2024-01-30
364
VAL and/or VRSL Exceeded
2024-01-30
366
VAL and/or VRSL Exceeded at Off-Site Property or ROW
2024-01-29
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2023 - 12/31/2023
2023-08-10
92
Operation & Maintenance (O&M) Report Received (non-fee)
SEMI-ANNUAL O&M REPORT JANUARY 1 - JUNE 30, 2023
2023-07-27
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 01/01/2023 - 06/30/2023
2023-06-08
92
Operation & Maintenance (O&M) Report Received (non-fee)
2022 ANNUAL O&M REPORT
2023-04-20
99
Miscellaneous
MODIFICATION TO PARAGRAPH 9 OF 2017 STIPULATION ORDER FOR JUDGEMENT
2023-03-23
99
Miscellaneous
GROUNDWATER ANALYTICAL SUMMARY TABLE THROUGH OCT 2022
2023-01-28
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2022 - 12/31/2022
2023-01-16
92
Operation & Maintenance (O&M) Report Received (non-fee)
O&M SEMI-ANNUAL REPORT
2023-01-06
27
Long Term Monitoring Plan Approved
WDNR RESPONSE TO GRWM PLAN FOR PCBS
2022-07-27
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2022 - 6/30/2022
2022-06-30
114
PFAS Scoping Statement Received
2022-06-30
25
Long Term Monitoring Plan Received (fee)
2022-06-24
43
Site Activity Status Update Received
OPERATION, MONITORING, AND MAINTENANCE ANNUAL REPORT
2022-01-29
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2021 - 12/31/2021
2021-09-03
-
Site Assessment
2021-09-03
-
Site Investigation
2021-09-02
-
Remediation
2021-09-02
-
Maps
VARIETY OF MAPS FROM 2012
2021-09-02
-
Remediation
2021-09-02
-
Remediation
2021-09-02
-
Remediation
2021-09-02
-
Remediation
2021-09-02
-
Remediation
2021-07-30
92
Operation & Maintenance (O&M) Report Received (non-fee)
2021-07-30
43
Site Activity Status Update Received
DMR LONG REPORT
2021-07-26
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2021 - 6/30/2021
2021-06-30
43
Site Activity Status Update Received
DMR SHORT REPORT
2021-06-30
43
Site Activity Status Update Received
DMR LONG REPORT
2021-06-25
92
Operation & Maintenance (O&M) Report Received (non-fee)
JANUARY 1, 2020 – DECEMBER 31, 2020
2021-05-31
43
Site Activity Status Update Received
DMR LONG REPORT
2021-04-30
43
Site Activity Status Update Received
DMR LONG REPORT
2021-04-06
130
DNR Regulatory Reminder Sent
VAPOR INTRUSION AND TCE REMINDER LETTER
2021-03-31
43
Site Activity Status Update Received
DMR SHORT REPORT
2021-03-31
43
Site Activity Status Update Received
DMR LONG REPORT
2021-02-26
43
Site Activity Status Update Received
DMR LONG REPORT
2021-01-29
43
Site Activity Status Update Received
DMR LONG REPORT
2021-01-25
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2020 - 12/31/2020
2021-01-21
43
Site Activity Status Update Received
DECEMBER 2020 LONG REPORT
2021-01-21
43
Site Activity Status Update Received
DECEMBER 2020 SHORT REPORT
2020-12-21
43
Site Activity Status Update Received
NOVEMBER 2020 LONG REPORT
2020-11-21
43
Site Activity Status Update Received
OCTOBER 2020 LONG REPORT
2020-10-21
43
Site Activity Status Update Received
SEPTEMBER 2020 LONG REPORT
2020-10-21
43
Site Activity Status Update Received
SEPTEMBER 2020 SHORT REPORT
2020-09-21
43
Site Activity Status Update Received
AUGUST 2020 LONG REPORT
2020-08-21
43
Site Activity Status Update Received
JULY 2020 LONG REPORT
2020-08-19
43
Site Activity Status Update Received
OPERATIONS, MONITORING, AND MAINTENANCE SEMI-ANNUAL REPORT – JANUARY 1, 2020 – JUNE 30,2020
2020-08-17
130
DNR Regulatory Reminder Sent
EMERGING CONTAMINANTS REMINDER LETTER
2020-07-27
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2020 - 6/30/2020
2020-07-20
43
Site Activity Status Update Received
JUNE 2020 LONG REPORT
2020-07-20
43
Site Activity Status Update Received
JUNE 2020 SHORT REPORT
2020-06-18
43
Site Activity Status Update Received
MAY 2020 LONG REPORT
2020-05-18
43
Site Activity Status Update Received
APRIL 2020 LONG REPORT
2020-04-07
92
Operation & Maintenance (O&M) Report Received (non-fee)
OPERATION, MONITORING, AND MAINTENANCE ANNUAL REPORT
2020-04-01
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING LONG REPORT
2020-04-01
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING SHORT REPORT
2020-03-01
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING LONG REPORT
2020-02-07
43
Site Activity Status Update Received
NOTIFICATION OF UTILITY WORK BENEATH MADISON KIPP CORPORATION CAP
2020-02-01
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING LONG REPORT
2020-01-20
43
Site Activity Status Update Received
DMR DECEMBER 2019 SHORT FORM
2020-01-20
43
Site Activity Status Update Received
