WIDNR on FaceBook  WIDNR on Twitter  WIDNR on YouTube  WIDNR on Instagram  WIDNR on LinkedIn  WIDNR Podcast  WIDNR on Pinterest

ENVIRONMENTAL CLEANUP & BROWNFIELDS REDEVELOPMENT
BRRTS on the Web

Click the Location Name or FID below to view the Location Details page. If additional Activities are present at this location, they may be accessed from Location Details.

ACTIVITY DETAILS

 
02-05-217270 ONE HOUR MARTINIZING
Activity Type / Status Jurisdiction
ERP  OPEN DNR RR
Location Name County DNR Region
MARTINIZING DRY CLEANING & LAUNDRY SERVICE BROWN NORTHEAST
Address Municipality
1233 S MILITARY AVE GREEN BAY
PLSS Description Latitude (WGS84) Longitude (WGS84) Google Maps RR Sites Map
NW 1/4 of the NW 1/4 of Sec 34, T24N, R20E 44.5160839 -88.0684033 Click to view on Google Maps using Lat/Long Click to View RR Sites Map
Additional Activity Details Acres
Electronic Only - No Hard File .3
Facility ID PECFA No. EPA ID Start Date End Date
405008780 1999-03-31
Characteristics
Above Ground
Petrol Tank

Drycleaner
EPA
NPL Site
EPA
Superfund
PECFA Funds
Eligible

PFAS

ROW Impact

Sediments
Underground
Petrol Tank
WI DOT
Site
Drycleaner Flag  
Site Files
Name File
SITE FILE FOR YEARS 1999 THRU 2017 Download PDF Document
Actions and Documents
Date Code Name File Comment
2024-05-01 43 Site Activity Status Update Received Download PDF file DERF AGENT AGMT NOT SIGNED YET, ATU FILTERS ORDERED, RECOMMEND REPLACING EVERY 6-12 MONTHS
2024-03-18 99 Miscellaneous Download PDF file DERF VARIANCE REQUEST NOT APPROVED
2024-03-15 43 Site Activity Status Update Received Download PDF file VMS PIPE RECONNECTED OUTSIDE. BLOWER OPERATING DURING DAY, ATUS PLACED IN ALL TENANT SPACES
2024-03-14 43 Site Activity Status Update Received Download PDF file NO UPDATE ON DERF AGENT AGMT, BOTH VMS'S OPERATING, NEED ADDITIONAL SOIL SOURCE DELINEATION AND RAOR
2024-02-22 43 Site Activity Status Update Received Download PDF file LARGE BLOWER TURNED BACK ON, RECOMMEND RUNNING WHEN PEOPLE IN BLDG; VMS PVC PIPE CAME APART
2024-02-21 2 Responsible Party (RP) letter sent Download PDF file NEW OWNER
2024-02-08 43 Site Activity Status Update Received Download PDF file EJ DOMBROWSKI PURCHASED THE PROPERTY AND IS NOW THE RP; DNR PROVIDED RECOMMENDATIONS FOR SITE
2024-02-06 43 Site Activity Status Update Received Download PDF file DERF VARIANCE REQUEST
2024-01-09 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2023 - 12/31/2023
2023-12-19 43 Site Activity Status Update Received Download PDF file RAOR/RAP SUBMITTAL MAY NEED A DEADLINE EXTENSION
2023-12-14 364 VAL and/or VRSL Exceeded
2023-11-14 200 Push Action Taken Download PDF file DNR PUSH LETTER REQUESTING RAP BY JANUARY 15, 2024
2023-11-03 43 Site Activity Status Update Received Download PDF file VMS FANS TURNED BACK ON
2023-10-26 43 Site Activity Status Update Received Download PDF file INDOOR AIR PASSIVE VAPOR SAMPLING RESULTS ABOVE VALS AT 1219 AND 1235 MILITARY AVE
