENT DESIGN LETTER
1995-08-01
37
Site Investigation Report (SIR) Received (non-fee)
RPT #9 - SITE INVESTIGATION REPORT AND REMEDIAL ACTION PLAN - D&M
1995-08-01
41
Remedial Action Report Received
SITE INVESTIGATION AND REMEDIAL ACTION REPORT
1995-08-01
39
Remedial Action Options Report (RAOR) Received (non-fee)
NSP SITE INVESTIGATION AND REVISED RAP
1995-07-31
99
Miscellaneous
MEMO: PHONE CONVERSATION
1995-07-27
99
Miscellaneous
LETTER
1995-07-25
99
Miscellaneous
MEMO: PROJECT NAME CHANGE
1995-07-14
99
Miscellaneous
CHANGE ORDER NO 3
1995-07-12
99
Miscellaneous
MEMO: GW AND SURFACE WATER RESULTS
1995-07-10
99
Miscellaneous
MEMO: CHANGE ORDER
1995-07-05
99
Miscellaneous
MEMO: RESPONSE TO NSP'S DRAFT SI AND RAP
1995-06-30
99
Miscellaneous
LETTER: FOLLOW UP OF PHONE CONVERSATION
1995-06-27
37
Site Investigation Report (SIR) Received (non-fee)
RPT #8 - DRAFT SI REPORT & RA PLAN - D&M
1995-06-20
99
Miscellaneous
ACCESS PERMISSION FORM: WISCONSIN CENTRAL RR
1995-06-19
99
Miscellaneous
INVOICE FROM SEH
1995-06-13
99
Miscellaneous
PRESS RELEASE: REPORT ON LAKEFRONT AREA
1995-06-02
99
Miscellaneous
LETTER: CONDITIONAL APPROVAL OF PROPOSED SCOPE OF WORK
1995-05-30
99
Miscellaneous
ACCESS PERMISSION FORM: CITY OF ASHLAND
1995-05-29
99
Miscellaneous
LETTER AND CHANGE ORDERS
1995-05-18
99
Miscellaneous
LETTER RE: SAMPLING
1995-05-10
99
Miscellaneous
CHANGE ORDER
1995-05-09
99
Miscellaneous
MEMO RE: FENCE DONSTRUCTION
1995-05-01
99
Miscellaneous
LETTER: SURVEY OF TAR WASTE DISPOSAL LOCATIONS
1995-04-27
99
Miscellaneous
LETTER: CONDITIONAL APPROVAL OF SCOPE OF WORK
1995-04-26
99
Miscellaneous
LETTER: CONDITIONAL APPROVAL RESPONSE
1995-04-25
99
Miscellaneous
DRAFT GUIDANCE ON SEDIMENT QUALITY
1995-04-24
99
Miscellaneous
LETTER: CONDITIONAL APPROVAL OF PROPOSED SOW
1995-04-20
99
Miscellaneous
PHONE CONVERSATION RECORD
1995-04-19
99
Miscellaneous
LETTER FOR PROPOSED WORKPLAN
1995-04-05
99
Miscellaneous
LETTER CONFIRMING DISCUSSIONS
1995-04-04
99
Miscellaneous
LETTER RE: 3/21/95 MEETING
1995-04-03
99
Miscellaneous
LETTER
1995-04-02
99
Miscellaneous
INVOICE FROM SEH FOR REMEDIAL INVESTIGATION
1995-03-30
99
Miscellaneous
CITY RESPONSE TO PRP LETTER
1995-03-27
99
Miscellaneous
LETTER RE: INDIANA MICH POWER & SOUTHEASTERN MICH POWER
1995-03-24
99
Miscellaneous
LETTER: REQUEST DOCUMENTS
1995-03-17
99
Miscellaneous
LETTER
1995-03-16
99
Miscellaneous
MEMO RE: MEETING IN EAU CLAIRE
1995-03-15
99
Miscellaneous
NEWSPAPER ARTICLE: ASHLAND WON'T PAY
1995-03-14
99
Miscellaneous
NEWSPAPER ARTICLE
1995-03-13
99
Miscellaneous
MEMO
1995-03-08
99
Miscellaneous
RESPONSE LETTER
1995-03-07
99
Miscellaneous
NEWS RELEASE
1995-03-02
2
Responsible Party (RP) letter sent
DUNN TO MUSSO
1995-03-01
37
Site Investigation Report (SIR) Received (non-fee)
RPT #7 - FINAL NSP REPORT - D&M
1995-02-28
99
Miscellaneous
LETTER RE: REMEDIAL INVESTIGATION
1995-02-20
43
Site Activity Status Update Received
LETTER UPDATE
1995-02-19
99
Miscellaneous
LETTER: DRAFT REMEDIATION ACTION OPTIONS
1995-02-17
99
Miscellaneous
MEMO RE: SEDIMENT SAMPLING
1995-02-06
99
Miscellaneous
MEMO RE: INFO ON KREHER PARK
1995-02-01
99
Miscellaneous
RPT #6 - EXISTING CONDITIONS REPORT - SEH
1995-02-01
37
Site Investigation Report (SIR) Received (non-fee)