DMR DECEMBER 2019 LONG FORM
2020-01-15
43
Site Activity Status Update Received
NOTIFICATION OF RENOCLEAN SGC 62 CLEANING AGENT INTRODUCED TO GROUNDWATER EXTRACTION AND
TREATMENT
2020-01-09
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2019 - 12/31/2019
2019-12-20
43
Site Activity Status Update Received
DMR NOVEMBER 2019
2019-12-12
43
Site Activity Status Update Received
TABLES
2019-11-19
43
Site Activity Status Update Received
DMR OCTOBER
2019-10-30
43
Site Activity Status Update Received
DMR LONG REPORT
2019-10-30
43
Site Activity Status Update Received
DMR SHORT REPORT
2019-09-24
43
Site Activity Status Update Received
DMR
2019-08-31
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING LONG REPORT
2019-08-26
92
Operation & Maintenance (O&M) Report Received (non-fee)
OPERATIONS, MONITORING, AND MAINTENANCE SEMI-ANNUAL REPORT – JANUARY 1, 2019 – JUNE 30
2019-07-24
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2019 - 6/30/2019
2019-07-23
43
Site Activity Status Update Received
DMR SHORT REPORT
2019-07-23
43
Site Activity Status Update Received
DMR LONG REPORT
2019-06-20
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING LONG REPORT
2019-06-20
43
Site Activity Status Update Received
DMR
2019-06-03
43
Site Activity Status Update Received
UPDATED GROUNDWATER ANALYTICAL SUMMARY TABLE INCLUDING RESULTS FROM THE LATEST ROUND OF MONITORING
2019-05-22
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING LONG REPORT
2019-04-23
43
Site Activity Status Update Received
DMR
2019-04-23
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING SHORT REPORT
2019-04-08
43
Site Activity Status Update Received
REVIEW OF THE U.S. EPA TSCA PCB COORDINATED APPROVAL – APRIL 3, 2019
2019-03-29
43
Site Activity Status Update Received
DMR
2019-03-07
43
Site Activity Status Update Received
2018 ANNUAL REPORT
2019-02-22
43
Site Activity Status Update Received
DMR
2019-01-08
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2018 - 12/31/2018
2019-01-08
43
Site Activity Status Update Received
DMR
2018-12-21
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING LONG REPORT
2018-12-07
43
Site Activity Status Update Received
PROGRESS REPORT
2018-12-06
43
Site Activity Status Update Received
DMR
2018-11-21
43
Site Activity Status Update Received
DMR
+
2018-10-23
43
Site Activity Status Update Received
MONTHLY DMR
20181023_43_DMR.pdf
20181023_43_DMR.pdf
2018-10-23
43
Site Activity Status Update Received
QUARTERLY DMR
2018-09-24
43
Site Activity Status Update Received
DMR
2018-09-21
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING LONG REPORT
2018-09-19
36
Site Investigation Workplan (SIWP) Approved
2018-09-18
92
Operation & Maintenance (O&M) Report Received (non-fee)
2018-09-17
92
Operation & Maintenance (O&M) Report Received (non-fee)
2018-09-17
43
Site Activity Status Update Received
DMR
2018-08-27
135
Site Investigation Workplan (SIWP) Received (fee)
2018-08-24
43
Site Activity Status Update Received
DMR
2018-08-22
43
Site Activity Status Update Received
SVE SHUTDOWN AND MW NETWORK MODIFICATION WORKPLAN
2018-07-31
43
Site Activity Status Update Received
WASTEWATER DISCHARGE MONITORING LONG REPORT
2018-07-30
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2018 - 6/30/2018
2018-07-06
43
Site Activity Status Update Received
JUNE DMR
2018-06-13
43
Site Activity Status Update Received
MAY DMR
2018-06-06
43
Site Activity Status Update Received
GW ANALYTICAL SUMMARY TABLE
2018-05-08
43
Site Activity Status Update Received
APRIL DMR
2018-04-09
43
Site Activity Status Update Received
MARCH DMR
2018-03-14
43
Site Activity Status Update Received
DMR
2018-03-02
92
Operation & Maintenance (O&M) Report Received (non-fee)
2018-03-01
43
Site Activity Status Update Received
SEMI ANNUAL REPORT
2018-02-19
43
Site Activity Status Update Received
ON SITE PCB MONITORING
2018-02-08
43
Site Activity Status Update Received
DMR JANUARY 2018
2018-01-29
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2017 - 12/31/2017
2018-01-12
43
Site Activity Status Update Received
DMR
2017-12-06
43
Site Activity Status Update Received
DMR
2017-11-30
43
Site Activity Status Update Received
STIPULATION AND ORDER FOR JUDGEMENT
2017-11-06
43
Site Activity Status Update Received
DMR
2017-10-30
43
Site Activity Status Update Received
PCE PLUME REPORT
2017-10-20
43
Site Activity Status Update Received
DMR
2017-10-19
43
Site Activity Status Update Received
PROPOSED MANAGEMENT PLAN
2017-10-06
43
Site Activity Status Update Received
