2024-04-17
|
79
|
Case Closure Review Request Received
|
|
AUTO-ENTERED
|
|
2024-04-11
|
779
|
Case Closure Review Fee Received
|
|
|
|
2024-04-11
|
700
|
Database Fee Paid for Groundwater Continuing Obligation(s)
|
|
|
|
2024-04-11
|
710
|
Database Fee Paid for Soil Continuing Obligation(s)
|
|
|
|
2024-01-16
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2023 - 12/31/2023
|
|
2023-12-14
|
364
|
VAL and/or VRSL Exceeded
|
|
|
|
2023-07-25
|
99
|
Miscellaneous
|
|
DNR RESPONSE TO RADR AND VMS OM&M PLAN; ADDITIONAL GW MONITORING AND REVISIONS NEEDED
|
|
2023-07-18
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 01/01/2023 - 06/30/2023
|
|
2023-06-07
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
REVISED VMS OPERATION AND MAINTENANCE PLAN
|
|
2023-06-06
|
151
|
Remedial Action (RA) Documentation Report Received (non-fee)
|
|
DOCUMENTATION OF EXCAVATION AND EX-SITU TREATMENT OF CONTAMINATED SOIL
|
|
2023-06-06
|
119
|
PFAS Sampling Completed - Not Detected
|
|
SEE AC 151 FOR DOCUMENTATION; PFAS NOT DETECTED AND NO MORE PFAS SAMPLING REQUIRED
|
|
2023-04-05
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
REMEDIAL ACTION PLAN FOR EXCAVATION AND IN-SITU TREATMENT TO DISPOSE AT LICENSED LANDFILL
|
|
2023-03-28
|
43
|
Site Activity Status Update Received
|
|
3RD ROUND PASSIVE VAPOR SAMPLING RESULTS FOR 856 MATHER & 714 LINCOLN BELOW STANDARDS
|
|
2023-01-09
|
43
|
Site Activity Status Update Received
|
|
VAPOR SAMPLING RESULTS SENT TO OFF-SITE RESIDENCES; 712 LINCOLN & 856 MATHER
|
|
2023-01-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2022 - 12/31/2022
|
|
2022-12-15
|
99
|
Miscellaneous
|
|
PHONE CONFERENCE WITH KEN JUZA, ANDY DELFORGE, ROXANNE CHRONERT, & JOSIE SCHULTZ
|
|
2022-12-01
|
99
|
Miscellaneous
|
|
DNR REQUESTING ROUND OF OFF-SITE PASSIVE VI SAMPLING, SOIL RA, MODS TO VMS OM&M PLAN & PFAS SAMPLING
|
|
2022-12-01
|
116
|
PFAS Sampling Required
|
|
SEE AC 99 OF SAME DATE FOR DOCUMENTATION
|
|
2022-09-28
|
43
|
Site Activity Status Update Received
|
|
VAPOR SAMPLING RESULTS FOR 856 MATHER & 714 LINCOLN BELOW STDS; RECENT GW MONITORING AND SOIL TCLP
|
|
2022-09-28
|
114
|
PFAS Scoping Statement Received
|
|
SEE AC 43 OF SAME DATE FOR DOCUMENTATION
|
|
2022-08-18
|
43
|
Site Activity Status Update Received
|
|
OFF-SITE VAPOR SAMPLING RESULTS FOR 864 MATHER & 714 LINCOLN RESIDENCES BELOW VRSLS & VALS
|
|
2022-07-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2022 - 6/30/2022
|
|
2022-03-22
|
99
|
Miscellaneous
|
|
OFF-SITE RESIDENCES ARE ALLOWING ACCESS; DNR REQUESTING PASSIVE VAPOR SAMPLING
|
|
2022-03-10
|
99
|
Miscellaneous
|
|
DNR RESPONSE THAT A SOIL REMEDIAL ACTION IS NEEDED
|
|
2022-01-11
|
43
|
Site Activity Status Update Received
|
|
SOIL & GW SAMPLING, REQUEST OFF-SITE ACCESS FOR VAPOR SAMPLING
|
|
2022-01-04
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2021 - 12/31/2021
|
|
2021-07-01
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2021 - 6/30/2021