2023-08-11 43 Site Activity Status Update Received Download PDF file WILL PERFORM GW MONITORING ON 8/21 & TRYING TO CONTACT HVAC CONTRACTOR TO INTRODUCE MORE FRESH AIR
2023-08-08 99 Miscellaneous Download PDF file DNR REQUEST FOR STATUS UPDATE FOR VAPOR MITIGATION AND REMEDIAL ACTION
2023-07-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 01/01/2023 - 06/30/2023
2023-05-12 43 Site Activity Status Update Received Download PDF file FEB & MARCH 2023 INDOOR AIR, SANITARY SEWER GAS, GROUNDWATER, AND PFE TESTING RESULTS
2023-04-14 43 Site Activity Status Update Received Download PDF file RP PLANS TO PERFORM WORK LESS THAN $5K ON HIS OWN AND WORK OVER $5K UNDER DERF
2023-04-12 99 Miscellaneous Download PDF file DNR FOLLOW-UP EMAIL FOR 3/22/23 SITE VISIT. DNR RECOMMENDS INTRODUCING FRESH AIR TO JIMS MUSIC
2023-04-12 99 Miscellaneous Download PDF file UPDATE FOR REMEDIAL ACTION BIDDING
2023-03-22 99 Miscellaneous JOSIE SCHULTZ & ROBERT HOVERMAN OF DNR PERFORMED SITE VISIT AND LOOKED AT VMS OPERATION
2023-03-08 43 Site Activity Status Update Received Download PDF file NOTIFICATION OF VAPOR RESULTS SENT TO BLDG OCCUPANTS; WAKANDA CURRENTLY REMAINS UNOCCUPIED
2023-03-06 99 Miscellaneous Download PDF file DNR RESPONSE TO RP ATTORNEY REGARDING SITE HISTORY AND REQUEST FOR RETROACTIVE APPROVAL FOR DERF
2023-02-22 43 Site Activity Status Update Received Download PDF file INDOOR AIR RESULTS FROM ALL ON-SITE TENANT SPACES; CONTINUED IAL & VAL EXCEEDANCES, BUT DECREASING
2023-01-26 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file DNR COMMENTS TO 12/29/22 WORKPLAN FOR NEXT STEPS TO ADDRESS VI AND ADDITIONAL SI
2023-01-26 116 PFAS Sampling Required SEE AC30 OF SAME DATE FOR DOCUMENTATION
2023-01-23 43 Site Activity Status Update Received Download PDF file RP'S ATTORNEY IS REQUESTING DNR RETROACTIVELY APPROVE PREVIOUS WORK TO BE COVERED BY DERF
2023-01-21 99 Miscellaneous Download PDF file DNR RESPONSE TO REQUEST TO RECONSIDER PFAS SAMPLING. PFAS SAMPLING REQUIRED IN SOURCE AREA MWS
2023-01-17 43 Site Activity Status Update Received Download PDF file 12/30/22 INDOOR AIR SAMPLING RESULTS; ALL SAMPLES ABOVE THE VAL OR IAL FOR PCE
2023-01-03 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2022 - 12/31/2022
2022-12-29 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file PROPOSED INDOOR AIR SAMPLING, PFE MEASUREMENTS, GW SAMPLING, AND SANITARY INVESTIGATION W/ SCHEDULE
2022-12-29 114 PFAS Scoping Statement Received SEE AC35 OF SAME DATE FOR DOCUMENTATION
2022-12-21 43 Site Activity Status Update Received Download PDF file AIR TREATMENT UNIT PHOTOS AND PHOTOS FROM SWAT FOR WORK PERFORMED IN JUNE 2022
2022-12-08 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file COMMENTS ABOUT AIR TREATMENT UNIT PLACEMENT & INDOOR AIR SAMPLE LOCATIONS
2022-12-05 43 Site Activity Status Update Received Download PDF file REVISED SIGNED COMMITMENT TO COMPLIANCE WITH RP, QEFLI NEZIRI SIGNATURE