DISCHARGE MONITORING REPORT SEPTEMBER 2017
+
2017-09-22
92
Operation & Maintenance (O&M) Report Received (non-fee)
20170922_92_O&M.pdf
20170922_92_O&M_Semi_Annual_Report.pdf
2017-09-22
92
Operation & Maintenance (O&M) Report Received (non-fee)
JULY 1 2016 - DECEMBER 31 2016
2017-09-07
43
Site Activity Status Update Received
DISCHARGE MONITORING REPORT
2017-08-29
92
Operation & Maintenance (O&M) Report Received (non-fee)
GW AND SOIL VAPOR EXTRACTION AND TREATMENT SYSTEMS
2017-08-03
43
Site Activity Status Update Received
DISCHARGE MONITORING REPORT
2017-08-01
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2017 - 6/30/2017
2017-07-12
43
Site Activity Status Update Received
DMR
2017-06-09
43
Site Activity Status Update Received
DMR
2017-05-11
43
Site Activity Status Update Received
APRIL DMR
2017-04-04
43
Site Activity Status Update Received
DMR
2017-03-14
43
Site Activity Status Update Received
DMR MARCH 2017
2017-03-10
43
Site Activity Status Update Received
DMR FEB 2017
2017-03-07
43
Site Activity Status Update Received
OM SEMI ANNUAL REPORT
2017-03-07
43
Site Activity Status Update Received
PROPOSED MODIFICATION TO PERFORMANCE MONITORING PROGRAM
2017-02-15
43
Site Activity Status Update Received
PROPOSED MANAGEMENT PLAN – POLYCHLORINATED BIPHENYLS (PCBS) IN GROUNDWATER
2017-02-07
43
Site Activity Status Update Received
JANUARY 2017 WPDES DISCHARGE MONITORING REPORT
2017-01-30
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2016 - 12/31/2016
2017-01-09
43
Site Activity Status Update Received
DMR REPORT
2016-12-02
43
Site Activity Status Update Received
DISCHARGE MONITORING REPORT
2016-11-03
43
Site Activity Status Update Received
DMR OCTOBER 2016
2016-11-02
43
Site Activity Status Update Received
VAPOR INTRUSION ASSESSMENT AND MITIGATION
2016-11-02
43
Site Activity Status Update Received
MARQUETTE STREET INSPECTION
2016-10-25
43
Site Activity Status Update Received
KIPP PAH BACKGROUND STUDY REPORTS
2016-10-13
43
Site Activity Status Update Received
PCB MEMO
2016-10-13
43
Site Activity Status Update Received
PCB'S IN GROUNDWATER
2016-10-03
43
Site Activity Status Update Received
GROUNDWATER EXTRACTION AND TREATMENT SYSTEM,
2016-09-12
92
Operation & Maintenance (O&M) Report Received (non-fee)
2016-09-12
43
Site Activity Status Update Received
PROGRESS REPORT
2016-09-09
43
Site Activity Status Update Received
DISCHARGE MONITORING REPORT
2016-09-08
43
Site Activity Status Update Received
GROUNDWATER AND SOIL VAPOR EXTRACTION AND TREATMENT SYSTEMS
2016-09-07
43
Site Activity Status Update Received
SOIL RESULTS
2016-08-04
43
Site Activity Status Update Received
DMR JULY 2016
2016-07-28
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2016 - 6/30/2016
2016-07-20
99
Miscellaneous
RESPONSES TO CITIZENS’ QUESTIONS REGARDING CLEAN-UP AT THE MADISON KIPP CORPORATION SITE
2016-07-06
43
Site Activity Status Update Received
PROGRESS REPORT
+
2016-06-06
43
Site Activity Status Update Received
DISCHARGE MONITORING REPORT
0213558625_DMR_06062016.pdf
0213558625_DMR_May2016.pdf
2016-05-06
99
Miscellaneous
PROGRESS REPORT
2016-05-05
43
Site Activity Status Update Received
DMR
2016-04-18
43
Site Activity Status Update Received
PROGRESS REPORT
2016-04-14
43
Site Activity Status Update Received
RESULTS SUMMARY
2016-04-12
43
Site Activity Status Update Received
ANNUAL REPORT
2016-04-12
43
Site Activity Status Update Received
PROGRESS REPORT
+
2016-04-01
43
Site Activity Status Update Received
DISCHARGE MONITORING REPORT
0213558625_DMR_04012016.pdf
0213558625_DMR_April2016.pdf
0213558625_DMR_March2016.pdf
2016-03-02
43
Site Activity Status Update Received
MONITORING REPORT
2016-02-18
37
Site Investigation Report (SIR) Received (non-fee)
2016-02-15
43
Site Activity Status Update Received
INTERIOR INVESTIGATION SUMMARY
+
2016-02-02
43
Site Activity Status Update Received
DMR
0213558625_DMR_02022016.pdf
0213558625_February2016_DMR.pdf
0213558625_January_DMR.pdf
2016-01-29
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2015 - 12/31/2015
+
2016-01-15
43
Site Activity Status Update Received
DISCHARGE MONITORING REPORT
0213558625_DMR_2015.pdf
0213558625_Jan2016_GW_Results.pdf
2016-01-12
43
Site Activity Status Update Received
DMR FINAL
2015-12-16
35
Site Investigation Workplan (SIWP) Received (non-fee)
2015-12-07
43
Site Activity Status Update Received
DMR
2015-11-19
43
Site Activity Status Update Received
CONSTRUCTION DOCUMENTATION REPORT
2015-11-13
43
Site Activity Status Update Received
WATER SYSTEM
+