|
|
2021-06-23
|
99
|
Miscellaneous
|
|
DNR REQUESTING ADDITIONAL SITE INVESTIGATION & DOCUMENTATION FOR SITE
|
|
2021-04-06
|
130
|
DNR Regulatory Reminder Sent
|
|
VAPOR INTRUSION AND TCE REMINDER LETTER
|
|
2021-01-05
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2020 - 12/31/2020
|
|
2020-10-28
|
99
|
Miscellaneous
|
|
VMS NEEDS OM&M PLAN & INSPECTION LOG; NEXT STEPS TO INVESTIGATE VI IN OFF-SITE RESIDENCES
|
|
2020-10-27
|
130
|
DNR Regulatory Reminder Sent
|
|
DERF FUNDING STATUS LTR
|
|
2020-10-05
|
126
|
Interim Action Report Received (non-fee)
|
|
VAPOR MITIGATION SYSTEM DOCUMENTATION & QTLY GROUNDWATER SAMPLING POST-INJECTION
|
|
2020-08-17
|
130
|
DNR Regulatory Reminder Sent
|
|
EMERGING CONTAMINANTS REMINDER LETTER
|
|
2020-07-06
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2020 - 6/30/2020
|
|
2020-03-18
|
151
|
Remedial Action (RA) Documentation Report Received (non-fee)
|
|
DOCUMENTATION OF SUMMER 2019 INJECTION & FIRST 2 ROUNDS OF GW SAMPLING POST-INJECTION
|
|
2020-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2019 - 12/31/2019
|
|
2019-11-05
|
217
|
DERF - Cost Reimbursement Application Received
|
|
|
|
2019-10-10
|
99
|
Miscellaneous
|
|
DERP REMEDIAL ACTION CHANGE ORDER #3 APPROVAL-INSTALL REPLACEMENT WELLS DESTROYED IN ROAD CONST
|
|
2019-09-16
|
112
|
DERF - Change Order Received
|
|
REQUEST TO REPLACE MONITORING WELLS DESTROYED DURING ROAD CONSTRUCTION
|
|
2019-07-16
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2019 - 6/30/2019
|
|
2019-05-09
|
64
|
Inject/Infiltrate Request Approved
|
|
|
|
2019-04-19
|
63
|
Inject/Infiltrate Request Received (fee)
|
|
|
|
2019-02-11
|
99
|
Miscellaneous
|
|
CHANGE IN PROJECT MANAGER (SCHULTZ)
|
|
2019-01-18
|
99
|
Miscellaneous
|
|
APPROVAL OF CAP 18 PROPOSED REMEDIAL ACTION
|
|
2019-01-03
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2018 - 12/31/2018
|
|
2018-12-17
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER SAMPLING RESULTS
|
|
2018-10-16
|
99
|
Miscellaneous
|
|
DNR APPROVAL OF PROPOSED COST
|
|
2018-09-12
|
43
|
Site Activity Status Update Received
|
|
DERF COST ESTIMATE FOR GROUNDWATER MONITORING & REMEDIAL ACTION
|
|
2018-08-14
|
99
|
Miscellaneous
|
|
APPROVAL OF NEW CONSULTANT SELECTION (REI ENGINEERING)
|
|
2018-06-27
|
7
|
Environmental Consultant Hired
|
|
REI ENGINEERING INC
|
|
2018-01-31
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2017 - 12/31/2017
|
|
2017-08-08
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2017 - 6/30/2017
|
|
2017-05-05
|
99
|
Miscellaneous
|
|
APPROVAL OF MACH IV RA PROPOSAL DATED 04/01/2017
|
|
2017-04-20
|
113
|
DERF - Bid Review Request Received
|
|
REQUEST TO HIRE MACH IV
|
|
2017-01-27
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 7/1/2016 - 12/31/2016
|
|
2016-12-02
|
43
|
Site Activity Status Update Received
|
|
BUILDING IS CURRENTLY VACANT. ANTICIPATED CONSULTANT INTENDS TO GET THIS SITE MOVING AGAIN.