2022-11-30 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file SIWP FOR TEMPORARY AIR UNITS & ATTORNEY SIGNED COMMITMENT TO COMPLIANCE
2022-11-02 99 Miscellaneous Download PDF file ENFORCEMENT CONFERENCE FOLLOW-UP EMAIL TO RP
2022-11-01 4 Enforcement Conference Held Download PDF file CONFERENCE ON 11/1/2022; SUMMARY SENT ON 11/14/2022
2022-10-24 99 Miscellaneous JENNIE PELCZAR PHONE LOG OF CONVERSATION WITH RESPONSIBLE PARTY REGARDING THE NOV
2022-10-17 14 Notice of Violation (NOV) Issued Download PDF file
2022-10-05 99 Miscellaneous Download PDF file DNR RESPONSE TO PREVIOUS RP, SYNERGY INVESTORS, FOR BRIEF STATUS UPDATE/HISTORY OF SITE
2022-05-09 3 Notice of Noncompliance (NON) Issued Download PDF file NOTICE OF NONCOMPLIANCE, REQUIRING DOCUMENTATION OF VMS UPDATES AND/OR AIR FILTRATION BY 6/9/22
2022-04-21 99 Miscellaneous Download PDF file PHONE CALL TO CONSULTANT FOLLOWED UP WITH EMAIL REQUESTING UPDATE ON VMS/FILTRATION AND RA
2022-03-21 99 Miscellaneous DNR REQUESTS UPDATE FOR VMS MODIFICATIONS, AIR FILTRATION & RA; SEE AC 99 DATED 4/21/2022 FOR DOC
2022-02-24 43 Site Activity Status Update Received Download PDF file UPDATE THAT RP HAS GIVEN PERMISSION TO HIRE RADON MITIGATOR TO INSPECT AND SEAL PENETRATIONS
2022-02-18 99 Miscellaneous Download PDF file DNR REQUESTING UPDATE FOR TEMPORARY AIR FILTRATION AND/OR CHANGES TO MITIGATION SYSTEM
2022-02-07 43 Site Activity Status Update Received Download PDF file DNR EMAILS TO RESPONSIBLE PARTY & JIMS MUSIC WITH DHS'S PASSIVE INDOOR AIR SAMPLING RESULTS
2022-01-24 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2021 - 12/31/2021
2022-01-18 99 Miscellaneous Download PDF file EMAIL DOCUMENTING PID SCREENING & POTENTIAL VAPOR ENTRY POINTS @ JIMS MUSIC
2022-01-13 99 Miscellaneous Download PDF file MEMO FOR DHS PASSIVE INDOOR AIR SAMPLING WITHIN JIM'S MUSIC 1/13/22 - 1/18/22
2022-01-10 99 Miscellaneous Download PDF file EMAIL INFORMING RP THAT DHS WILL BE PERFORMING PASSIVE INDOOR AIR SAMPLING @ JIMS MUSIC ON 1/13/2021
2022-01-10 99 Miscellaneous Download PDF file EMAIL REQUIRING UPDATES TO VAPOR MITIGATION SYSTEM & DESIGN OF A REMEDIAL ACTION
2021-12-10 43 Site Activity Status Update Received Download PDF file PRESSURE FIELD EXTENSION VACUUM MEASUREMENTS FOR THE VAPOR MITIGATION SYSTEM
2021-11-09 43 Site Activity Status Update Received Download PDF file DOCUMENTATION OF VAPOR MITIGATION SYSTEM MODIFICATIONS & RECENT SITE INVESTIGATION
2021-10-15 356 Superfund Removal Action Taken REPORT CONTAINING EPAS GROUNDWATER, SOIL GAS & VAPOR SAMPLING RESULTS
2021-09-27 99 Miscellaneous Download PDF file EMAIL TO CONSULTANT REQUESTING INFORMATION ON COMMISSIONING OF SYSTEM & TIMELINE FOR DOC SUBMITTAL
2021-08-02 99 Miscellaneous Download PDF file DNR RESPONSE TO QUESTIONS FROM EDWARD JONES FOR VAOR CONCENTRATIONS DETECTED IN 2020
2021-07-06 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2021 - 6/30/2021
2021-06-10 43 Site Activity Status Update Received Download PDF file 1223, 1229, 1233 ST. AGNES DRIVE NOT ALLOWING US EPA ACCESS FOR VAPOR SAMPLING