2015-11-05
43
Site Activity Status Update Received
SOIL INVESTIGATION BIKE PATH WORKPLAN
0213558625_20102015_GW.pdf
0213558625_Bike_Path_Workplan.pdf
0213558625_Photograph.pdf
+
2015-11-04
43
Site Activity Status Update Received
DMR OCTOBER 2015
0213558625_DMR_11042015.pdf
0213558625_DMR_OCT2015.pdf
2015-10-21
43
Site Activity Status Update Received
BIKE PATH SOIL INVESTIGATION
2015-10-12
43
Site Activity Status Update Received
PROGRESS REPORT
2015-10-12
43
Site Activity Status Update Received
DMR SEPT 2015
2015-10-12
43
Site Activity Status Update Received
PCB INTERIOR INVESTIGATION SAMPLING SUMMARY OCT2015
+
2015-09-30
43
Site Activity Status Update Received
SVE PROGRESS REPORT
0213558625_SVE Report_Sept2015.pdf
0213558625_SVE_Report_Sept2015.pdf
2015-09-16
43
Site Activity Status Update Received
VAPOR RESULTS 2009-2015
+
2015-09-15
43
Site Activity Status Update Received
DISCHARGE MONITORING REPORT
0213558625_August 2015 DMR.pdf
0213558625_DMR.pdf
2015-08-20
43
Site Activity Status Update Received
PERFORMANCE MONITORING PLAN
+
2015-08-19
43
Site Activity Status Update Received
GROUNDWATER ANALYSIS
0213558625_GW_20102015.pdf
0213558625_Table1_GW_Results_2010_2015_08192015.pdf
2015-08-14
43
Site Activity Status Update Received
PROGRESS REPORT
+
2015-08-14
43
Site Activity Status Update Received
DMR JULY 2015
0213558625_DMR_July2015.pdf
0213558625_DMR_July2015.pdf
2015-08-12
43
Site Activity Status Update Received
PROGRESS REPORT
2015-08-07
35
Site Investigation Workplan (SIWP) Received (non-fee)
PROGRESS REPORT
2015-07-29
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2015 - 6/30/2015
2015-07-08
43
Site Activity Status Update Received
NEUTRALIZATION MEMO
2015-06-25
35
Site Investigation Workplan (SIWP) Received (non-fee)
2015-06-24
43
Site Activity Status Update Received
PCB GW MW 220 JUNE 2015
2015-06-17
35
Site Investigation Workplan (SIWP) Received (non-fee)
2015-05-19
43
Site Activity Status Update Received
GROUNDWATER ANALYSIS 2010-2015
2015-05-15
35
Site Investigation Workplan (SIWP) Received (non-fee)
DRAFT
2015-04-22
43
Site Activity Status Update Received
PCB INTERIOR
2015-04-21
37
Site Investigation Report (SIR) Received (non-fee)
2015-04-17
43
Site Activity Status Update Received
PCB INTERIOR INVESTIGATION SAMPLING SUMMARY APRIL 2015 REV
2015-04-03
43
Site Activity Status Update Received
2014 ANNUAL REPORT
2015-04-03
43
Site Activity Status Update Received
2014 ANNUAL REPORT - PART 2
2015-04-03
43
Site Activity Status Update Received
2014 ANNUAL REPORT - PART 3
2015-04-03
43
Site Activity Status Update Received
2014 ANNUAL REPORT - PART 4
2015-04-03
43
Site Activity Status Update Received
2014 ANNUAL REPORT - PART 5
2015-04-03
43
Site Activity Status Update Received
2014 ANNUAL REPORT - PART 6
2015-04-03
43
Site Activity Status Update Received
2014 ANNUAL REPORT - PART 7
2015-04-03
43
Site Activity Status Update Received
2014 ANNUAL REPORT - PART 8
2015-03-31
43
Site Activity Status Update Received
2014 ANNUAL REPORT
+
2015-03-30
43
Site Activity Status Update Received
SVE REPORT MARCH 2015 FINAL
0213558625_SVE Report_March 2015_FINAL.pdf
0213558625_SVE_Report_March2015.pdf
2015-03-18
43
Site Activity Status Update Received
SUMMARY OF 2015 LAWSUITS
2015-02-25
43
Site Activity Status Update Received
WPDES APPLICATION
2015-02-15
43
Site Activity Status Update Received
BI MONTHLY REPORT
2015-02-01
43
Site Activity Status Update Received
BI MONTHLY REPORT
2015-01-30
43
Site Activity Status Update Received
QUAP WIPE SAMPLING
2015-01-29
35
Site Investigation Workplan (SIWP) Received (non-fee)
2015-01-27
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 7/1/2014 - 12/31/2014
2015-01-21
99
Miscellaneous
PROGRESS REPORT
+
2015-01-12
43
Site Activity Status Update Received
WPDES PERMIT
0213558625_PCB_Interior_Investigation_Sampling Summary_Oct2015.pdf
0213558625_WPDES_PP_01122015.pdf
0213558625_WPSDES.pdf
+
2014-11-25
43
Site Activity Status Update Received
GW DATA AND WPDES PERMIT
0213558625_GW_Data_Dec2014.pdf
0213558625_WPDES_Permit_Application.pdf
2014-11-03
43
Site Activity Status Update Received
PCB BUILDING INTERIOR WIPE SAMPLING
2014-10-22
43
Site Activity Status Update Received
RAIN GARDEN CLEANUP CITY OF MADISON PARCEL EXCAVATION
2014-10-22
43
Site Activity Status Update Received
TECHNICAL JUSTIFICATION
2014-10-13
43
Site Activity Status Update Received
PARKING LOT EXCAVATION
2014-10-12
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2014-10-02
43
Site Activity Status Update Received