DNR SITE INVESTIGATION
1995-01-23
99
Miscellaneous
DATA FROM RAVINE PROJECT
1995-01-19
99
Miscellaneous
LETTER RE: PROJECT COSTS, STATUS REPORT, CHANGE ORDER
1995-01-18
99
Miscellaneous
INVOICES RE: REQUEST NO 5 CREOSOTE PIT
1995-01-12
99
Miscellaneous
MEMO RE: SCOOT PROCESS
1995-01-03
99
Miscellaneous
VOLATILE ORGANICS ANALYSIS SHEET
1995-01-01
99
Miscellaneous
PICTURES
1994-12-28
99
Miscellaneous
LETTER
1994-12-27
99
Miscellaneous
MEMO RE: ENVIRONMENTAL FUND PROJECT
1994-12-20
99
Miscellaneous
ANALYTICAL RESULTS AND BORING LOGS
1994-12-16
99
Miscellaneous
NEWSPAPER ARTICLE ON SUPERFUND CLEANUP
1994-12-07
99
Miscellaneous
REMEDIAL INVESTIGATION SUMMARY
1994-12-01
99
Miscellaneous
LETTER
1994-11-18
99
Miscellaneous
LETTER: CHANGE ORDER NO 1
1994-10-25
99
Miscellaneous
MEMO RE: PHASE 2
1994-10-15
99
Miscellaneous
NEWSPAPER ARTICLE
1994-10-10
99
Miscellaneous
INVOICES RE: CREOSOTE PIT NO 2
1994-10-01
99
Miscellaneous
SLIDE PICTURES
1994-08-25
99
Miscellaneous
LETTER RE: PHASE 2 INVESTIGATION
1994-08-01
35
Site Investigation Workplan (SIWP) Received (non-fee)
RPT #5 - REMEDIAL INVESTIGATION INTERIM REPORT - SEH
1994-08-01
37
Site Investigation Report (SIR) Received (non-fee)
INVESTIGATION INTERIM REPORT
1994-07-27
99
Miscellaneous
AGENDA FOR MEETING
1994-07-14
99
Miscellaneous
NEWSPAPER ARTICLE
1994-07-13
99
Miscellaneous
ORIGINAL PLAN FROM GREELEY AND HANSEN
1994-07-12
99
Miscellaneous
NEWSPAPER ARTICLE
1994-06-24
99
Miscellaneous
LETTER: CONTRACT RE CREOSOTE PIT INVESTIGATION
1994-06-24
205
Site Investigation Start - State Lead
1994-05-23
99
Miscellaneous
LETTER RE: SIGNED AGREEMENT
1994-05-06
213
DERF - Interim Action Workplan Received
SCOPE OF WORK
1994-04-25
99
Miscellaneous
MICHIGAN DNR GUIDANCE DOCUMENTS
1994-03-21
99
Miscellaneous
MEMO MINUTES OF SOW MEETING
1994-03-15
99
Miscellaneous
RPT #4 - WATERFRONT PLAN FOR CITY OF ASHLAND - DG LTD.
1994-03-10
99
Miscellaneous
MEMO RE: CONSULTANT SELECTION
1994-01-01
99
Miscellaneous
RPT #3 - SITE HEALTH & SAFETY PLAN - SEH
1993-12-07
99
Miscellaneous
MEMO: REQUESTING ERF FUNDING FOR CREOSOTE PIT PROJECT
1992-08-25
99
Miscellaneous
MEMO RE: ADEQUATE SAMPLING OF COAL GAS WASTE
1992-05-01
37
Site Investigation Report (SIR) Received (non-fee)
DNR REPORT
1991-10-30
99
Miscellaneous
LETTER RE: PROBLEMS WITH THE MAIN SEWER
1991-10-24
99
Miscellaneous
PRELIMINARY TEST PITS LAB RESULTS
1991-10-21
99
Miscellaneous
LETTER RE: CONDITIONAL APPROVAL OF PLANS FOR SEWER
1991-09-21
99
Miscellaneous
LETTER RE: PROPOSED BAYFRONT SEWER EXTENSION
1991-08-28
99
Miscellaneous
CONTACTS AND PHONE NUMBERS
1991-08-07
99
Miscellaneous
RPT #2 - SPECS FOR BAYFRONT AREA SANITARY SEWER IMPROVEMENT - BRA&A
1991-06-21
99
Miscellaneous
LETTER RE: TELEPHONE CONVERSATION
1990-06-01
99
Miscellaneous
WIS REF SUMMARY RANKING SHEET
1989-10-20
99
Miscellaneous
COVER LETTER: APPENDIX G
1989-08-22
99
Miscellaneous
COVER LETTER: FINAL REPORT ENVIRONMENTAL ASSESS
1989-08-21
99
Miscellaneous
RPT #1 - ENVIRONMENTAL ASSESSEMENT WW TREATMENT PLANT - NET
1989-02-15
1
Notification of Hazardous Substance Discharge
1988-06-27
99
Miscellaneous
DRAFT LETTER REVIEW AND APPROVAL OF PHASE I
1987-12-22
99
Miscellaneous
LETTER RE: NSP COAL TAR REMOVAL