2021-05-24 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP) Download PDF file COMMENTS TO THE SUPPLEMENTAL SI WORKPLAN & SUB-SLAB DEPRESSURIZATION MODIFICATIONS
2021-05-13 35 Site Investigation Workplan (SIWP) Received (non-fee) Download PDF file SCOPE OF WORK FOR VAPOR MITIGATION SYSTEM UPDATES & ADDITIONAL SITE INVESTIGATION
2021-05-07 99 Miscellaneous Download PDF file NOTIFIFYING 1219 S MILITARY AVE OF VAL EXCEEDANCES IN INDOOR AIR FOR PCE
2021-04-06 130 DNR Regulatory Reminder Sent Download PDF file VAPOR INTRUSION AND TCE REMINDER LETTER
2021-03-30 43 Site Activity Status Update Received Download PDF file EPA VAPOR & SUMP SAMPLING RESULTS FROM 3/9/2021 & 3/10/2021 SAMPLING EVENT
2021-02-02 99 Miscellaneous Download PDF file REQUEST VIRTUAL MEETING WITH RESPONSIBLE PARTY TO GO OVER VMS & NEXT STEPS
2021-01-22 43 Site Activity Status Update Received Download PDF file PHOTOS OF MANOMETERS INSTALLED ON FANS & BLOWERS
2020-12-21 99 Miscellaneous Download PDF file CLARIFICATION OF DNR 4/17/2020 RESPONSE TO THE INTERIM ACTION PLAN SUBMITTED 4/15/2020
2020-12-08 99 Miscellaneous Download PDF file FOLLOWUP TO NON WITH UPDATE TO REFER TO ENVIRONMENTAL ENFORCEMENT
2020-11-10 3 Notice of Noncompliance (NON) Issued Download PDF file NON FOR MISSING 11/6/2020 DEADLINE FOR VMS INSPECTION; SERVES AS FIRST REQUIRED NOTICE UNDER 728.11
2020-11-06 99 Miscellaneous Download PDF file DNR REQUESTING UPDATE FOR IF VMS BLOWER FAN WAS INSTALLED & ENTIRE SYSTEM INSPECTED/COMMISSIONED
2020-10-27 130 DNR Regulatory Reminder Sent Download PDF file DERF FUNDING STATUS LTR
2020-10-27 99 Miscellaneous Download PDF file VMS UPDATES ON 10/23/20, DNR REQUIRING VMS INSPECTION 11/6/20
2020-10-26 99 Miscellaneous Download PDF file VAPOR MITIGATION SYSTEM DESIGN DOES NOT MEET ANSI/AARST STANDARDS
2020-09-15 99 Miscellaneous Download PDF file CORRESPONDENCE FOR EPA REMOVAL ACTION
2020-09-08 43 Site Activity Status Update Received Download PDF file CITY OF GREEN BAY REQUIRING PLUMBING BE BROUGHT UP TO CODE. PLUMBING ISSUES MAY BE ADDING TO VAPORS
2020-08-19 99 Miscellaneous Download PDF file NEW WATER REQUESTING TO SAMPLE SUMPS & PROVIDED RP WITH LIST FOR VMS CONTRACTORS TO HIRE
2020-08-17 130 DNR Regulatory Reminder Sent Download PDF file EMERGING CONTAMINANTS REMINDER LETTER
2020-08-14 43 Site Activity Status Update Received Download PDF file CONSULTANT NO LONGER REPRESENTING RP
2020-08-06 99 Miscellaneous Download PDF file RESPONSE WITH EDITS & COMMENTS FOR INTERIM ACTION REPORT
2020-07-29 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2020 - 6/30/2020
2020-07-28 99 Miscellaneous Download PDF file INSPECTION OF DRYCLEANING MACHINE - IN GOOD CONDITION
2020-07-14 99 Miscellaneous OCCUPANCY & AGE RANGES FOR EMPLOYEES & CUSTOMERS
2020-07-07 43 Site Activity Status Update Received Download PDF file PLUMBING & SANITARY SEWER UPDATE FROM CITY OF GREEN BAY-LICENSED PLUMBER REQUIRED FOR FIXES