|
|
2016-08-01
|
195
|
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
|
|
Period: 1/1/2016 - 6/30/2016
|
|
2016-07-12
|
99
|
Miscellaneous
|
|
RP SHOULD HAVE CONSULTANT SUBMIT A SOW & DERF COST ESTIMATE FOR DNR APPROVAL
|
|
2016-07-11
|
43
|
Site Activity Status Update Received
|
|
REQUEST TO HIRE NEW CONSULTANT
|
|
2016-06-24
|
43
|
Site Activity Status Update Received
|
|
REQUEST TO CHANGE CONSULTANTS WILL BE SUBMITTED TO DNR IN THE NEAR FUTURE
|
|
2016-05-17
|
43
|
Site Activity Status Update Received
|
|
NEW CONSULTANT & COST ESTIMATE TO BE SUBMITTED TO DNR IN THE NEAR FUTURE
|
|
2016-02-16
|
43
|
Site Activity Status Update Received
|
|
SEEKING NEW CONSULTANT
|
|
2015-06-02
|
99
|
Miscellaneous
|
|
REQUEST FOR CASE STATUS UPDATE
|
|
2015-06-02
|
43
|
Site Activity Status Update Received
|
|
POTENTIAL TO HIR A NEW CONSULTANT
|
|
2014-07-24
|
43
|
Site Activity Status Update Received
|
|
RP TO CONTACT CONSULTAN TO COLLECT A ROUND OF GROUNDWATER SAMPLES
|
|
2014-07-14
|
99
|
Miscellaneous
|
|
REQUEST FOR CASE STATUS UPDATE
|
|
2014-01-30
|
130
|
DNR Regulatory Reminder Sent
|
|
DERF FUNDING STATUS LTR
|
|
2013-04-10
|
99
|
Miscellaneous
|
|
REQUEST FOR CASE STATUS UPDATE
|
|
2013-01-25
|
43
|
Site Activity Status Update Received
|
|
RP/DNR MEETING TO DISCUSS SITE STATUS
|
|
2013-01-16
|
99
|
Miscellaneous
|
|
REQUEST FOR CASE STATUS UPDATE
|
|
2012-09-10
|
99
|
Miscellaneous
|
|
DOT REPORTS AND NOTES
|
|
2012-01-17
|
99
|
Miscellaneous
|
|
REQUEST FOR RP TO CONTACT DNR TO DISCUSS NOVEMBER 2011 RA CHANGE ORDER
|
|
2012-01-17
|
43
|
Site Activity Status Update Received
|
|
RP OK WITH RA APPROACH OUTLINED IN NOV 2011 SHAW SUBMITTAL
|
|
2012-01-17
|
99
|
Miscellaneous
|
|
DNR PROVIDED COMMENTS AND REQUESTED ADDITIONAL INFO REGARDING NOV 2011 RA CHANGE ORDER
|
|
2011-12-22
|
99
|
Miscellaneous
|
|
REQUEST FOR RP TO CONTACT THE DNR TO DISCUSS 11/22/11 CHANGE ORDER REQUEST
|
|
2011-11-22
|
112
|
DERF - Change Order Received
|
|
|
|
2011-09-08
|
130
|
DNR Regulatory Reminder Sent
|
|
Vapor Intrusion (VI) Assessment Notification Ltr Sent
|
|
2011-07-25
|
217
|
DERF - Cost Reimbursement Application Received
|
|
|
|
2011-01-04
|
99
|
Miscellaneous
|
|
RP AGREED TO HAVE CONSULTANT SUBMIT COSTS FOR ADDITIONAL REMEDIAL ACTION
|
|
2010-11-22
|
43
|
Site Activity Status Update Received
|
|
GROUNDWATER AND AIR SAMPLING DATA
|
|
2010-06-02
|
99
|
Miscellaneous
|
|
REQUEST FOR MODIFICATIONS TO 4/26/10 CHANGE ORDER REQUEST
|
|
2010-05-26
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
AUDIT OF 2ND RA CLAIM (DC-359) COMPLETE, REIMBURSEMENT CHECK TO BE SENT ASAP.