SVE SOIL VAPOR EXTRACTION
2014-09-29
43
Site Activity Status Update Received
SVE REPORT SEPT 2014
2014-09-19
195
Semi-Annual/PECFA Cost Reporting (NR700) Requirement Met
Period: 1/1/2014 - 6/30/2014
2014-09-02
43
Site Activity Status Update Received
AN EVALUATION OF THE POTENTIAL HEALTH CONCERNS ASSOCIATED WITH THE CONSTRUCTION OF GOODMAN CENTER
2014-08-14
43
Site Activity Status Update Received
RAIN GARDEN EXCAVATION REPORT AUG 2014
2014-08-13
43
Site Activity Status Update Received
ANALYTICAL RESULTS
+
2014-08-12
43
Site Activity Status Update Received
OFFICE INDOOR AIR
0213558625_SummaryofVaporData_20140812.pdf
0213558625_Vapor_Office_Indoor Air_20140812.pdf
2014-08-05
43
Site Activity Status Update Received
VOC AND PCB RESULTS
2014-07-23
43
Site Activity Status Update Received
VAPOR PROBE DATA
2014-07-18
43
Site Activity Status Update Received
INDOOR AIR SAMPLING RESULTS
2014-05-29
99
Miscellaneous
SCHMOLLER LETTER REGARDING INTERIOR BUILDING MAINTENANCE
2014-05-19
43
Site Activity Status Update Received
EVALUATION OF PLUME STABILITY AND FATE AND TRANSPORT MODELING
2014-04-22
43
Site Activity Status Update Received
PCB BUILDING INTERIOR INVESTIGATION
2014-04-17
43
Site Activity Status Update Received
GROUNDWATER SAMPLING DATA
2014-04-16
43
Site Activity Status Update Received
PLUME STABILITY EVALUATION FOR PCE IN BEDROCK GROUNDWATER
2014-04-07
43
Site Activity Status Update Received
ANNUAL REPORT
2014-04-02
147
Remedial Action (RA) Design Report Received (non-fee)
+
2014-04-01
43
Site Activity Status Update Received
GROUNDWATER EXTRACTION AND TREATMENT SYSTEM
0213558625_BOD_04012014.PDF
0213558625_Groundwater_Treatment.pdf
2014-03-31
43
Site Activity Status Update Received
SOIL SVE PROGRESS REPORT
2014-03-18
43
Site Activity Status Update Received
STEP TEST
2014-03-07
43
Site Activity Status Update Received
PAH BACKGROUND STUDY
2014-03-05
43
Site Activity Status Update Received
ISCO INJECTION APPROVAL LETTER
+
2014-03-03
43
Site Activity Status Update Received
2013 ANNUAL REPORT VOLUME 1
0213558625_Annual_Report_VoL_3_2013.pdf
0213558625_Annual_Report_Vol1_2013.pdf
0213558625_Annual_Report_Vol_2_2013.pdf
+
2014-02-24
43
Site Activity Status Update Received
INDOOR AIR SAMPLING
0213558625_Indoor_Air_Study.pdf
0213558625_Office_indoor_air_02242014.pdf
2014-02-21
39
Remedial Action Options Report (RAOR) Received (non-fee)
2014-02-21
43
Site Activity Status Update Received
ISCO EXEMPTION
2014-02-19
37
Site Investigation Report (SIR) Received (non-fee)
2014-02-14
92
Operation & Maintenance (O&M) Report Received (non-fee)
+
2014-02-13
43
Site Activity Status Update Received
ANNUAL INSPECTION
0213558625_Annual_Inspection_2014.pdf
0213558625_Annual_Inspection_2014.pdf
0213558625_SummaryofVaporData_02132014.pdf
2014-02-07
37
Site Investigation Report (SIR) Received (non-fee)
2014-02-07
43
Site Activity Status Update Received
PAH BACKGROUND SUMMARY
2014-02-03
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2014-01-30
92
Operation & Maintenance (O&M) Report Received (non-fee)
2014-01-24
92
Operation & Maintenance (O&M) Report Received (non-fee)
2014-01-17
43
Site Activity Status Update Received
WELL LOCATIONS MAP
2014-01-08
43
Site Activity Status Update Received
SAMPLING ACTIVITIES
2013-12-18
43
Site Activity Status Update Received
SI AND INTERIM ACTIONS REPORT TABLES
+
2013-12-18
35
Site Investigation Workplan (SIWP) Received (non-fee)
0213558625_SIWP_2013.pdf
0213558625_Workplan2013.pdf
2013-12-16
43
Site Activity Status Update Received
DMR
2013-12-11
43
Site Activity Status Update Received
GEOPHYSICAL LOGS
2013-12-09
43
Site Activity Status Update Received
SAMPLING MEMORANDUM PAH BACKGROUND SAMPLING PLAN
+
2013-12-02
43
Site Activity Status Update Received
SOIL SAMPLING RESULTS
0213558625_GWEwell_and_Pump_Test.pdf
0213558625_GW_VOC_PCB_Dev2013.pdf
0213558625_Soil_Results_2013.pdf
2013-11-27
43
Site Activity Status Update Received
REMOX® L ISCO REAGENT
2013-11-26
43
Site Activity Status Update Received
SVE REPORT
2013-11-14
43
Site Activity Status Update Received
PAH DETAILS
2013-10-25
35
Site Investigation Workplan (SIWP) Received (non-fee)
2013-10-25
43
Site Activity Status Update Received
SAMPLING PROPOSAL
+
2013-10-15
39
Remedial Action Options Report (RAOR) Received (non-fee)
0213558625_GW_Remedy_letter101013.pdf
0213558625_RAOR_2013.pdf
2013-10-11
37
Site Investigation Report (SIR) Received (non-fee)
+
2013-10-11
43
Site Activity Status Update Received
PCB ACTIVITIES