2020-06-30 99 Miscellaneous Download PDF file BROWN CNTY HEALTH DEPT PROVIDED LITERATURE TO OCCUPANTS & CONTACT INFO FOR DHS FOR CVOC VAPORS
2020-06-30 126 Interim Action Report Received (non-fee) Download PDF file VAPOR MITIGATION SYSTEM CONSTRUCTION REPORT, GW SAMPLING & VAPOR SAMPLING RESULTS
2020-06-16 99 Miscellaneous Download PDF file NOTES FROM CONFERENCE CALL W/ DNR VAPOR EXPERT, CITY OF GREEN BAY PLUMBING INSPECTOR & CONSULTANT
2020-06-15 99 Miscellaneous Download PDF file REQUEST FOR ADDITIONAL INFORMATION,DOCUMENTATION & ACTION IN RESPONSE TO RECENT VAPOR SAMPLING
2020-06-15 43 Site Activity Status Update Received Download PDF file PFE TESTING,SUB-SLAB VACUUM READINGS FOR COMMISSIONING OF SSDS
2020-06-03 43 Site Activity Status Update Received Download PDF file INDOOR AIR SAMPLING RESULTS POST-VMS INSTALL FOR COMMISSIONING
2020-04-20 43 Site Activity Status Update Received Download PDF file STATE LEAD SCS SITE RECON & VAPOR SCREENING REPORT
2020-04-17 99 Miscellaneous Download PDF file DNR RESPONSE TO VAPOR MITIGATION PROPOSAL- REQUIRES IMMEDIATE COMMISSIONING & PROPER DOCUMENTATION
2020-04-15 122 Interim Action Plan Received (non-fee) Download PDF file DOCUMENTATION FOR VAPOR MITIGATION APPROACH & PROPOSAL FOR VAPOR MITIGATION SYSTEM, GW SAMPLING
2020-04-13 99 Miscellaneous Download PDF file DHS RESPONSE TO VAL EXCEEDANCE AT JIMS MUSIC
2020-04-08 43 Site Activity Status Update Received Download PDF file STATE LEAD VAPOR SCREENING RESULTS FROM APRIL 2020
2020-04-03 99 Miscellaneous Download PDF file NOTICE OF INTENT TO INCUR COSTS FOR STATE-FUNDED RESPONSE
2020-04-03 43 Site Activity Status Update Received Download PDF file GASMET FTIR METER READINGS FROM 4/2/2020
2020-03-22 43 Site Activity Status Update Received Download PDF file RP EMAIL RESPONSE TO MOVE FORWARD WITH STATE LEAD VAPOR INVESTIGATION
2020-03-20 99 Miscellaneous Download PDF file RP IS A DOCTOR DEALING WITH COVID CASES; RP GIVING GO AHEAD TO PERFORM STATE LEAD RESPONSE
2020-03-18 43 Site Activity Status Update Received Download PDF file MARCH 2020 VAPOR SAMPLING RESULTS
2020-02-27 99 Miscellaneous Download PDF file DNR ATTORNEY IN CONTACT WITH RP'S ATTORNEY FOR TIMELINE FOR WORK THAT HASN'T BEEN INITIATED YET
2020-02-25 99 Miscellaneous Download PDF file UPDATE THAT THE RP HAS NOT PROVIDED THE CONSULTANT WITH A NOTICE TO PROCEED WITH WORK
2020-01-23 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2019 - 12/31/2019
2019-12-04 99 Miscellaneous Download PDF file DNR RESPONSE TO INDEMNIFICATION AGREEMENT BETWEEN QELFI NEZIRI & PREVIOUS RP MIKE NASS
2019-11-26 214 DERF - Interim Action Workplan Approved Download PDF file
2019-11-22 213 DERF - Interim Action Workplan Received Download PDF file IAWP FOR VAPOR SAMPLING
2019-11-20 43 Site Activity Status Update Received Download PDF file DNR REQUESTING REVISIONS TO VAPOR INTRUSION SCOPE OF WORK
2019-10-21 99 Miscellaneous Download PDF file RP ASKING WHAT HAPPENS IF DRY CLEANER VACATE THE BUILDING