|
|
2010-04-26
|
112
|
DERF - Change Order Received
|
|
REQUEST FOR VAPOR & UTILITY ASSESSMENT
|
|
2010-03-31
|
29
|
Phase II Environmental Site Assessment (ESA) Rpt Received
|
|
DOT PROJECT ID: #1450-04-00 (GREEN BAY), 1450-06-00 (HOWARD)
|
|
2010-03-19
|
93
|
Operation & Maintenance (O&M) Report Approved
|
|
ADDITIONAL INFORMATION TO BE SUBMITTED
|
|
2010-02-23
|
217
|
DERF - Cost Reimbursement Application Received
|
|
|
|
2010-02-23
|
92
|
Operation & Maintenance (O&M) Report Received (non-fee)
|
|
|
|
2009-05-08
|
99
|
Miscellaneous
|
|
CHECK FOR REIMB CLAIM DC-248 (RCVD 12/07, RA #1) ISSUED 5/8/09
|
|
2009-05-07
|
43
|
Site Activity Status Update Received
|
|
REMEDIAL ACTION ACTIVITIES TO RESUME NOW THAT DERP REIMBURSEMENT IS TO TAKE PLACE MAY OR JUNE 2009
|
|
2009-04-15
|
99
|
Miscellaneous
|
|
REQUEST FOR CASE STATUS UPDATE
|
|
2008-11-24
|
43
|
Site Activity Status Update Received
|
|
REMEDIATION SYSTEM HAS BEEN SHUT DOWN FOR WINTER & WILL RESTART IN SPRING 2009
|
|
2008-10-06
|
43
|
Site Activity Status Update Received
|
|
GW SAMPLES COLLECTED APRIL 2008. SYSTEM TO RUN UNTIL LATE NOVEMBER BEFORE BEING SHUT OFF FOR WINTER.
|
|
2008-03-28
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
AUDIT OF CLAIM #2 COMPLETE. REIMB CHECK NOT YET SENT, NO FUNDS AVAILABLE. WILL BE ISSUED ASAP
|
|
2008-03-12
|
43
|
Site Activity Status Update Received
|
|
REMEDIAT SYSTEM TURNED OFF OVER WINTER. RESTART IN SPRING. GW SAMPLES COLLECTED PRIOR TO START UP.
|
|
2007-05-21
|
43
|
Site Activity Status Update Received
|
|
SYSTEM RETROFITS BEING IMPLEMENTED. SYSTEM T/BE RUNNING IN NEAR FUTURE.
|
|
2007-05-11
|
43
|
Site Activity Status Update Received
|
|
SVE SYSTEM TO BE INSTALLED ON 06-04-2007
|
|
2007-04-05
|
43
|
Site Activity Status Update Received
|
|
CONSULTANT IS PREPARING BID SPECS
|
|
2007-02-14
|
43
|
Site Activity Status Update Received
|
|
GATHERING SUBCONTRACTOR BIDS. CONSTRUCTION ANTICIPATED FOR SPRING 2007,
|
|
2006-11-07
|
112
|
DERF - Change Order Received
|
|
REMEDIAL ACTION CHANGE ORDER #1
|
|
2006-09-21
|
43
|
Site Activity Status Update Received
|
|
RESPONSE TO DNR QUESTIONS
|
|
2006-09-14
|
43
|
Site Activity Status Update Received
|
|
CONSULTANT TO RESPOND TO DNR'S REQUEST THE WEEK OF SEPT 18, 2006
|
|
2006-09-12
|
99
|
Miscellaneous
|
|
REQUEST FOR ADDITIONAL INFORMATION
|
|
2006-08-30
|
112
|
DERF - Change Order Received
|
|
|
|
2006-08-30
|
147
|
Remedial Action (RA) Design Report Received (non-fee)