0213558625_PCB_Activities_2013.pdf
0213558625_PCB_Activities_May_August_2013.pdf
0213558625_Proposed_Well_Locations10112013.pdf
+
2013-09-30
37
Site Investigation Report (SIR) Received (non-fee)
0213558625_Addendum2_SIR_Sept2013.pdf
0213558625_SI_Addendum.pdf
2013-09-30
43
Site Activity Status Update Received
SVE REPORT
2013-09-16
43
Site Activity Status Update Received
PCB EXCAVATION SUMMARY
2013-09-06
43
Site Activity Status Update Received
BI-MONTHLY REPORT
+
2013-08-01
35
Site Investigation Workplan (SIWP) Received (non-fee)
0213558625_Air_Sampling_July2013.pdf
0213558625_IndoorAir_Workplan.pdf
0213558625_NorthernWell_Workplan.pdf
0213558625_PAH_Background_Workplan.pdf
0213558625_PCB investigation_workplan_aug2013.pdf
0213558625_PCB_Subsurface_Workplan.pdf
0213558625_Work_Plan_north_well_installations_aug2013.pdf
2013-08-01
43
Site Activity Status Update Received
REVIEW LETTER FOR WORKPLAN
2013-08-01
39
Remedial Action Options Report (RAOR) Received (non-fee)
2013-08-01
35
Site Investigation Workplan (SIWP) Received (non-fee)
PCB INVESTIGATION
2013-08-01
43
Site Activity Status Update Received
NORTHERN WELL INSTALLATIONS WORK PLAN
2013-08-01
43
Site Activity Status Update Received
SUPPLEMENTAL BUILDING INTERIOR POLYCHLORINATED BIPHENYL INVESTIGATION WORK PLAN
2013-07-31
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2013-07-18
43
Site Activity Status Update Received
SAMPLING PLAN WESTERN BOUNDARY
+
2013-06-26
43
Site Activity Status Update Received
REMEDIAL PRESENTATION
0213558625_2014_Annual_Report.pdf
0213558625_Remedial_Presentation.pdf
2013-06-20
43
Site Activity Status Update Received
REVIEW LETTER FOR SITE INVESTIGATION AND INTERIM ACTION REPORT
2013-06-14
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2013-06-01
43
Site Activity Status Update Received
BI-MONTHLY REPORT
+
2013-05-29
37
Site Investigation Report (SIR) Received (non-fee)
0213558625_SI_Addendum2013.pdf
0213558625_Supp_site information_052913.pdf
2013-05-16
37
Site Investigation Report (SIR) Received (non-fee)
+
2013-05-15
43
Site Activity Status Update Received
BI-MONTHLY REPORT
0213558625_Bi-Monthly_Report_May 15_2013.pdf
0213558625_DMR_May_15_2013 Letter.pdf
2013-05-15
43
Site Activity Status Update Received
DMR
2013-05-01
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2013-04-29
43
Site Activity Status Update Received
MW-25 GROUNDWATER VERTICAL AQUIFER PROFILING ANALYTICAL RESULTS,
2013-04-22
43
Site Activity Status Update Received
TELEVIEWERS
2013-03-27
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2013-03-15
37
Site Investigation Report (SIR) Received (non-fee)
2013-03-15
43
Site Activity Status Update Received
DMR
+
2013-03-14
43
Site Activity Status Update Received
BI-MONTHLY REPORT
0213558625_Bi-Monthly_Report_March_14_2013.pdf
0213558625_GW_Analytical_Results_MARCH2013.pdf
2013-03-12
43
Site Activity Status Update Received
CONDITIONAL APPROVAL OF OFF SITE PCB WORKPLAN
2013-03-12
99
Miscellaneous
CONDITIONAL APPROVAL: ADDENDUM TO THE FINAL REVISED WORK PLAN FOR PCB RECOMMENDED ACTIVITIES
2013-03-04
43
Site Activity Status Update Received
HEALTH STATEMENT: POLYCYCLIC AROMATIC HYDROCARBONS IN SOIL ON MADISON’S EAST SIDE
+
2013-03-01
43
Site Activity Status Update Received
BI-MONTHLY REPORT
0213558625_Bi-Monthly_Report_Mar1_2013.pdf
0213558625_Progress_Report_Feb2013.pdf
2013-03-01
40
Remedial Action Options Report (RAOR) Approved
2013-02-19
37
Site Investigation Report (SIR) Received (non-fee)
+
2013-02-15
43
Site Activity Status Update Received
ISCO PILOT TEST REPORT FEB 2013
0213558625_Bi-Monthly_Report_Feb15_2013.pdf
0213558625_ISCO_Feb2013.pdf
0213558625_ISCO_Injection_Summary.pdf
2013-02-15
43
Site Activity Status Update Received
BI-MONTHLY PROGRESS REPORT
+
2013-02-14
43
Site Activity Status Update Received
ON-SITE PCB INVESTIGATION REPORT FEB 2013
0213558625_Building_interior_investigation.pdf
0213558625_PCB_Feb2013.pdf
2013-02-12
43
Site Activity Status Update Received
ARCADIS RESPONSE
+
2013-02-01
43
Site Activity Status Update Received
PAH EVALUATION
0213558625_Bi-Monthly_Report_Feb1_2013.pdf
0213558625_PAH_2013.pdf
2013-01-27
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2013-01-21
37
Site Investigation Report (SIR) Received (non-fee)
2013-01-15
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2013-01-01
43
Site Activity Status Update Received
GW FLOW FIGURES
+
2012-12-14
43
Site Activity Status Update Received
VAPOR SAMPLING RESULTS
0213558625_Soil_Vapor_Dec2012.pdf
0213558625_Soil_Vapor_Summary_2012.pdf