2019-10-18 99 Miscellaneous Download PDF file FEEDBACK FOR PHASED APPROACH TO VAPOR SAMPLING
2019-10-09 43 Site Activity Status Update Received Download PDF file EMAIL UPDATES FROM 9/17/19 TO 10/9/19 STATING THAT THE RP IS HAVING DIFFICULTY HIRING A CONSULTANT
2019-10-04 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE FOR VI INTERIM SCOPE OF WORK
2019-09-23 99 Miscellaneous Download PDF file UPDATE ON HIRING CONSULTANT TO PERFORM NECESSARY INTERIM VAPOR WORK
2019-09-09 2 Responsible Party (RP) letter sent Download PDF file NEW OWNER RP LETTER HAND-DELIVERED DURING MEETING WITH RP ON 9/9/2019
2019-09-09 99 Miscellaneous Download PDF file EMAIL TO QELFI NEZIRI OF 9/9/2019 IN-PERSON MEETING SUMMARY
2019-08-16 99 Miscellaneous Download PDF file EMAIL CORRESPONDENCE TO SET UP IN-PERSON MEETING
2019-07-31 43 Site Activity Status Update Received Download PDF file VAPOR SAMPLING RESULTS FROM JULY 2015
2019-07-02 99 Miscellaneous Download PDF file DNR EMAIL CORRESPONDENCE REQUESTING VAPOR RESULTS FROM 2015
2017-04-18 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2017-04-18 43 Site Activity Status Update Received CONSULTANT WAITING FOR A RESPONSE FROM RP REGARDING NEXT STEP(S) TO TAKE
2016-07-28 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2016 - 6/30/2016
2016-06-16 43 Site Activity Status Update Received CONSULTANT HAS NOT BEEN IN CONTACT W/RP
2016-06-01 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2016-01-31 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2015 - 12/31/2015
2015-08-26 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2015 - 6/30/2015
2015-06-23 99 Miscellaneous NEW PROPERTY OWNER: INNOVATIVE PROPERTIES GROUP LLC
2015-06-10 43 Site Activity Status Update Received VAPOR SAMPLING CONDUCTED 06-10-2015
2015-02-01 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 7/1/2014 - 12/31/2014
2015-01-07 98 Technical Assistance Provided Download PDF file ENVIRONMENTAL CONDITIONS OF PROPERTY
2015-01-05 97 Technical Assistance Request Received (fee)
2014-09-25 195 Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met Open NR700 Report Period: 1/1/2014 - 6/30/2014
2014-02-04 99 Miscellaneous REQUEST FOR INFORMATION PERTAINING TO FUTURE VAPOR SAMPLING PLAN
2014-01-30 130 DNR Regulatory Reminder Sent DERF FUNDING STATUS LTR
2014-01-26 43 Site Activity Status Update Received GROUNDWATER SAMPLING DATA
2013-11-06 43 Site Activity Status Update Received STATUS UPDATE - GW SAMPLING EVENT RECENTLY CONDUCTED
2013-07-26 99 Miscellaneous RA CHANGE ORDER @2 APPROVED
2013-06-28 112 DERF - Change Order Received RA CHANGE ORDER #2
2013-06-12 99 Miscellaneous REQUEST FOR ADDITIONAL INFORMATION REGARDING REMAINING RA TASKS AND BUDGET
2013-05-29 43 Site Activity Status Update Received INQUIRY REGARDING DERF REIMBURSEMENT RATES
2013-05-23 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2013-05-14 43 Site Activity Status Update Received 05-10-2013 REQUEST FOR CASE STATUS UPDATE LETTER RETURNED TO DNR