|
|
REMEDIAL DESIGN REPORT
|
|
2006-05-05
|
43
|
Site Activity Status Update Received
|
|
REPORT AND CHANGE ORDER TO BE SUBMITTED BY JUNE 1, 2006
|
|
2006-05-03
|
99
|
Miscellaneous
|
|
REQUEST FOR CASE STATUS UPDATE
|
|
2006-03-28
|
3
|
Notice of Noncompliance (NON) Issued
|
|
|
|
2005-08-30
|
99
|
Miscellaneous
|
|
REQUEST FOR CASE STATUS UPDATE
|
|
2004-11-08
|
43
|
Site Activity Status Update Received
|
|
UPDATE ON GW DISPOSAL & RAP
|
|
2004-04-28
|
218
|
DERF - Cost Reimbursement Application Approved
|
|
AUTO-POPULATED BY CAOS
|
|
2004-03-22
|
99
|
Miscellaneous
|
|
SUB-SLAB DEPRESSURIZATION SYSTEM NO LONGER NEEDED AT ADJACENT PROPERTY
|
|
2004-03-05
|
217
|
DERF - Cost Reimbursement Application Received
|
|
REIMURSEMENT PACKET SENT TO SOELLNER ON 03-08-2004
|
|
2004-01-30
|
43
|
Site Activity Status Update Received
|
|
ADDITIONAL BID INFORMATION FROM ONE RA BIDDER
|
|
2004-01-27
|
99
|
Miscellaneous
|
|
REQUEST FOR ADDITIONAL INFOMATION FROM BIDDERS
|
|
2004-01-23
|
113
|
DERF - Bid Review Request Received
|
|
|
|
2003-12-23
|
43
|
Site Activity Status Update Received
|
|
2 RA PROPOSALS. 3 MORE WILL BE COMING.
|
|
2003-10-27
|
146
|
Remedial Action Plan Go Ahead (Notice to Proceed)
|
|
|
|
2003-10-21
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
REVISED RAOR. PAPER COPY.
|
|
2003-10-16
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
REVISED RAOR. ELECTRONIC VERSION.
|
|
2003-10-16
|
99
|
Miscellaneous
|
|
DNR PROVIDED COMMENTS TO REVISED RAOR.
|
|
2003-10-13
|
99
|
Miscellaneous
|
|
DNR PROVIDED COMMENTS TO REVISED RAOR.
|
|
2003-10-08
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
REVISED RAOR. ELECTRONIC VERSION.
|
|
2003-09-24
|
38
|
Site Investigation Report (SIR) Approved
|
|
|
|
2003-09-24
|
82
|
Remedial Action Options Report (RAOR) Not Approved
|
|
DNR COMMENTS SENT TO NORTHERN ENVIRONMENTAL
|
|
2003-09-22
|
39
|
Remedial Action Options Report (RAOR) Received (non-fee)
|
|
|
|
2003-09-18
|
37
|
Site Investigation Report (SIR) Received (non-fee)
|
|
|
|
2003-09-18
|
43
|
Site Activity Status Update Received
|
|
RAP WILL BE MAILED TO DNR ON 09/19/03
|
|
2003-08-07
|
43
|
Site Activity Status Update Received
|
|
DHFS LETTER SUMMARIZING VAPOR INTRUSION POTENTIAL
|
|
2003-07-08
|
43
|
Site Activity Status Update Received
|
|
EMAIL SUMMARIZING SI ANALYTICAL RESULTS
|
|
2003-06-02
|
43
|
Site Activity Status Update Received
|
|
HAZARDOUS WASTE DETERMINATION
|
|
2003-06-02
|
216
|
DERF - Contained-in Rulings Review Request Received
|
|
|
|
2003-05-30
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
PROPOSAL FOR ADDITIONAL SI ACTIVITIES
|
|
2003-05-30
|
112
|
DERF - Change Order Received
|
|
SITE INVESTIGATION ACTIVITIES
|
|
2003-05-20
|
99
|
Miscellaneous
|
|
DNR RECOMMENDATIONS REGARDING 05/15/2003 E-MAIL
|
|
2003-05-15
|
43
|
Site Activity Status Update Received
|
|
E-MAIL UPDATING DNR ON ADDITIONAL SI ACTIVITIES & PROPOSED WORK
|
|
2003-03-11
|
43
|
Site Activity Status Update Received
|
|
LETTER FROM AGENT TO FORMER OWNER REGARDING WASTE DETERMINATION
|
|
2003-02-27
|
43
|
Site Activity Status Update Received
|
|
CONSULTANT RQT TO OFF-SITE PROP OWNER REQUESTING ACCESS TO INSTALL SOIL BORINGS
|
|
2003-02-26
|
43
|
Site Activity Status Update Received
|
|
REQUEST TO ADD AREA TO CITY'S DATABASE/MASTER PLAN
|
|
2003-02-26
|
43
|
Site Activity Status Update Received
|
|