0213558625_Vapor_Sampling_122012.pdf
0213558625_Vapor_Sampling_Dec2012.pdf
+
2012-12-14
35
Site Investigation Workplan (SIWP) Received (non-fee)
0213558625_AddendumtoPCBWorkPlan_Dec2012rev.pdf
0213558625_PAH_Work_Plan_121412.pdf
0213558625_SIWP_PCB_Dec2012.pdf
2012-12-05
36
Site Investigation Workplan (SIWP) Approved
+
2012-12-04
43
Site Activity Status Update Received
SUMMARY OF VAPOR DATA
0213558625_SummaryofVaporData_12042012.pdf.pdf
0213558625_VI_Final_Report_Dec2012.pdf
2012-11-20
35
Site Investigation Workplan (SIWP) Received (non-fee)
2012-11-15
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2012-11-02
30
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
2012-10-17
35
Site Investigation Workplan (SIWP) Received (non-fee)
2012-10-09
37
Site Investigation Report (SIR) Received (non-fee)
2012-10-01
30
Site Investigation Workplan (SIWP) Notice to Proceed (NTP)
+
2012-10-01
43
Site Activity Status Update Received
BI-MONTHLY REPORT
0213558625_Bi-Monthly_Report_Oct_1_2012.pdf
0213558625_Soil_Investigation_report_oct2012.pdf
2012-09-28
199
Additional Information Received (Fee-Based or Closure)
2012-09-28
35
Site Investigation Workplan (SIWP) Received (non-fee)
2012-09-26
35
Site Investigation Workplan (SIWP) Received (non-fee)
2012-09-26
43
Site Activity Status Update Received
SOIL SAMPLING RESULTS
2012-09-14
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2012-09-13
35
Site Investigation Workplan (SIWP) Received (non-fee)
2012-09-11
37
Site Investigation Report (SIR) Received (non-fee)
2012-09-06
43
Site Activity Status Update Received
VAPOR SAMPLING STATUS
2012-08-31
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2012-08-27
43
Site Activity Status Update Received
FINAL SOIL BORING
+
2012-08-24
43
Site Activity Status Update Received
SUMMARY OF VERTICAL AQUIFER PROFILE GROUNDWATER ANALYTICAL RESULTS,
0213558625_VAP_Data_08242012.pdf
0213558625_VAP_Data_08242012.pdf
+
2012-08-15
43
Site Activity Status Update Received
BI-MONTHLY REPORT
0213558625_Bi-Monthly_Report_Aug_15_2012.pdf
0213558625_Geoprobe_gw_results_2012.pdf
2012-08-11
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2012-08-03
99
Miscellaneous
MONTHLY REPORT
2012-08-01
43
Site Activity Status Update Received
BI MONTHLY REPORT
2012-07-30
43
Site Activity Status Update Received
BORING DATA
2012-07-23
35
Site Investigation Workplan (SIWP) Received (non-fee)
+
2012-07-16
43
Site Activity Status Update Received
SOIL SAMPLING APRIL THROUGH JUNE 2012
0213558625_BoringDataSummary_07162012.pdf
0213558625_Soil_Results_July2012.pdf
0213558625_bedrock CORE VOC july2012.pdf
2012-07-13
43
Site Activity Status Update Received
VI PCE TESTING RESULTS JULY 2012
2012-07-11
43
Site Activity Status Update Received
PCB RESULTS
2012-07-01
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2012-06-30
43
Site Activity Status Update Received
GEOPHYSICAL LOG
2012-06-25
43
Site Activity Status Update Received
CONTAMINATION INVESTIGATION
2012-06-07
36
Site Investigation Workplan (SIWP) Approved
CONDITIONAL APPROVAL BEDROCK CHARACTERIZATION WORKPLAN
2012-05-31
35
Site Investigation Workplan (SIWP) Received (non-fee)
2012-05-30
36
Site Investigation Workplan (SIWP) Approved
CONDITIONAL APPROVAL PCB INVESTIGATION WORKPLAN
2012-05-24
135
Site Investigation Workplan (SIWP) Received (fee)
2012-05-24
198
Request for Additional Information (Fee-Based or Closure)
ADDITIONAL INFORMATION REQUESTED
2012-05-23
151
Remedial Action (RA) Documentation Report Received (non-fee)
2012-05-22
43
Site Activity Status Update Received
BEDROCK CHARACTERIZATION WORK PLAN
+
2012-05-21
35
Site Investigation Workplan (SIWP) Received (non-fee)
BEDROCK CHARACTERIZATION WORKPLAN
0213558625_SIWP_2012.pdf
0213558625_Workplan_May2012.pdf
2012-05-21
35
Site Investigation Workplan (SIWP) Received (non-fee)
2012-05-15
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2012-05-11
43
Site Activity Status Update Received
LETTER REGARDING COMPREHENSIVE CONTAMINATION INVESTIGATION
2012-05-09
43
Site Activity Status Update Received
BI-MONTHLY REPORT
2012-05-09
43
Site Activity Status Update Received
PCB CONTAMINATION
2012-05-07
37
Site Investigation Report (SIR) Received (non-fee)
2012-05-07
35
Site Investigation Workplan (SIWP) Received (non-fee)
+
2012-05-07
43
Site Activity Status Update Received
SOIL SAMPLING RESULTS PCB AND VOC AND VAPOR SAMPLING
0213558625_Arcadis_Vapor_Sampling _Letter_May2012.pdf
0213558625_Soil_Sampling_May2012.pdf
2012-05-04
14