2013-05-10 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2012-06-13 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2011-09-08 130 DNR Regulatory Reminder Sent Download PDF file Vapor Intrusion (VI) Assessment Notification Ltr Sent
2011-06-15 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2011-06-15 43 Site Activity Status Update Received DRAFT WP AVAILABLE FOR RP REVIEW. RP DETERMINING DERP ELIGIBILITY
2011-03-17 99 Miscellaneous CONSULTANT REQUEST FOR CASE STATUS UPDATE
2010-09-23 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE FROM CONSULTANT
2010-09-23 43 Site Activity Status Update Received AECOM (AKA STS) WORKING W/ CORPORATE OFFICE REGARDING DERP RATES. RP TO HAVE NEW CONSULTANT CONTRACT
2009-09-21 99 Miscellaneous REQUEST FOR ADDITIONAL INFO REGARDING 08-04-09 VARIANCE REQUEST
2009-08-04 112 DERF - Change Order Received VARIANCE REQUEST FOR CHANGE IN HOURLY RATES DUE TO DEATH OF ORIGINAL RP
2009-06-25 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2009-04-20 7 Environmental Consultant Hired PROPERTY OWNER RETAINED AECOM (FORMERLY STS) TO RESUME WORK
2009-04-03 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2008-10-21 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE
2008-08-28 99 Miscellaneous ADDITIONAL PCN SUBMITTED BY G.B. CLEANER CORP. ACKNOWLEDGEMENT LETTER SENT 03/17/2009.
2008-08-26 99 Miscellaneous NEW PCN APPROVED FOR NEW RP, SYNERGY INVESTORS
2008-08-15 2 Responsible Party (RP) letter sent Download PDF file NEW RP - MIKE NASS
2008-06-10 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE FROM RP'S ATTORNEY
2008-06-05 99 Miscellaneous REQUEST FOR CASE STATUS UPDATE FROM CONSULTANT
2008-06-05 43 Site Activity Status Update Received CONSULTANT STATES NO FURTHER ENVIRONMENTAL WORK BEING COMPLETED
2007-06-15 218 DERF - Cost Reimbursement Application Approved
2007-06-13 43 Site Activity Status Update Received GROUNDWATER RESULTS
2007-05-21 43 Site Activity Status Update Received RP PASSED AWAY
2007-01-30 217 DERF - Cost Reimbursement Application Received
2007-01-30 43 Site Activity Status Update Received CONTINUED GROUNDWATER MONITORING
2007-01-04 99 Miscellaneous UNABLE TO PROCESS DERF CLAIM UNTIL STATUS UPDATE IS SUBMITTED
2006-07-12 99 Miscellaneous CHANGE ORDER NOT APPROVED AT THIS TIME
2006-07-06 217 DERF - Cost Reimbursement Application Received
2006-06-15 112 DERF - Change Order Received
2006-05-31 218 DERF - Cost Reimbursement Application Approved
2006-01-06 99 Miscellaneous REQUEST FOR STATUS UPDATE - NEEDED BEFORE REIMBURSEMENT CLAIM CAN BE PROCESSED.
2006-01-04 217 DERF - Cost Reimbursement Application Received
2005-09-26 218 DERF - Cost Reimbursement Application Approved
2005-08-22 112 DERF - Change Order Received
2005-06-30 217 DERF - Cost Reimbursement Application Received
2005-05-09 43 Site Activity Status Update Received RP/CONSULTANT INTERESTED IN ACTIVE GW REMEDY BASED ON 1 YR QTLY GW MONITORING. GW DATA TO COME.