LTR NOTIFYING CITY OF POTENTIAL FOR CONTAMINANTS IN STREET
|
|
2003-02-14
|
112
|
DERF - Change Order Received
|
|
SITE INVESTIGATION ACTIVITIES
|
|
2003-01-16
|
99
|
Miscellaneous
|
|
DNR PROVIDED COMMENTS ON 01/06/03 SUBMITTAL
|
|
2003-01-06
|
43
|
Site Activity Status Update Received
|
|
COPY OF LATEST SOIL & GW ANALYTICAL RESULTS
|
|
2002-12-12
|
43
|
Site Activity Status Update Received
|
|
RESPONSE FROM CITY DENYING REQUEST FOR OFF-SITE ACCESS
|
|
2002-12-05
|
43
|
Site Activity Status Update Received
|
|
LTR TO CITY OF GREEN BAY REQUESTING OFF-SITE ACCESS FOR SB & MW INSTALLATION
|
|
2002-12-04
|
99
|
Miscellaneous
|
|
RESPONSE TO OFF-SITE PROPERTY OWNER REGARDING ACCESS
|
|
2002-11-27
|
43
|
Site Activity Status Update Received
|
|
RESPONSE FROM OFF-SITE PROP. OWNER RE: RP'S RQT TO INSTALL GW MONITORING WELL
|
|
2002-11-18
|
112
|
DERF - Change Order Received
|
|
SITE INVESTIGATION ACTIVITIES
|
|
2002-11-11
|
99
|
Miscellaneous
|
|
ADDITIONAL WORK SHOULD PROCEED WITH CONDITIONS
|
|
2002-11-06
|
43
|
Site Activity Status Update Received
|
|
SUMMARY OF LATEST SI RESULTS & PROPOSAL FOR ADDITIONAL WORK
|
|
2002-10-22
|
43
|
Site Activity Status Update Received
|
|
ORIGINAL DERF POTENTIAL CLAIM NOTIFICATION FORM FOR AGENT AGREEMENT
|
|
2002-10-22
|
110
|
DERF - Potential Claim Form Approved
|
|
WITH AGENT AGREEMENT
|
|
2002-09-25
|
30
|
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
|
|
WITH CONDITIONS
|
|
2002-09-20
|
35
|
Site Investigation Workplan (SIWP) Received (non-fee)
|
|
|
|
2002-07-24
|
110
|
DERF - Potential Claim Form Approved
|
|
|
|
2002-07-23
|
43
|
Site Activity Status Update Received
|
|
PREPARING AGENT AGREEMENT & POTENTIAL CLAIM NOTIFICATION FORM
|
|
2002-07-18
|
43
|
Site Activity Status Update Received
|
|
UPDATED/FINAL SI COST PROPOSAL FROM NORTHERN ENVIRONMENTAL
|
|
2002-07-10
|
43
|
Site Activity Status Update Received
|
|
NORTHERN ENV RETAINED. RP SUBMITTING AGENT AGREEMENT TO WDNR
|
|
2002-06-27
|
99
|
Miscellaneous
|
|
DENIAL OF RP REQUEST TO USE HIGHEST BIDDER FOR SI
|
|
2002-05-20
|
43
|
Site Activity Status Update Received
|
|
REVISED NORTHERN ENVIRONMENTAL DERF SI PROPOSAL
|
|
2002-05-03
|
43
|
Site Activity Status Update Received
|
|
REVISED ARCADIS DERF SI PROPOSAL
|
|
2002-04-30
|
43
|
Site Activity Status Update Received
|
|
REVISED ALPHA TERRA DERF SI PROPOSAL
|
|
2002-04-15
|
99
|
Miscellaneous
|
|
REQUEST FOR ADDITIONAL INFORMATION REGARDING SI PROPOSALS
|
|
2002-04-11
|
43
|
Site Activity Status Update Received
|
|
DERF SI PROPOSALS
|
|
2002-04-11
|
113
|
DERF - Bid Review Request Received
|
|
|
|
2001-08-09
|
43
|
Site Activity Status Update Received
|
|
COPY OF REQUEST FOR PROPOSAL LETTERS
|
|
2001-06-21
|
43
|
Site Activity Status Update Received
|
|
GW MONITORING RESULTS
|
|
2001-05-15
|
43
|
Site Activity Status Update Received
|
|
WILL BE COLLECTING ANOTHER ROUND OF GW
|
|
2000-06-21
|
43
|
Site Activity Status Update Received
|
|
GW MONITORING DATA
|
|
1999-08-20
|
43
|
Site Activity Status Update Received
|
|
APPLYING FOR DERP - 3 CONSULTANT PROPOSALS
|
|
1999-07-22
|
43
|
Site Activity Status Update Received
|
|
|
|
1999-07-06
|
43
|
Site Activity Status Update Received
|
|
|
|
1999-03-25
|
2
|
Responsible Party (RP) letter sent
|
|
|
|
1999-03-22
|
1
|
Notification of Hazardous Substance Discharge
|
|
|
|
1999-03-22
|
111
|
DERF - Site Investigation Scoping Report Received
|
|
|