Notice of Violation (NOV) Issued
2012-05-04
43
Site Activity Status Update Received
LETTER TO KIPP REGARDING PCB CONTAMINATION
2012-04-27
99
Miscellaneous
SUPPLEMENT OUR APRIL 20, 2012 LETTER
+
2012-04-19
2
Responsible Party (RP) letter sent
0213558625_RP_Letter.pdf
0213558625_RP_letter_2012.pdf
2012-04-12
43
Site Activity Status Update Received
GROUNDWATER SAMPLING
2012-03-27
43
Site Activity Status Update Received
LETTER TO SOGLIN
2012-02-29
99
Miscellaneous
PUBLIC MEETING
2012-02-27
43
Site Activity Status Update Received
SOIL VAPOR EXTRACTION PILOT TEST SUMMARY AND PHASE 1 SYSTEM DESIGN
2012-01-30
43
Site Activity Status Update Received
LETTER TO HOMEOWNERS ADJACENT TO KIPP
2011-12-01
43
Site Activity Status Update Received
SOIL VAPOR SAMPLING RESULTS NOV 2011
2011-10-27
99
Miscellaneous
MONTHLY REPORT
2011-10-21
43
Site Activity Status Update Received
PCE POLLUTION IN MADISON KIPP ENVIRONS
2011-10-15
99
Miscellaneous
MEETING NOTES PUBLIC COMMENTS & CONCERNS
2011-10-15
99
Miscellaneous
PUBLIC MEETING
2011-10-14
99
Miscellaneous
RESPONSE TO COMMUNITY COMMENTS ON DRAFT SCOPE OF WORK OCT 2011
2011-10-13
99
Miscellaneous
CHLORINATED ORGANIC CONTAMINATION ISSUES
2011-10-10
23
Referral to Department of Justice (DOJ)
2011-10-03
43
Site Activity Status Update Received
SCOPE OF WORK DRAFT
2011-07-19
43
Site Activity Status Update Received
SOIL AND GROUNDWATER SAMPLING REPORT 07/19/11
2011-06-29
99
Miscellaneous
MONTHLY REPORT
2011-06-23
99
Miscellaneous
MONTHLY REPORT
2011-05-05
99
Miscellaneous
MONTHLY REPORT
2011-01-19
43
Site Activity Status Update Received
UPDATE
2010-04-26
43
Site Activity Status Update Received
SOIL VAPOR SAMPLING AND LOCATION DATA
2010-02-03
43
Site Activity Status Update Received
UPDATE
2009-02-12
92
Operation & Maintenance (O&M) Report Received (non-fee)
2008-05-16
43
Site Activity Status Update Received
UPDATE
2007-02-08
92
Operation & Maintenance (O&M) Report Received (non-fee)
2007-01-19
40
Remedial Action Options Report (RAOR) Approved
2007-01-02
39
Remedial Action Options Report (RAOR) Received (non-fee)
2006-08-31
43
Site Activity Status Update Received
UPDATE
2006-06-26
43
Site Activity Status Update Received
UPDATE
2006-03-29
92
Operation & Maintenance (O&M) Report Received (non-fee)
2005-07-07
43
Site Activity Status Update Received
UPDATE
2005-05-23
43
Site Activity Status Update Received
UPDATE
2005-03-30
92
Operation & Maintenance (O&M) Report Received (non-fee)
2005-01-31
43
Site Activity Status Update Received
UPDATE
2004-11-16
43
Site Activity Status Update Received
UPDATE
2004-10-12
39
Remedial Action Options Report (RAOR) Received (non-fee)
2004-07-21
40
Remedial Action Options Report (RAOR) Approved
2004-06-24
39
Remedial Action Options Report (RAOR) Received (non-fee)
2004-04-15
43
Site Activity Status Update Received
UPDATE
2003-05-23
43
Site Activity Status Update Received
UPDATE
2003-04-08
36
Site Investigation Workplan (SIWP) Approved
2003-01-10
43
Site Activity Status Update Received
UPDATE
2003-01-07
43
Site Activity Status Update Received
UPDATE
2002-11-01
43
Site Activity Status Update Received
GROUNDWATER QUALITY UPDATE SOIL SAMPLING RESULTS
2002-09-03
43
Site Activity Status Update Received
GROUNDWATER QUALITY UPDATE
2002-01-07
37
Site Investigation Report (SIR) Received (non-fee)
GROUNDWATER MONITORING RESULTS
2001-04-04
43
Site Activity Status Update Received
UPDATE
2001-02-01
36
Site Investigation Workplan (SIWP) Approved
2000-12-15
43
Site Activity Status Update Received
UPDATE
2000-11-22
43
Site Activity Status Update Received
UPDATE
2000-03-23
43
Site Activity Status Update Received
UPDATE
1999-12-21
99
Miscellaneous
LETTERS TO NEIGHBORS
1999-09-16
43
Site Activity Status Update Received
UPDATE
1999-06-18
43
Site Activity Status Update Received
UPDATE
1998-04-07
39
Remedial Action Options Report (RAOR) Received (non-fee)
1997-06-02
37
Site Investigation Report (SIR) Received (non-fee)
1997-04-21
140
Site Investigation Report (SIR) Not Approved
1997-03-19
37
Site Investigation Report (SIR) Received (non-fee)
1996-03-21
43
Site Activity Status Update Received
STATUS UPDATE
1995-05-05
36
Site Investigation Workplan (SIWP) Approved
1995-04-21
35
Site Investigation Workplan (SIWP) Received (non-fee)
1994-12-14
43
Site Activity Status Update Received
STATUS UPDATE
1994-07-18
2
Responsible Party (RP) letter sent
1994-07-08
1
Notification of Hazardous Substance Discharge
1983-05-01
355
Superfund No Further Remedial Action Planned (NFRAP)
FROM SUPERFUND DATABASE