2005-05-09 43 Site Activity Status Update Received GW ANALYTICAL DATA
2005-04-13 218 DERF - Cost Reimbursement Application Approved AUTO-POPULATED BY CAOS
2005-01-04 217 DERF - Cost Reimbursement Application Received
2004-10-21 218 DERF - Cost Reimbursement Application Approved AUTO-POPULATED BY CAOS
2004-07-01 43 Site Activity Status Update Received REVISED BID SUMMARY FORM AND GW DATA
2004-06-30 99 Miscellaneous REQUEST FOR ADDT'L INFO
2004-06-29 217 DERF - Cost Reimbursement Application Received
2004-02-25 43 Site Activity Status Update Received RP NO LONGER WORKING WITH ATTORNEY. RP TO PROVIDE ADDT'L INFO REGARDING RA CONSULTANT SELECTION
2003-12-09 99 Miscellaneous SEEKING ADDT'L CONSULTANT JUSTIFICATION INFORMATION
2003-11-17 43 Site Activity Status Update Received ADDT'L BID INFORMATION
2003-11-06 43 Site Activity Status Update Received ADDT'L BID INFORMATION
2003-10-29 113 DERF - Bid Review Request Received RA BIDS
2003-10-29 99 Miscellaneous REQUEST FOR ADDT'L INFORMATION FROM BIDDERS
2003-09-15 43 Site Activity Status Update Received IN THE PROCESS OF GATHERING 3 BIDS FOR DERF
2003-07-02 43 Site Activity Status Update Received RP IN PROCESS OF OBTAINING BIDS & SELECTING A CONSULTANT
2003-06-23 218 DERF - Cost Reimbursement Application Approved AUTO-POPULATED BY CAOS
2003-03-12 217 DERF - Cost Reimbursement Application Received SI REIMBURSEMENT REQUEST
2002-11-26 38 Site Investigation Report (SIR) Approved
2002-11-18 37 Site Investigation Report (SIR) Received (non-fee)
2002-05-22 82 Remedial Action Options Report (RAOR) Not Approved ADDITIONAL INFORMATION NEEDS TO BE INCORPORATED
2002-05-15 39 Remedial Action Options Report (RAOR) Received (non-fee) DRAFT VERSION OF AMENDED RAOR
2002-03-08 82 Remedial Action Options Report (RAOR) Not Approved
2002-02-04 39 Remedial Action Options Report (RAOR) Received (non-fee)
2001-12-04 43 Site Activity Status Update Received SUMMARY OF ADDITIONAL SITE INVESTIGATION ACTIVITIES
2001-07-16 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
2001-07-13 35 Site Investigation Workplan (SIWP) Received (non-fee)
2001-06-06 110 DERF - Potential Claim Form Approved
2001-05-10 99 Miscellaneous NEW CORRESPONDENCE ADDRESS IN COMMENT FIELD
2001-05-04 140 Site Investigation Report (SIR) Not Approved
2001-05-04 82 Remedial Action Options Report (RAOR) Not Approved
2001-03-12 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
2001-03-12 39 Remedial Action Options Report (RAOR) Received (non-fee)
2000-06-29 140 Site Investigation Report (SIR) Not Approved
2000-04-21 37 Site Investigation Report (SIR) Received (non-fee) Download PDF file
1999-09-07 43 Site Activity Status Update Received Download PDF file SOIL & GW SAMPLING RESULTS
1999-05-05 30 Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
1999-04-30 35 Site Investigation Workplan (SIWP) Received (non-fee)
1999-04-19 111 DERF - Site Investigation Scoping Report Received
1999-04-19 29 Phase II Environmental Site Assessment (ESA) Rpt Received Download PDF file
1999-04-01 2 Responsible Party (RP) letter sent
1999-03-31 1 Notification of Hazardous Substance Discharge
Substances
Substance Type Amt Released Units
Chlorinated Solvents VOC
Tetrachloroethene (Perchloroethylene) VOC
Trichloroethylene Industrial Chem
Financial
Category Fiscal Year Amount
DERF Reimbursements:Grant 2003 $29,494
DERF Reimbursements:Grant 2005 $4,432
DERF Reimbursements:Grant 2005 $2,609
DERF Reimbursements:Grant 2006 $3,722
DERF Reimbursements:Grant 2006 $1,024
DERF Reimbursements:Grant 2007 $2,215
DERF Reimbursements:Grant 2007 $4,237
Responsible Party
TMC PROPERTIES LLC 1219 S MILITARY AVE, GREEN BAY, WI 54304
DNR Project Manager
JOSIE SCHULTZ  josie.schultz@wisconsin.gov
217270 | 02-05-217270
BOTW Release 4.9 | 04/23/2024 | Release Notes  Help  Disclaimers  Glossary of Terms  Supplemental Pages